CN102507248B CN 201110353263 CN201110353263A CN102507248B CN 102507248 B CN102507248 B CN 102507248B CN 201110353263 CN201110353263 CN 201110353263 CN 201110353263 A CN201110353263 A CN 201110353263A CN 102507248 B CN102507248 B CN 102507248B
Authority
CN
China
Prior art keywords
bearing
nothing
curve
theoretical
comes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110353263
Other languages
English (en)
Other versions
CN102507248A (zh
Inventor
周正茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TONGHAO CIVIL ENGINEERING CONSULTING CO LTD
Tongna Testing & Certification Group Co ltd
Original Assignee
Shanghai Tonghao Civil Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tonghao Civil Engineering Consulting Co Ltd filed Critical Shanghai Tonghao Civil Engineering Consulting Co Ltd
Priority to CN 201110353263 priority Critical patent/CN102507248B/zh
Publication of CN102507248A publication Critical patent/CN102507248A/zh
Application granted granted Critical
Publication of CN102507248B publication Critical patent/CN102507248B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种测试桥梁支座是否脱空的方法,利用位移测量装置,在分级加载过程中测量支座上、下接触面之间的距离变化;根据现场试验所得到的理论支反力增量-实测相对位移曲线,并结合无支座情况下的理论相对位移计算曲线,可判断桥梁支座是否脱空。如果理论支反力增量-实测相对位移曲线中出现斜率增大的拐点,则表明在拐点处的荷载作用下,支座发生脱空;如果理论支反力增量-实测相对位移曲线未出现拐点,且实测曲线斜率与理论曲线斜率的比值小于某一界限,则表明支座没有脱空;否则表明支座在试验前已脱空。本发明方案简单、易于实施,无需在施工期间提前安装传感器,无需顶升桥梁,测试精度高,特别适用于在役桥梁的支座脱空测试。

