CN102537516A - 砂性土顶管减阻泥浆套形成装置 - Google Patents

砂性土顶管减阻泥浆套形成装置 Download PDF

Info

Publication number
CN102537516A
CN102537516A CN2010105843119A CN201010584311A CN102537516A CN 102537516 A CN102537516 A CN 102537516A CN 2010105843119 A CN2010105843119 A CN 2010105843119A CN 201010584311 A CN201010584311 A CN 201010584311A CN 102537516 A CN102537516 A CN 102537516A
Authority
CN
China
Prior art keywords
tool head
jacking
horn mouth
push pipe
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105843119A
Other languages
English (en)
Inventor
罗云峰
李耀良
袁芬
徐玉夏
陈永飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Original Assignee
SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI FOUNDATION ENGINEERING Co Ltd filed Critical SHANGHAI FOUNDATION ENGINEERING Co Ltd
Priority to CN2010105843119A priority Critical patent/CN102537516A/zh
Publication of CN102537516A publication Critical patent/CN102537516A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种砂性土顶管减阻泥浆套形成装置,包括工具头,工具头尾部沿顶管顶进方向接一由钢制成的环形喇叭口套环,环形喇叭口套环从工具头尾部向喇叭口开口方向扩展形成一小斜率锥面,并与工具头尾部外壳焊接成一体。环形喇叭口套环沿顶管顶进方向长度为20cm,喇叭口处的外径比工具头外径大1~1.5cm。该环形喇叭口套环随工具头顶进时,环形喇叭口套环产生的阻力较小,不会因增加了本顶管减阻泥浆套形成装置而额外增加顶管的顶进阻力。本发明能解决现有的顶管在砂性土中顶进其注浆系统形不成良好的减阻泥浆套,不能起到很好的支撑和减阻的作用等技术问题。

