CN102493455A - 一种基桩拔除方法 - Google Patents

一种基桩拔除方法 Download PDF

Info

Publication number
CN102493455A
CN102493455A CN2011104306934A CN201110430693A CN102493455A CN 102493455 A CN102493455 A CN 102493455A CN 2011104306934 A CN2011104306934 A CN 2011104306934A CN 201110430693 A CN201110430693 A CN 201110430693A CN 102493455 A CN102493455 A CN 102493455A
Authority
CN
China
Prior art keywords
foundation pile
foundation
foundation piles
unloading hole
periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104306934A
Other languages
English (en)
Inventor
谢俊
朱丹
孙文昊
石太伟
王腾飞
郭磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN2011104306934A priority Critical patent/CN102493455A/zh
Publication of CN102493455A publication Critical patent/CN102493455A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及土木工程领域,具体涉及基于周边孔卸荷的基桩拔除方法,包括以下步骤:①、围绕基桩的外壁,在基桩的外围钻一圈卸荷孔;②、采用基桩拨出设备将基桩从地面拔除。本发明有效降低了基桩拔除的难度,且安全性高,适用于各种地质及水文条件下各种不同直径的既有基桩拔除,同时对周边环境的影响小,对于大直径桩基的拔除,经济性和安全性尤为显著。

Description

一种基桩拔除方法
技术领域
本发明涉及土木工程领域,具体涉及基于周边孔卸荷的基桩拔除方法。
背景技术
目前,对于既有基桩的拔除一般采取人工挖孔拔除、下套管(筒)拔除等方法。人工挖孔拔除在软土、易发生流沙的场地具有很高的技术风险,安全性差;对于地下水位高的场地,采用该方法拔除一般需要降水后方能施工,降水不可避免会对周边环境造成一定程度的影响。下套管(筒)拔除涉及大型专用机械调配问题,对于基桩较少时一般很不经济。特别的对于直径较大的人工挖孔桩,套管(筒)拔桩专用设备庞大,在施工场地受限处实施困难,且拔桩工程费用很高。
发明内容
本发明的目的是解决上述问题,提供一种安全性高,经济性好,适用于各种地质及水文条件下各种不同直径的既有基桩拔除,同时对周边环境的影响小的基桩拔除方法,其技术方案包括以下步骤
①、围绕基桩的外壁,在基桩的外围钻一圈卸荷孔;
②、采用基桩拨出设备将基桩从地面拔除。
在上述技术方案中,步骤①中,卸荷孔的深度超过基桩的桩底。
在上述技术方案中,步骤①中,在基桩的外围钻一圈卸荷孔后,向卸荷孔中注入泥浆,防止孔壁坍塌。
在上述技术方案中,步骤②中,在基桩拔出的同时,从基桩周边的卸荷孔向基桩底部的空洞处注入泥浆或砂浆,防止孔壁坍塌。
在上述技术方案中,在步骤②中,在基桩拔出的同时,借助周边卸荷孔向桩底空洞处注入泥浆或砂浆。
本发明具有以下显著有益效果:
本发明使用小型钻孔设备,在既有基桩周边打设钻孔,依据既有拔除设备的装备的提拔力,可以采取不同的周边钻孔密度,卸荷孔可以间隔一定距离,亦可孔之间不设间隔即采取咬合钻孔的方式,钻孔深度超过既有基桩桩底。之后采用普通拔除设备(千斤顶或吊车)对已经卸除周边摩擦力的基桩进行拔除,拔除之前可视情况在打设的孔洞中进行射水操作,进一步降低基桩与周边地层的粘结能力,降低基桩拔除的难度,且安全性高,适用于各种地质及水文条件下各种不同直径的既有基桩拔除,同时对周边环境的影响小,对于大直径桩基的拔除,经济性和安全性尤为显著。
附图说明
图1是本发明基桩拔除之前基桩的外围钻一圈卸荷孔的布置平面图;
图2是图1的立面图;
图中:1、基桩;2、卸荷孔,3、桩底。
具体实施方式
以下结合附图和具体实施例对本发明作进一步的详细描述:
基桩拔除方法,其技术方案包括以下步骤
①、围绕基桩的外壁,在基桩的外围钻一圈卸荷孔,卸荷孔的深度超过基桩的桩底,然后向卸荷孔中注入泥浆,防止孔壁坍塌;
②、采用基桩拨出设备将基桩从地面拔除,在基桩拔出的同时,借助周边卸荷孔向桩底空洞处注入泥浆或砂浆,防止孔壁坍塌。
具体实施过程中,参阅图1和图2所示,使用小型钻孔设备,在既有基桩1周边打设钻孔,依据既有拔除设备的装备提拔能力,可以采取不同的周边卸荷孔2的钻孔密度,卸荷孔2可以间隔一定距离,或者咬合,当然,可根据拔除设备的装备提拔能力选择不同卸荷孔2孔径大小,当拔除设备的装备提拔能力很强时,可选择较大孔径的卸荷孔2,当拔除设备的装备提拔能力较弱时,可选择较小孔径的,页可现场根据施工经验和装备实际提拔能力及参数确定,同时保证卸荷孔2钻孔深度超过既有基桩1的桩底3,卸除基桩1的周边摩阻力,然后采用拔除设备(千斤顶或吊车)对已经卸除周边摩擦力的基桩进行拔除,拔除之前可视情况在打设的卸荷孔2洞中进行射水操作,进一步降低基桩与周边地层的粘结能力,降低基桩拔除的难度,也可以在基桩的外围钻一圈卸荷孔2后,向卸荷孔2中灌注泥浆,维持孔壁稳定性;在基桩拔出的同时,借助周边卸荷孔向桩底空洞处注入泥浆或砂浆,防止孔壁坍塌。
本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (4)

1.一种基桩拔除方法,其特征在于包括以下步骤:
①、围绕基桩的外壁,在基桩的外围钻一圈卸荷孔;
②、采用基桩拨出设备将基桩从地面拔除。
2.根据权利要求1所述的基桩拔除方法,其特征在于:在步骤①中,卸荷孔的深度超过基桩的桩底。
3.根据权利要求1或2所述的基桩拔除方法,其特征在于:在步骤①中,在基桩的外围钻一圈卸荷孔后,向卸荷孔中注入泥浆。
4.根据权利要求1或2所述的基桩拔除方法,其特征在于:在步骤②中,在基桩拔出的同时,从基桩周边的卸荷孔向基桩底部的空洞处注入泥浆或砂浆。
CN2011104306934A 2011-12-20 2011-12-20 一种基桩拔除方法 Pending CN102493455A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104306934A CN102493455A (zh) 2011-12-20 2011-12-20 一种基桩拔除方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104306934A CN102493455A (zh) 2011-12-20 2011-12-20 一种基桩拔除方法

Publications (1)

Publication Number Publication Date
CN102493455A true CN102493455A (zh) 2012-06-13

Family

ID=46185311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104306934A Pending CN102493455A (zh) 2011-12-20 2011-12-20 一种基桩拔除方法

Country Status (1)

Country Link
CN (1) CN102493455A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485344A (zh) * 2013-09-17 2014-01-01 常熟理工学院 一种拔除建筑工程桩基的方法
US10486782B2 (en) 2017-11-10 2019-11-26 Industrial Technology Research Institute Carrying device and operation method thereof
CN110984624A (zh) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 一种超长竖向地下钢管拔出系统及其施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482309A (zh) * 2003-06-12 2004-03-17 上海隧道工程股份有限公司 钻孔灌注桩减阻拔除方法
CN101538857A (zh) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 一种拔桩施工方法
JP2009287326A (ja) * 2008-05-30 2009-12-10 Fukuda Corp 既存杭の引き抜き方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482309A (zh) * 2003-06-12 2004-03-17 上海隧道工程股份有限公司 钻孔灌注桩减阻拔除方法
JP2009287326A (ja) * 2008-05-30 2009-12-10 Fukuda Corp 既存杭の引き抜き方法
CN101538857A (zh) * 2009-04-10 2009-09-23 黄河水利委员会河南黄河河务局 一种拔桩施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
翟世鸿等: "巴基斯坦卡拉奇港OP-Ⅱ旧高桩码头群桩基础的拔除施工", 《中国港湾建设》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485344A (zh) * 2013-09-17 2014-01-01 常熟理工学院 一种拔除建筑工程桩基的方法
US10486782B2 (en) 2017-11-10 2019-11-26 Industrial Technology Research Institute Carrying device and operation method thereof
CN110984624A (zh) * 2019-12-20 2020-04-10 中建一局集团建设发展有限公司 一种超长竖向地下钢管拔出系统及其施工方法
CN110984624B (zh) * 2019-12-20 2024-04-05 中建一局集团建设发展有限公司 一种超长竖向地下钢管拔出系统及其施工方法

Similar Documents

Publication Publication Date Title
CN105735251B (zh) 桥梁桩基旋挖钻机切削式全护筒跟进成桩施工方法及系统
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN102505945B (zh) 一种在已建建筑物内矩形顶管机进洞的施工方法
CN104164873B (zh) 预应力管桩及其施工方法
CN101838988B (zh) 一种抽拔锚索的综合施工方法
CN107489158A (zh) 一种旋挖成孔搅喷水泥土咬合帷幕桩的施工方法
CN102108706A (zh) 预应力管桩桩芯补强简易手动螺旋取土装置
CN101851922A (zh) 用全套管钻机清除地下锚索/杆的方法
CN103953030B (zh) 螺纹旋后插筋挤密灌注桩
CN203403404U (zh) 高效灌注桩设备
CN103031847B (zh) 变径搭接组合式孔口管灌浆法
CN104975611B (zh) 流质土层的井点降水管的沉设装置及沉设方法
CN102493455A (zh) 一种基桩拔除方法
CN103526754A (zh) 一种富砂风化岩中扩大头锚杆的施工方法
CN204401612U (zh) 一种超大直径全钢护筒干作业成孔灌注桩施工装置
CN104762970B (zh) 一种深孔岩溶注浆辅助拔管装置及施工方法
CN102505691B (zh) 预制管桩施工方法
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN203808055U (zh) 螺纹旋后插筋挤密灌注桩
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN110273413A (zh) 一种预制桩的高效施工方法
CN105586978A (zh) 基于砾石的换土搅拌止水帷幕施工方法
CN205713982U (zh) 一种适用于岩溶地区的桩基施工钻孔装置
CN202000360U (zh) 用于边坡支护施工的设备
CN204326061U (zh) 一种易拔出的管桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613