CN102535869A - Steel structure hoisting sliding track device and construction method - Google Patents

Steel structure hoisting sliding track device and construction method Download PDF

Info

Publication number
CN102535869A
CN102535869A CN2011104086506A CN201110408650A CN102535869A CN 102535869 A CN102535869 A CN 102535869A CN 2011104086506 A CN2011104086506 A CN 2011104086506A CN 201110408650 A CN201110408650 A CN 201110408650A CN 102535869 A CN102535869 A CN 102535869A
Authority
CN
China
Prior art keywords
steel member
wide
slideway
slide rail
prepackage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104086506A
Other languages
Chinese (zh)
Other versions
CN102535869B (en
Inventor
刘治国
许新琦
安凤杰
朱立江
顾友娥
方鹏
栾天
迟骋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN2011104086506A priority Critical patent/CN102535869B/en
Publication of CN102535869A publication Critical patent/CN102535869A/en
Application granted granted Critical
Publication of CN102535869B publication Critical patent/CN102535869B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A steel structure hoisting sliding track device and a construction method thereof are provided, wherein a plurality of slide rail supports on which wide-face slideways are paved are arranged between an upper steel member and a middle steel member. The surface of the wide-surface slideway is coated with lubricating grease, and a pre-installed steel member provided with an anti-deviation card is placed on the wide-surface slideway. The bottom of the preassembled steel member and the central line of the top of the preassembled steel member are respectively connected with a set of sliding traction equipment, the top of the preassembled steel member is respectively connected with a set of sliding vertical guarantee equipment at four corners, and the four corners are also connected with a tower crane in an articulated manner through a steel cable. Two sides of the middle steel member are respectively provided with a set of jacking adjusting equipment. The invention solves the technical problem that large-tonnage steel members are difficult to be safely installed due to the limitation that a working site and a tower crane cannot be hoisted in place through the wide-surface slideway and various auxiliary devices. And hoisting the preassembled steel member to the wide-surface slideway by using a tower crane, and sliding the preassembled steel member on the wide-surface rail in place. The construction method of the steel structure hoisting sliding track device is simple, convenient, rapid and safe to operate, small in technical difficulty and capable of recycling equipment.

Description

Steel structure hoisting slide rail set and job practices
Technical field
The present invention relates to a kind of steel work mobile device and job practices, particularly relate to a kind of hoisting slide rail set and job practices of large-scale steel structure.
Background technology
In large-scale steel spare installation process, often receive effects limit such as construction plant condition, tower crane elevating capacity, hanging device can't put the lifting of large-scale steel spare in place.Set up the scaffold lifting if adopt, because the member tonnage is big, artificial mobile security hidden danger is big, drops into also very greatly, and installation quality also is difficult for assurance.Surpass 300 tons large-scale crane if adopt, receive the restriction of region and work-yard on the one hand, expense is high on the other hand.
Summary of the invention
An object of the present invention is to provide a kind of simple in structure, cost is low, easy and simple to handle, the steel structure hoisting slide rail set that can large-scale steel spare be transplanted on station.
The objective of the invention is to realize.Steel structure hoisting slide rail set of the present invention comprises tower crane.The realization of steel structure hoisting slide rail set of the present invention is characterised in that: between upper steel member that installs and middle steel member, establish some slide rail bearings; Establish wide slideway on the said slide rail bearing; The line of centres of said wide slideway longitudinal centre line and said upper steel member and middle steel member is on the same vertical plane; Said wide slideway upper surface scribbles lubricating grease; Said wide of scribbling lubricating grease puts prepackage steel member above the slideway; Said prepackage steel member bottom is provided with the anti-skew card that is in said wide slideway both lateral sides, and said prepackage steel member bottom and top respectively connect a cover slippage pulling equipment on the surface at wide slideway longitudinal centre line place, and the top respectively connects the vertical support equipment of a cover slippage at four edges; Four corners also articulate through lifting cable wire and said tower crane, and the both sides, front and back of said middle steel member respectively are provided with a cover jacking conditioning equipment.
Steel structure hoisting slide rail set of the present invention, wherein said prepackage steel member have wide the slideway in edge straight line motion track longitudinally on said wide slideway.
Steel structure hoisting slide rail set of the present invention, wherein said each anti-skew card is fitted with said wide slideway upper flange both sides of the edge.
Another purpose of the present invention is the job practices that provides a kind of steel structure hoisting slide rail set, and steel structure hoisting slide rail set job practices of the present invention is accomplished through following steps, comprising:
Step 1, making slide rail bearing and wide slideway are made the confirmed lattice that fold in the back that finishes;
Step 2, the preceding preparation of steel member installation of carrying out;
A, respectively weld a top link at prepackage steel member top four edges; On four top links, respectively connect a cover vertical support equipment of slippage and a lifting cable wire; Vertically respectively weld a traction link along wide slideway in the center of prepackage steel member bottom and side, top; On four traction links, respectively connect a cover slippage pulling equipment, respectively weld an anti-skew card in the bottom of two other side of prepackage steel member;
B, one cover jacking conditioning equipment respectively is set in the both sides, top of middle steel member at wide slideway two side directions;
C, between upper steel member that has installed and middle steel member, lay some slide rail bearings, the line of centres of all slide rail bearings with two in the middle of the line of centres of steel members be on the same vertical plane wide slideway of laying on some slide rail bearings basically; 2, the line of centres of the center line of wide slideway and all slide rail bearings is on the same vertical plane basically, and steel member upper end installed surface formed and regulates displacement nargin in the middle of wide slideway upper surface was higher than;
D, be coated with one deck lubricating grease at wide slideway upper surface;
Step 3, through four top links and lifting cable wire; To pre-install the steel member by tower crane hangs on wide the slideway; And make anti-skew card below the prepackage steel member be stuck in the both sides of wide guide rail downwards; Prevent to pre-install steel member lateral sliding, the other end of quadruplet slippage pulling equipment is connected respectively on two upper steel members that installed;
Step 4, examination slippage; Check all connecting portion firm and reliable connection, loosen tower crane lifting cable wire gradually, the whole slippage pulling equipments of hand control slowly move prepackage steel member with vertical support equipment to installation direction; Stop afterwards; Check that whole slippage pulling equipments are reliable with vertical support equipment working stability, inspection lifting cable wire connects reliable, and hands over inspection qualified;
Step 5, mobile and installation prepackage steel member; All speed, slow moving are pre-installed the steel member to the whole slippage pulling equipments of hand control to installation direction with vertical support equipment; When prepackage steel member moves to middle steel member top, pre-install the steel members by two jack stands of two cover jacking conditioning equipments 8, regulate through the jacking conditioning equipment and pre-install the steel member in place fully; To pre-install the steel member through connection and welding procedure at last and be installed on the middle steel member, accomplish installation work;
Step 6, on the prepackage steel member that installs, do following work: the hook of taking tower crane; Extract whole slippage pulling equipments, vertical support equipment; Remove lifting cable wire, top link, traction link and anti-skew card, remove wide slideway, slide rail bearing and jacking conditioning equipment in addition and move to next station for use;
Step 7, according to the content of step 2~6, installation work that another prepackage steel member is carried out in circulation finishes until engineering.
The job practices of steel structure hoisting slide rail set of the present invention, the length of wherein said wide slideway should be greater than sliding path length 300mm.
The adjusting displacement nargin that steel member upper end installed surface formed in the middle of the job practices of steel structure hoisting slide rail set of the present invention, wherein said wide slideway upper surface were higher than is 100mm.
Steel structure hoisting slide rail set difference from prior art of the present invention is that steel structure hoisting slide rail set of the present invention has solved through wide slideway being provided with and various auxiliary equipment and receives work-yard and tower crane can't lift the restriction that puts in place, is difficult to the technical barrier of safety installation large-tonnage steel member.Large-scale steel spare sliding rail device of the present invention will be pre-installed the steel member earlier and hang on wide the slideway with tower crane, and the slow loose hook of tower crane adopts several bottle gouards moved by hands slowly to spur prepackage steel member, makes the slippage on wide track of prepackage steel member in place.The job practices of steel structure hoisting slide rail set of the present invention and data by MoM and MEI: simple and efficient to handle and safety; Technical difficulty is little; Integrated cost is lower; Slide rail bearing, wide slideway and slippage pulling equipment, vertical support equipment and regulate all recyclable recycling of Lifting Equipment, economic benefit is obvious.
Below in conjunction with accompanying drawing steel structure hoisting slide rail set of the present invention is described further.
Description of drawings
Fig. 1 is the structural representation of steel structure hoisting slide rail set of the present invention.
The specific embodiment
As shown in Figure 1, the steel structure hoisting slide rail set comprises tower crane 10.The completion means of steel structure hoisting slide rail set of the present invention are between upper steel member 7 that installs and middle steel member 9, to establish some slide rail bearings 3, and the height of slide rail bearing 3 can be adjusted.Establish wide slideway 2 on the slide rail bearing 3.The line of centres of wide slideway 2 longitudinal centre line and upper steel member 7 and middle steel member 9 is on the same vertical plane.Wide slideway 2 upper surfaces scribble lubricating grease 4.Scribble wide the slideway 2 top prepackage steel members 7 ' of putting of lubricating grease 4.The anti-skew card 1 of prepackage steel member 7 ' bottom welding, anti-skew card 1 is in wide slideway 2 both lateral sides.Anti-skew card 1 is made by the steel plate of 200mm * 100mm * 30mm.Weld seam requires full weld.Each anti-skew card 1 is fitted with wide slideway 2 upper flange both sides of the edge.Prepackage steel member 7 ' bottom and top respectively connect a cover slippage pulling equipment 5 on the surface at wide slideway 2 longitudinal centre line places, respectively connect 6, four corners of a cover vertical support equipment of slippage at four edges and also articulate through lifting cable wire and tower crane 10.The both sides, front and back of middle steel member 9 respectively are provided with a cover jacking conditioning equipment 8.
Steel member 7 ' has wide the slideway 2 in edge straight line motion track longitudinally on wide slideway 2.Through lubricating of lubricating grease 4, prepackage steel member 7 ' can slide along wide slideway 2.
Steel structure hoisting slide rail set job practices is accomplished through following steps, and completing steps comprises:
Step 1,, make slide rail bearing 3 and wide slideway 2, make the confirmed lattice that fold in the back that finishes.
Step 2, the preceding preparation of steel member installation of carrying out.
A, respectively weld a top link at prepackage steel member 7 tops four edges; On four top links, respectively connect a cover vertical support equipment 6 of slippage and a lifting cable wire; Vertically respectively weld a traction link along wide slideway 2 in the center of prepackage steel member 7 ' bottom and side, top; On four traction links, respectively connect a cover slippage pulling equipment 5, respectively weld an anti-skew card 1 in the bottom of prepackage steel member 7 ' two other side.
B, one cover jacking conditioning equipment 8 respectively is set in the both sides, top of middle steel member 9 at 2 liang of side directions of wide slideway.
C, between upper steel member 7 that has installed and middle steel member 9, lay some slide rail bearings 3; Guarantee that the line of centres of all slide rail bearings 3 and the line of centres of two middle steel members 9 are on the same vertical plane; On some slide rail bearings 3, lay wide slideway 2; The line of centres of the center line of wide slideway 2 and all slide rail bearings 3 is on the same vertical plane, and steel member 9 upper end installed surfaces in the middle of wide slideway 2 upper surfaces are higher than form one and regulate displacement nargin.
D, be coated with one deck lubricating grease 4 at wide slideway 2 upper surfaces.
Step 3, through four top links and lifting cable wire; To pre-install steel member 7 ' by tower crane 10 hangs on wide the slideway 2; And make prepackage steel member 7 ' following anti-skew card 1 be stuck in the both sides of wide guide rail 2 downwards; Prevent to pre-install steel member 7 ' lateral sliding, the other end of quadruplet slippage pulling equipment 5 is connected respectively on two upper steel members 7 that installed.
Step 4, examination slippage; Check all connecting portion firm and reliable connection, loosen the lifting cable wire of tower crane 10 gradually, the whole slippage pulling equipments 5 of hand control slowly move prepackage steel member 7 ' with vertical support equipment 6 to installation direction; Stop afterwards; Check that whole slippage pulling equipments 5 are reliable with vertical support equipment 6 working stabilities, inspection lifting cable wire connects reliable, and hands over inspection qualified.
Step 5, mobile and installation prepackage steel member 7 '; All speed, slow moving are pre-installed steel member 7 ' to the whole slippage pulling equipments 5 of hand control to installation direction with vertical support equipment 6; When prepackage steel member 7 ' moves to middle steel member 9 tops; Two jack stand prepackage steel members 7 ' by two cover jacking conditioning equipments 8; Regulate prepackage steel member 7 ' in place fully through jacking conditioning equipment 8, will pre-install steel member 7 ' through connection and welding procedure at last and be installed on the middle steel member 9, accomplish installation work.
Step 6, on the prepackage steel member 7 ' that installs, do following work: the hook of taking tower crane 10; Extract whole slippage pulling equipments 5 and vertical support equipment 6; Remove top link, traction link and anti-skew card 1, remove wide slideway 2, ring rail bearing 3 and jacking conditioning equipment 8 in addition and move to another station.
Step 7, according to the content of step 2~6, installation work that another prepackage steel member 7 ' is carried out in circulation finishes until engineering.
The length of wide slideway 2 should be greater than sliding path length 300mm.Steel member 9 upper end installed surfaces in the middle of wide slideway 2 upper surfaces are higher than, the adjusting displacement nargin of formation is 100mm.
The present invention's embodiment more specifically is described in further detail below:
In the slippage operation: the loose hook time that note controlling tower crane.If one of full-time commander, the loose hook of commander's tower crane, each bottle gouard moved by hands keep pine consistent with the amount of drawing respectively by two people Song Hela, if deviation is arranged at any time by commander's unification adjustment.
Wide guide rail 2 made: through the calculating to required sliding component, the ordinary circumstance sliding component can adopt H shaped steel in 10t be girder steel, and the wing plate width is 600mm, and deck-molding 600mm, wing plate and web thickness are 25mm.It is girder steel that 10~15t adopts H shaped steel, and the wing plate width is 800mm, and deck-molding 800mm, wing plate and web thickness are 30mm.Length is that sliding path length adds 300mm at the starting end, makes allowable error planeness ± 2mm.
Slide rail bearing 3 is made: the H section steel manufacture that adopts 600mm * 600mm * 25mm.Per two slide rail bearing 3 arrangement pitchs are 500mm.The height of every one slide rail bearing 3 is slide rail bearing 3 height+wide track 2 height=installation site absolute altitude+100mm.
Lubricating grease 4 can be selected lubricated butter for use, and track upper surface will be smeared evenly, must not holiday.
At top, bottom 500mm place and wide slideway 2 equidirectional layout quadruplet slippage pulling equipments 5 of hang prepackage steel member 7 ', pulling equipment is made up of the wire rope of traction draw ring, 5t bottle gouard moved by hands, diameter 18.The traction draw ring is that Ф 16 specifications are processed for the HPB235 reinforcing bar.Traction draw ring center is identical with wide slideway 2 centers.The welding of traction draw ring is received on the shaft side according to the 5d double welding.The center is consistent with prepackage steel member 7 ' steel column center, allows journal offset error ± 2mm.The loose power of pulling force He latter two slippage pulling equipment through preceding two slippage pulling equipments guarantees that steel member 7 at the uniform velocity advances along planned orbit all the time.
At four top draw rings of prepackage steel member 7 ' welded top, the top draw ring is that Ф 20 specifications are the reinforcement fabrication of HPB235.Each top draw ring is installed a vertical support equipment 6, and vertical support equipment 6 connects earth anchor, and vertical support equipment 6 is made up of the wire rope of a 15t bottle gouard moved by hands and diameter 18.Pulling force through preceding two earth anchors is guaranteed to pre-install steel member 7 ' with the loose power of latter two earth anchor and is in plumbness all the time.
Tower crane participates in cooperating co-operation, and in the whole slipping, tower crane lifting cable wire should slowly loosen, and forbids to break off relations, and plays safety rope and prevents accident.
During the examination slippage, all wire rope tensions are while send rope, tight rope, the slow slack rope of tower crane, examination slippage 300mm~500mm.Begin formal slippage after confirming to stablize, as deviation occurs, should in time adjust wire rope.
After prepackage steel member 7 ' moves to assigned address; Jack by two 10t of jacking conditioning equipment 10 will be pre-installed steel member 7 ' steady jack-up 50mm, remove sliding rail, and will be then that member is in place fully; Connect, weld, accomplish the installation work of a prepackage steel member 7 '.
Above-described embodiment describes preferred implementation of the present invention; Be not that scope of the present invention is limited; Design under the prerequisite of spirit not breaking away from the present invention; Various distortion and improvement that those of ordinary skills make technical scheme of the present invention all should fall in the definite protection domain of claims of the present invention.

Claims (6)

1. steel structure hoisting slide rail set; Comprise tower crane (10); It is characterized in that: between upper steel member (7) that installs and middle steel member (9), establish some slide rail bearings (3); Establish wide slideway (2) on the said slide rail bearing (3); The line of centres of said wide slideway (2) longitudinal centre line and said upper steel member (7) and middle steel member (9) is on the same vertical plane; Said wide slideway (2) upper surface scribbles lubricating grease (4), the said top prepackage steel member (7 ') of putting of wide slideway (2) that scribbles lubricating grease (4), and said prepackage steel member (7 ') bottom is provided with the anti-skew card (1) that is in said wide slideway (2) both lateral sides; Said prepackage steel member (7 ') bottom and top respectively connect a cover slippage pulling equipment (5) on the surface at wide slideway (2) longitudinal centre line place; The top respectively connects a cover vertical support equipment of slippage (6) at four edges, and four corners also articulate through lifting cable wire and said tower crane (10), and the both sides, front and back of said middle steel member (9) respectively are provided with a cover jacking conditioning equipment (8).
2. steel structure hoisting slide rail set according to claim 1 is characterized in that: said prepackage steel member (7 ') has wide the slideway in an edge (2) straight line motion track longitudinally on said wide slideway (2).
3. steel structure hoisting slide rail set according to claim 1 and 2 is characterized in that: said each anti-skew card (1) is fitted with said wide slideway (2) upper flange both sides of the edge.
4. the job practices of a steel structure hoisting slide rail set is characterized in that may further comprise the steps in the method:
Step 1, making slide rail bearing (3) and wide slideway (2) are made the confirmed lattice that fold in the back that finishes;
Step 2, the preceding preparation of steel member installation of carrying out;
A, respectively weld a top link at prepackage steel member (7) top four edges; On four top links, respectively connect a cover vertical support equipment of slippage (6) and a lifting cable wire; Vertically respectively weld a traction link along wide slideway (2) in the center of prepackage steel member (7 ') bottom and side, top; On four traction links, respectively connect a cover slippage pulling equipment (5), respectively weld an anti-skew card (1) in the bottom of two other side of prepackage steel member (7 ');
B, wide slideway (2) two side directions respectively be provided with in the both sides, top of middle steel member (9) one the cover jacking conditioning equipment (8);
C, between upper steel member (7) that has installed and middle steel member (9), lay some slide rail bearings (3); The line of centres of the line of centres of all slide rail bearings (3) and two middle steel members (9) is on the same vertical plane basically; Go up laying wide slideway (2) at some slide rail bearings (3); The line of centres of the center line of wide slideway (2) and all slide rail bearings (3) is on the same vertical plane basically, and steel member (9) upper end installed surface formed and regulates displacement nargin in the middle of wide slideway (2) upper surface was higher than;
D, be coated with one deck lubricating grease (4) at wide slideway (2) upper surface,
Step 3, through four top links and lifting cable wire; To pre-install steel member (7 ') by tower crane (10) hangs on wide the slideway (2); And make the following anti-skew card (1) of prepackage steel member (7 ') be stuck in the both sides of wide guide rail (2) downwards; Prevent to pre-install steel member (7 ') lateral sliding, the other end of quadruplet slippage pulling equipment (5) is connected respectively on two the upper steel members (7) that installed;
Step 4, examination slippage; Check all connecting portion firm and reliable connection, loosen tower crane (10) lifting cable wire gradually, the whole slippage pulling equipments of hand control (5) slowly move prepackage steel member (7 ') with vertical support equipment (6) to installation direction; Stop afterwards; Check that whole slippage pulling equipments (5) are reliable with vertical support equipment (6) working stability, inspection lifting cable wire connects reliable, and hands over inspection qualified;
Step 5, mobile and installation prepackage steel member (7 '); All speed, slow moving are pre-installed steel member (7 ') to the whole slippage pulling equipments of hand control (5) to installation direction with vertical support equipment (6); When prepackage steel member (7 ') moves to middle steel member (9) top; By two jack stands prepackage steel members (7 ') of two cover jacking conditioning equipments (8), regulate prepackage steel member (7 ') in place fully through jacking conditioning equipment (8), at last through connecting and welding procedure will be pre-installed steel member (7 ') and be installed on the middle steel member (9); Accomplish installation work
Step 6, on the prepackage steel member (7 ') that installs, do following work: the hook of taking tower crane (10); Extract whole slippage pulling equipments (5), vertical support equipment (6); Remove lifting cable wire, top link, traction link and anti-skew card 1; Remove wide slideway (2), slide rail bearing (3) and jacking conditioning equipment (8) in addition and move to next station for use
Step 7, according to the content of step 2~6, installation work that another prepackage steel member (7 ') is carried out in circulation finishes until engineering.
5. the job practices of steel structure hoisting slide rail set according to claim 4, the length that it is characterized in that said wide slideway (2) is greater than sliding path length 300mm.
6. the job practices of steel structure hoisting slide rail set according to claim 4, it is characterized in that said wide slideway (2) upper surface be higher than in the middle of the adjusting displacement nargin that forms of steel member (9) upper end installed surface be 100mm.
CN2011104086506A 2011-12-09 2011-12-09 Steel structure hoisting sliding track device and construction method Expired - Fee Related CN102535869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104086506A CN102535869B (en) 2011-12-09 2011-12-09 Steel structure hoisting sliding track device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104086506A CN102535869B (en) 2011-12-09 2011-12-09 Steel structure hoisting sliding track device and construction method

Publications (2)

Publication Number Publication Date
CN102535869A true CN102535869A (en) 2012-07-04
CN102535869B CN102535869B (en) 2013-12-11

Family

ID=46343761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104086506A Expired - Fee Related CN102535869B (en) 2011-12-09 2011-12-09 Steel structure hoisting sliding track device and construction method

Country Status (1)

Country Link
CN (1) CN102535869B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627849A (en) * 2015-02-03 2015-05-20 中建五局工业设备安装有限公司 Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN104963537A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Large storage tank installation device and water discharge installation method
CN106988539A (en) * 2017-05-07 2017-07-28 中铁十八局集团有限公司 For running the draw-gear that light rail station special-shaped steel structure is installed on line
CN109510092A (en) * 2018-12-28 2019-03-22 宁波甬新东方电气有限公司 A kind of installing mechanism and installation method of pole-mounted circuit breaker

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01193419A (en) * 1988-01-28 1989-08-03 Sanwa Tekki Corp Coil-type damper for piping
JPH06313362A (en) * 1993-04-30 1994-11-08 Ohbayashi Corp Working frame of slip form construction method
JPH0776934A (en) * 1993-09-07 1995-03-20 Taisei Corp Stock lift-up assembling device used for building skyscraper
JPH1193419A (en) * 1997-09-16 1999-04-06 Shuji Takase Mobile working table for use in slip form construction method
CN1793591A (en) * 2006-01-05 2006-06-28 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN101629455A (en) * 2009-08-18 2010-01-20 北京城建精工钢结构工程有限公司 Accumulation slippage construction device in icesword manner and construction method thereof
CN101899905A (en) * 2010-08-10 2010-12-01 中建五局工业设备安装有限公司 Hoisting slide devices and hoisting slide equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01193419A (en) * 1988-01-28 1989-08-03 Sanwa Tekki Corp Coil-type damper for piping
JPH06313362A (en) * 1993-04-30 1994-11-08 Ohbayashi Corp Working frame of slip form construction method
JPH0776934A (en) * 1993-09-07 1995-03-20 Taisei Corp Stock lift-up assembling device used for building skyscraper
JPH1193419A (en) * 1997-09-16 1999-04-06 Shuji Takase Mobile working table for use in slip form construction method
CN1793591A (en) * 2006-01-05 2006-06-28 北京市机械施工有限公司 Supporting displacement method for lifting component and supporting system thereof
CN101629455A (en) * 2009-08-18 2010-01-20 北京城建精工钢结构工程有限公司 Accumulation slippage construction device in icesword manner and construction method thereof
CN101899905A (en) * 2010-08-10 2010-12-01 中建五局工业设备安装有限公司 Hoisting slide devices and hoisting slide equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627849A (en) * 2015-02-03 2015-05-20 中建五局工业设备安装有限公司 Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN104627849B (en) * 2015-02-03 2017-05-10 中建五局工业设备安装有限公司 Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN104963537A (en) * 2015-07-08 2015-10-07 中国十七冶集团有限公司 Large storage tank installation device and water discharge installation method
CN106988539A (en) * 2017-05-07 2017-07-28 中铁十八局集团有限公司 For running the draw-gear that light rail station special-shaped steel structure is installed on line
CN109510092A (en) * 2018-12-28 2019-03-22 宁波甬新东方电气有限公司 A kind of installing mechanism and installation method of pole-mounted circuit breaker
CN109510092B (en) * 2018-12-28 2023-06-06 宁波甬新东方电气有限公司 Mounting mechanism and mounting method of pole-mounted circuit breaker

Also Published As

Publication number Publication date
CN102535869B (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN101434366B (en) Hoisting tool and hoisting method for column component
CN102071644B (en) Lifting installation method of integral bridge arch rib
CN105672673B (en) A kind of quick positioning apparatus of precast floor slab and method
CN102139832B (en) Gantry crane device with lengthways and transverse traveling functions and hoisting method
CN103967284B (en) The steel column installation method of reserved stigma docking
CN101664762A (en) Ultra-large type memorial archway side-standing rotating installation technology
CN102535869B (en) Steel structure hoisting sliding track device and construction method
CN212832464U (en) Underground pipe gallery construction is with promoting formula jacking equipment certainly
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN105019664B (en) High-altitude sliding installation method for box room type electric room
CN204689430U (en) To Construction of Silo movable hoisting device
KR20170040837A (en) Heavy lifting device
CN109537466B (en) Positioning method for suspending steel structure beam in air
US3194412A (en) Multiple mast section tower crane
CN209066905U (en) Back-bracing type overhanging discharging platform
CN205399232U (en) Artifical bridging device of combination steel construction
CN214570042U (en) Hoisting tool
CN212742231U (en) Self-supporting overhanging formwork and formwork construction auxiliary device
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN204873491U (en) Self -supporting does not have crossbeam hoist system
CN103979442A (en) Method for lifting Fischer-Tropsch reactor by 6400t hydraulic combined crane
CN102515030A (en) Construction process for replacement for steam pocket in narrow condition
CN201990401U (en) Gate-type lifting device with vertically and horizontally-travelling functions
CN202201650U (en) Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform
EP2962978A1 (en) Device for lifting loads and method for erecting the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20171209