Description

砂性土顶管减阻泥浆套形成装置
技术领域
本发明涉及一种建筑施工用的顶管减阻泥浆套形成装置,尤其是一种在砂性土中顶进钢顶管减阻泥浆套形成装置。
背景技术
在顶管施工中,注浆减阻是非常重要的一个环节,它是顶管成功与否的关键。顶管施工过程中,如果注入的减阻泥浆能在管道外周形成较完整的减阻泥浆套,则其减阻效果和支撑效果将会十分令人满意。形成良好的减阻泥浆套,可以增加单级顶进长度,减少中断间用量,加大工作井与接收井之间距离,从而减少工作井与接收井的数量,降低工程成本等。顶管在砂性土中顶进时,由于土层本身极不稳定,若不采取其它辅助措施,在工具头向前推进之后,砂性土体会立刻坍落在管道外壁上填补工具头外径与顶管外径之间差值(一般工具头外径比管道外径大1~1.5cm左右)所引起的空隙,进而会抱紧管壁增大摩阻力,阻碍顶管的正常顶进。所以对顶管在砂性土中顶进来说,减阻泥浆的支承作用和减阻作用尤其具有重要意义。若减阻泥浆形成不了良好的泥浆套就会支撑不足,则土体就会塌落于管外壁使滑动摩擦变为干摩擦,此时整个管段摩阻力会大幅上升。故顶管在砂性土中顶进能不能形成好的减阻泥浆套将对工程成败起到决定性的作用。
现有的顶管施工注浆系统考虑了减阻泥浆的配制,注浆孔数量,位置等,注浆孔压出的泥浆直接与土体接触,没有考虑到在注浆孔压浆到管道外部时额外增加一辅助装置使其形成良好的泥浆套后再与土体接触。现有的顶管泥浆注浆系统在非砂性土中顶进时,由于土体自身成拱效应比较强,在工具头往前推进时,管道与土体之间的空隙还能暂时形成,不会马上被土体填充,及时的进行注浆还可能形成比较完整的泥浆套。但在砂性土中,在工具头往前推进时,如没有额外的装置对管道与土体之间进行暂时的隔离,砂性土体本身极不稳定,管道与土体之间的空隙会马上被砂性土所填充,现有的顶管泥浆注浆系统的弊端就显现出来了。
发明内容
本发明所要解决技术问题是现有的顶管在砂性土中顶进时其注浆系统无法形成完整的减阻泥浆套,起不到良好的支撑减阻作用,对顶管能否顺利顶进将起到决定性的影响等问题,而提供一种砂性土顶管减阻泥浆套形成装置。
为解决上述技术问题,本发明的技术方案是:一种砂性土顶管减阻泥浆套形成装置,包括工具头,其特点是:工具头尾部沿顶管顶进方向接一由钢制成的环形喇叭口套环,环形喇叭口套环从工具头尾部向喇叭口开口方向扩展形成一小斜率锥面,并与工具头尾部外壳焊接成一体。
环形喇叭口套环沿顶管顶进方向长度为20cm,喇叭口处的外径比工具头外径大1~1.5cm。
本发明的有益效果是:
(1)环形喇叭口套环由钢制成,并和工具头尾部外壳焊接成一体,环形喇叭口套环从工具头尾部向喇叭口开口方向扩展形成一小斜率锥面。环形喇叭口套环能把工具头尾部的减阻泥浆注浆孔或紧接工具头尾部的管道上的减阻泥浆注浆孔与土体隔离开来,使该处的注浆孔不直接与土体接触,该处注浆孔刚压出的减阻泥浆也不与土体直接接触,在顶管向前顶进的过程中,形成完整的泥浆套后再与土体直接相接触。由于有完整的减阻泥浆套把土体与管道隔离开来,整个管道在泥浆套中顶进,由干摩擦变为滑动摩擦,其减阻效果将会十分明显,顶进阻力亦小,将加快工程施工效率节约工程成本。
(2)环形喇叭口套环喇叭口处的外径比工具头外径大1~1.5cm,一般工具头外径又比顶进管道外径大1~1.5cm左右,环形喇叭口套环喇叭口处外径比管道外径大2~3cm,按工程实践来看,如果先用泥浆对这2~3cm的空隙进行填充,在环形喇叭口套环向前脱出后,能形成1~1.5cm左右的泥浆套。一般在顶管施工中,能形成1cm厚的泥浆套已经可以认为泥浆套形成情况是非常之理想了。
(3)环形喇叭口套环喇叭口处的外径比工具头外径大1~1.5cm,套环产生的阻力较小,如果套环喇叭口处的外径比工具头外径过大,在顶管顶进时,将产生很大的阻力,外径比工具头外径大1~1.5cm时,此时该套环随工具头顶进时,不会因施加了本顶管减阻泥浆套形成装置而额外增加顶管的顶进阻力,环形喇叭口套环产生的阻力相对于工具头顶进产生的阻力而言十分微小,可以忽略不计。
附图说明
图1是本发明的结构局剖视图。
具体实施方式
下面结合具体实施实例,进一步阐述本发明。应理解,这些实施实例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
如图1所示,本发明的砂性土中顶管减阻泥浆套形成装置,包括环形喇叭口套环1,减阻泥浆注浆孔2,工具头3,顶进管道4。
环形喇叭口套环1由钢制成,并和工具头3尾部外壳焊接成一体。环形喇叭口套环1能把工具头3尾部的减阻泥浆注浆孔2或紧接工具头3尾部的顶进管道4上的减阻泥浆注浆孔2与土体隔离开来,使该处的注浆孔压出的减阻泥浆在顶管向前顶进的过程中,形成完整的泥浆套后再与土体直接相接触。该环形喇叭口套环1喇叭口处的外径比工具头外径仅大1~1.5cm,环形喇叭口套环1沿顶管顶进方向长度20cm左右,此时该环形喇叭口套环1随工具头3顶进时,环形喇叭口套环1产生的阻力较小,不会因增加了本顶管减阻泥浆套形成装置而额外增加顶管的顶进阻力。
一般顶管施工,都是工具头3外径比顶进的管节外径略大,在工具头向前推进时,顶进管道4与土体之间必然会产生空隙,一般使用减阻泥浆来填补这个空隙,在工具头3尾部减阻泥浆注浆孔2处施加的环形喇叭口套环1在工具头3脱出时将临时的起到一个支撑作用,可以使减阻泥浆套形成好之后,环形喇叭口套环1脱出,土体将与泥浆套接触,而不是与管道外壁直接接触。
本发明应用实施实例:
工程用φ1800钢顶管施工,主要在④3层粉砂中掘进,其渗透性良好,顶管摩阻力相对较大,顶管外摩阻力减阻是本工程关键问题。工具头外径比顶管外径大1.5cm,焊接在工具头尾部外壳上的环形喇叭口套环喇叭口处外径比工具头大1cm,环形喇叭口套环沿管道顶进方向长度为20cm。由于顶管在地下施工,无法用肉眼观测泥浆套情况,故通过记录的顶力数据分析减阻效果及泥浆套形成情况。
工程顺利顶进完毕,根据记录的顶力数据计算出该工程顶管顶进时的平均摩阻力仅为规范规程规定的施加减阻泥浆后的平均摩阻力1/3~1/2,其减阻效果良好,由于顶管只使用了泥浆减阻,未使用其他减阻措施,故进而可认为泥浆套形成情况也十分良好。此外从顶进情况来看,并没有因为增加了本顶管减阻泥浆套形成装置而额外增加顶管的顶进阻力。

Claims (2)

1.一种砂性土顶管减阻泥浆套形成装置,包括工具头(3),其特征在于:所述工具头(3)尾部沿顶管顶进方向焊接一由钢制成的环形喇叭口套环(1),环形喇叭口套环(1)从工具头(3)尾部向喇叭口开口方向扩展形成一小斜率锥面,并与工具头(3)尾部外壳焊接成一体。
2.根据权利要求1所述的砂性土顶管减阻泥浆套形成装置,其特征在于;所述环形喇叭口套环(1)沿顶管顶进方向长度为20cm,喇叭口处的外径比工具头(3)外径大1~1.5cm。
CN2010105843119A 2010-12-13 2010-12-13 砂性土顶管减阻泥浆套形成装置 Pending CN102537516A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105843119A CN102537516A (zh) 2010-12-13 2010-12-13 砂性土顶管减阻泥浆套形成装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105843119A CN102537516A (zh) 2010-12-13 2010-12-13 砂性土顶管减阻泥浆套形成装置

