CN102521305A - Data integration method for relay protection setting calculation - Google Patents

Data integration method for relay protection setting calculation Download PDF

Info

Publication number
CN102521305A
CN102521305A CN2011103924099A CN201110392409A CN102521305A CN 102521305 A CN102521305 A CN 102521305A CN 2011103924099 A CN2011103924099 A CN 2011103924099A CN 201110392409 A CN201110392409 A CN 201110392409A CN 102521305 A CN102521305 A CN 102521305A
Authority
CN
China
Prior art keywords
file
target area
needs
circuit
steps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103924099A
Other languages
Chinese (zh)
Other versions
CN102521305B (en
Inventor
石东源
粟小华
陈明
李怀强
胡勇
李银红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Northwest China Grid Co Ltd
Original Assignee
Huazhong University of Science and Technology
Northwest China Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, Northwest China Grid Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN 201110392409 priority Critical patent/CN102521305B/en
Publication of CN102521305A publication Critical patent/CN102521305A/en
Application granted granted Critical
Publication of CN102521305B publication Critical patent/CN102521305B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a data integration method for relay protection setting calculation, which comprises the following steps of: determining whether an export mode selected by a provincial power grid is complete export or not, if so, selecting graphical topology parameters and primary parameters of the provincial power grid; determining an export range selected by the provincial power grid is export all or not, if so, selecting all stations and lines of the provincial power grid; exporting the selected export mode and the export range as an XML (Extensible Markup Language) format file, and transmitting the XML format file to a network board dispatch center; and selecting the file needing to be imported from the XML format file, and determining whether the selected XML format file needs to be imported in a matching manner. The data integration method provided by the invention imports a database used by province dispatch setting calculation to a network dispatching database, realizes the distribution and maintenance of the setting calculation data, and centralized sharing, and effectively reduces the workload of data interaction.

Description

The data integration method that relay protection setting calculates
Technical field
The invention belongs to the relay protection of power system technical field, be specifically related to the data integration method that a kind of relay protection setting calculates.
Background technology
Correctly carrying out of relay protection setting evaluation work is the important foundation sex work of guaranteeing power network safety operation; Obtaining very big progress aspect the robotization of large-scale power grid relay protection setting evaluation work in recent years; But the method for system equivalent is still adopted in regional power grid scheduling at present neutral (being called for short net transfers) and net province dispatching center (be called for short to economize and transfer) relay protection setting calculating parameter exchange, and promptly net is in harmonious proportion to economize to transfer respectively and exchanges the multiple spot equivalent parameters that we transfer the scope tube electrical network to the other side.
Yet; Along with the continuous expansion of scale of power, according to the pattern of present uniform dispatching, differentiated control, net is economized to transfer and the separation on the scope tube more and more; It is more and more to exchange the required data such as grid equipment parameter, equivalent impedance and cooperation definite value of the calculating of adjusting between net is economized and transferred; Continue to adopt the drawback of traditional equivalent parameters switching method more and more obvious: on the one hand, along with the fast development of power grid construction, the contact that net is economized between transferring is tight further; The system equivalent separation is also in continuous adjustment, and the typing of equivalent calculating and equivalent parameters etc. becomes and becomes increasingly complex.On the other hand; The equivalent parameters of annual exchange all was according to current or next year system's maximum operational mode and minimum operational mode calculate between net economize to be transferred; Thereby make that equivalent parameters is difficult to mate fully with real system ruuning situation; Especially be difficult to contain some extreme methods of operation, these errors result of calculation that possibly cause adjusting can't be considered the most extreme method of operation, causes protecting the hidden danger of malfunction or tripping.
Summary of the invention
In view of this; The data integration method that the object of the present invention is to provide a kind of relay protection setting to calculate; In the existing calculation automation system of adjusting, increase data integration function, import to the database of economizing adjustment devise a stratagem calculation use in the net adjusting data storehouse, the computational data of having realized adjusting distributes and safeguards; Concentrate and share, and can reduce the workload of data interaction effectively.
The present invention realizes through following technical scheme:
The data integration method that a kind of relay protection setting calculates may further comprise the steps: judge whether the derivation mode that provincial power network is selected is complete derivation, if the derivation mode of selecting is complete derivation; Then select the graph topology parameter and the primary parameter of provincial power network, judge whether the ExportRange that provincial power network is selected is whole derivation, if the ExportRange of selecting is whole derivation; Then select the whole factories station and the circuit of provincial power network, derivation mode and the ExportRange selected are exported as the XML formatted file, the XML formatted file is transferred to net office dispatching center; Selection needs the file of importing from the XML formatted file, judges whether the XML formatted file of selecting need mate importing, if the XML formatted file of selecting need mate importing; Two steps operation below then all factory that need mate stations being carried out:; Judge whether the factory station all is present in the file and target area of needs importing, if the factory station all is present in the file and target area of needs importing, graph topology parameter that factory stands in the graph topology parameter at factory station and primary parameter and the target area in the file that then will import and primary parameter coupling; Judging whether all factory station travels through finishes; If all factories station all traversal finishes, the circuit of then selecting article one to mate judges whether circuit all is present in the file and target area of needs importing; If circuit all is present in the file and target area of needs importing; The parameter matching of circuit in the parameter of circuit and the target area in the file that then will import is judged whether all circuits that need mate travel through to finish, if all circuits all travel through and finish; Then to all two steps operations below the operating modes for performing:; Judge whether the method for operation is arranged in the target area, if in the target area method of operation is arranged, the method for operation in the file that then will import and the coupling of the method for operation in the target area; Judging whether all methods of operation travel through finishes; If all methods of operation all travel through and finish, the electric pressure of the file that then will import and the electric pressure of target area coupling import to the target area with the file that disposes.
Method of the present invention is further comprising the steps of: if the derivation mode of selecting is not complete derivation, then select the primary parameter of provincial power network.
Method of the present invention is further comprising the steps of: if the ExportRange of selecting is not complete derivation, then select the part factory station and the circuit of provincial power network.
Method of the present invention is further comprising the steps of: if the XML formatted file of selecting need not mate importing, and the step that the electric pressure of then returning the file that needs are imported and the electric pressure of target area are mated.
Method of the present invention is further comprising the steps of: if the factory station is not all to be present in the file and target area of needs importing, then judging whether needs to keep the factory station, if then keep the factory station, then deletes factory if not and stands.
Method of the present invention is further comprising the steps of: standing to travel through as if all factories does not finish, and then jumps to next factory station, and returns and judge whether the factory station all is present in the file of needs importing and the step in the target area.
Method of the present invention is further comprising the steps of: if circuit is not all to be present in the file and target area of needs importings, need then to judge whether reserved line, if reserved line is then then deleted circuit if not.
Method of the present invention is further comprising the steps of: if all circuits do not travel through and finish, then jump to next bar circuit, and return and judge whether circuit all is present in the file of needs importing and the step in the target area.
Method of the present invention is further comprising the steps of: if do not have the method for operation in the target area, then add the method for operation to target area.
Method of the present invention is further comprising the steps of: if all methods of operation do not travel through and finish, then jump to the next method of operation, and return and judge the step whether method of operation is arranged in the target area.
The invention has the advantages that: the distribution of the computational data of having realized adjusting is safeguarded, concentrates and shares, and has reduced the mutual workload of the computational data of adjusting; Make dispatching centers at different levels all can grasp more comprehensive electrical network parameter, protection configuring condition, the cooperation between conveniently protecting is checked.
Description of drawings
Fig. 1 is the process flow diagram of relay protection setting calculation data integration method of the present invention.
Embodiment
As shown in Figure 1, relay protection setting calculation data of the present invention is integrated implementation method and may further comprise the steps:
(1) judges whether the derivation mode that provincial power network is selected is complete derivation, if then forward step (2) to, otherwise forwards step (23) to;
(2) the graph topology parameter and the primary parameter of selection provincial power network; The graph topology parameter is meant the figure and the residing position of power network wiring mode, each element of electric system, and primary parameter is meant parameters such as the resistance, reactance of generator, transformer, circuit etc.;
(3) judge whether the ExportRange that provincial power network is selected is whole derivation.If then forward step (4) to, otherwise forward step (24) to;
(4) select whole factories of provincial power network to stand and circuit;
(5) derivation mode and the ExportRange with said selection exports as the XML formatted file;
(6) the XML formatted file of deriving is transferred to net office dispatching center;
(7) file that selection need import from all XML formatted files;
(8) judge whether the XML formatted file of selecting need mate importing; If then forward step (9) to; Otherwise forward step (21) to, coupling imports and is meant when content that imports and the content that is imported into the zone are distinct, is not directly to replace being imported into the content in the zone with the content that imports; But method according to the rules combines both; Stay the content of needs, and graph topology parameter matching, primary parameter coupling, circuit coupling are meant that when both graph topology parameter, primary parameter and line parameter circuit value are inconsistent mode is according to the rules selected the content of needs in the present invention;
(9) mate importing, select the factory station of a needs coupling;
(10) judge whether this factory station all is present in the file and target area of said needs importing, if then forward step (11) to, otherwise forwards step (25) to, and the target area is meant that the needs of relay protection staff selection import the zone of above-mentioned XML formatted file;
The graph topology parameter and the primary parameter of (11) the graph topology parameter at factory station described in the said file that need to import and factory described in primary parameter and the said target area being stood mate;
(12) judge whether all factory station travels through and finish, if then forward step (13) to, otherwise jump to next factory station, and return step (10);
(13) select a circuit that needs coupling;
(14) judge that whether this circuit all is present in the file and target area of said needs importing, if then forward step (15) to, otherwise forwards step (26) to;
(15) with the parameter matching of circuit described in the parameter of circuit described in the said file that need to import and the said target area, line parameter circuit value is meant parameters such as the resistance, reactance of circuit;
(16) judge whether all circuits that need mate travel through and finish, if then forward step (17) to, otherwise jump to next circuit, and return step (14);
(17) select a method of operation, the method for operation is meant that the throwing of generator, transformer and circuit stops state;
(18) judge whether this method of operation is arranged in the target area,, otherwise forward step (27) to if then forward step (19) to;
(19) with the said method of operation coupling in the said method of operation in the said file that needs to import and the said target area;
(20) judge whether all methods of operation travel through and finish, if then forward step (21) to, otherwise jump to next method of operation, and return step (18);
(21) with the electric pressure of the said file that need import and the electric pressure coupling of said target area;
(22) file that disposes is imported to the target area.
(23) only select the primary parameter of provincial power network, and return step (3);
(24) a part factory of selecting to be chosen stands and circuit, and returns step (5);
(25) judge whether to need to keep this factory station,, then delete this factory station if not, and return step (12) if then keep this factory station;
(26) judge whether this circuit of this reservation,, then delete this circuit if not, and return step (16) if then keep this circuit;
(27) add this method of operation, and jump to step (20).

