CN102507348B CN 201110317418 CN201110317418A CN102507348B CN 102507348 B CN102507348 B CN 102507348B CN 201110317418 CN201110317418 CN 201110317418 CN 201110317418 A CN201110317418 A CN 201110317418A CN 102507348 B CN102507348 B CN 102507348B
Authority
CN
China
Prior art keywords
tunnel
secondary lining
lining concrete
load
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110317418
Other languages
English (en)
Other versions
CN102507348A (zh
Inventor
周一勤
张旭东
周琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Traffic Construction Engineering Test Center Co., Ltd.
Original Assignee
Ningbo Communication Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communication Engineering Construction Group Co Ltd filed Critical Ningbo Communication Engineering Construction Group Co Ltd
Priority to CN 201110317418 priority Critical patent/CN102507348B/zh
Publication of CN102507348A publication Critical patent/CN102507348A/zh
Application granted granted Critical
Publication of CN102507348B publication Critical patent/CN102507348B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明涉及一种隧道二次衬砌混凝土结构承载能力的试验方法,预先将若干个压力盒固定埋设在隧道初期支护与二次衬砌混凝土之间,预先将若干个挂钩固定埋设在隧道二次衬砌混凝土上,同一断面上左右各安装一个,且关于隧道二次衬砌混凝土轴线对称分布,将挂杆、弹簧秤和堆载平台依次连接安装在挂钩上,选择二次衬砌混凝土表面测点,粘贴若干个应力应变计,在堆载平台进行逐级加载,读取数据进行分析。本发明可以有效试验检测隧道二次衬砌混凝土结构的承载能力,是一种无损试验试验方法,既不破坏原有隧道二次衬砌混凝土结构又能给设计、施工和工程竣工验收提供重要的科学依据。

Description

一种隧道二次衬砌混凝土结构承载能力的试验方法
技术领域
本发明涉及隧道二次衬砌混凝土的质量控制领域,特别是涉及一种隧道二次衬砌混凝土结构承载能力的试验方法。
背景技术
目前,在公路、铁路、市政、水利等工程中,隧道是一种普遍的结构,二次衬砌混凝土结构是隧道的主体结构,现在二次衬砌混凝土结构常规设计方法是采用类比法进行设计,再通过理论计算复核或通过室内模型试验验证,但由于地质情况十分复杂,隧道围岩变化频繁,理论计算或室内模型的地质参数难以准确确定,导致理论计算或室内模型的试验结果与实际情况出入较大,不能准确反映工程的实际。同时,隧道初期支护和二次衬砌混凝土现场浇筑的施工质量也难以保证,正是由于目前没有现场隧道二次衬砌混凝土结构承载力的试验方法,无法检测其承载能力,一般的设计都比较保守,造成了较大的浪费。在质量检验验收时,不能检测其承载力,一旦施工完成,如有质量问题也无法发现,安全隐患不能排除,这也是目前隧道安全事故多发的主要原因之一。
发明内容
本发明所要解决的技术问题是提供一种隧道二次衬砌混凝土结构承载能力的试验方法,能有效试验检测隧道二次衬砌混凝土结构的承载能力,为设计、施工和工程验收提供重要的科学依据。
本发明解决其技术问题所采用的技术方案是:提供一种隧道二次衬砌混凝土结构承
载能力的试验方法,其具体操作步骤如下:
(a)在二次衬砌混凝土施工时,预先将若干个压力盒固定埋设在隧道初期支护与二次衬砌混凝土之间,将若干个挂钩固定埋设在隧道二次衬砌混凝土上,同一断面上左右各安装一个,且关于隧道二次衬砌混凝土轴线对称分布;
(b)荷载试验时,将挂杆、弹簧秤和堆载平台依次连接安装在挂钩上;
(c)根据工程情况选择二次衬砌混凝土表面测点,粘贴应力应变计;
(d)在堆载平台上直接加载可行式车辆或重物,加载时适宜逐级加载,先由零载加至第一级荷载、卸载至零载;再由零载加至第二级荷载,卸至零载;直至所有荷载施加完毕,在逐级加载过程中可以不卸载,逐级加至最大荷载,每次加载后待各弹簧秤的读数误差小于5%时再予以读数记录加载重量;
(e)每次加载稳定之后,通过计算机将压力盒、应力应变计的测试数据进行汇总;
(f)试验结果分析评价。
所述的试验方法得到的数据可以用以下公式进行计算分析:将二次衬砌结构加载试验应变或变形实测结果与理论值的比进行比较,即
η = Vs V l . . . ( 1 )
(1)式中
η——二次衬砌结构加载试验应变或变形实测结果与理论值的比;
Vs——(围岩压力q+试验荷载P)作用下的应变或变形实测值;
Vl——(围岩压力q+试验荷载P)作用下的应变或变形理论值;
根据隧道断面形式、围岩类别和二次衬砌混凝土的厚度、强度等的实际情况,简化成数学模型,通过有限元方法计算Vl值。Vl值在隧道空间的分布是不同的,根据隧道断面形式、围岩类别和二次衬砌混凝土的厚度、强度等的实际情况,选择特征点计算,不同的隧道特征点的选择也不同,Vl值的计算都是由装有特定计算软件的计算机来完成。
结果中η越小,二次衬砌超载能力越大,安全储备越高。可以根据结果绘制实测值和理论分析计算的对照图表,理论计算按弹性材料进行计算,如果两者呈线性关系,说明二次衬砌结构处于良好的弹性工作状态。
有益效果
本发明涉及一种隧道二次衬砌混凝土结构承载能力测试装置及试验方法,本发明可以有效试验检测隧道二次衬砌混凝土结构的承载能力,是一种无损试验检测装置和方法,既不破坏原有隧道二次衬砌混凝土结构又能给设计、施工和工程竣工验收提供重要的科学依据。
附图说明
图1是本发明所述的试验示意图;
图2是本发明所述的试验装置的布置图;
图3是本发明所述的静载荷试验图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
本发明的实施方式涉及一种隧道二次衬砌混凝土结构承载能力的试验方法,以图1~3为例提供一种与本发明相配的试验装置,包括压力盒1、挂钩2、挂杆3、弹簧秤4、堆载平台5和应力应变计6,其特征在于,所述的压力盒1固定埋设在隧道初期支护和二次衬砌混凝土之间,所述的挂钩2固定在二次衬砌混凝土上,所述的挂杆3与挂钩2相连,所述的挂杆3通过弹簧秤4与堆载平台5相连,所述的应力应变计6安装在二次衬砌混凝土的表面,所述的压力盒1预先埋设有若干个,每个压力盒1都通过导线连接到计算机上,所述的应力应变计6安装有若干个,每个应力应变计6都通过导线连接到计算机上,所述的挂钩2在同一断面上左右各安装一个,且关于隧道二次衬砌混凝土轴线对称分布,所述的挂钩2预埋断面至少为4个。
实施例1
一条宽度为9~10米的双车道隧道,围岩类别为3级,在隧道初期支护完成后,根据隧道二次衬砌混凝土结构的试验检测频率,选取一段长度约为10米(一模板长度)的测试区域,预先将压力盒1固定埋设在隧道初期支护上,数量为40~60个,每一个压力盒1都通过导线连接到计算机上;二次衬砌混凝土开始施工时,预先将8~10个挂钩2固定埋设在隧道二次衬砌混凝土内;荷载试验时,选择二次衬砌混凝土表面测点,粘贴40~60个应力应变计6;将挂杆3、弹簧秤4、堆载平台5依次连接在挂钩2上;选用可行式车辆进行加载,加载时进行逐级加载,先由零载加至第一级荷载、卸载至零载;再由零载加至第二级荷载,卸至零载;直至所有荷载施加完毕,每次加载后待各弹簧秤的读数误差小于5%时再予以读数记录加载重量;每次加载稳定之后,通过计算机将读取压力盒1和应力应变计6的数据进行汇总;现场试验结束后,通过计算机计算二次衬砌结构加载试验应变或变形实测结果与理论值的比(η),同时绘制实测值和理论分析计算的对照图表,评价二次衬砌承载能力。
实施例2
一条宽度为14~15米的三车道隧道,围岩类别为3级,在隧道初期支护完成后,根据隧道二次衬砌混凝土结构的试验检测频率,选取一段长度约为10米(一模板长度)的测试区域,预先将压力盒1固定埋设在隧道初期支护上,数量为60~80个,每一个压力盒1都通过导线连接到计算机上;二次衬砌混凝土开始施工时,预先将10~14个挂钩2固定埋设在隧道二次衬砌混凝土内;荷载试验时,选择二次衬砌混凝土表面测点,粘贴60~80个应力应变计6;将挂杆3、弹簧秤4、堆载平台5依次连接在挂钩2上;选用重物堆载的方式进行加载,加载时进行逐级加载,先由零载加至第一级荷载、卸载至零载;再由零载加至第二级荷载,卸至零载;直至所有荷载施加完毕,每次加载后待各弹簧秤的读数误差小于5%时再予以读数记录加载重量;每次加载稳定之后,通过计算机将读取压力盒1和应力应变计6的数据进行汇总;现场试验结束后,通过计算机计算二次衬砌结构加载试验应变或变形实测结果与理论值的比(η),同时绘制实测值和理论分析计算的对照图表,评价二次衬砌承载能力。

Claims (2)

1.一种隧道二次衬砌混凝土结构承载能力的试验方法,其具体操作步骤如下:
(a)在二次衬砌混凝土施工时,预先将若干个压力盒(1)固定埋设在隧道初期支护与二次衬砌混凝土之间,并将若干个挂钩(2)固定埋设在二次衬砌混凝土上,同一断面上左右各安装一个,且关于二次衬砌混凝土轴线对称分布;
(b)荷载试验时,将挂杆(3)、弹簧秤(4)和堆载平台(5)依次连接安装在挂钩(2)上;
(c)根据工程情况选择二次衬砌混凝土表面测点,粘贴若干个应力应变计(6);
(d)在堆载平台(5)上直接加载可行式车辆或重物,加载时逐级加载,先由零载加至第一级荷载,卸载至零载,再由零载加至第二级荷载,卸载至零载;直至所有荷载施加完毕;或在逐级加载过程中不卸载,逐级加至最大荷载;每次加载后待各弹簧秤的读数误差小于5%时再予以读数记录加载重量;
(e)每次加载稳定之后,通过计算机将压力盒(1)、应力应变计(6)的测试数据进行汇总;
(f)试验结果分析评价。
2.根据权利要求1所述的一种隧道二次衬砌混凝土结构承载能力的试验方法,其特征在于:所述的试验方法得到的数据用以下公式进行计算分析:
η = Vs V l . . . ( 1 )
(1)式中
η——二次衬砌混凝土结构加载试验应变或变形实测值与理论值的比;
Vs——围岩压力和试验荷载作用下的应变或变形实测值;
Vl——围岩压力和试验荷载作用下的应变或变形理论值。
CN 201110317418 2011-10-19 2011-10-19 一种隧道二次衬砌混凝土结构承载能力的试验方法 Active CN102507348B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110317418 CN102507348B (zh) 2011-10-19 2011-10-19 一种隧道二次衬砌混凝土结构承载能力的试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110317418 CN102507348B (zh) 2011-10-19 2011-10-19 一种隧道二次衬砌混凝土结构承载能力的试验方法

Publications (2)

Publication Number Publication Date
CN102507348A CN102507348A (zh) 2012-06-20
CN102507348B true CN102507348B (zh) 2013-08-07

Family

ID=46219455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110317418 Active CN102507348B (zh) 2011-10-19 2011-10-19 一种隧道二次衬砌混凝土结构承载能力的试验方法

Country Status (1)

Country Link
CN (1) CN102507348B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332739B (zh) * 2015-10-14 2018-02-09 同济大学 一种隧道支护结构受力监测装置及方法
CN105486586B (zh) * 2016-01-19 2018-04-06 山东科技大学 围岩变形与压力模拟试验系统及试验方法
CN108930540B (zh) * 2017-05-27 2024-02-13 中冶长天国际工程有限责任公司 隧道初支-二衬接触压力测量装置及其埋设方法
CN107621538A (zh) * 2017-10-13 2018-01-23 浙江省交通规划设计研究院 一种测试隧道补偿收缩混凝土衬砌所受地层弹性抗力的试验方法
CN110132718B (zh) * 2019-04-19 2021-11-09 同济大学 基于隧道衬砌变形特征的结构剩余承载力测定方法及系统
CN110514518B (zh) * 2019-07-19 2021-03-26 同济大学 基于隧道衬砌病害特征的隧道衬砌结构服役性能检测方法
CN113588465A (zh) * 2021-07-30 2021-11-02 上海应用技术大学 模拟地铁行车荷载作用下隧道变形的方法及装置
CN113916672B (zh) * 2021-10-11 2024-03-26 河南新华五岳抽水蓄能发电有限公司 一种洞室围岩支护压力试验装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858403A (zh) * 2006-06-02 2006-11-08 四川省交通厅公路规划勘察设计研究院 一种隧道支护结构
CN101435746A (zh) * 2008-12-15 2009-05-20 西南交通大学 盾构隧道结构模型综合试验系统
CN101832140A (zh) * 2010-04-20 2010-09-15 北京交通大学 海底隧道衬砌水压力分布规律试验方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1858403A (zh) * 2006-06-02 2006-11-08 四川省交通厅公路规划勘察设计研究院 一种隧道支护结构
CN101435746A (zh) * 2008-12-15 2009-05-20 西南交通大学 盾构隧道结构模型综合试验系统
CN101832140A (zh) * 2010-04-20 2010-09-15 北京交通大学 海底隧道衬砌水压力分布规律试验方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
乌鞘岭隧道F4~F7断层区段压力、应力实测与分析;刘志春等;《石家庄铁道学院学报》;20060630;第19卷(第2期);13-17 *
刘志春等.乌鞘岭隧道F4~F7断层区段压力、应力实测与分析.《石家庄铁道学院学报》.2006,第19卷(第2期),13-17.

Also Published As

Publication number Publication date
CN102507348A (zh) 2012-06-20

Similar Documents

Publication Publication Date Title
CN102507348B (zh) 一种隧道二次衬砌混凝土结构承载能力的试验方法
CN106120878B (zh) 一种地基极限承载力及容许承载力的载荷试验测定方法
CN102507347A (zh) 一种隧道二次衬砌混凝土结构承载能力试验装置
CN110864968A (zh) 一种应力梯度加载试验装置及精确确定加载能量的方法
CN105651474B (zh) 预应力混凝土整孔预制箱梁梁上运梁模拟加载试验方法
CN209400324U (zh) 一种模拟不同受力条件下隧道管环受力变形的实验装置
CN102866070B (zh) 一种隧道二次衬砌混凝土结构承载力试验的加载方法
Shi et al. Experimental and numerical investigation on local–overall interactive buckling behavior of welded I-section steel columns
CN114254534B (zh) 一种基于钢筋三维加强效应的混凝土本构模型计算方法
CN104133960A (zh) 一种改进的静力传感器的优化布设方法
CN111665137A (zh) 一种公路单梁静载试验系统
CN103048088A (zh) 一种支撑轴力校核的实验装置及支撑轴力校核方法
Wang et al. Fatigue life prediction based on natural frequency changes for spot welds under random loading
Chen et al. Displacement-based simplified calculation for pile-soil interaction under reciprocating low-cycle pseudo-static loads
CN202305349U (zh) 一种隧道二次衬砌混凝土结构承载能力试验装置
Hong et al. Deflection determination of concrete structures considering nonlinearity based on long-gauge strain sensors
CN207079641U (zh) 基于自平衡法的桩承载能力自动检测系统
CN110472368A (zh) 基于剪力和倾角影响线曲率的简支梁损伤识别方法
CN202994352U (zh) 一种支撑轴力校核的实验装置
CN206945424U (zh) 一种高地应力软岩隧道室内模型试验设备及系统
Yan et al. Research on engineering geomechanics characteristics and CFRP reinforcement technology based on machine learning algorithms
CN201762738U (zh) 一种敞开组合式荷载箱
CN110487580A (zh) 一种基于支座反力和倾角斜率的梁结构损伤识别方法
Zhao Evaluation method of highway quality and safety based on finite element analysis
Shenton et al. Load rating of bridges without plans

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170508

Address after: 315124 Zhejiang city in Ningbo province Dongqian Lake resort Mei fang Road No. 12

Co-patentee after: Ningbo Communication Engineering Construction Group Co.,Ltd.

Patentee after: Ningbo Traffic Construction Engineering Test Center Co., Ltd.

Address before: 315000 Zhejiang Province, Ningbo city Haishu District Yin Feng Road, No. 32-2

Patentee before: Ningbo Communication Engineering Construction Group Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190201

Address after: 315124 Meifang Road, Dongqianhu Tourist Resort, Ningbo City, Zhejiang Province

Patentee after: Ningbo Traffic Construction Engineering Test Center Co., Ltd.

Address before: 315124 Meifang Road, Dongqianhu Tourist Resort, Ningbo City, Zhejiang Province

Co-patentee before: Ningbo Communication Engineering Construction Group Co.,Ltd.

Patentee before: Ningbo Traffic Construction Engineering Test Center Co., Ltd.

TR01 Transfer of patent right