CN102535447A - Construction method for operating cement-soil compaction pile by punching vibration compaction method - Google Patents
Construction method for operating cement-soil compaction pile by punching vibration compaction method Download PDFInfo
- Publication number
- CN102535447A CN102535447A CN2012100369695A CN201210036969A CN102535447A CN 102535447 A CN102535447 A CN 102535447A CN 2012100369695 A CN2012100369695 A CN 2012100369695A CN 201210036969 A CN201210036969 A CN 201210036969A CN 102535447 A CN102535447 A CN 102535447A
- Authority
- CN
- China
- Prior art keywords
- compaction pile
- compaction
- drill bit
- cement
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a construction method for operating a cement-soil compaction pile by a punching vibration compaction method. A kind of compaction pile drill is adopted, a filler is directly filled in a blanking opening on the top of the drill after holes are formed, and a drill body periodically stops vibrating in the sectional filling process, so that hole formation, blanking and compaction coherent construction operation is realized. Under the condition that the original track is not detached, hole formation, feeding and vibration integrated construction is realized, and the whole construction period is shortened, so that construction efficiency is improved.
Description
Technical field
The present invention relates to a kind of cement-soil compaction pile continuity job practices, especially a kind ofly be used for existing track and do not remove ground stabilization and the cement-soil compaction pile continuity job practices of transformation under the prerequisite.
Background technology
At present in the trackage foundation stabilization construction; Tradition compacting pile construction process using respectively pore-forming, fed intake, tamp three steps; Can't under the condition that existing line is not removed, carry out operation; Need to tear open rail, clear tiny fragments of stone, coal, etc. construction, and exist long construction period, step repeatedly, problem such as the constraint based on sites condition is many;
Summary of the invention
The present invention will solve under the condition of not removing original track; Still can accomplish technical problem to the strengthening construction of ground under the track; A kind of job practices that adopts punching vibratory compaction method to carry out the cement-soil compaction pile operation is provided; This method can be eliminated because of the influence to whole foundation stabilization construction of the carrying out of the operation of tearing rail, the clear tiny fragments of stone, coal, etc. open, shortens construction period, improves speed of application.
For solving technical problem of the present invention, the technical scheme that is adopted is following:
A kind of job practices that adopts punching vibratory compaction method to carry out the cement-soil compaction pile operation,
Concrete steps are:
1. installation is mechanical
The hydraulic vibration chuck is connected with the mechanical arm of excavator, clamps the top of compaction pile drill bit again with the hydraulic vibration chuck;
2. clamp-on pore-forming
At existing track construction area along the line the vibrations of compaction pile drill bit are squeezed into and to treat in the soil mass consolidation, and the embedded depth of control compaction pile drill bit;
3. feed intake
With the cement inserts through inserting in the compaction pile of shaping in the feed opening of compaction pile drill bit top;
4. vibrate; Closely knit with carry the pipe pile
Utilize the hydraulic vibration chuck reinforced cementitious inserts successively vibrate in the compaction pile to inserting, closely knit and carry pipe, to compaction pile drill bit bottom ground is proposed fully.
The concrete grammar of clamp-oning control compaction pile drill bit embedded depth in the pore forming process is: on the compaction pile drill bit, put on the absolute altitude control line according to the compaction pile degree of depth, and utilize the embedded depth of the height and position positioning control compaction pile drill bit of absolute altitude control line and existing track.
The invention has the beneficial effects as follows:
It number is 201120486382.5 compaction pile drill bit that the present invention utilizes a kind of utility model patent; Behind pore-forming, directly utilize the feed opening at drill bit top to carry out filler; Simultaneously drill body is at segmentation filler process interval failure of oscillation, thereby realizes limit perforate, limit blanking, the closely knit continuity construction operation in limit.Therefore, the present invention realizes pore-forming, the integrated construction that feeds intake, vibrates under the condition of not removing original track, shortened the integral construction cycle, thereby improves efficiency of construction.
Description of drawings
Fig. 1 is a construction machinery scheme of installation of the present invention;
Fig. 2 clamp-ons the drilling construction sketch map;
Fig. 3 is the manual work construction sketch map that feeds intake;
Fig. 4 be vibrate, closely knit and carry the pipe construction sketch map;
Fig. 5 carries pipe bore forming sketch map.
The specific embodiment
A kind of job practices that adopts punching vibratory compaction method to carry out the cement-soil compaction pile operation, concrete steps are:
(1) construction machinery is installed (Fig. 1)
The mechanical arm of hydraulic vibration chuck 3 with excavator 2 is connected, clamps the top of compaction pile drill bit 1 again with hydraulic vibration chuck 3;
(2) clamp-on pore-forming (Fig. 2)
The Work machine vibrations that will connect compaction pile drill bit 1, excavator 2, hydraulic vibration chuck 3 at existing track 4 construction areas along the line are squeezed into and are treated in the soil mass consolidation 5;
(3) absolute altitude control
On compaction pile drill bit 1, put on the absolute altitude control line, and utilize the embedded depth that concerns positioning control compaction pile drill bit 1 of absolute altitude control line and existing track 4 according to the absolute altitude relation according to compaction pile 9 degree of depth.
(4) manual work feed intake (Fig. 3)
Mix the cement inserts 7 of system according to design and code requirement, 7 manual works of cement inserts are inserted in the pile crown top feed opening 8.
(5) vibrate, closely knit, carry pipe (Fig. 4)
Utilize compaction pile drill bit 1, excavator 2, hydraulic vibration chuck 3 machineries reinforced cementitious inserts 7 successively vibrate in the compaction pile 9 to inserting, closely knit, carry pipe.
(6) carry pile tube and become (Fig. 5)
Compaction pile drill bit bottom 10 is proposed ground fully.
Claims (2)
1. job practices that adopts punching vibratory compaction method to carry out the cement-soil compaction pile operation is characterized in that:
Concrete steps are:
1) installation machinery
The mechanical arm of hydraulic vibration chuck (3) with excavator (2) is connected, uses hydraulic vibration chuck (3) to clamp the top of compaction pile drill bit (1) again;
1) clamp-ons pore-forming
At existing track (4) construction area along the line compaction pile drill bit (1) vibrations are squeezed into and to treat in the soil mass consolidation (5), and the embedded depth of control compaction pile drill bit (1);
2) feed intake
With cement inserts (7) through in the compaction pile (9) of inserting shaping in compaction pile drill bit (1) the top feed opening (8);
3) vibrate; Closely knit with carry the pipe pile
Utilize hydraulic vibration chuck (3) reinforced cementitious inserts (7) successively vibrate in the compaction pile (9) to inserting, closely knit and carry pipe, to compaction pile drill bit (1) bottom (10) ground is proposed fully.
2. the job practices that employing punching vibratory compaction method according to claim 1 is carried out the cement-soil compaction pile operation; It is characterized in that: the said concrete grammar of clamp-oning control compaction pile drill bit (1) embedded depth in the pore forming process is: go up at compaction pile drill bit (1) and put on the absolute altitude control line according to compaction pile (9) degree of depth, and utilize the embedded depth of the height and position positioning control compaction pile drill bit (1) of absolute altitude control line and existing track (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100369695A CN102535447A (en) | 2012-02-17 | 2012-02-17 | Construction method for operating cement-soil compaction pile by punching vibration compaction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100369695A CN102535447A (en) | 2012-02-17 | 2012-02-17 | Construction method for operating cement-soil compaction pile by punching vibration compaction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102535447A true CN102535447A (en) | 2012-07-04 |
Family
ID=46343352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100369695A Pending CN102535447A (en) | 2012-02-17 | 2012-02-17 | Construction method for operating cement-soil compaction pile by punching vibration compaction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535447A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314121A (en) * | 2014-10-11 | 2015-01-28 | 钟景尧 | Pore forming machine with symmetrical rotating wheels for geotechnical engineering |
CN113323584A (en) * | 2021-06-18 | 2021-08-31 | 四川振杰岩土工程有限责任公司 | Drilling method of large vibrating long spiral drilling machine |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4126007A (en) * | 1977-01-03 | 1978-11-21 | L.B. Foster Company | Compaction of soil |
CN2871646Y (en) * | 2005-12-29 | 2007-02-21 | 北京振冲工程股份有限公司 | Vibrating impactor with discharger on bottom |
CN101781888A (en) * | 2010-02-01 | 2010-07-21 | 河海大学 | Vibration sinking tube compacted gravel-concrete combined pile and construction method thereof |
-
2012
- 2012-02-17 CN CN2012100369695A patent/CN102535447A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4126007A (en) * | 1977-01-03 | 1978-11-21 | L.B. Foster Company | Compaction of soil |
CN2871646Y (en) * | 2005-12-29 | 2007-02-21 | 北京振冲工程股份有限公司 | Vibrating impactor with discharger on bottom |
CN101781888A (en) * | 2010-02-01 | 2010-07-21 | 河海大学 | Vibration sinking tube compacted gravel-concrete combined pile and construction method thereof |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314121A (en) * | 2014-10-11 | 2015-01-28 | 钟景尧 | Pore forming machine with symmetrical rotating wheels for geotechnical engineering |
CN113323584A (en) * | 2021-06-18 | 2021-08-31 | 四川振杰岩土工程有限责任公司 | Drilling method of large vibrating long spiral drilling machine |
CN113323584B (en) * | 2021-06-18 | 2023-11-07 | 四川振杰岩土工程有限责任公司 | Drilling method of large-scale vibration long spiral drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101581092B (en) | Method for processing soft ground by rapid pressurizing pre-compression | |
RU2005131295A (en) | METHOD FOR BED UP | |
CN106049465B (en) | A kind of construction method of | |
CN106049464B (en) | The construction method of stake | |
CN103628463A (en) | Construction method for ultra-deep vibroflotation gravel pile of complicated stratum | |
CN105442532A (en) | Construction method for pile-head-expanded bored pile | |
CN105714773A (en) | Foundation treatment method | |
CN103898892A (en) | Processing method and device for reinforcing soft foundation by hydraulic vibration combined with vacuum water suction | |
CN1963044A (en) | Construction method for withdrawal of waste pile | |
CN101298769B (en) | Pile concrete filling method aiming at karst cave area | |
CN102535447A (en) | Construction method for operating cement-soil compaction pile by punching vibration compaction method | |
CN202323950U (en) | Rotary casing connecting structure of rotary pile extractor | |
CN106759332A (en) | The construction method and construction equipment of stake | |
CN106050239A (en) | Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum | |
CN203741843U (en) | Punching grouting conical head | |
CN107542081A (en) | The installation method of a kind of deep yard drain plate that rockfills and for the hole-forming device in this method | |
CN205276245U (en) | Vibrate joint vacuum pumping system | |
CN201539209U (en) | Light-duty well-point dewatering and punching device | |
CN102966089B (en) | Plate plug method capable of realizing vibratory compaction | |
CN106759289A (en) | The construction method and construction equipment of a kind of | |
CN202644518U (en) | Post-inserted reinforcement cage cement fly ash gravel pile | |
CN205875146U (en) | Broken pile's reinforced structure | |
RU2551590C1 (en) | Method to produce root piles | |
CN104631458B (en) | A kind of static pile press reaming pile sinking engineering method | |
CN109024544B (en) | Hydraulic high-frequency compaction treatment method for collapsible loess tunnel substrate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120704 |