Claims (10)

1. the data integration method that relay protection setting calculates is characterized in that, may further comprise the steps:
Judge whether the derivation mode that provincial power network is selected is complete derivation;
If the derivation mode of selecting is complete derivation, then select the graph topology parameter and the primary parameter of provincial power network;
Judge whether the ExportRange that provincial power network is selected is whole derivation;
If the ExportRange of selecting is whole derivation, then select the whole factories station and the circuit of provincial power network;
The derivation mode and the ExportRange of said selection are exported as the XML formatted file;
Said XML formatted file is transferred to net office dispatching center;
Selection needs the file of importing from said XML formatted file;
Judge whether the XML formatted file of selecting need mate importing;
If the XML formatted file of selecting need mate importing, two steps operation below then all factory that need mate stations being carried out:;
Judge whether said factory station all is present in the file and target area of said needs importing;
If said factory station all is present in the file and said target area that said needs import, the graph topology parameter and the primary parameter of then the graph topology parameter at factory station described in the said file that needs to import and factory described in primary parameter and the said target area being stood mate;
Judging whether all factory station travels through finishes;
If all factories station all traversal finishes, two steps operation below then all circuits that need mate being carried out;
Judge whether said circuit all is present in the file and said target area of said needs importing;
If said circuit all is present in the file and said target area that said needs import, then with the parameter matching of circuit described in the parameter of circuit described in the said file that needs importing and the said target area;
Judging whether all circuits that need mate travel through finishes;
If all circuits all travel through and finish, then to all two steps operations below the operating modes for performing:;
Judge whether the said method of operation is arranged in the said target area;
If in the said target area the said method of operation is arranged, then with the said method of operation coupling in the said method of operation in the said file that needs to import and the said target area;
Judging whether all methods of operation travel through finishes;
If all methods of operation all travel through and finish, then with the electric pressure of the said file that need import and the electric pressure coupling of said target area;
The file that disposes is imported to the target area.
2. data integration method according to claim 1 is characterized in that, and is further comprising the steps of: if the derivation mode of selecting is not complete derivation, then select the primary parameter of provincial power network.
3. data integration method according to claim 1 is characterized in that, and is further comprising the steps of: if the ExportRange of selecting is not complete derivation, then select the part factory station and the circuit of provincial power network.
4. data integration method according to claim 1; It is characterized in that; Further comprising the steps of: as, then to return the step that said electric pressure with the said file that needs to import and the electric pressure of said target area are mated if the XML formatted file of selecting need not mate importing.
5. data integration method according to claim 1; It is characterized in that; It is further comprising the steps of: if said factory station is not all to be present in the file and said target area of said needs importing; Then judging whether needs to keep said factory station, if then keep said factory station, then deletes said factory station if not.
6. data integration method according to claim 1; It is characterized in that; Further comprising the steps of: if all factory station traversal do not finish, then jump to next factory station, and return and saidly judge whether said factory station all is present in the file of said needs importing and the step in the target area.
7. data integration method according to claim 1; It is characterized in that; It is further comprising the steps of: if said circuit is not all to be present in the file and said target area of said needs importing; Then judging whether needs to keep said circuit, if then keep said circuit, then deletes said circuit if not.
8. data integration method according to claim 1; It is characterized in that; Further comprising the steps of: as if all circuits do not travel through and finish, then to jump to next bar circuit, and return and saidly judge whether said circuit all is present in the file of said needs importing and the step in the said target area.
9. data integration method according to claim 1 is characterized in that, and is further comprising the steps of: if do not have the said method of operation in the said target area, then add the said method of operation to said target area.
10. data integration method according to claim 1; It is characterized in that; Further comprising the steps of: as, then to jump to the next method of operation, and return the said the step whether said method of operation is arranged in the said target area of judging if all methods of operation do not travel through and finish.
CN 201110392409 2011-12-01 2011-12-01 Data integration method for relay protection setting calculation Active CN102521305B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110392409 CN102521305B (en) 2011-12-01 2011-12-01 Data integration method for relay protection setting calculation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110392409 CN102521305B (en) 2011-12-01 2011-12-01 Data integration method for relay protection setting calculation