Description

一种测试桥梁支座是否脱空的方法
技术领域
本发明涉及一种测试桥梁支座是否脱空的方法。属土木工程桥梁结构测试技术领域。
背景技术
桥梁支座是桥梁中的重要构件,用于将上部结构的力传递到下部结构中,其受力特点是只能承受压力,不能承受拉力。如果支座上的压力消失,则表明该支座没有起到应有的作用,一方面,它改变了桥梁的受力形式,使桥梁没有处于设计中的受力状态;另一方面,支座脱空一般都是桥梁倾覆的先兆。支座脱空往往意味着桥梁处于失控的状态,应极力避免,否则桥梁结构的安全将受到威胁,因此,桥梁结构试验中时常会要求测试在使支座反力减小的测试荷载(以下简称测试荷载)作用下桥梁支座是否脱空。
检查桥梁支座是否脱空的方法一般有两种。一是压力传感器法,即在支座安装过程中,将传感器与支座上下放置,使传感器与支座承受同样的压力,通过传感器所受压力的变化来判断支座是否脱空,如果在加载过程中,传感器压力减小为0,则表明支座已脱空。该法要求压力传感器应在支座安装时一并安装,所以,对于已建成的桥梁,压力传感器法不适用。另一种方法可称之为刀片法,即在最不利荷载作用下,用很薄的物体探入支座与桥梁之间,如能通过,则表示支座已经脱空。该法要求探入的物体很薄,一般采用刀片,所以称之为刀片法。由于支座和桥梁均为表面粗糙的物体,若刀片能探入,则表明桥梁与支座之间的缝隙已远超刀片本身的厚度。反之,若刀片不能探入,并不能说明支座没有脱空。所以,刀片法有一定的滞后性,由于支座在压力作用下的变形本来就不大,这种滞后性带来的误差还是相当可观的。
目前的在役桥梁,基本上都没有事先安装过压力传感器,如需安装,则要对桥梁顶升以腾出操作空间后才能安装。顶升不仅花费巨大,而且对桥梁结构来说还存在一定的风险,操作不当会导致桥梁开裂。而刀片法由于误差较大,测试结果往往没有说服力。因此,开发一种无需在施工期间事先安装传感器且具有较高灵敏度的测试方法,以解决在役桥梁支座脱空的测试问题,是非常必要的。
发明内容
本发明公开了一种测试在役桥梁在测试荷载作用下支座是否脱空的方法,其目的在于克服传统的传感器测试方法需要顶升桥梁、花费巨大且可能给桥梁结构带来巨大风险,采用刀片法测试则误差太大等弊端。本发明技术方案不仅简单易行,而且测试精度高、无需顶升桥梁,易于推广。
理论研究证明:某支座脱空时,相当于桥梁在该处无支座。桥梁在有支座和无支座情况下的变形规律是不同的,一般来说,由于支座刚度很大,在单位荷载作用下,有支座的梁在支座位置处的变形是很小的,而当支座脱空时,支座处的变形将成倍放大,一般会超过10倍。
支座在正常使用荷载范围内表现为较好的弹性特征,在加载和卸载过程中,其变形规律是可逆的。对支座脱空工况施加测试荷载,相当于对支座实施卸载。因此,对尚未脱空的支座施加测试荷载时,理论支反力增量-实测相对位移曲线会先经历曲线斜率较小的过程,在支座脱空后,曲线斜率将成倍增加,理论支反力增量-实测相对位移曲线出现斜率增大的拐点。
对于本来就已脱空的支座或施加测试荷载过程中一直没有脱空的支座,其理论支反力增量-实测相对位移曲线不会出现明显的拐点,此时,可结合无支座情况下的理论支反力增量-理论相对位移曲线,依据实测曲线斜率与理论曲线斜率的比值,判断支座是否脱空。
为实现上述目的,本发明采用如下技术方案:
1、一种测试桥梁支座是否脱空的方法,其特征在于:按照如下步骤进行:
A)在支座上接触面与支座下接触面之间设置位移测量装置;
B)在桥面上布置测试荷载,将该荷载分级,并计算在各级测试荷载作用下该支座处的理论支反力增量;
C)测量在各级测试荷载作用下支座上接触面与支座下接触面的相对位移,并绘制理论支反力增量-实测相对位移曲线;
D)计算在各级测试荷载作用下支座上接触面与支座下接触面的相对位移,并绘制理论支反力增量-理论相对位移曲线;
E)根据实测曲线斜率与理论曲线斜率的关系,判断支座是否脱空:
(1)如理论支反力增量-实测位移曲线出现明显拐点,则表明在拐点处理论支反力增量所对应的荷载作用下,支座发生脱空;
(2)如理论支反力增量-实测位移曲线未出现明显拐点,可结合无支座情况下的理论支反力增量-理论相对位移曲线,判断支座是否脱空,若实测曲线斜率与理论曲线斜率的比值小于某一界限,则说明支座没有脱空;否则说明支座在试验前已脱空。
所述的位移测量装置一般是千分表、百分表或5mm以下的小量程位移计,其最小分辨率须达到0.02mm。
所述的测试荷载指可使支座反力减小的荷载。
所述的荷载分级不少于4级。
所述的明显拐点是指该点前与该点后的斜率之比小于1:3。
所述的实测曲线斜率与理论曲线斜率比值界限为0.2。
本发明所述的荷载分级是指:将测试荷载分多次施加,例如当测试荷载为4辆汽车时,可分4次,每次施加一辆汽车的重量。
本发明最大的优点和积极效果是:
(1)方案简单、易于实施,无需在桥梁架设的当初安装传感器,也无需在测试桥梁支座是否脱空时顶升桥梁,安装传感器,因此特别适用于在役桥梁的支座脱空测试;
(2)有无支座的理论支反力增量-实测相对位移曲线斜率差别大,根据该曲线斜率很容易辨别支座是否脱空,测试精度高;
(3)对支座类型和支座环境无限制,即使支座被覆盖、遮挡,也可以在支座周围安装位移传感器测试,适用范围广。
附图说明
图1为本发明测试方案示意图;
图2为本发明测试结果示意图。
图1中:1.被测试支座,2.测试荷载,3.支座上接触面,4.支座下接触面,5.千分表。
图2中:I.支座一直未脱空,II.支座在试验中脱空,III.支座在试验前脱空。
具体实施方式
以下结合附图和实施例对本发明进行详细说明,但本实施例并不用于限制本发明,凡是采用本发明的相似结构和方法及其相似变化,均应列入本发明的保护范围。
某两跨连续钢箱梁桥,如图1所示:三个桥墩上各布置有支座。理论计算结果表明,边墩支座反力较小。把边墩支座视为被测试支座1,本实施例的目标是测试在荷载作用下,被测试支座1是否脱空。使用的位移测量装置是千分表5。
首先在支座上接触面3和支座下接触面4之间安装千分表5。分别记录每级加载的荷载吨位和千分表5的相应读数,并结合所施加的荷载计算理论支反力增量,绘出理论支反力增量-实测相对位移曲线。
为得到三种不同类型的曲线,试验分三次进行,三次试验的荷载采用累加的方式施加,即后一次试验在前一次试验荷载的基础上继续施加。三次试验所施加的荷载将使支座经历从不脱空到脱空的过程,三次试验中分别将测试荷载分为4级、8级和4级,每级荷载所对应的支反力增量分别为-50kN、-25kN和-50kN。为方便比较,在数据处理时,将三次试验的初始理论支反力增量和初始相对位移均设为0。
测试得到的理论支反力增量-实测相对位移曲线出现如图2所示的3种形式。可以看出曲线II明显是由两段斜率不同的线段组成,其中,左边线段的斜率要远小于右边线段,斜率比约为1:6,小于1:3,表明支座脱空发生在试验过程中,根据曲线拐点所对应的横坐标可推算脱空发生时所施加的荷载。曲线III的斜率未发生明显的变化,未出现拐点,但曲线斜率接近于支座脱空情况下的理论曲线斜率,表明试验前支座就已经脱空了。曲线I的斜率也未发生明显的变化,未出现拐点,且曲线斜率远小于支座脱空情况下的理论曲线斜率,斜率比约为0.17,小于0.2,表明试验过程中支座一直未脱空。

