CN102518011A - Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper - Google Patents
Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper Download PDFInfo
- Publication number
- CN102518011A CN102518011A CN2011104326942A CN201110432694A CN102518011A CN 102518011 A CN102518011 A CN 102518011A CN 2011104326942 A CN2011104326942 A CN 2011104326942A CN 201110432694 A CN201110432694 A CN 201110432694A CN 102518011 A CN102518011 A CN 102518011A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- concrete sleeper
- pipe taking
- getting
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The invention discloses a pipe taking method for replacing a pre-embedded sleeve of a railway concrete sleeper, which comprises steps: firstly, forming a longitudinal groove on the inner wall of the pre-embedded sleeve to be taken out; secondly, inserting a pipe taking tool matched with the groove formed on the inner wall of the sleeve into the sleeve, wherein a longitudinal ribbed protrusion on the pipe taking tool is fixedly meshed with the groove formed on the inner wall of the sleeve; and thirdly, rotating the pipe taking tool to take out the pre-embedded sleeve. The groove is formed in the pre-embedded sleeve, and the pipe taking tool matched with the groove is inserted into the sleeve to be fixedly meshed with the groove, so that the sleeve can be taken out by rotating the pipe taking tool with great effort. The whole pipe taking process is convenient and quick, and no track bed slab or concrete sleeper is damaged.
Description
Technical field
The present invention relates to a kind of tube side method of getting that railway concrete sleeper service sleeve is changed in the railroad maintenance construction that is used for.
Background technology
Development of High Speed Railway was very fast in recent years, a kind of quick, convenient, comfortable mode of transportation was provided for people's trip.What high-speed railway adopted all is gapless rail and non-fragment orbit, typically uses spring secures rail to sleeper in order to guarantee road-ability, even do not having to guarantee also on the monolithic railway roadbed of stone that train operation is smooth-going.
The rail of high-speed railway is fixed on concrete sleeper or the monolithic road bed board through fastener, and wherein rail fastening is embedded in wherein when concrete sleeper or monolithic road bed board are prefabricated with sleeve pipe.Sleeve pipe is that a kind of highstrenghtpiston processes, has certain intensity and elasticity, but sleeve pipe has certain useful life, needs periodic replacement to guarantee the security of operation of railway.More casing replacing needs to take out earlier originally to be embedded in the sleeve pipe in concrete sleeper or the road bed board; Usually adopt large-scale electric iron to melt original sleeve pipe; Prize then; So not only waste time and energy but also damage the sleeve pipe installing hole easily, installing hole needs to change whole sleeper or road bed board once damaging, thereby has increased cost widely.Therefore a kind of piping tool of conveniently getting is current urgent problem.
Summary of the invention
The technical problem that the present invention will solve provide a kind of easy to operate, change the tube side method of getting of railway concrete sleeper service sleeve quickly and easily.
In order to solve the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of tube side method of getting of changing railway concrete sleeper service sleeve may further comprise the steps: 1, the inwall at service sleeve to be removed forms longitudinal fluting; 2, the piping tool of getting that the groove that forms on use and the internal surface of sleeve pipe is complementary inserts sleeve pipe, and this protruding engagement that forms with internal surface of sleeve pipe of vertical rib shape of getting on the piping tool is fixed; 3, piping tool is got in rotation, takes out service sleeve.
The said longitudinal fluting that forms at internal surface of sleeve pipe is three.
Said is the hot melt molding device at the employed instrument of service sleeve inwall formation longitudinal fluting to be removed, and operating temperature is 600 ℃.
Beneficial effect of the present invention: because the present invention is through forming groove in service sleeve, the piping tool of getting that will match then inserts in the sleeve pipe and fixes with engagement, and firmly rotation is got piping tool and just can sleeve pipe be taken out; The whole pipe process convenient of getting is quick, does not destroy bed board or concrete sleeper.
The specific embodiment
Below in conjunction with embodiment the present invention is specified.Should be understood that said embodiment only to be used to the present invention is described and be not used in the restriction scope of the present invention.Should be understood that in addition those skilled in the art can do various changes or modification to the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
A kind of tube side method of getting of changing railway concrete sleeper service sleeve of the present invention may further comprise the steps: 1, the inwall at service sleeve to be removed forms longitudinal fluting; 2, the piping tool of getting that the groove that forms on use and the internal surface of sleeve pipe is complementary inserts sleeve pipe, and this protruding engagement that forms with internal surface of sleeve pipe of vertical rib shape of getting on the piping tool is fixed; 3, piping tool is got in rotation, takes out service sleeve.
The longitudinal fluting that forms at internal surface of sleeve pipe is preferably three.Employed instrument is the hot melt molding device, and operating temperature is 600 ℃.This hot melt molding device comprises shaped device, heater and operating grip, and shaped device, heater and operating grip are connected through bolt.Shaped device foremost is the cylinder that front end has tapering, and rib shape is protruding longitudinally to be provided with three around it, and rib shape convexity along the circumferential direction equidistantly distributes.
After hot melt molding device energising work; Can make the temperature of the shaped device that is connected with heater be raised to 600 ℃ operating temperature soon, at this moment on internal surface of sleeve pipe, melt and corresponding three grooves of three prismatic of shaped device through the operating grip of pushing the hot melt molding device.Then the hot melt molding device is taken out from sleeve pipe; Insertion matches gets piping tool; Because three prismatic of getting on the piping tool are fixed with three engagement on the internal surface of sleeve pipe, just so firmly rotating can be quickly and easily with the sleeve pipe taking-up, and does not destroy bed board or concrete sleeper.
Claims (3)
1. the tube side method of getting of changing railway concrete sleeper service sleeve is characterized in that, may further comprise the steps: (1) forms longitudinal fluting at the inwall of service sleeve to be removed; (2) piping tool of getting that the groove that forms on use and the internal surface of sleeve pipe is complementary inserts sleeve pipe, and this protruding engagement with internal surface of sleeve pipe formation of vertical rib shape of getting on the piping tool is fixed; (3) piping tool is got in rotation, takes out service sleeve.
2. a kind of tube side method of getting of changing railway concrete sleeper service sleeve as claimed in claim 1 is characterized in that, the said longitudinal fluting that forms at internal surface of sleeve pipe is three.
3. according to claim 1 or claim 2 a kind of tube side method of getting of changing railway concrete sleeper service sleeve is characterized in that, said to form the employed instrument of longitudinal fluting at service sleeve inwall to be removed is the hot melt molding device, and operating temperature is 600 ℃.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104326942A CN102518011A (en) | 2011-12-21 | 2011-12-21 | Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104326942A CN102518011A (en) | 2011-12-21 | 2011-12-21 | Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102518011A true CN102518011A (en) | 2012-06-27 |
Family
ID=46289055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104326942A Pending CN102518011A (en) | 2011-12-21 | 2011-12-21 | Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102518011A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104313958A (en) * | 2014-08-25 | 2015-01-28 | 武汉闻歇纳科技有限公司 | Process for replacing sleeve of vertical bolt on turnout |
CN107476148A (en) * | 2017-08-22 | 2017-12-15 | 中国建筑土木建设有限公司 | Passenger special line fastener installation and long steel rail fine adjustment construction method |
CN113774734A (en) * | 2021-10-27 | 2021-12-10 | 孔超 | Railway line nylon sleeve pipe pulling device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2077354U (en) * | 1990-07-12 | 1991-05-22 | 沈阳铁路局锦州科学技术研究所 | Vertical bolt spanner |
JPH11222801A (en) * | 1998-02-05 | 1999-08-17 | Nihon Decoluxe Co Ltd | Repair method for embedded plug of concrete sleeper |
CN2668682Y (en) * | 2003-11-01 | 2005-01-05 | 徐怀志 | Plastic casing-tube drilling device for speed-up railroad switch rail-pillow plate and preburying device |
CN101109164A (en) * | 2007-06-13 | 2008-01-23 | 杨红瑞 | Method for replacing disabled bolt weight anchor at speed improving runway switch crossing sleeper of railway |
CN201080581Y (en) * | 2007-09-14 | 2008-07-02 | 杨红瑞 | Railway speed-raising turnout sleeper failure kingbolt heavy anchor heating splined shaft |
CN202055120U (en) * | 2011-04-23 | 2011-11-30 | 洛阳双瑞橡塑科技有限公司 | Combined steel rail damping fastener capable of being repeatedly detached |
-
2011
- 2011-12-21 CN CN2011104326942A patent/CN102518011A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2077354U (en) * | 1990-07-12 | 1991-05-22 | 沈阳铁路局锦州科学技术研究所 | Vertical bolt spanner |
JPH11222801A (en) * | 1998-02-05 | 1999-08-17 | Nihon Decoluxe Co Ltd | Repair method for embedded plug of concrete sleeper |
CN2668682Y (en) * | 2003-11-01 | 2005-01-05 | 徐怀志 | Plastic casing-tube drilling device for speed-up railroad switch rail-pillow plate and preburying device |
CN101109164A (en) * | 2007-06-13 | 2008-01-23 | 杨红瑞 | Method for replacing disabled bolt weight anchor at speed improving runway switch crossing sleeper of railway |
CN201080581Y (en) * | 2007-09-14 | 2008-07-02 | 杨红瑞 | Railway speed-raising turnout sleeper failure kingbolt heavy anchor heating splined shaft |
CN202055120U (en) * | 2011-04-23 | 2011-11-30 | 洛阳双瑞橡塑科技有限公司 | Combined steel rail damping fastener capable of being repeatedly detached |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104313958A (en) * | 2014-08-25 | 2015-01-28 | 武汉闻歇纳科技有限公司 | Process for replacing sleeve of vertical bolt on turnout |
CN107476148A (en) * | 2017-08-22 | 2017-12-15 | 中国建筑土木建设有限公司 | Passenger special line fastener installation and long steel rail fine adjustment construction method |
CN107476148B (en) * | 2017-08-22 | 2019-05-24 | 中国建筑土木建设有限公司 | Passenger special line fastener installation and long steel rail fine adjustment construction method |
CN113774734A (en) * | 2021-10-27 | 2021-12-10 | 孔超 | Railway line nylon sleeve pipe pulling device |
CN113774734B (en) * | 2021-10-27 | 2023-02-24 | 孔超 | Railway line nylon sleeve pipe pulling device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102518011A (en) | Pipe taking method for replacing pre-embedded sleeve of railway concrete sleeper | |
CN103452018B (en) | Track gauge correction method for double-block type ballastless track construction | |
CN102635042A (en) | Method for welding seamless steel rail by moving flash welding on site | |
CN206015442U (en) | A kind of removable compound shield-tunneling construction sleeper | |
CN202390732U (en) | Intelligent anchor-replacing casing taker for railways | |
CN203440722U (en) | Gauge correction device for double-block type ballastless track construction | |
CN202530348U (en) | Hot melt former for taking down sleeve from railway | |
CN102505590A (en) | Intelligent anchor-changing and pipe-taking machine for railway | |
CN203727416U (en) | Turnout locking device | |
CN206666936U (en) | Fixing device for shield section marshaling track | |
CN205555202U (en) | High -efficient clearance formula electric automobile | |
CN203546547U (en) | Torsion taking and drawing equipment | |
CN204780484U (en) | Embedded orbital sightseeing mini train | |
CN205576653U (en) | A special tool for high -speed railway ballastless track changes rail bearing platform pre -embedded sleeve | |
CN202509363U (en) | Road junction protection device | |
CN206581979U (en) | A kind of pre-buried channel flow for being easy to repair | |
CN202318113U (en) | Ratchet socket wrench special for railway spikes | |
CN203334144U (en) | Nail-free sleeper | |
CN204196927U (en) | A kind of Novel protective cover for railway responser stern fast | |
CN202543743U (en) | Railway insulating crowbar | |
CN201801810U (en) | Drawable telescopic device used at end of railroad bridge | |
CN204295851U (en) | A kind of punching block of ladder-type sleepers | |
CN205189885U (en) | Simple and easy backing plate that is unearthed | |
CN101956367A (en) | Drawing-out retractor device for beam end of railroad bridge | |
CN202298368U (en) | Hollow cast-iron sleeper for coke-quenching vehicle track |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120627 |