Publications (2)

Publication Number Publication Date
CN102521305A true CN102521305A (en) 2012-06-27
CN102521305B CN102521305B (en) 2013-04-17

Family

ID=46292226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110392409 Active CN102521305B (en) 2011-12-01 2011-12-01 Data integration method for relay protection setting calculation

Country Status (1)

Country Link
CN (1) CN102521305B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103050931A (en) * 2012-12-12 2013-04-17 湖北省电力公司 Power system hierarchical data matching and relay protection setting merging method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895102A (en) * 2010-08-04 2010-11-24 宁夏回族自治区电力公司 Centralized and integrated application method of relay protection setting calculation
CN102025151A (en) * 2010-11-22 2011-04-20 河北省电力研究院 Method for acquiring power flow cross section data of online operation state of power grid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895102A (en) * 2010-08-04 2010-11-24 宁夏回族自治区电力公司 Centralized and integrated application method of relay protection setting calculation
CN102025151A (en) * 2010-11-22 2011-04-20 河北省电力研究院 Method for acquiring power flow cross section data of online operation state of power grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨增力 石东源 段献忠: "通用继电保护整定计算软件的研究与实现", 《2007中国继电保护及自动化行业年会论文集》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103050931A (en) * 2012-12-12 2013-04-17 湖北省电力公司 Power system hierarchical data matching and relay protection setting merging method

Also Published As

Publication number Publication date
CN102521305B (en) 2013-04-17

Similar Documents

Publication Publication Date Title
CN102157936B (en) Coordination control method
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN101673965B (en) Automatic switching control method for wide-area emergency power source of electric power system
CN102420432B (en) Practical layering and zoning reactive power optimization method on basis of power grid real time data
CN105846453A (en) Method for treating three-phase load imbalance of low-voltage distribution network
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN105552882B (en) A kind of control method of power network cyclization
CN103474972B (en) A kind of relaying protection on-line setting method
CN103632312A (en) Power grid resource module building method based on GIS (geographic information system)
CN106099917B (en) A kind of method that substation's load transfer scheme quickly determines
CN102495850A (en) Method for splicing multi-stage multi-region interconnected power grid relay protection model
CN102983594A (en) Control method of grid closed loop operation impact current
CN104680020A (en) SCD-based relay protection system reliability online evaluation system
CN104166944B (en) A kind of grid switching operation bill automatic generation method of railway substation
CN103457249B (en) A kind of distributed longitudinal protection method of intelligent distribution network and system
CN103986151B (en) A kind of computational methods exchanging the powered scale of receiving end electrical network direct current
CN106097159A (en) Related information topology analyzing method and system in a kind of power distribution network
CN104868596B (en) Change the method for rapidly positioning of coverage in a kind of empty loop of intelligent substation secondary
CN108233324A (en) Electric network model and computational methods based on more power type relay protection setting calculations
CN104578065A (en) Loop closing control method of distribution intelligent collecting switching device
CN102521305B (en) Data integration method for relay protection setting calculation
CN103996325A (en) Teaching plan manufacturing method in multi-level scheduling integrated mode in training system
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation
CN105633970A (en) Main network dispatching system based building method for standby dispatching control system of distribution network
CN106130009B (en) A kind of method that 220kV substation load transfer scheme quickly determines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant