CN102518472B - Mine goaf closing method - Google Patents

Mine goaf closing method Download PDF

Info

Publication number
CN102518472B
CN102518472B CN201110457981.9A CN201110457981A CN102518472B CN 102518472 B CN102518472 B CN 102518472B CN 201110457981 A CN201110457981 A CN 201110457981A CN 102518472 B CN102518472 B CN 102518472B
Authority
CN
China
Prior art keywords
airtight
seals
goaf
pipe
coal ash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110457981.9A
Other languages
Chinese (zh)
Other versions
CN102518472A (en
Inventor
于斌
贺仰兴
王立兵
胡锦元
薛龙山
马新平
张广福
韩树标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201110457981.9A priority Critical patent/CN102518472B/en
Publication of CN102518472A publication Critical patent/CN102518472A/en
Application granted granted Critical
Publication of CN102518472B publication Critical patent/CN102518472B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sealing Material Composition (AREA)

Abstract

The invention provides a mine goaf closing method to enhance a seal plugging effect of a stope face. The method includes: applying fireproof sealing to a face closure site, building two seal walls 1m in thickness on the closure site, reserving a space 1m wide between the two seal walls, filling coal ash into the space, and sequentially setting a coal ash pipe, a grout pipe, an observation pipe and a water return pipe on the walls from top to bottom. The face closure site comprises three system roadway seals, three seals at the front of an airbridge, three seals at the head of a belt and two seals at an air return bypass, which are located at a goaf face peripheral system and at the front and the rear of the airbridge. Using the method effectively enhances bearing capacity of the seals, prevents the fractured or cracked seals from forming leak passages, greatly reduces occurrence of internal fires of the goaf, prevents harmful gases in the goaf from leaking, and guarantees safety production of a mine.

