CN111005763A - Coal mine underground sealing wall and preparation method thereof - Google Patents

Coal mine underground sealing wall and preparation method thereof Download PDF

Info

Publication number
CN111005763A
CN111005763A CN201911340863.2A CN201911340863A CN111005763A CN 111005763 A CN111005763 A CN 111005763A CN 201911340863 A CN201911340863 A CN 201911340863A CN 111005763 A CN111005763 A CN 111005763A
Authority
CN
China
Prior art keywords
wall
wall body
pipe
sealing
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911340863.2A
Other languages
Chinese (zh)
Inventor
郜富平
范红斌
白璐
张红鸟
王振刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changcun Coal Mining of Shanxi Luan Environmental Energy Development Co Ltd
Original Assignee
Changcun Coal Mining of Shanxi Luan Environmental Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changcun Coal Mining of Shanxi Luan Environmental Energy Development Co Ltd filed Critical Changcun Coal Mining of Shanxi Luan Environmental Energy Development Co Ltd
Priority to CN201911340863.2A priority Critical patent/CN111005763A/en
Publication of CN111005763A publication Critical patent/CN111005763A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Sealing Material Composition (AREA)

Abstract

The invention provides a coal mine underground sealing wall which comprises a first wall body, a filling material layer, a second wall body, arc-shaped fixing parts, a gas drainage pipe, a water drainage pipe and a plurality of grouting pipes with ball valves, wherein the filling material layer is positioned between the first wall body and the second wall body, the arc-shaped fixing parts are arranged at the joint of the upper part of the outer wall of the second wall body and a top plate, the outer surfaces of the first wall body and the second wall body are provided with moisture-proof smear layers, the upper parts of the first wall body and the second wall body extend into the top plate coal bed by 0.3m, the bottom part of the first wall body and the second wall body extend into a bottom plate coal bed by 0.2m, the left part and the right part of the first wall body and the second wall body extend into a roadway wall coal bed by 0.. The sealing wall skin is not easy to fall off, the sealing effect is outstanding, and the gas accumulation on the upper part is less.

Description

Coal mine underground sealing wall and preparation method thereof
Technical Field
The invention belongs to the field of coal mine safety, and particularly relates to a coal mine lower sealing wall and a preparation method thereof.
Background
Spontaneous combustion of coal in the goaf and over-limit of gas content are major threats in the underground coal mine. After the coal on the coal face is mined, sealing treatment is needed to prevent the air leakage of the goaf from causing the spontaneous combustion of the residual coal in the goaf and inhibiting the gas in the goaf from flowing out to other places, which is very important for controlling the fire and the gas in the underground coal mine.
The underground coal mine airtight wall is mostly built by bricks, and the wall is plastered by mortar. Due to the humid and shady climate and the air oxidation effect of the underground coal mine, the skin of the underground coal mine sealing wall can fall off along with the lapse of time, namely the skin of the sealing wall falls off, so that the tightness of the sealing wall can be directly influenced, and the air leakage of the goaf is difficult to prevent, and hidden troubles are buried in other places for spontaneous combustion of coal left in the goaf and gas emission of the goaf.
Meanwhile, gas accumulation above the outer side of the wall body of the closed wall is a difficult problem troubling coal mine workers all the time, and the gas accumulation above the wall body brings potential safety hazards to coal mines.
Disclosure of Invention
The invention provides a coal mine underground sealing wall, which is difficult to fall off, has an outstanding sealing effect and less upper gas accumulation.
It is another object of the present invention to provide a method for preparing the sealant wall of the present invention.
In order to achieve the purpose, the technical scheme of the invention is as follows: a coal mine underground sealing wall comprises a first wall body, a filling material layer, a second wall body, arc-shaped fixing pieces, a gas drainage pipe, a drain pipe and a plurality of grouting pipes with ball valves, wherein the filling material layer is positioned between the first wall body and the second wall body, the arc-shaped fixing pieces are arranged at the joint of the upper part of the outer wall of the second wall body and a top plate, two straight edges of the arc-shaped fixing pieces are respectively fixedly connected with the outer wall of the second wall body and the top plate and have the same width with the sealing wall, moisture-proof smear layers are arranged on the outer surfaces of the first wall body and the second wall body, the upper parts of the first wall body and the second wall body extend into a coal seam of the top plate by 0.3m, the bottom part of the first wall body and the second wall body extend into a coal seam of a bottom plate by 0.2m, the left part and the right part of the first wall body extend into a coal seam of a roadway wall; the water drainage pipe is arranged on the lower side of the middle part of the sealing wall and penetrates through the sealing wall body, and a U-shaped pipe is arranged at the end part of the water drainage pipe, which extends out of the side of the second wall body; the grouting pipes are obliquely arranged on the upper portion of the second wall body in a penetrating mode at equal intervals, and discharge ports of the grouting pipes are located at the top of the filling layer.
The thickness of the filling material layer is 3 m.
The thickness of the first wall body and the second wall body is 0.5 m.
The filling material layer is a mixture of cement, fly ash and gel.
The gas drainage pipe is a high-pressure PE pipe, and the distance between the gas drainage pipe and the top plate and the wall of the side wall are respectively 0.3 m.
The drain pipe is 0.3m away from the bottom plate.
Still include gas sampling tube, negative pressure survey beam tube, run through the setting in the sealed wall upper left corner, the body length that stretches out first wall side is 20 ~ 30 m.
Still including the PE high pressure fire prevention slip casting pipe with the valve, run through the setting on sealing wall upper portion, the body length that stretches out the first wall side of department is 20m, stretches out the length that the second wall side is 0.3 m.
The invention has the advantages that the sealing wall skin is not easy to fall off, the sealing effect is outstanding, and the gas accumulation amount at the upper part of the sealing wall is small.
The preparation method suitable for the preparation method of the sealing wall comprises the following steps: a preparation method of a coal mine underground sealing wall comprises the following steps,
step 1, cutting a first wall and a second wall at a construction site, wherein the depth of a side groove is 0.5m after the solid coal is seen, the depth of a top groove is 0.3m after the solid coal is seen, the depth of a bottom groove is 0.2m after the solid coal is seen, the thickness of the first wall and the thickness of the second wall are 0.5m, and the distance is 3m during cutting;
step 2, arranging arc-shaped fixing pieces at the top of the outer side wall of the second wall, obliquely arranging grouting pipes at equal intervals on the upper part of the second wall, and enabling grouting pipe grout outlets to be located between the first wall and the second wall and close to the center of the top;
step 3, arranging a drain pipe, a gas extraction pipe, a gas sampling pipe, a negative pressure observation beam pipe and a high-pressure fireproof grouting pipe on the first wall body and the second wall body in a penetrating manner;
and 4, injecting a filling material between the first wall body and the second wall body through a grouting pipe to form a filling material layer, wherein the filling material is obtained by mixing cement and fly ash according to a weight ratio of 3:1 to obtain a mixture 1, filling gel into the mixture, wherein the weight of the gel is 10-13% of that of the mixture 1 to form a mixture 2, and mixing the mixture 2 with water according to a grey water ratio of 13-14: 10 mixing to prepare a filling material;
and 5, painting moisture-proof skin-removing layers on the outer side walls of the first wall body and the second wall body.
According to the manufacturing method, the filler of the middle filling material layer has the advantages of no toxicity, no corrosion and no pollution, and can play a good role in sealing and reduce the falling of the wall skin.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Detailed Description
As shown in fig. 1, a novel coal mine underground sealing wall comprises: the first wall body 3, the second wall body 5 that 0.5m is thick set up the filler layer 7 that 3m is thick between two wall bodies, and 5 outer wall upper portions of second wall body and roof junction are provided with arc firmware 8, and the arc firmware reduces ventilation resistance, reduces the gas and gathers. The outer surfaces of the first wall body and the second wall body are provided with the moisture-proof plastering layers, so that the problem that the wall plaster of the airtight wall is easy to be applied in a humid environment in the future is solved. The filling material is prepared by mixing cement and fly ash according to a weight ratio of 3:1 to obtain a mixture 1, filling gel into the mixture, wherein the weight of the gel is 10-13% of that of the mixture 1 to form a mixture 2, and mixing the mixture 2 with water according to a grey water ratio of 13-14: 10 mixing to prepare a filling material;
the first wall body and the second wall body are dug to a hard bottom in advance, the depth of the side groove is 0.5m after the solid coal is seen during the process of digging, the depth of the top groove is 0.3m after the solid coal is seen, the depth of the bottom groove is 0.2m after the solid coal is seen, the width of the digging groove is larger than the thickness of a wall by 0.3m, and skirt edges of not less than 0.1m are arranged around the first wall body and the second wall body during the process of plastering. When the wall is built, the wall is connected with the coal body firmly, and the wall ledge is filled with mortar tightly.
And a gas drainage pipe with the diameter of 110mm is reserved at the position 0.3m away from the top and the side of the left upper corner of the airtight wall. The pipeline uses high-pressure PE pipes (namely, two ends are provided with steel sleeves) to penetrate through the inner side and the outer side of the airtight wall, the pipe orifice at the outer side is 0.3-1 m away from the outer side wall surface of the second wall, a gate valve is arranged, and the pipe orifice at the inner side is 30-50 m away from the outer wall of the first wall.
A drain pipe with the diameter of 159mm is laid in the middle of the airtight wall at a distance of 0.3m from the bottom plate, and a U-shaped pipe and a valve are arranged at the end part of the drain pipe extending out of the second wall body.
2 pieces of 1.5m long phi 110mmPE grouting pipes are preset at the upper part of the second wall body at equal intervals, are 0.3m away from the top and 1.0m away from the side, are obliquely arranged, a grout outlet is tightly attached to a roadway roof, and a phi 25 spherical stop valve is arranged at the outer end of the second wall body for grouting.
A gas sampling tube and a negative pressure observation beam tube are additionally arranged at the position of the left upper corner of the airtight wall, which is 0.3m away from the top and the side of the airtight wall respectively, and the airtight wall extends out of the first wall by 20 m.
The sealed wall is provided with a phi 110mmPE high-pressure fireproof grouting pipe at a position 0.3m away from the top of the wall, a grout outlet is 20m away from the first wall, a grout inlet is 0.3m away from the second wall, and a valve is arranged.
When the underground sealing wall of the coal mine is constructed, railways, steel wire ropes, anchor nets and other metal objects which are easy to conduct electricity and lead to the inside of the sealing wall are completely cleaned, the conducting objects which lead to a sealing area cannot be left, and stray current is prevented from entering the sealing area. After the underground coal mine sealing wall is constructed, the coal body around the sealing wall is cemented.

Claims (9)

1. A colliery is sealing wall in pit which characterized in that: the sealing wall comprises a first wall body, a filling material layer, a second wall body, arc-shaped fixing parts, a gas drainage pipe, a drain pipe and a plurality of grouting pipes with ball valves, wherein the filling material layer is positioned between the first wall body and the second wall body, the arc-shaped fixing parts are arranged at the joint of the upper part of the outer wall of the second wall body and a top plate, two straight edges of the arc-shaped fixing parts are fixedly connected with the outer wall of the second wall body and the top plate respectively and have the same width as the sealing wall, moisture-proof coating layers are arranged on the outer surfaces of the first wall body and the second wall body, the upper parts of the first wall body and the second wall body extend into a coal seam of the top plate for 0.3m, the bottom of the first wall body and the second wall body extends into a coal seam of a bottom plate for 0.2m, the left part and the right part of the first wall body extend into a coal seam of; the water drainage pipe is arranged on the lower side of the middle part of the sealing wall and penetrates through the sealing wall body, and a U-shaped pipe is arranged at the end part of the water drainage pipe, which extends out of the side of the second wall body; the grouting pipes are obliquely arranged on the upper portion of the second wall body in a penetrating mode at equal intervals, and discharge ports of the grouting pipes are located at the top of the filling layer.
2. The coal mine underground sealing wall according to claim 1, characterized in that: the thickness of the filling material layer is 3 m.
3. The coal mine underground sealing wall according to claim 1, characterized in that: the thickness of the first wall body and the second wall body is 0.5 m.
4. The coal mine underground sealing wall according to claim 1, characterized in that: the filling material layer is a mixture of cement, fly ash and gel.
5. The coal mine underground sealing wall according to claim 1, characterized in that: the gas drainage pipe is a high-pressure PE pipe, and the distance between the gas drainage pipe and the top plate and the wall of the side wall are respectively 0.3 m.
6. The coal mine underground sealing wall according to claim 1, characterized in that: the drain pipe is 0.3m away from the bottom plate.
7. The coal mine underground sealing wall according to claim 1, characterized in that: still include gas sampling tube, negative pressure survey beam tube, run through the setting in the sealed wall upper left corner, the body length that stretches out first wall side is 20 ~ 30 m.
8. The coal mine underground sealing wall according to claim 1, characterized in that: still including the PE high pressure fire prevention slip casting pipe with the valve, run through the setting on sealing wall upper portion, the body length that stretches out the first wall side of department is 20m, stretches out the length that the second wall side is 0.3 m.
9. A preparation method of a coal mine underground sealing wall comprises the following steps,
step 1, cutting a first wall and a second wall at a construction site, wherein the depth of a side groove is 0.5m after the solid coal is seen, the depth of a top groove is 0.3m after the solid coal is seen, the depth of a bottom groove is 0.2m after the solid coal is seen, the thickness of the first wall and the thickness of the second wall are 0.5m, and the distance is 3m during cutting;
step 2, arranging arc-shaped fixing pieces at the top of the outer side wall of the second wall, obliquely arranging grouting pipes at equal intervals on the upper part of the second wall, and enabling grouting pipe grout outlets to be located between the first wall and the second wall and close to the center of the top;
step 3, arranging a drain pipe, a gas extraction pipe, a gas sampling pipe, a negative pressure observation beam pipe and a high-pressure fireproof grouting pipe on the first wall body and the second wall body in a penetrating manner;
and 4, injecting a filling material between the first wall body and the second wall body through a grouting pipe to form a filling material layer, wherein the filling material is obtained by mixing cement and fly ash according to a weight ratio of 3:1 to obtain a mixture 1, filling gel into the mixture, wherein the weight of the gel is 10-13% of that of the mixture 1 to form a mixture 2, and mixing the mixture 2 with water according to a grey water ratio of 13-14: 10 mixing to prepare a filling material;
and 5, painting moisture-proof skin-removing layers on the outer side walls of the first wall body and the second wall body.
CN201911340863.2A 2019-12-23 2019-12-23 Coal mine underground sealing wall and preparation method thereof Pending CN111005763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911340863.2A CN111005763A (en) 2019-12-23 2019-12-23 Coal mine underground sealing wall and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911340863.2A CN111005763A (en) 2019-12-23 2019-12-23 Coal mine underground sealing wall and preparation method thereof

Publications (1)

Publication Number Publication Date
CN111005763A true CN111005763A (en) 2020-04-14

Family

ID=70117510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911340863.2A Pending CN111005763A (en) 2019-12-23 2019-12-23 Coal mine underground sealing wall and preparation method thereof

Country Status (1)

Country Link
CN (1) CN111005763A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112228153A (en) * 2020-09-04 2021-01-15 贵州大学 Protective wall for preventing coal and gas from being extruded
CN116291716A (en) * 2023-04-26 2023-06-23 中矿地科技术研究院(江苏)有限公司 Goaf sealing device is used in mine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112228153A (en) * 2020-09-04 2021-01-15 贵州大学 Protective wall for preventing coal and gas from being extruded
CN116291716A (en) * 2023-04-26 2023-06-23 中矿地科技术研究院(江苏)有限公司 Goaf sealing device is used in mine

Similar Documents

Publication Publication Date Title
CN104481588B (en) A kind of encapsulating method of coal mine gob
KR101500667B1 (en) steel pipe grouting device and tunnel reinforcement andbarrier grouting method using this
CN104514577A (en) Method for efficiently treating spontaneous ignition of remaining coal in large area goaf of shallow-buried coal bed
CN109083682A (en) A kind of construction method of mine working antiseepage high intensity fire dam
CN107956509B (en) Method for preventing wind leakage by stages in roof cutting gob-side entry retaining
CN109139052B (en) Grouting hole device based on high-pressure deep hole grouting and construction method
CN112377243B (en) Outburst prevention construction method for coal and gas outburst tunnel
CN115182737A (en) Vertical orthogonal ejection type air duct structure of deep-buried subway station and construction method
CN104141314B (en) The method of complete seepage proof curtain is formed in rock, native two media
CN111005763A (en) Coal mine underground sealing wall and preparation method thereof
CN201232572Y (en) Coal mine tunnel goaf fire wall
CN107642375A (en) A kind of method for preventing the goaf coal spontaneous combustion of mining of closed distance coal seam group levels
CN106050302A (en) Constructing system and method for coal mine permanent sealing wall
CN109630157A (en) A kind of regulator control system of Tunnel Engineering and ground water regime
CN202441393U (en) Forepoling structure of horizontal rotary jet grouting and big pipe shed combined tunnel
CN102518472B (en) Mine goaf closing method
CN202560318U (en) Water guide structure of laneway seal wall
CN112282844A (en) Pollution blocking method for acid waste water of abandoned mine
CN211474183U (en) Colliery is sealing wall in pit
CN202431278U (en) Double-layer horizontal jet grouting pre-retaining structure
CN210509192U (en) Novel closed tunnel for underground coal mine
CN116771386A (en) Dynamic sequential grouting method for ultra-temperature hot water tunnel
CN204356738U (en) Concrete panel dam upstream surface structure for preventing panel from being empty
CN212406806U (en) Coal mine underground sealing wall
CN113323710B (en) Goaf nitrogen injection pressure-equalizing air leakage prevention structure, system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination