CN102493492B - Construction method for waterproof roll material on settlement joint - Google Patents

Construction method for waterproof roll material on settlement joint Download PDF

Info

Publication number
CN102493492B
CN102493492B CN201110405641.1A CN201110405641A CN102493492B CN 102493492 B CN102493492 B CN 102493492B CN 201110405641 A CN201110405641 A CN 201110405641A CN 102493492 B CN102493492 B CN 102493492B
Authority
CN
China
Prior art keywords
building
steel pipe
construction
waterproof roll
earth anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110405641.1A
Other languages
Chinese (zh)
Other versions
CN102493492A (en
Inventor
田利涛
曹新飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Beijing Tianrun Construction Co Ltd
Original Assignee
China 22MCC Group Corp Ltd
Beijing Tianrun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd, Beijing Tianrun Construction Co Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201110405641.1A priority Critical patent/CN102493492B/en
Publication of CN102493492A publication Critical patent/CN102493492A/en
Application granted granted Critical
Publication of CN102493492B publication Critical patent/CN102493492B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a construction method for a waterproof roll material on a settlement joint in the building construction field. the method comprises the following steps: embedding two rows of ground anchors used for fixing a longitudinal steel pipe when the first-floor structure of a main building is constructed; causing the longitudinal steel pipe to extend out of the edge of the structure for 300mm; laterally adding one path of steel pipe on a second row of ground anchor; when an auxiliary building base cushion ply is constructed, embedding one row of auxiliary building ground anchor corresponding to the position of the main building ground anchor; installing fixed rigging turnbuckles in front of and in the back of an interval between the steel pipe of the main building and the edge of the structure; after the basement outer wall waterproof roll material of the main building is constructed, installing a bracing wire connected with the rigging; after the bracing wire is tightly braced, installing a polyphenyl plate, smearing and sticking a mortar layer, and carrying out the waterproof roll material construction on the outer wall of the auxiliary building as well as the protection layer and auxiliary building structure construction; and after the underground wall body of the auxiliary building is constructed, removing the fixed rigging turnbuckles and the lateral and longitudinal steel pipes of the main building. If construction is carried out with the method, the waterproof effect of the settlement joint is obvious without leaking water, and the method is simple and has low construction cost.