Publications (1)

Publication Number Publication Date
CN102537516A true CN102537516A (zh) 2012-07-04

Family

ID=46345139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105843119A Pending CN102537516A (zh) 2010-12-13 2010-12-13 砂性土顶管减阻泥浆套形成装置

Country Status (1)

Country Link
CN (1) CN102537516A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662281A (zh) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 顶管装置及顶管施工方法
CN110645410A (zh) * 2019-09-03 2020-01-03 上海市基础工程集团有限公司 砂土层顶管施工减阻泥浆套辅助成型装置
CN110700859A (zh) * 2019-10-28 2020-01-17 煤科集团沈阳研究院有限公司 一种井下救援用顶管注浆装置及方法
CN110700859B (zh) * 2019-10-28 2024-04-30 中煤科工集团沈阳研究院有限公司 一种井下救援用顶管注浆装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020122704A1 (en) * 2000-05-15 2002-09-05 Hutton William M. Method and apparatus for underground connection of pipe
CN1773151A (zh) * 2005-11-17 2006-05-17 上海交通大学 顶管施工中以环状泥浆护套减小顶力的方法
CN201535392U (zh) * 2009-08-05 2010-07-28 叶香竹 一种顶管注浆构造
CN201627206U (zh) * 2010-04-08 2010-11-10 中国葛洲坝集团股份有限公司 砂浆锚杆用注浆装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020122704A1 (en) * 2000-05-15 2002-09-05 Hutton William M. Method and apparatus for underground connection of pipe
CN1773151A (zh) * 2005-11-17 2006-05-17 上海交通大学 顶管施工中以环状泥浆护套减小顶力的方法
CN201535392U (zh) * 2009-08-05 2010-07-28 叶香竹 一种顶管注浆构造
CN201627206U (zh) * 2010-04-08 2010-11-10 中国葛洲坝集团股份有限公司 砂浆锚杆用注浆装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108662281A (zh) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 顶管装置及顶管施工方法
CN108662281B (zh) * 2018-05-31 2020-07-07 成都金玉雄辉建筑工程有限公司 顶管装置及顶管施工方法
CN110645410A (zh) * 2019-09-03 2020-01-03 上海市基础工程集团有限公司 砂土层顶管施工减阻泥浆套辅助成型装置
CN110700859A (zh) * 2019-10-28 2020-01-17 煤科集团沈阳研究院有限公司 一种井下救援用顶管注浆装置及方法
CN110700859B (zh) * 2019-10-28 2024-04-30 中煤科工集团沈阳研究院有限公司 一种井下救援用顶管注浆装置及方法

Similar Documents

Publication Publication Date Title
CN104074529B (zh) 一种深部巷硐连续双壳加固方法
CN109882223A (zh) 利用注浆锚索进行分段注浆的方法
CN109083668A (zh) 一种适于高应力破碎围岩支护用的注浆加固锚杆
CN104100273B (zh) 一种减少箱涵顶进时土体纵向变形的反拖曳装置
CN110645410A (zh) 砂土层顶管施工减阻泥浆套辅助成型装置
CN100489361C (zh) 顶管施工中以环状泥浆护套减小顶力的方法
CN103422873B (zh) 一种高强可伸长锚杆
CN102635117B (zh) 开闭式注浆前端装置
CN102537516A (zh) 砂性土顶管减阻泥浆套形成装置
CN103774649B (zh) 反口防止从锚孔中拔出的预应力锚杆
CN104110265A (zh) 大断面矩形顶管管道的触变泥浆注浆系统
CN201050062Y (zh) 砂层土加固件
CN101864968A (zh) 一种用于隧道底地层加固的防喷涌装置及其施工方法
CN103967509B (zh) 能承担横向剪切力的锚管索支护结构
CN205089343U (zh) 矿用高压注浆锚杆
CN103527242A (zh) 一种联合带压瓦斯抽放封孔方法及其应用的双层膨胀胶管
CN205297608U (zh) 一种新型液压膨胀式可回收锚杆
CN201924340U (zh) 一种注浆管
CN204311443U (zh) 一种锥-柱形组合管桩
CN204083520U (zh) 管道贯穿混凝土楼面防水结构
CN206530344U (zh) 一种顶管管节减摩注浆孔构造
CN208010382U (zh) 一种可回收式胀管锚杆
CN201214788Y (zh) 砂浆锚杆用有压注浆装置
CN201661305U (zh) 一种可回收的摩擦型锚杆
CN202560115U (zh) 稠油井选注堵水一体管柱

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120704