Claims (6)

1.一种测试桥梁支座是否脱空的方法,其特征在于:按照如下步骤进行:
A)在支座上接触面与支座下接触面之间设置位移测量装置;
B)在桥面上布置测试荷载,将该荷载分级,并计算在各级测试荷载作用下该支座处的理论支反力增量;
C)测量在各级测试荷载作用下支座上接触面与支座下接触面的相对位移,并绘制理论支反力增量-实测相对位移曲线;
D)计算在各级测试荷载作用下支座上接触面与支座下接触面的相对位移,并绘制理论支反力增量-理论相对位移曲线;
E)根据实测曲线斜率与理论曲线斜率的关系,判断支座是否脱空:
(1)如理论支反力增量-实测位移曲线出现明显拐点,则表明在拐点处理论支反力增量所对应的荷载作用下,支座发生脱空;
(2)如理论支反力增量-实测位移曲线未出现明显拐点,可结合无支座情况下的理论支反力增量-理论相对位移曲线,判断支座是否脱空,若实测曲线斜率与理论曲线斜率的比值小于某一界限,则说明支座没有脱空;否则说明支座在试验前已脱空。
2.根据权利要求1所述的测试桥梁支座是否脱空的方法,其特征在于:所述的位移测量装置最小分辨率须达到0.02mm。
3.根据权利要求1所述的测试桥梁支座是否脱空的方法,其特征在于:所述的测试荷载是指可使支座反力减小的荷载。
4.根据权利要求1所述的测试桥梁支座是否脱空的方法,其特征在于:所述的荷载分级不少于4级。
5.根据权利要求1所述的测试桥梁支座是否脱空的方法,其特征在于:所述的明显拐点是指该点前与该点后的斜率之比小于1:3。
6.根据权利要求1所述的测试桥梁支座是否脱空的方法,其特征在于:所述的实测曲线斜率与理论曲线斜率比值界限为0.2。
CN 201110353263 2011-11-09 2011-11-09 一种测试桥梁支座是否脱空的方法 Active CN102507248B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110353263 CN102507248B (zh) 2011-11-09 2011-11-09 一种测试桥梁支座是否脱空的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110353263 CN102507248B (zh) 2011-11-09 2011-11-09 一种测试桥梁支座是否脱空的方法

Publications (2)

Publication Number Publication Date
CN102507248A CN102507248A (zh) 2012-06-20
CN102507248B true CN102507248B (zh) 2013-12-18

Family

ID=46219355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110353263 Active CN102507248B (zh) 2011-11-09 2011-11-09 一种测试桥梁支座是否脱空的方法

Country Status (1)

Country Link
CN (1) CN102507248B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458401A (zh) * 2014-12-12 2015-03-25 广西科技大学 一种连续梁试验方法
CN104502076B (zh) * 2014-12-12 2017-02-22 广西科技大学 一种连续梁塑性力试验中应变片的布置方法
CN113252260B (zh) * 2021-06-24 2021-09-21 湖南大学 基于间接模态识别的桥梁支座病害检测方法及相关组件
CN113701712B (zh) * 2021-08-09 2024-02-02 广州建设工程质量安全检测中心有限公司 一种检测桥梁与支座脱空时主梁倾斜度的方法及装置
CN115060523B (zh) * 2022-08-17 2022-11-29 山东大学 一种桥梁支座损伤检测方法、系统、存储介质及设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2836035Y (zh) * 2005-11-29 2006-11-08 李云峰 桥梁支座检查镜
KR100726164B1 (ko) * 2006-03-15 2007-06-13 주식회사 에스코알티에스 부반력저항탄성재를 갖는 교좌장치
CN201193310Y (zh) * 2008-01-02 2009-02-11 李云峰 可测力的板式橡胶支座
CN102095539A (zh) * 2010-11-23 2011-06-15 北京铁科首钢轨道技术有限公司 一种自调高多向智能测力支座

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3585580B2 (ja) * 1995-06-09 2004-11-04 オイレス工業株式会社 橋梁における弾性支持構造
KR100635137B1 (ko) * 2004-11-08 2006-10-17 주식회사 효성엘비데크 교량 슬래브 시공방법 및 그에 적용되는 래티스바아데크형 피씨플레이트
KR100930805B1 (ko) * 2008-08-08 2009-12-09 성균관대학교산학협력단 거더 시험용 비틀림 장치

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2836035Y (zh) * 2005-11-29 2006-11-08 李云峰 桥梁支座检查镜
KR100726164B1 (ko) * 2006-03-15 2007-06-13 주식회사 에스코알티에스 부반력저항탄성재를 갖는 교좌장치
CN201193310Y (zh) * 2008-01-02 2009-02-11 李云峰 可测力的板式橡胶支座
CN102095539A (zh) * 2010-11-23 2011-06-15 北京铁科首钢轨道技术有限公司 一种自调高多向智能测力支座

Non-Patent Citations (9)

* Cited by examiner, † Cited by third party
Title
JP特开平8-333717A 1996.12.17
刘宗海.矩形板、空心板梁支座脱空分析及施工控制措施.《东北公路》.2002,第25卷(第2期),
某钢箱梁桥支座脱空原因分析及处治;陈福斌等;《中外公路》;20100831;第30卷(第4期);第149-152页 *
滑动支座竖向动反力对桥梁结构动力性能的影响;聂利英等;《同济大学学报》;20021130;第30卷(第11期);第1290-1294页 *
皮天祥等.钢筋混凝土连续梁支反力增量相关方程的计算.《重庆大学学报(自然科学版)》.2005,第28卷(第7期),第98-101页.
矩形板、空心板梁支座脱空分析及施工控制措施;刘宗海;《东北公路》;20021231;第25卷(第2期);第85-86页 *
聂利英等.滑动支座竖向动反力对桥梁结构动力性能的影响.《同济大学学报》.2002,第30卷(第11期),第1290-1294页.
钢筋混凝土连续梁支反力增量相关方程的计算;皮天祥等;《重庆大学学报(自然科学版)》;20050731;第28卷(第7期);第99-101页 *
陈福斌等.某钢箱梁桥支座脱空原因分析及处治.《中外公路》.2010,第30卷(第4期),

Also Published As

Publication number Publication date
CN102507248A (zh) 2012-06-20

Similar Documents

Publication Publication Date Title
CN102507248B (zh) 一种测试桥梁支座是否脱空的方法
CN106959248B (zh) 一种混凝土试件损伤裂缝检测试验方法
Sah et al. Estimating bolt tightness using transverse natural frequencies
CN110502856B (zh) 支座反力影响线曲率的连续梁损伤识别方法
Zheng et al. Investigation of measurability and reliability of adhesive-bonded built-in fiber Bragg grating sensors on steel wire for bridge cable force monitoring
CN102393330B (zh) 一种测试结合面切向刚度特性的装置
CN110502855B (zh) 支座反力影响线曲率的等截面连续梁损伤识别方法
CN110487496B (zh) 基于长标距应变的改进弯矩面积法识别桥梁挠度方法
CN102928145B (zh) 预应力混凝土桥梁绝对应力检测方法
CN102621220A (zh) 钢箱梁桥顶板-纵肋焊接细节的剩余使用寿命预测方法
CN103940626A (zh) 在役正交异性钢桥面板疲劳开裂后剩余使用寿命评估方法
CN212007614U (zh) 一种基于反拉法的竖向有效预应力检测装置
CN201707261U (zh) 组合式多功能平板载荷测试仪
CN101672707B (zh) 一种船舶对闸墙碰擦力测试方法
CN109060352A (zh) 轴系的轴承负荷测试工艺
CN105352433A (zh) 一种船体典型焊接结构表面裂纹深度及形状测量装置及其方法
CN102156097A (zh) 钢-混凝土界面剪力传递试验装置
CN108760114B (zh) 一种铁路轨道轮轨力的测量方法及装置
Gillham et al. Measuring support reactions and damage detection in steel beams using distributed strain sensing
CN112816115B (zh) 内置式浮置板道床中弹性隔振器的受力检测方法及测量工具
CN104005432A (zh) 竖直-水平向复合荷载下桩基础静载试验装置和方法
CN109238606A (zh) 一种适用于桥梁主梁的荷载检测装置及其测算方法
RU2730737C1 (ru) Шинно-рельсовый стенд для статических испытаний
CN108760108A (zh) 基于应力测试技术的起重机轮压检测方法
CN202214716U (zh) 平板载荷测试仪

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170301

Address after: 200331 Gulang Road, Shanghai, Lane No. 415, Lane 6, No.

Patentee after: SHANGHAI TONGNA CONSTRUCTION ENGINEERING QUALITY TESTING Co.,Ltd.

Address before: 200092 Chifeng Road, Shanghai, room 65, No. 613, room

Patentee before: SHANGHAI TONGHAO CIVIL ENGINEERING CONSULTING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20170327

Address after: 200092 room 1701-1704, building 63, Chifeng Road, Shanghai, Yangpu District, 31

Patentee after: SHANGHAI TONGHAO CIVIL ENGINEERING CONSULTING Co.,Ltd.

Patentee after: SHANGHAI TONGNA CONSTRUCTION ENGINEERING QUALITY TESTING Co.,Ltd.

Address before: 200331 Gulang Road, Shanghai, Lane No. 415, Lane 6, No.

Patentee before: SHANGHAI TONGNA CONSTRUCTION ENGINEERING QUALITY TESTING Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 200092 rooms 1701-1704, building 31, No.63 Chifeng Road, Yangpu District, Shanghai

Patentee after: SHANGHAI TONGHAO CIVIL ENGINEERING CONSULTING Co.,Ltd.

Patentee after: Tongna testing & Certification Group Co.,Ltd.

Address before: 200092 rooms 1701-1704, building 31, No.63 Chifeng Road, Yangpu District, Shanghai

Patentee before: SHANGHAI TONGHAO CIVIL ENGINEERING CONSULTING Co.,Ltd.

Patentee before: SHANGHAI TONGNA CONSTRUCTION ENGINEERING QUALITY TESTING Co.,Ltd.

CP01 Change in the name or title of a patent holder