Description

The construction method of waterproof roll material on settlement joint
Technical field
The present invention relates to a kind of construction method of the realm of building construction waterproof roll, specifically
A kind of construction method of waterproof roll material on settlement joint.
Background technology
In our daily construction, designers usually design main building, auxiliary building, general auxiliary building one or both sides are against main building, the present invention is directed to Shi Fu building one side against main building, there is long 42m centre, wide 0.1m, the settlement joint of high 6m, main building F3/B3, foundation ditch dark (15.6m), 20 layers on the ground, auxiliary building B1 (6.80m), 5 layers on the ground, first layer ground main building ± 0.000, auxiliary building-0.8m, auxiliary building starts to construct when main building structure construction to 10 floor, after main building underground external wall waterproof construction completes, main building backfill starts to construct, below backfill construction Dao Fu building bed course, auxiliary building starts to construct, the settlement joint Chu Fu building outer wall of underground structure waterproof construction in main building Yu Fu building is construction difficult problem: operating space is narrow and small, cannot construct, select other waterproof roll, cost is too high.
The construction method traditional for the waterproof roll at settlement joint place is:
Later stage auxiliary building outer wall of basement waterproof roll, due to without operating space, cannot carry out waterproof construction by drawing.Thereby likely cause unit in charge of construction not carry out waterproof construction to this position, for later infiltration has left hidden danger, the later stage makes up suitable difficulty; Or adopt water-repellent paint to replace, but this method will cause the increase of construction cost, and waterproof effect does not have waterproof roll effective.
Summary of the invention
The object of the invention is the many deficiencies for prior art, provide a kind of can meet according to design drawing carry out waterproof construction, can, as the template of auxiliary building outer wall of basement one side, also solve a body of wall formwork difficulty difficult problem simultaneously, the simple waterproof roll material on settlement joint of construction method again
Construction method.
Realize foregoing invention object by the following technical solutions: a kind of waterproof roll material on settlement joint construction method, described settlement joint is between main building Yu Fu building, and the construction method of this waterproof roll material on settlement joint is carried out in the steps below:
A, when main building first floor structure construction pre-buried two rows for the earth anchors of fixing longitudinal steel pipe, two described row's earth anchor spacing are 600mm, first row earth anchor is 300mm apart from structural edge, the spacing of described longitudinal steel pipe is 600mm, longitudinally steel pipe leans out structural edge 300mm, the sub-jam-pack of timber wedge for gap of longitudinal steel pipe and earth anchor, at second row earth anchor, place laterally adds steel pipe one, and horizontal, longitudinal steel pipe intersection connects with cruciform fastening for falsework;
B, when construction auxiliary building foundation pad pre-buried Yi Paifu building earth anchor, the position of auxiliary building earth anchor is corresponding with main building first floor earth anchor position, auxiliary building earth anchor equals settlement joint width apart from the distance of main building exterior wall and deducts waterproof roll thickness and deduct polyphenyl plate thickness again;
C, standing rigging screw-button is installed: at the main building steel pipe leaning out, apart from the front and back position of structural edge spacing, weld respectively 50mm reinforcing bar, wire tensioner is arranged between two reinforcing bars, be positioned at the top of bracing wire, one of described bracing wire ties with wire tensioner, the earth anchor of Yu Fu building, other end foundation pad connects, and the height of the setting space You Fu building basement of wire tensioner and bracing wire is determined;
After D, main building outer wall of basement waterproof coiled material construction, bracing wire is installed, after tension bracing wire, polyphenyl plate is installed, until polyphenyl plate, constructed after acceptance(check), smearing thickness is 10mm adhesive mortar layer, then carries out the external wall waterproof coiled material construction of auxiliary building, topping and auxiliary building structure construction;
After E, auxiliary building underground structure wall construction, remove the horizontal stroke of standing rigging screw-button and main building, longitudinal steel pipe.
As preferred version, described earth anchor is several character form structures.
As preferred version, at the main building steel pipe leaning out, apart from the spacing of structural edge, be that settlement joint width deducts waterproof roll thickness and deducts polyphenyl plate thickness again, before and after this position, weld respectively two grade reinforcing steels of the Φ 14mm that 50mm is high.
Adopt technique scheme, compared with prior art, not only solved the hidden danger that construction stays in earlier stage, solved the difficult problem that constuction joint place body of wall cannot formwork simultaneously, overcome the hidden danger of leaking that construction stays, according to this method, constructed, settlement joint place waterproof effect is remarkable, water-tight, and method is simple, and construction cost is low.
Accompanying drawing explanation
Fig. 1 is main building earth anchor of the present invention, steel pipe arrangement schematic diagram.
Fig. 2 is earth anchor of the present invention, steel pipe fixing structure schematic diagram.
Fig. 3 is that the I-I of Fig. 1 is to sectional view.
Fig. 4 is wire tensioner scheme of installation of the present invention, is also the partial enlarged drawing of Fig. 3.
In figure, earth anchor 1, longitudinal steel pipe 2, reinforcing bar 3, horizontal steel pipe 4, cruciform fastening for falsework 5, frame column 6, timber wedge 7, main building floor 8, wire tensioner 9, galvanized wire 10, auxiliary building outer wall of basement steel concrete is from waterproof 11, auxiliary building 12, auxiliary building waterproof roll 13, auxiliary building sole plate 14, auxiliary building foundation pad 15, main building 16, main building waterproof roll 17, main building outer wall of basement steel concrete is from waterproof 18.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described further.
The present embodiment is a kind of construction method of waterproof roll material on settlement joint, settlement joint is between main building 16Yu Fu building 12, the construction method of this waterproof roll material on settlement joint is mainly the construction method for auxiliary building waterproof roll 13, and main building waterproof roll 17 and main building outer wall of basement steel concrete are from waterproof 18 construction technology operation routinely.
Construction method is carried out in the steps below
See Fig. 1, Fig. 2, during main building 16 first floor structure construction, between structural framing 6, pre-buried two rows are used for the fixedly earth anchor 1 of longitudinal steel pipe 2 of 48*3.5, and earth anchor 1 adopts two grade reinforcing steels of Φ 14 mm, and earth anchor 1 is fixed under the lower iron of floor 8 for several character form structures.Earth anchor 1 spacing of several character form structures of two rows is 600mm, and first row earth anchor 1 is 300mm apart from structural edge.Longitudinal steel pipe 2 spaced sets fixedly its spacing are 600mm, and length is 1.5m, and longitudinally steel pipe 2 leans out structural edge 300mm.
See Fig. 2, longitudinally steel pipe 2 and the gap of earth anchor 1 timber wedge 7 jam-packs, add together laterally steel pipe 4 at second row earth anchor 1 place, and the intersection of horizontal, longitudinal steel pipe 4,2 connects with cruciform fastening for falsework 5; Longitudinally steel pipe 2 is mainly used for installing wire tensioner 9 tension bracing wires 10, and bracing wire 10 adopts 8# galvanized wire two-wire 600 mm, and longitudinally steel pipe 2 plays the stressed effect of encorbelmenting; Laterally the effect of steel pipe 4 and cruciform fastening for falsework 5 is to prevent the outside slippage of longitudinal steel pipe 2.
Pre-buried Yi Paifu building earth anchor 1 when the auxiliary building of construction foundation pad 15, the position of Yi Paifu building earth anchor 1 is corresponding with the position of main building 16 first floor earth anchors 1, exterior wall distance apart from main building 16 is determined according to design, and the auxiliary building of the present embodiment earth anchor 1 distance apart from main building exterior wall equals settlement joint width and deducts waterproof roll thickness and deduct polyphenyl plate thickness again.Auxiliary building earth anchor 1 spacing is 600mm.
Standing rigging screw-button 9 is installed:
See Fig. 4, at the longitudinal steel pipe 2 of the main building leaning out, weld respectively the reinforcing bar 3 of ф 14 mm apart from the position of structural edge, wire tensioner 9 use bracing wires (galvanized wire) are arranged between two reinforcing bars 3.
Bracing wire 10 is installed: bracing wire 10 adopts 8 ﹟ galvanized iron wires (every group of double joint), 10 1 of described bracing wires tie with wire tensioner 9, and Yu Fu building, other end earth anchor 1 connects.Wire tensioner 9 is arranged on the top of bracing wire 10, can have enough to meet the need use.Regulate wire tensioner 9 by bracing wire 10 tensions, make it in stress,
See Fig. 3; after tension bracing wire 10, be close to the bonding polyphenyl plate of bracing wire 10; form fish tail and waterproof layer; polystyrene board protecting layer has been constructed after acceptance(check); bonding thickness is 8~10mm screed; then according to routine operation, carry out 13 constructions of auxiliary building waterproof roll, auxiliary building waterproof roll 13 adopts SBS waterproof roll, and then carries out auxiliary building basement steel concrete from namely auxiliary building external wall waterproof topping construction of waterproof 11.
Longitudinal steel pipe 2 of the main building leaning out refers to that apart from the edge of structure settlement joint width deducts the position that waterproof roll thickness deducts polyphenyl plate thickness again, two grade reinforcing steels 3 of Φ 14 ㎜ that 50mm is high are welded in the front and back of this position, wire tensioner 9 is determined and is generally 400~600 ㎜ with the height of the setting space You Fu building basement of bracing wire 10, its objective is and prevent that wire tensioner 9 from moving forward and backward.
After 14 constructions of underground structure body of wall Ji Fu building, auxiliary building sole plate, remove standing rigging screw-button 9, untie horizontal, the longitudinal steel pipe 4,2 of cruciform fastening for falsework 5 dismounting main buildings.
Disclosed is above only specific embodiments of the invention, but the present invention is not limited thereto, and the changes that any person skilled in the art can think of, within all should dropping on protection scope of the present invention.

Claims (3)

1. a construction method for waterproof roll material on settlement joint, described settlement joint, between main building Yu Fu building, is characterized in that, the construction method of described waterproof roll material on settlement joint is carried out in the steps below:
A, when main building first floor structure construction pre-buried two rows for the earth anchors of fixing longitudinal steel pipe, two described row's earth anchor spacing are 600mm, first row earth anchor is 300mm apart from structural edge, the spacing of described longitudinal steel pipe is 600mm, longitudinally steel pipe leans out structural edge 300mm, the sub-jam-pack of timber wedge for gap of longitudinal steel pipe and earth anchor, at second row earth anchor, place laterally adds steel pipe one, and horizontal, longitudinal steel pipe intersection connects with cruciform fastening for falsework;
B, when construction auxiliary building foundation pad pre-buried Yi Paifu building earth anchor, the position of auxiliary building earth anchor is corresponding with main building first floor earth anchor position, auxiliary building earth anchor equals settlement joint width apart from the distance of main building exterior wall and deducts waterproof roll thickness and deduct polyphenyl plate thickness again;
C, standing rigging screw-button is installed: at the longitudinal steel pipe of the main building leaning out, apart from the front and back position of structural edge spacing, weld respectively 50mm reinforcing bar, at the longitudinal steel pipe of the main building leaning out, apart from the spacing of structural edge, be that settlement joint width deducts waterproof roll thickness and deducts polyphenyl plate thickness again, wire tensioner is arranged between two reinforcing bars, be positioned at the top of bracing wire, one of described bracing wire ties with wire tensioner, the earth anchor of Yu Fu building, other end foundation pad connects, and the height of the setting space You Fu building basement of wire tensioner and bracing wire is determined;
After D, main building outer wall of basement waterproof coiled material construction, bracing wire is installed, after tension bracing wire, polyphenyl plate is installed, until polyphenyl plate, constructed after acceptance(check), smearing thickness is 10mm adhesive mortar layer, then carries out the external wall waterproof coiled material construction of auxiliary building, topping and auxiliary building structure construction;
After E, auxiliary building underground structure wall construction, remove the horizontal stroke of standing rigging screw-button and main building, longitudinal steel pipe.
2. waterproof roll material on settlement joint construction method according to claim 1, is characterized in that, described earth anchor is several character form structures.
3. the construction method of waterproof roll material on settlement joint according to claim 1, it is characterized in that, at the main building steel pipe leaning out, apart from the spacing of structural edge, be that settlement joint width deducts waterproof roll thickness and deducts polyphenyl plate thickness again, before and after this position, weld respectively two grade reinforcing steels of the Φ 14mm that 50mm is high.
CN201110405641.1A 2011-12-08 2011-12-08 Construction method for waterproof roll material on settlement joint Active CN102493492B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110405641.1A CN102493492B (en) 2011-12-08 2011-12-08 Construction method for waterproof roll material on settlement joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110405641.1A CN102493492B (en) 2011-12-08 2011-12-08 Construction method for waterproof roll material on settlement joint

Publications (2)

Publication Number Publication Date
CN102493492A CN102493492A (en) 2012-06-13
CN102493492B true CN102493492B (en) 2014-03-19

Family

ID=46185348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110405641.1A Active CN102493492B (en) 2011-12-08 2011-12-08 Construction method for waterproof roll material on settlement joint

Country Status (1)

Country Link
CN (1) CN102493492B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100814943B1 (en) * 2006-09-22 2008-03-19 주식회사 동호 Method constrain buoyancy in under ground used permanent ground anchor assembly
CN101225667A (en) * 2008-02-02 2008-07-23 宁波建工集团有限公司 Design of settlement joint provided inside underground continuous wall and construction method thereof
KR20090022880A (en) * 2007-08-31 2009-03-04 쌍용건설 주식회사 Construction method of byoyance protection anchor
CN201865352U (en) * 2010-11-26 2011-06-15 北京中兰环境工程有限公司 Geo-synthetic clay liner laying device
CN201891133U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100814943B1 (en) * 2006-09-22 2008-03-19 주식회사 동호 Method constrain buoyancy in under ground used permanent ground anchor assembly
KR20090022880A (en) * 2007-08-31 2009-03-04 쌍용건설 주식회사 Construction method of byoyance protection anchor
CN101225667A (en) * 2008-02-02 2008-07-23 宁波建工集团有限公司 Design of settlement joint provided inside underground continuous wall and construction method thereof
CN201891133U (en) * 2010-11-03 2011-07-06 中建三局第二建设工程有限责任公司 Manual assembled type self-waterproof late poured band prefabricated slab of basement outer wall
CN201865352U (en) * 2010-11-26 2011-06-15 北京中兰环境工程有限公司 Geo-synthetic clay liner laying device

Also Published As

Publication number Publication date
CN102493492A (en) 2012-06-13

Similar Documents

Publication Publication Date Title
CN204780994U (en) Underground continuous wall inwall construction structures
CN102296571B (en) Rock-fill dam of anchoring panel and construction method thereof
CN109403371A (en) A kind of Steep Slope Embankment retaining structure and construction method
CN105862873A (en) Construction method of underground water prevention and exterior wall structures of narrow space of deep foundation pit
CN105240018B (en) Construction of Silo device and method
CN204199330U (en) The overall steel plate for sealing water in a kind of ater-casting
CN103410173A (en) Construction method for vertical post pouring belt plugging of underground structural outer wall
CN204849820U (en) Unilateral formwork of shaped steel combination
CN209368867U (en) A kind of Steep Slope Embankment retaining structure
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN106351343A (en) Basement outer wall waterproof protection structure capable of realizing synchronous crossing construction and construction method thereof
CN112376624A (en) Secondary pouring and retaining advanced water stop structure for basement floor post-cast strip and construction method
CN111779147A (en) Advanced water stop structure of roof post-cast strip
CN103122627B (en) Impervious face slab anti-seismic structure of concrete rock-fill dam and construction method thereof
CN105386779B (en) The counterfort method of large underground structure is built in shallow embedding rock stratum
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN210766835U (en) Foundation beam side vertical face waterproof structure
CN107893418A (en) A kind of reinforcement means and structure of embedded prestress anchorage cable
CN201077988Y (en) Hidden beam-column type prestressing force earth nail wall
CN102493492B (en) Construction method for waterproof roll material on settlement joint
CN110952563A (en) Temporary anti-floating structure for excavation of foundation pit above existing subway tunnel
CN109113030B (en) Concrete panel rock-fill dam panel seismic structure and construction method thereof
CN107587476B (en) Wave-blocking wall with prefabricated reverse arc olecranon structure and design and construction method thereof
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN205954632U (en) Pipeline crosses supporting construction of foundation ditch department in rich water sand layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant