CN102506722A - 一种冻结壁位移测试方法 - Google Patents
一种冻结壁位移测试方法 Download PDFInfo
- Publication number
- CN102506722A CN102506722A CN2011103690236A CN201110369023A CN102506722A CN 102506722 A CN102506722 A CN 102506722A CN 2011103690236 A CN2011103690236 A CN 2011103690236A CN 201110369023 A CN201110369023 A CN 201110369023A CN 102506722 A CN102506722 A CN 102506722A
- Authority
- CN
- China
- Prior art keywords
- displacement
- reflective mirror
- measurement device
- distance measurement
- freezing wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Length Measuring Devices By Optical Means (AREA)
Abstract
本发明涉及一种冻结壁位移测试方法。主要解决现有的冻结壁位移测试方法精度低及不可连续测试等问题。其特征在于包括以下步骤:(一)在开挖到本段高1/4~1/2时在井帮上埋入固定销;(二)把激光测距装置及反光镜固定在相对的两个固定销上;(三)人工调试激光测距装置,让其对准反光镜后自动巡检,筛选出距离最大的数值;(四)设定测试频率,自动采集激光测距仪与反光镜之间的距离并存储;(五)待绑扎钢筋落模板前将测距装置及反光镜取下;(六)对采集数据进行处理分析。该冻结壁位移测试方法利用自动采集系统进行数据采集,在实施过程中只在一个固定点处进行布设测点,减小了对正常掘砌施工的影响,且相对测试精度较高。
Description
技术领域
本发明涉及煤炭工程技术领域,具体的说是一种冻结壁位移测试方法。
背景技术
随着我国浅部煤炭资源的枯竭,新建矿井多具有穿越冲积层厚、地压大、地质条件复杂等特点,冻结法凿井成为穿过深厚冲积层最主要的特殊凿井方法。冻结法凿井是采用人工制冷技术暂时加固不稳定地层和隔绝地下水的特殊施工方法,先在将要开凿的井筒周围形成不透水的且能抵抗一定压力的冻结帷幕(简称冻结壁),并在冻结壁的保护下安全地进行井筒掘砌工作。深部厚粘土层特征是冻结强度低,冻结壁位移大,不合理的控制冻结壁位移,会造成冻结壁位移过大,造成冻结壁失稳,导致冻结管断裂等事故。因此,进行冻结壁位移监测,目的在于掌握冻结壁位移随时间的变化规律,为合理的确定掘进段高和掘进时间提供依据。
目前冻结壁位移测试主要有两种方法:重锤吊挂钢尺法,数显收敛计监测法。重锤吊挂钢尺法是采用重锤掉挂在刃脚上,在井帮上置入钢钉或者销子,用钢板尺量出井帮至垂线的距离,间隔一段时间再次测量出井帮至垂线的距离,两次测量的差值即为该点单边位移。采用重锤悬吊法测试能测出任何方向上的单边位移,但是在井下由于施工环境较恶劣,不确定因素较多,每次挂重锤位置必须相同、每次测量时钢板尺一端必须靠在钢钉或者销子上次测量的位置,以及测试人员人为误差,造成此方法测试精度不高;采用数显收敛计测试时可以量测井筒直径方向上冻结壁的收敛位移,然后平均到两边算出单边径向位移,得到的为单边平均位移速率。该测试方法精确度高,能精确到百分之一毫米,但该测试方法需停止掘砌施工、需提升系统配合、不可连续测试操作。并且由于在井筒直径上对数显收敛计钢尺施加一定的力,人员走动及罐桶提升等都有可能碰到钢尺,容易造成尺断伤人。
发明内容
为了克服现有技术中上述的不足,本发明提供一种冻结壁位移测试方法,该冻结壁位移测试方法利用自动采集系统进行数据采集,在实施过程中只在一个固定点处进行布设测点,减小了对正常掘砌施工的影响,且相对测试精度较高。
本发明的技术方案是:一种冻结壁位移测试方法,其特征在于包括以下步骤:(一)、在开挖到本段高的1/4~1/2时在井帮上埋入固定销;(二)、把激光测距装置及反光镜固定在相对的两个固定销上;(三)、人工调试激光测距装置,让其对准反光镜后自动巡检,筛选出距离最大的数值;(四)、设定测试频率,自动采集激光测距仪与反光镜之间的距离并存储;(五)、待绑扎钢筋落模板前将测距装置及反光镜取下;(六)、对采集数据进行处理分析。
上述步骤(一)中,在井帮的四个面均埋入固定销。
所述的反光镜为凹面镜。
上述步骤(六)中对采集的数据进行提取,将时间和测试的距离绘制成曲线看收敛位移趋势,根据测试数据计算出累计位移速率乘以掘砌本段高所用时间得到可能最大位移。
本发明具有如下有益效果:由于采取上述方案,本发明将激光测距装置及反光镜安装在井帮上的固定销上,通过激光测距装置对反光镜反射的光进行处理,从而得出冻结壁位移。该测试方法由于采用自动采集系统进行数据采集,可以采集较多数据来分析冻结壁的位移规律,在实施过程中只在一个固定点处进行布设测点,减小了对正常掘砌施工的影响,且相对测试精度较高,测试精度0.1mm。
附图说明:
图1是本发明中测距装置及反光镜安装示意图。
图中1-左固定销,2-左接头,3-激光测距装置,4-反光镜,5-右接头,6-右固定销。
具体实施方式:
下面结合附图对本发明作进一步说明:
由图1所示,一种冻结壁位移测试方法,其特征在于包括以下步骤:(一)、在开挖到本段高1/4~1/2时在井帮上埋入左固定销1及右固定销6,为测量冻结壁四个方向的位移,则需要在井帮四个方向上均进入固定销;(二)、把激光测距装置3通过左接头2固定在左固定销1上,反光镜4通过右接头5固定右固定销6上,且左固定销1和右固定销6相对,如果四个井帮上均有固定销,则每组激光测距装置3和反光镜4相对;(三)、人工调试激光测距装置3,让其对准反光镜4后自动巡检,筛选出距离最大的数值;(四)、设定测试频率,自动采集激光测距仪与反光镜之间的距离并存储;(五)、待凿井单位绑扎钢筋落模板前将激光测距装置3及反光镜4取下;(六)、对采集的数据进行提取,将时间和测试的距离绘制成曲线看收敛位移趋势,根据测试数据计算出累计位移速率乘以掘砌本段高所用时间得到可能最大位移,单边径向位移为收敛位移的一半,看单边径向位移是否超过50mm(规范规定值)来判断冻结壁是否处于稳定状态,是否需要采取措施。
本方法所应用的激光测距装置为常用的装置,在此应用于冻结壁收敛位移测试上,可以自动采集数据;上述的固定销的接头可旋转,从而使激光测距装置可以旋转自动巡检,来进行筛选出距离最大的数值并存储数据,固定销的长度以20mm为宜;上述的反光镜4为凹面镜。
下面通过具体实施例对本发明进行说明:
由表中可以看出,其中实施例一的单边径向位移为27.10/2=13.55,实施例三的单边径向位移为13.44/2=6.72,均小于50mm,因此可以判断,冻结壁处于稳定状态;
实施例二的单边径向位移为76.17/2=38.09,虽然小于50mm,但考虑到径向位移速率为2.2mm/h,50/2.2=22.73,因此从开挖至浇筑混凝土不应超过22.73h,如超过22.73h则需要采取措施来控制冻结壁位移。
以上所述,仅为本发明较佳的具体实施方式,这些具体实施方式都是基于本发明整体构思下的不同实现方式,而且本发明的保护范围并不局限于此,本领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。
Claims (4)
1.一种冻结壁位移测试方法,其特征在于包括以下步骤:(一)、在开挖到本段高1/4~1/2时在井帮上埋入固定销;(二)、把激光测距装置及反光镜固定在相对的两个固定销上;(三)、人工调试激光测距装置,让其对准反光镜后自动巡检,筛选出距离最大的数值;(四)、设定测试频率,自动采集激光测距仪与反光镜之间的距离并存储;(五)、待绑扎钢筋落模板前将测距装置及反光镜取下;(六)、对采集数据进行处理分析。
2.根据权利要求1所述的冻结壁位移测试方法,其特征在于:上述步骤(一)中,在井帮的四个面均埋入固定销。
3.根据权利要求2所述的冻结壁位移测试方法,其特征在于:所述的反光镜为凹面镜。
4.根据权利要求2或3所述的冻结壁位移测试方法,其特征在于:上述步骤(六)中对采集的数据进行提取,将时间和测试的距离绘制成曲线看收敛位移趋势,根据测试数据计算出累计位移速率乘以掘砌本段高所用时间得到可能最大位移。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103690236A CN102506722A (zh) | 2011-11-21 | 2011-11-21 | 一种冻结壁位移测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103690236A CN102506722A (zh) | 2011-11-21 | 2011-11-21 | 一种冻结壁位移测试方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102506722A true CN102506722A (zh) | 2012-06-20 |
Family
ID=46218830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103690236A Pending CN102506722A (zh) | 2011-11-21 | 2011-11-21 | 一种冻结壁位移测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102506722A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108489412A (zh) * | 2018-04-17 | 2018-09-04 | 中国矿业大学(北京) | 一种新型斜井冻结壁变形监测装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001108592A (ja) * | 1999-10-12 | 2001-04-20 | Taisei Corp | 地盤の密度の測定方法 |
CN2876707Y (zh) * | 2005-12-30 | 2007-03-07 | 中国神华能源股份有限公司 | 地下岩移的监测装置 |
CN101251371A (zh) * | 2008-04-14 | 2008-08-27 | 中铁西南科学研究院有限公司 | 一种激光准直tbm隧道净空位移监测方法 |
CN101520312A (zh) * | 2008-02-25 | 2009-09-02 | 佳能株式会社 | 位移检测装置及具有该位移检测装置的光学仪器 |
CN102072704A (zh) * | 2010-11-11 | 2011-05-25 | 清华大学 | 用于水泥基材料的非接触式激光位移测量系统 |
CN201983767U (zh) * | 2011-01-24 | 2011-09-21 | 张雪轮 | 一种桥梁形变检测系统 |
CN102221334A (zh) * | 2011-04-15 | 2011-10-19 | 中铁隧道集团有限公司 | 一种用于隧道工程中准确测量围岩内部位移的方法 |
-
2011
- 2011-11-21 CN CN2011103690236A patent/CN102506722A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001108592A (ja) * | 1999-10-12 | 2001-04-20 | Taisei Corp | 地盤の密度の測定方法 |
CN2876707Y (zh) * | 2005-12-30 | 2007-03-07 | 中国神华能源股份有限公司 | 地下岩移的监测装置 |
CN101520312A (zh) * | 2008-02-25 | 2009-09-02 | 佳能株式会社 | 位移检测装置及具有该位移检测装置的光学仪器 |
CN101251371A (zh) * | 2008-04-14 | 2008-08-27 | 中铁西南科学研究院有限公司 | 一种激光准直tbm隧道净空位移监测方法 |
CN102072704A (zh) * | 2010-11-11 | 2011-05-25 | 清华大学 | 用于水泥基材料的非接触式激光位移测量系统 |
CN201983767U (zh) * | 2011-01-24 | 2011-09-21 | 张雪轮 | 一种桥梁形变检测系统 |
CN102221334A (zh) * | 2011-04-15 | 2011-10-19 | 中铁隧道集团有限公司 | 一种用于隧道工程中准确测量围岩内部位移的方法 |
Non-Patent Citations (2)
Title |
---|
吕康成等: "《岩土工程位移实时监测系统研究》", 《公路》 * |
张开顺等: "《某井筒冻结壁径向位移规律计算研究》", 《2005全国矿山建设学术会议论文集(上册)》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108489412A (zh) * | 2018-04-17 | 2018-09-04 | 中国矿业大学(北京) | 一种新型斜井冻结壁变形监测装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106405675B (zh) | 用于露天矿坑尾矿库边坡滑坡预警的动态监测方法 | |
CN108489435B (zh) | 对井壁进行监测的钢弦式传感器系统和变形预警的方法 | |
CN104613885B (zh) | 一种隧道内管道监测预警系统 | |
CN102829728A (zh) | 边坡、滑坡综合监测系统 | |
CN108960621A (zh) | 一种盾构隧道施工下穿高铁桥梁的桥梁监测与评价方法 | |
CN204177381U (zh) | 一种光纤光栅测斜仪器 | |
CN103257644A (zh) | 一种尾矿库安全状态在线监测方法 | |
CN108180885B (zh) | 一种隧道变形自动监测系统及监测方法 | |
CN105091951A (zh) | 一种闸站水工建筑物变形监测及状态预警方法 | |
CN103017673A (zh) | 隧道围岩变形实时连续监测报警方法 | |
CN213092515U (zh) | 一种基于边坡内部应力应变监控的滑坡监测与预警系统 | |
CN111946356B (zh) | 超长距离硬岩顶管施工方法 | |
CN109184709B (zh) | 一种盾构设备施工出渣监控管理系统及方法 | |
CN103759706B (zh) | 矿山溜井三维测量方法及测量装置 | |
CN109405880A (zh) | 一种浅部采空区地表与地下相结合监测预警系统及方法 | |
CN103994846A (zh) | 围岩应力场分布测试装置及方法 | |
CN102979071A (zh) | 深基坑受力稳定性远程智能监测及三维预警方法与系统 | |
CN209355903U (zh) | 堆石坝堆石体机械式沉降变形监测新系统 | |
CN202869442U (zh) | 边坡、滑坡综合监测系统 | |
Fuławka et al. | Monitoring of the stability of underground workings in Polish copper mines conditions | |
CN105043611B (zh) | 一种膨胀土侧向膨胀力原位测试装置 | |
CN113188517A (zh) | 用于滑坡探井内深部岩体变形的监测系统及数据处理方法 | |
CN109184802A (zh) | 一种大断面多导洞隧道信息化监测施工方法 | |
CN113591347A (zh) | 一种高边坡施工过程中动态监测方法及预警系统 | |
CN109556524A (zh) | 基于光纤光栅技术的裂缝宽度监测系统及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120620 |