Description

Mine goaf closing method
Technical field
The present invention relates to Safety of Coal Mine Production field, concrete a kind of mine goaf closing method.
Background technology
In coal production, " two lane two lines " of stope (air intake lane, return airway, open-off cut, stop adopting line) has a large amount of float coal to pile up, and the most easily spontaneous combustion occurs.Special in the back production later stage, drawing speed is slack-off, and reach 3 ~ 5 months from stopping adopting removal of home end period, heterogeneous goaf band rests on the same area for a long time, easier regenerative oxidation, and goaf ignition probability increases.
Work plane enclosed point is before and after work plane peripheral system and air crossing, and what generally all adopt is forever airtight, and because permanent airtight body of wall thinner (1m), bearing capacity are limited, by often being collapsed by pressure, pressure break, very easily forms the passage that leaks out.Smear not in time if repaiied, goaf very easily spontaneous combustion cause gas leak.
Adopt rear work plane pressure-bearing coal column and generally only stay 10 ~ 15m, owing to stopping adopting line near panel coal column, adopted rear concentrated stress effect, isolated coal pillar rib is crisp by pressure break, pressure, and integrality is deteriorated, and forms the passage that leaks out, more exacerbates the ignition hidden danger of " two lane two lines ".
Summary of the invention
In order to strengthen the sealed blockage effect on stope, provide a kind of mine goaf closing method.
To achieve these goals, the technical solution used in the present invention is: a kind of mine goaf closing method, adopt fire prevention airtight in work plane enclosed point, described fire prevention is airtight is build the thick fire dam of twice 1m by laying bricks or stones in enclosed point, the space of 1m is left in the middle of twice fire dam, powder filler coal ash in space, body of wall sets gradually fine coal ash pipe, grout pipe, sighting tube from top to bottom and pipe of turning one's coat.The present invention is on airtight construction technology, airtight middle filling loess of being prevented fires in past changes filling powder coal ash into, due to flyash has dilatancy can well backfilled enclosed and two cracks helped, and can well top be connect, thus the appearance of airtight air leakage phenomena can be prevented to greatest extent.
Work plane enclosed point before and after goaf work plane peripheral system and air crossing, comprise that three, system lane is airtight, first three is airtight for air crossing, leather belt head three is airtight and return air detours two airtight.The present invention is airtight for preventing fires by the permanent airtight reconstruction before and after peripheral system, air crossing during past close the goaf, airtightly become multilayer from individual layer, thickness becomes 3 meters from 1 meter, enhances airtight bearing capacity, change over and airtightly often to be collapsed by pressure, the situation of pressure break.
The present invention (1) is airtight for preventing fires by the permanent airtight reconstruction before and after peripheral system, air crossing during past close the goaf from closing process; (2) on airtight construction technology, the structure that fire prevention is airtight is changed.Airtight bearing capacity can be effectively strengthened by the improvement of above two aspects, prevent from airtightly being collapsed rear formation to leak out passage by pressure break, pressure, greatly reduce the occurrence probability of goaf breeding fire and stop goaf pernicious gas to leak, ensureing the safety in production of mine.
Accompanying drawing explanation
Fig. 1 is the airtight construction structure schematic diagram of fire prevention of the present invention.
Fig. 2 is goaf of the present invention work plane enclosed point schematic diagram.
In figure, 1-16 and A, B, C are detent position, 21-fire dam, 22-flyash, 23-fine coal ash pipe, 24-grout pipe, 25-sighting tube, and 26-turns one's coat pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described.
A kind of mine goaf closing method of the present invention, as shown in Figure 1, work plane enclosed point adopts fire prevention airtight, described fire prevention is airtight is build the thick fire dam of twice 1m 21 by laying bricks or stones in enclosed point, the space of 1m is left in the middle of twice fire dam 21, powder filler coal ash 22 in space, body of wall sets gradually fine coal ash pipe 23, grout pipe 24, sighting tube 25 and pipe 26 of turning one's coat from top to bottom.
As shown in Figure 2, goaf work plane enclosed point, comprise two airtight (15,16) that three, system lane airtight (6,8,9), air crossing first three airtight (11,13,14), leather belt head three airtight (A, B, C) and return air detour, concentrate on before and after work plane peripheral system and air crossing.
Ore deposit, the Datong Coal Group Company coal exit of valley is example, and the economic benefit that the present invention originally brings is described.(1) past brings adverse effect owing to often needing to repair to other production work, and the fire prevention of the constructing airtight repairerment cycle (closes for 307 return airways: after being enclosed within filling powder coal ash in 2008 for 1 year to 2 years, do not occur that overvoltage is collapsed up to now, pressure break phenomenon), decrease repairerment recruitment, effectively save work efficiency, the repairerment recruitment of saving can have been used in other work.(2) former airtight average monthly just needs repairs once, and often repair and once about need 2 works, repair expenses is about about 600 yuan, 1 year repair expenses about 7200 yuan/.After innovation, flyash charging quantity presses 10m 3/ seat calculates, and filling expense about needs 6000 yuan/, and every airtight saves 1200 yuan.My ore deposit expose at present airtight have about 280 and increase, the present invention promotes rear annual airtight repair expenses can save about 330,000 yuan.

Claims (1)

1. a mine goaf closing method, it is characterized in that: adopt fire prevention airtight in work plane enclosed point, described fire prevention is airtight is build the thick fire dam of twice 1m (21) by laying bricks or stones in enclosed point, the space of 1m is left in the middle of twice fire dam (21), powder filler coal ash (22) in space, body of wall sets gradually fine coal ash pipe (23) from top to bottom, grout pipe (24), sighting tube (25) and pipe (26) of turning one's coat, described goaf work plane enclosed point comprises three airtight (6, system lane, 8, 9), air crossing first three airtight (11, 13, 14), leather belt head three airtight (A, B, and return air two airtight (15 of detouring C), 16).
CN201110457981.9A 2011-12-31 2011-12-31 Mine goaf closing method Active CN102518472B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110457981.9A CN102518472B (en) 2011-12-31 2011-12-31 Mine goaf closing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110457981.9A CN102518472B (en) 2011-12-31 2011-12-31 Mine goaf closing method

Publications (2)

Publication Number Publication Date
CN102518472A CN102518472A (en) 2012-06-27
CN102518472B true CN102518472B (en) 2015-07-15

Family

ID=46289510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110457981.9A Active CN102518472B (en) 2011-12-31 2011-12-31 Mine goaf closing method

Country Status (1)

Country Link
CN (1) CN102518472B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726874B (en) * 2013-12-30 2016-06-08 王昆 A kind of airtight body of wall method for blocking of underground coal mine
CN103726875A (en) * 2014-01-16 2014-04-16 华北科技学院 Method for remote filling of explosion-proof compression-resistant closing of coal mine
CN103939125A (en) * 2014-04-29 2014-07-23 中国矿业大学(北京) Gob hot air treatment method
CN105317461A (en) * 2015-03-27 2016-02-10 中国矿业大学 Construction method of short-distance coal seam connecting cross drift sealing wall
CN105507950B (en) * 2015-12-17 2018-02-23 大同煤矿集团有限责任公司 Arch cushion wall water-proof sealing structure
CN107620605A (en) * 2017-08-10 2018-01-23 长春黄金研究院 A kind of underground mine goaf large area air-leakage control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343167A (en) * 2007-07-10 2009-01-14 中国矿业大学(北京) Backfilled enclosed material and its use method
CN201546758U (en) * 2009-10-27 2010-08-11 淄博矿业集团有限责任公司岱庄煤矿 Rapid fire-proof seal door for coal mines
CN201763394U (en) * 2010-08-17 2011-03-16 阜新矿业(集团)有限责任公司 Mining roadway fast-sealing curtain
CN102121369A (en) * 2010-12-15 2011-07-13 中国神华能源股份有限公司 Method for separating gas

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201232572Y (en) * 2008-07-14 2009-05-06 义马煤业(集团)有限责任公司 Coal mine tunnel goaf fire wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101343167A (en) * 2007-07-10 2009-01-14 中国矿业大学(北京) Backfilled enclosed material and its use method
CN201546758U (en) * 2009-10-27 2010-08-11 淄博矿业集团有限责任公司岱庄煤矿 Rapid fire-proof seal door for coal mines
CN201763394U (en) * 2010-08-17 2011-03-16 阜新矿业(集团)有限责任公司 Mining roadway fast-sealing curtain
CN102121369A (en) * 2010-12-15 2011-07-13 中国神华能源股份有限公司 Method for separating gas

Also Published As

Publication number Publication date
CN102518472A (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN102518472B (en) Mine goaf closing method
CN104481588B (en) A kind of encapsulating method of coal mine gob
CN102628345B (en) Sealing method of high sealing quasi-horizontal drilling hole
CN102071958B (en) Inverse Y-shaped ventilation method for coal mining working face
CN201232572Y (en) Coal mine tunnel goaf fire wall
CN108104865B (en) A kind of concordant drilling Anti-air-leakage gas pumping method
CN205297583U (en) Slurry shield shield tail sealing system
CN103121566B (en) Cavern nitrogen displacement method used for underground water-sealed rock cavern oil storages
CN112012782B (en) Advanced closed area gas prevention and control technology for air inlet and return roadway of fully mechanized caving face
CN102913249A (en) Inclined shaft transverse-through positive hole single horn lifting construction method
CN207485466U (en) Gas at upper corner drainage device during high methane coal working face is just adopted
CN204960882U (en) Underground hydraulic fracturing drill hole sealing device of coal mine
CN208564549U (en) A kind of tunneling close range down river and bearing pipe constructing device
CN102758639A (en) Anti-blowout long tube grouting method for limited-space tunnels
CN106761923A (en) The blind lane enclosing wall in coal seam and the blind lane explosion-proof method using the enclosing wall
CN208220811U (en) A kind of inverted arch support component suitable for the tunnel shield formula TBM prefabricated pipe section liner structure
CN206607609U (en) Rich water sand-pebble layer underground engineering deformation joint structure
CN110005421A (en) Sandy soil layer shield driven Metro tunnel originates portal sealing device and encapsulating method
CN202927358U (en) A steel liner repair structure of a large-diameter concrete non-bearing pipeline fissure
CN111005763A (en) Coal mine underground sealing wall and preparation method thereof
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN207363699U (en) A kind of device for improving downdraft mode paste body filling mining methods Tight filling rate
CN103362548B (en) Provisions for grouting
CN205036404U (en) Problem of working face gas transfinites is solved special gas drainage under suction lane arrange device
CN205400661U (en) Colliery is hydraulic fracturing hole packer in pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant