CN102535827A - Interlocking-type formwork-support scaffold - Google Patents

Interlocking-type formwork-support scaffold Download PDF

Info

Publication number
CN102535827A
CN102535827A CN2012100058639A CN201210005863A CN102535827A CN 102535827 A CN102535827 A CN 102535827A CN 2012100058639 A CN2012100058639 A CN 2012100058639A CN 201210005863 A CN201210005863 A CN 201210005863A CN 102535827 A CN102535827 A CN 102535827A
Authority
CN
China
Prior art keywords
lock pin
type formwork
interlock type
formwork scaffold
vertical rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100058639A
Other languages
Chinese (zh)
Inventor
蔡炳权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012100058639A priority Critical patent/CN102535827A/en
Publication of CN102535827A publication Critical patent/CN102535827A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an interlocking-type formwork-support scaffold which comprises vertical rods, and is characterized in that the vertical rods are respectively and fixedly provided with a plurality of lock pins; at least one pair of cross supports is connected between any two horizontal adjacent vertical rods; and the four ends of the cross supports are fixed on the lock pins. The interlocking-type formwork-support scaffold has the advantages of saving the energy, reducing the consumption, improving the work efficiency, being safe in construction and stable in quality, reducing the transportation cost, being low in maintenance rate, standard in management, economical, environment-friendly and the like.

Description

A kind of interlock type formwork scaffold
Technical field
The present invention relates to architectural furniture, specifically is a kind of scaffold as the construction formwork support.
Background technology
Scaffold is an operation facility commonly used in the building trade construction.The traditional type scaffold is to utilize the metal fastener that the crisscross tight lock of steel pipe is formed by connecting.Because fastener is many, fastening quite consuming time, and when practical operation, is difficult to guarantee that it is firm,, can cause the firm performance of steel pipe to reduce if adopt the metal fastener of different structure.If as the top template support, use steel pipe quantity big, the fastener of assembling usefulness is various again, and working strength of workers is higher.
The gate-type steel pipe scaffold that uses now is made up of vertical rod, vertical rod bracing piece, cross bar, cross bar bracing piece and lock pin.The shortcoming that exists is: unit area consumption tube material is many, and gate-type steel pipe scaffold pad is many, and it is big to be prone to consumption material (welding rod) loss; Power consumption is also many; Add labour cost etc., make the cost of product higher, and annual need are thrown in the substantial contribution maintenance and had potential safety hazard on practice.
Summary of the invention
The objective of the invention is to the defective that exists to prior art; A kind of interlock type formwork scaffold is provided, and this shelf unit area uses tube material few, novel structure; Be convenient to transportation, installing/dismounting, stacking and storage; And degree of safety is high, realize energy-conservation, subtract consumption, be low-carbon (LC), environment-friendly novel scaffold.
A kind of interlock type formwork scaffold comprises vertical rod, it is characterized in that: fixing several lock pins in the vertical rod, connecting pair of cross at least between two laterally adjacent arbitrarily vertical rods and support, four ends of cross support all are fixed on the lock pin.
Further, lockpin ventilating is crossed the lock pin holder and is fixed in the vertical rod.
Further, pair of cross support by two identical poles through in point articulated forming, the both ends of pole are provided with allocates the circular hole that lock pin is used into.
Further, also connect a horizon bar at least between two laterally adjacent arbitrarily vertical rods, horizon bar is fixed on the lock pin.
Further, cross support and horizon bar angulation are 30~60 degree.
Further, two vertical rods that vertically link to each other arbitrarily connect through sleeve.
Further, described lock pin only disposes a lock pin position perpendicular to vertical rod on the single lock pin; Perhaps lock pin is set to " Contraband " formula lock pin, can dispose two lock pin positions or three lock pin positions easily.
Interlock type formwork scaffold of the present invention compared with prior art has following advantage:
(1) energy-saving consumption-reducing.Interlock type formwork scaffold of the present invention reduces by 35% weld seam than traditional gate-type steel pipe scaffold, has both practiced thrift power consumption, welding rod and attrition component, has reduced the air pollution that brings because of electric welding generation waste gas again.
(2) work efficiency improves.The mounting means of interlock type formwork scaffold of the present invention is simple, and the lock pin that only needs cross support is buckled in the vertical rod just can put up, because shelf is light, the workman is easy to operate, sets up efficient and doubles than traditional scaffold.
(3) construction safety.Adopt interlock type formwork scaffold of the present invention to set up, owing to both used cross support, usage level bar again, the constructor climbs foot-operated very convenient, and they are had a sense of security, and the operative employee uses with pleasure.
(4) steady quality.Interlock type formwork scaffold of the present invention, form of structure is advanced, has both satisfied the requirement of traditional design load, highlights the advantage of unit interlock type formwork scaffold integrated carrying ability force rate tradition frame multiplication again, and its unit area load capacity value surpasses 120kN/m 2
(5) cost of transportation reduces.Interlock type formwork scaffold of the present invention; Because of being steel tube member bar all,, and load and unload light, quick so the transport and load amount of equal volume is bigger 2 times than traditional gate-type steel pipe scaffold; Between the construction site with need with transhipment; Alleviate freight greatly, rob the time for construction again, both sides of supply and demand are all satisfied.
(6) maintenance rate is low.Interlock type formwork scaffold of the present invention, because of all being steel tube member bar, set up with unloading process in not fragile, can not resemble yet and in irregular stacking, be out of shape traditional gate-type steel pipe scaffold, so maintenance rate is very low.
(7) management regulation.Interlock type formwork scaffold of the present invention, the accessory that only is equipped with 2~3 kinds of specification kinds gets final product, and it is little to stack the volume that takes up room, and warehousing is orderly, for the standardized administration of job site provides advantageous conditions.
(8) economic environmental protection.Adopt interlock type formwork scaffold of the present invention, because of production process is few, assembly is simple, and production efficiency has improved 2 times than traditional gate-type steel pipe scaffold, and power consumption reduces 50%, and manufacturing cost reduces by 25%, and is convenient to realize mechanization production.
Description of drawings
Fig. 1 is the sketch map of setting up of interlock type formwork scaffold;
Fig. 2 is a kind of lock pin sketch map;
Fig. 3 is the cross support sketch map;
Fig. 4 is the horizon bar sketch map;
Fig. 5 is the sleeve sketch map;
Fig. 6 is " Contraband " formula lock pin sketch map of joining two lock pin positions;
Fig. 7 is the schematic top plan view of " Contraband " shown in Figure 6 formula lock pin;
Fig. 8 is " Contraband " formula lock pin sketch map of joining three lock pins;
Fig. 9 is lock pin shown in Fig. 8 " Contraband " formula lock pin schematic top plan view;
Shown in the figure, 1: vertical rod; 2: cross support; 3: lock pin; 4: horizon bar; 5: upper bracket; 6: base; 7: bolt; 8, lock pin holder.
The specific embodiment
Embodiment 1
As shown in Figure 1, interlock type formwork scaffold unit is made up of vertical rod 1, cross support 2, lock pin 3, horizon bar 4, upper bracket 5 and base 6.As shown in Figure 2, lock pin 3 is perpendicular to vertical rod 1, and is fixed in the vertical rod 1 through lock pin holder 8.Lock pin 3 can be welded on the lock pin holder 8, also can the main part and the lock pin holder 8 of lock pin 3 is one-body molded.Shown in Figure 1, every vertical rod 16 groups of totally 12 lock pins 3 that distributing, a plurality of cross support 2 and/or horizon bar 4 can be fixed on the steady pin jointly, can expand the formwork area of scaffold unit easily.Four ends of cross support 2 are individually fixed on the lock pin 3, connect two adjacent vertical rods 1.As shown in Figure 1, connect 2,9 vertical rods of two pairs of cross support 1 between every adjacent two vertical rods and forming square scaffold unit, fixing 24 pairs of cross support 2 altogether, and 12 horizon bars 4 have been installed.The specification of vertical rod 1 is the steel pipe of Φ 42 * 1930 * 2.5; The specification of the single pole of cross support 2 is the steel pipe of Φ 25 * 1100 * 2.5; The specification of horizon bar 4 is the steel pipe of Φ 25 * 915 * 2.5; Mechanical test shows that the body supporting capacity of interlock type formwork scaffold unit shown in Figure 1 is not less than 120kN/m 2, have the ability of very strong carrying bending resistance.Along with the increase of building operations area, can add corresponding vertical rod 1 and cross support 2 again, just can reliable supporting be provided for template.
Fig. 2 is the structural representation of lock pin 3 among Fig. 1, and lock pin 3 is welded in the vertical rod 1 through lock pin holder 8.
Fig. 3 is the structural representation of cross support 2, by two identical poles in point articulated forming, the both ends of pole are provided with circular hole, convenient storage and transportation.
Fig. 4 is the structural representation of horizon bar 4.
If need to promote the height of formwork scaffold, sleeve pipe capable of using connects vertical adjacent vertical rod 1, and is as shown in Figure 5, sets up also very convenient for all round victory.
Embodiment 2
Compare with embodiment 1, the main distinction is the difference of lock pin 3, and like Fig. 6, shown in Figure 7, present embodiment adopts " Contraband " formula lock pin, and each " Contraband " formula lock pin disposes two lock pin positions (among Fig. 7 each " Contraband " formula lock pin only illustrated a lock pin position).
Embodiment 3
Compare with embodiment 1; The main distinction also is the difference of lock pin 3; Present embodiment adopts two members to be fixed in the vertical rod 1 through bolt 7, forms " Contraband " formula lock pin, like Fig. 8, shown in Figure 9; In the present embodiment, three lock pin positions of each " Contraband " formula lock pin configuration (among Fig. 9 each " Contraband " formula lock pin only illustrated a lock pin position).

Claims (10)

1. interlock type formwork scaffold; Comprise vertical rod (1); It is characterized in that: fixing several lock pins (3) in the vertical rod (1); At least connect pair of cross between laterally adjacent arbitrarily two vertical rods (1) and support (2), four ends of cross support (2) all are fixed on the lock pin (3).
2. interlock type formwork scaffold according to claim 1 is characterized in that: lock pin (3) is fixed in the vertical rod (1) through lock pin holder (8).
3. interlock type formwork scaffold according to claim 2 is characterized in that: pair of cross support (2) by two identical poles through in point articulated forming, the both ends of pole are provided with the circular hole of allocating lock pin (3) usefulness into.
4. interlock type formwork scaffold according to claim 3 is characterized in that: also connect a horizon bar (4) at least between laterally adjacent arbitrarily two vertical rods (1), horizon bar (4) is fixed on the lock pin (3).
5. interlock type formwork scaffold according to claim 4 is characterized in that: cross support (2) is 30~60 degree with horizon bar (4) angulation.
6. interlock type formwork scaffold according to claim 5 is characterized in that: two vertical rods (1) that vertically link to each other arbitrarily connect through sleeve.
7. according to each described interlock type formwork scaffold of claim 1 to 6, it is characterized in that: described lock pin (3) is perpendicular to vertical rod (1).
8. according to each described interlock type formwork scaffold of claim 1 to 6, it is characterized in that: described lock pin (3) is " Contraband " formula lock pin.
9. interlock type formwork scaffold according to claim 8 is characterized in that: each " Contraband " formula lock pin disposes two lock pin positions.
10. interlock type formwork scaffold according to claim 8 is characterized in that: each " Contraband " formula lock pin disposes three lock pin positions.
CN2012100058639A 2012-01-10 2012-01-10 Interlocking-type formwork-support scaffold Pending CN102535827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100058639A CN102535827A (en) 2012-01-10 2012-01-10 Interlocking-type formwork-support scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100058639A CN102535827A (en) 2012-01-10 2012-01-10 Interlocking-type formwork-support scaffold

Publications (1)

Publication Number Publication Date
CN102535827A true CN102535827A (en) 2012-07-04

Family

ID=46343719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100058639A Pending CN102535827A (en) 2012-01-10 2012-01-10 Interlocking-type formwork-support scaffold

Country Status (1)

Country Link
CN (1) CN102535827A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654057A (en) * 2017-10-27 2018-02-02 北京城建北方建设有限责任公司 Fix self-locking type steel pipe scaffold
CN107747395A (en) * 2017-10-21 2018-03-02 南京荣鑫信息咨询有限公司 A kind of crane

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1234298A (en) * 1981-03-27 1988-03-22 Aluma Systems Incorporated Shoring and scaffolding frames of mechanically connected components
CN2143248Y (en) * 1992-09-14 1993-10-06 上海市奉贤轻工机械一厂 Moveable assembled scaffold
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
CN202055509U (en) * 2011-05-04 2011-11-30 蔡炳权 Upright rod installation structure of directly-inserted scaffold
CN202416822U (en) * 2012-01-10 2012-09-05 蔡炳权 Interlocking formwork scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1234298A (en) * 1981-03-27 1988-03-22 Aluma Systems Incorporated Shoring and scaffolding frames of mechanically connected components
CN2143248Y (en) * 1992-09-14 1993-10-06 上海市奉贤轻工机械一厂 Moveable assembled scaffold
CN102191851A (en) * 2010-03-18 2011-09-21 王云剑 Novel support system
CN202055509U (en) * 2011-05-04 2011-11-30 蔡炳权 Upright rod installation structure of directly-inserted scaffold
CN202416822U (en) * 2012-01-10 2012-09-05 蔡炳权 Interlocking formwork scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107747395A (en) * 2017-10-21 2018-03-02 南京荣鑫信息咨询有限公司 A kind of crane
CN107654057A (en) * 2017-10-27 2018-02-02 北京城建北方建设有限责任公司 Fix self-locking type steel pipe scaffold

Similar Documents

Publication Publication Date Title
CN204753392U (en) Standardized device of assembly lattice formula construction temporary support
CN210914947U (en) Hoisting and turning-over system suitable for large prefabricated stand board
CN206539058U (en) A kind of bracing means of container sample room
CN203568064U (en) Foldable hoisting storage rack
CN204726870U (en) A kind of dismantled and assembled extendible reinforcing bar pushes away puts support
CN102535827A (en) Interlocking-type formwork-support scaffold
CN202416822U (en) Interlocking formwork scaffold
CN203889888U (en) Steel plate hoisting clamp
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN205990773U (en) A kind of construction discharging platform
CN201950379U (en) Welding gas cylinder anti-overturning device capable of being assembled and detached
CN211068827U (en) Welding safety rope support
RU154791U1 (en) REINFORCED CONSTRUCTION COMPONENT OF BUILDING FROM CONTAINER MODULES
CN203066043U (en) Diversion tunnel top arch concrete lining steel formwork support
CN202913356U (en) Load-bearing frame for bridge construction
CN202707066U (en) Manual hole digging pile wall-protecting integral template
CN103276889B (en) Full hall fastener type steel pipe scaffold anti-side shifting method
CN203284169U (en) Hanging basket fixed balancing weight device for exterior wall construction
CN214650766U (en) Container convenient to dismantle
CN205927652U (en) Total frock of building hoist lifting cage welding
CN219690735U (en) Mounting base of steel structure engineering house
CN204173767U (en) Cantilevered mast-up
CN204873440U (en) Big section section bar special lifting device of high -speed railway
CN211226110U (en) Special hoisting tool of cantilever type
CN205224273U (en) It constructs girder construction that links up to do benefit to steel between roof beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120704