CN102505677A - Method for controlling sedimentation through recharging engineering groundwater - Google Patents

Method for controlling sedimentation through recharging engineering groundwater Download PDF

Info

Publication number
CN102505677A
CN102505677A CN2011102953253A CN201110295325A CN102505677A CN 102505677 A CN102505677 A CN 102505677A CN 2011102953253 A CN2011102953253 A CN 2011102953253A CN 201110295325 A CN201110295325 A CN 201110295325A CN 102505677 A CN102505677 A CN 102505677A
Authority
CN
China
Prior art keywords
groundwater
recharging
engineering
recharge
underground water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102953253A
Other languages
Chinese (zh)
Inventor
朱雁飞
潘伟强
沈尉
裴烈烽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tunnel Engineering Co Ltd
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN2011102953253A priority Critical patent/CN102505677A/en
Publication of CN102505677A publication Critical patent/CN102505677A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for controlling sedimentation through recharging engineering groundwater, comprising the following steps of: establishing a plurality of recharging working wells; ejecting a preset pipe to establish a recharging pipe; pumping groundwater in a dewatering well, meanwhile, carrying out purification treatment on the pumped groundwater, and recharging the groundwater to a water-bearing stratum. Due to the adoption of the method for controlling sedimentation through recharging engineering groundwater in the invention, high-flow groundwater recharge is realized, and groundwater pumping and recharging are kept balanced; and the method has the advantages of low cost, high efficiency, good sedimentation control effect and environment friendliness.

Description

The method of engineering groundwater recharge control sedimentation
Technical field
The present invention relates to a kind of method of controlling sedimentation, refer to a kind of method of engineering groundwater recharge control sedimentation especially.
Background technology
A large amount of exploiting groundwaters in China's commercial production, the engineering construction groundwater table occurred and have continued a series of serious problems such as decline, surface settlement at present; Wherein the underground construction dewatering construction has become the important channel of mining of groundwater.The problem that produces in order to improve mining of groundwater except controlling from the perspective of policy the mining of groundwater, measure such as can be taked to recharge and control.Generally speaking, groundwater recharge adopts pipe well to recharge, but existing pipe well diameter is less, and the single well reinjection amount is less, so the required recharge well quantity that sets is more, thereby cost has high input, and the amount of recharging of inaccessible design, and the control effect of settling is poor.
Summary of the invention
The objective of the invention is to overcome the defective of prior art; And provide a kind of engineering groundwater recharge to control the method for sedimentation; Realized the groundwater recharge of big flow, guaranteed groundwater mining and recharge and balance each other to have that cost is low, efficient is high, control that effect of settling is good, the advantage of environmental protection.
The technical scheme that realizes above-mentioned purpose is:
The method of a kind of engineering groundwater recharge control sedimentation of the present invention comprises the steps:
Set up a plurality of active wells that recharge;
The jacking present tube is set up and is recharged pipeline;
Extract the underground water in the precipitation well, simultaneously the underground water that has extracted is carried out purified treatment, and recharge to the aquifer.
Have plurality of through holes on the above-mentioned present tube, the inside and outside both sides of said through hole respectively are fixed with one first screen pack and one second screen pack, fill filtrate between said first screen pack and said second screen pack.
Above-mentioned present tube diameter is more than or equal to 2 meters.
Underground water in the above-mentioned extraction precipitation well carries out purified treatment to the underground water that has extracted simultaneously, and recharges to the aquifer and comprise the steps:
With the first water storage silo of the groundwater mining in the precipitation well;
Through strainer the underground water in the said first water storage silo is carried out purified treatment simultaneously, the underground water after the purified treatment is stored to one second water storage silo; And the underground water after the purified treatment in the second water storage silo recharged to the aquifer through the said pipeline that recharges.
Above-mentioned strainer is the filtration with manganese sand device.
The present invention has been owing to adopted above technical scheme, makes it have following beneficial effect to be:
Thereby owing to adopted large diameter present tube to realize that large diameter groundwater recharge pipeline has increased the amount of recharging of individual well; Promoted the efficient of recharging; Reduce required foundation and recharged the number of active well; Thereby reduced the cost of construction significantly, reduced the workload of engineering, improved the efficient of engineering.The underground water that has extracted is carried out purified treatment recharge again, prevented to recharge the problem that engineering pollutes quality of groundwater to the aquifer.Be fixed with double-layer filtering net on the through hole, when having guaranteed that the water in the present tube can recharge through through hole, prevented effectively that also the outside silt of present tube from getting in the pipe, causes the problem of prefabricated pipe pipeline blockage.Precipitation carries out with recharging synchronously in the engineering, has guaranteed groundwater mining and recharges and balance each other, and makes the drawdown that causes of drawing water go to zero, and has solved owing to causing the problem of stratum settlement for precipitation makes the groundwater table reduction in the engineering construction.
The specific embodiment
Below in conjunction with specific embodiment the present invention is described further.
The method of a kind of engineering groundwater recharge control sedimentation of the present invention comprises the steps:
Set up a plurality of active wells that recharge;
The jacking present tube is set up and is recharged pipeline, and the present tube diameter has plurality of through holes more than or equal to 2 meters on the present tube; The inside and outside both sides of through hole respectively are fixed with one first screen pack and one second screen pack; Fill filtrate between first screen pack and second screen pack, be fixed with double-layer filtering net on the through hole, when having guaranteed that the water in the present tube can recharge through through hole; Prevented effectively that also the outside silt of present tube from getting in the pipe, causes the problem of prefabricated pipe pipeline blockage.Thereby owing to adopted large diameter present tube to realize that large diameter groundwater recharge pipeline has increased the amount of recharging of individual well; Promoted the efficient of recharging; Reduce required foundation and recharged the number of active well; Thereby reduced the cost of construction significantly, reduced the workload of engineering, improved the efficient of engineering.With the first water storage silo of the groundwater mining in the precipitation well;
Through strainer the underground water in the first water storage silo is carried out purified treatment simultaneously, and the underground water after the purified treatment is stored to one second water storage silo; Underground water after the purified treatment in the second water storage silo is recharged to the aquifer through recharging pipeline.The underground water that has extracted is carried out purified treatment recharge again, prevented to recharge the problem that engineering pollutes quality of groundwater to the aquifer.Precipitation carries out with recharging synchronously in the engineering, has guaranteed groundwater mining and recharges and balance each other, and makes the drawdown that causes of drawing water go to zero, and has solved owing to causing the problem of stratum settlement for precipitation makes the groundwater table reduction in the engineering construction.
For example:
One underground five-layer structure, the dark 62m of space enclosing structure gets into top, aquifer, and excavation of foundation pit depth 32.88m establishes 8 roads and supports.Engineering is built the location space enclosing structure and is not cut off artesian aquifer, and next-door neighbour's structure has Building two high-rise, and bracing of foundation pit is close to bracing of foundation pit, and from main building 5.6m only recently, rail traffic station is with interval from the nearest 20m of foundation ditch; The relative settlement of track requires 2mm as requested, and control requires very high.Pumping test according to early stage; It is bigger to the influence of neighboring buildings, the face of land, light rail to take out artesian water; Thereby, under the situation of other term restriction, need of the influence of control dewatering confined water to surrounding enviroment; The cost that intercepts the precipitation influence owing to employing intensification space enclosing structure is too big, can only adopt the scheme of recharging to reduce influence.
At first, respectively be provided with one at the two ends of structure and recharge active well, recharge the active well plane and adopt circular.
Then, recharge installation jacking equipment in the active well, prefabricated pipe jacking to the other end is recharged active well, form the pipeline that recharges of a connection at one.2 meters of prefabricated pipe diameters, thick 25cm has plurality of through holes on the present tube, and the inside and outside both sides of through hole respectively are fixed with one first screen pack and one second screen pack, fill filtrate between first screen pack and second screen pack, and percent opening is controlled at about 20%.
Pass through the precipitation well again with the first water storage silo of the groundwater mining in the foundation ditch; Simultaneously through after two filtration with manganese sand device purified treatment; Extraction to one second water storage cylinder storage is deposited, and with the groundwater mining after the purified treatment in the second water storage silo to recharging active well, recharge to the aquifer through recharging pipeline; Thereby make the drawdown on structure limit go to zero, prevented that effectively groundwater table from reducing and causing the situation generation of stratum settlement.
More than combine embodiment that the present invention is specified, those skilled in the art can make the many variations example to the present invention according to above-mentioned explanation.Thereby some details among the embodiment should not constitute qualification of the present invention, and the scope that the present invention will define with appended claims is as protection scope of the present invention.

Claims (5)

1. the method for an engineering groundwater recharge control sedimentation is characterized in that, comprises the steps:
Set up a plurality of active wells that recharge;
The jacking present tube is set up and is recharged pipeline;
Extract the underground water in the precipitation well, simultaneously the underground water that has extracted is carried out purified treatment, and recharge to the aquifer.
2. the method for engineering groundwater recharge control sedimentation according to claim 1; It is characterized in that; Have plurality of through holes on the said present tube; The inside and outside both sides of said through hole respectively are fixed with one first screen pack and one second screen pack, fill filtrate between said first screen pack and said second screen pack.
3. the method for engineering groundwater recharge control sedimentation according to claim 1 and 2 is characterized in that said present tube diameter is more than or equal to 2 meters.
4. the method for engineering groundwater recharge according to claim 1 control sedimentation is characterized in that the underground water in the said extraction precipitation well carries out purified treatment to the underground water that has extracted simultaneously, and recharges to the aquifer and comprise the steps:
With the first water storage silo of the groundwater mining in the precipitation well;
Through strainer the underground water in the said first water storage silo is carried out purified treatment simultaneously, the underground water after the purified treatment is stored to one second water storage silo; And the underground water after the purified treatment in the second water storage silo recharged to the aquifer through the said pipeline that recharges.
5. the method for engineering groundwater recharge control sedimentation according to claim 4 is characterized in that said strainer is the filtration with manganese sand device.
CN2011102953253A 2011-09-29 2011-09-29 Method for controlling sedimentation through recharging engineering groundwater Pending CN102505677A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102953253A CN102505677A (en) 2011-09-29 2011-09-29 Method for controlling sedimentation through recharging engineering groundwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102953253A CN102505677A (en) 2011-09-29 2011-09-29 Method for controlling sedimentation through recharging engineering groundwater

Publications (1)

Publication Number Publication Date
CN102505677A true CN102505677A (en) 2012-06-20

Family

ID=46217804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102953253A Pending CN102505677A (en) 2011-09-29 2011-09-29 Method for controlling sedimentation through recharging engineering groundwater

Country Status (1)

Country Link
CN (1) CN102505677A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787606A (en) * 2012-08-10 2012-11-21 中国二冶集团有限公司 Protection method for ambient environment in processes of excavation and precipitation of foundation pit
CN102787611A (en) * 2012-08-10 2012-11-21 中国二冶集团有限公司 Precipitation method for excavation of foundation pit at collapsible loess region
CN103088836A (en) * 2012-12-15 2013-05-08 天津大学 Sedimentation control method for pumping water and performing reinjection in well casing simultaneously

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3690458B2 (en) * 1998-02-06 2005-08-31 清水建設株式会社 Ground improvement method
CN101126558A (en) * 2007-09-27 2008-02-20 成都建工建筑节能科技有限公司 Groundwater recharge method
CN101153759A (en) * 2007-08-04 2008-04-02 赵克飞 Groundwater recharging method for water resource heat pump type central air-conditioner
CN101298945A (en) * 2008-06-18 2008-11-05 刘娇娜 Ground water back pouring cyclic utilization method
KR100886117B1 (en) * 2008-11-24 2009-02-27 (주)휠탑 Natural sand filtering method and the apparatus for artifical groundwater of valley
CN201367577Y (en) * 2008-12-30 2009-12-23 上海长凯岩土工程有限公司 Groundwater recharge well
CN101608445A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of engineering underground raw water recharging method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3690458B2 (en) * 1998-02-06 2005-08-31 清水建設株式会社 Ground improvement method
CN101153759A (en) * 2007-08-04 2008-04-02 赵克飞 Groundwater recharging method for water resource heat pump type central air-conditioner
CN101126558A (en) * 2007-09-27 2008-02-20 成都建工建筑节能科技有限公司 Groundwater recharge method
CN101298945A (en) * 2008-06-18 2008-11-05 刘娇娜 Ground water back pouring cyclic utilization method
KR100886117B1 (en) * 2008-11-24 2009-02-27 (주)휠탑 Natural sand filtering method and the apparatus for artifical groundwater of valley
CN201367577Y (en) * 2008-12-30 2009-12-23 上海长凯岩土工程有限公司 Groundwater recharge well
CN101608445A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of engineering underground raw water recharging method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787606A (en) * 2012-08-10 2012-11-21 中国二冶集团有限公司 Protection method for ambient environment in processes of excavation and precipitation of foundation pit
CN102787611A (en) * 2012-08-10 2012-11-21 中国二冶集团有限公司 Precipitation method for excavation of foundation pit at collapsible loess region
CN102787606B (en) * 2012-08-10 2015-08-26 中国二冶集团有限公司 Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN103088836A (en) * 2012-12-15 2013-05-08 天津大学 Sedimentation control method for pumping water and performing reinjection in well casing simultaneously

Similar Documents

Publication Publication Date Title
CN108457285B (en) Ultra-deep pit-in-pit open type dewatering construction method
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN205063005U (en) Can carry out novel rainwater well that compensates to groundwater
CN1948639A (en) Water taking gallery of self flow type for underground reservoir
CN105178289A (en) Prefabricated downcast pipe pile in building foundation pit and use method thereof
CN102383437B (en) Well point positioned pumping tubular well and well point positioned pumping method
CN107542107A (en) The dome type piping lane built using the pavement underground space
CN203530996U (en) Multi-well-point combined type precipitation facility
CN102926378A (en) Conductive composite vacuum soft soil reinforcing prepressing method
CN110777828A (en) A strainer well for foundation ditch well casing precipitation construction
CN102705006B (en) Method for governing operating tunnel flood by adopting wellpoint dewatering method
CN102505677A (en) Method for controlling sedimentation through recharging engineering groundwater
CN101446107B (en) Layered drainage structure of underground powerhouse chamber of hydropower station in water-rich region and construction method thereof
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN105178343A (en) Device for conducting siphon drainage by means of drainage ditch
CN203768881U (en) Water seepage draining device for corridors of mountain and dam body
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
CN207131449U (en) Region of FuShui tunnel inverted arch discharge structure
CN102350150B (en) Filter pipe for suction and discharge of biogas-containing stratum gas
CN205894090U (en) Job site fire water cyclic utilization device
CN106988330A (en) Soft soil foundation is layered dewatering construction structure and construction method
CN211773801U (en) A strainer well for foundation ditch well casing precipitation construction
CN201809752U (en) Water supply and drainage system for plunge pool
CN101871210A (en) Electro-osmotic drainage method in construction of large-area deep foundation pit in sludge region with high water ratio
CN202055256U (en) Concentrated water diversion and drainage device for large-area water seepage slope surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120620