CN102490262A - Steam curing construction method for ballastless track plate - Google Patents

Steam curing construction method for ballastless track plate Download PDF

Info

Publication number
CN102490262A
CN102490262A CN2011103895274A CN201110389527A CN102490262A CN 102490262 A CN102490262 A CN 102490262A CN 2011103895274 A CN2011103895274 A CN 2011103895274A CN 201110389527 A CN201110389527 A CN 201110389527A CN 102490262 A CN102490262 A CN 102490262A
Authority
CN
China
Prior art keywords
temperature
steam curing
track plate
steam
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103895274A
Other languages
Chinese (zh)
Inventor
唐洪强
简治城
李引平
余贵钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN2011103895274A priority Critical patent/CN102490262A/en
Publication of CN102490262A publication Critical patent/CN102490262A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a steam curing construction method for a ballastless track plate. After concrete for a track plate (1) is poured, the processes of standing for moisturizing, heating in a sail for steam curing, curing by steam in the sail at constant temperature, cooling in the sail, and demoulding a template (2) are carried out. The steam curing construction method for the ballastless track plate comprises the following specific processes: installing the template (2) on a pedestal base (3); after the track plate (1) is poured, inserting a temperature sensor (4) into the core part of the track plate (1); hanging a temperature sensor (6) on a sail rack; after the concrete stands for 4h, covering a plastic film (5) and sail cloth (7); opening a steam valve (8); introducing steam into a steam pipe (10); automatically controlling heating, keeping constant temperature and cooling by an electromagnetic valve (9) according to the parameters preset in the whole steam curing stage; after the concrete test block of the track plate (1) reaches 40MPa, demoulding; and before the template (2) is demoulded, ensuring that temperature difference between the core part temperature and the surface part of the concrete as well as the temperature difference between the surface temperature and the ambient temperature do not exceed 15DEG C.

Description

Fragment-free track slab steam curing construction method
Technical field
The present invention relates to a kind of fragment-free track slab steam curing construction method.
Background technology
The ballastless track of high-speed railway with independent intellectual property right that CRTS III type fragment-free track slab is is independently researched and developed as China, utilization also is not very extensive at home at present.Along with becoming to irritate the open-minded of high ferro; The security of its operation, smoothness, comfortableness have obtained expert and insider's favorable comment, but the prefabricated construction scheme of CRTS III type fragment-free track slab and key Quality Control also do not form a whole set of complete data that can reference at home.
Summary of the invention
The technical problem that the present invention will solve is; A kind of fragment-free track slab steam curing construction method is provided; This method can improve concrete intensity at short notice and not crack simultaneously; Do not influence the quality of concrete self, to fill up prior art in the blank aspect the fragment-free track slab steam curing construction.
Technical scheme of the present invention: the track board concrete build leave standstill successively after the completion preserve moisture, the cooling and the template demoulding in the constant temperature steam curing in the intensification steam curing in the paulin, paulin, paulin; Detailed process is: the track plate is built when accomplishing temperature sensor is inserted in the track plate core; Temperature sensor is suspended on the paulin frame; Concrete leaves standstill plastic sheeting and tarpaulin on the 4h bonnet; Open steam valve, steam pipe feeds steam, and the parameter that magnetic valve pre-set according to the whole steam curing stage heats up, constant temperature, cooling are controlled automatically.
Adopt automatic temperature-adjusting control system control core temperature and intensification, rate of temperature fall in the whole steam curing stage, track plate core temperature is no more than 55 OC, intensification, rate of temperature fall are controlled at 15 oIn the C/h.
Time in constant temperature stage is 5h~6h, and the constant temperature phase temperature is set to 40 ℃~45 ℃ usually.
Tarpaulin is evenly opened in the temperature-fall period.
Track board concrete intensity of test block reaches behind the 40MPa can the demoulding, should guarantee before the template demoulding that the temperature difference of concrete core temperature and surface temperature, surface temperature and environment temperature all is no more than 15 OC
This process using auto temperature controlled system, always be divided into quietly stop, intensification, constant temperature, cooling four-stage.
, the track plate behind the quiet 4h of stopping, normally begins after the concrete final set track plate is carried out steam curing after building completion.
In maintenance intensification and the temperature-fall period in order to prevent that concrete receives excessive temperature stress variable effect; The heating-cooling excessive velocities all might cause concrete cracking; Must control programming rate and cooling rate, programming rate and cooling rate all can not surpass 15 ℃/h.Too fast in order to control concrete cooling, but when concrete initial set covered with plastic film and tarpaulin, tarpaulin will be opened evenly cooling time simultaneously, avoids concrete local heating perhaps to catch a cold.Track board concrete intensity of test block reaches behind the 40MPa can the demoulding, should guarantee before the demoulding that the temperature difference of concrete core temperature and surface temperature, surface temperature and environment temperature all is no more than 15 OC
Description of drawings
Fig. 1 is maintenance facility sketch map of the present invention, front view;
Fig. 2 is maintenance facility sketch map of the present invention, plane.
The specific embodiment
Embodiments of the invention: track plate steam curing system, be divided into quietly stop, intensification, constant temperature, cooling four-stage.Mounting template 2 on pedestal basis 3; When 1 concreting of track plate is accomplished temperature sensor 4 is inserted in track plate 1 core, temperature sensor 6 is suspended on the paulin frame, concrete leaves standstill plastic sheeting 5 and tarpaulin 7 on the 4h bonnet; Open steam valve 8; Steam pipe 10 feeds steam, and magnetic valve 9 will heat up according to the parameter that the whole steam curing stage pre-sets, constant temperature, cooling are controlled automatically, so that concrete early strength gets a desired effect.Programming rate and cooling rate all can not surpass 15 ℃/h, are advisable with 12 ℃/h; Plastic sheeting 5 should evenly be opened with tarpaulin 7 in the time of cooling, avoids concrete local heating perhaps to catch a cold.Track plate 1 concrete test block intensity reaches behind the 40MPa can the demoulding, should guarantee before template 2 demouldings that the temperature difference of concrete core temperature and surface temperature, surface temperature and environment temperature all is no more than 15 ℃.
The time in constant temperature stage and temperature will be provided with according to concrete performance.Simultaneously be unlikely to make concrete cracking again in order to reach higher early strength, the time in constant temperature stage is set to 5.5h (can not surpass 6h) usually, and the constant temperature phase temperature is set to 42 ℃ (can not above 45 ℃) usually.
Will control four key temperatures when concrete steam maintenance processes and form removal well: temperature can not be above 45 ℃ in the paulin; Core temperature can not be above 55 ℃; The concrete core temperature and the surface temperature temperature difference can not be above 15 ℃; The concrete surface temperature and the environment temperature temperature difference can not be above 15 ℃ during the demoulding.

Claims (5)

1. fragment-free track slab steam curing construction method is characterized in that: leave standstill successively after track plate (1) concreting is accomplished preserve moisture, the cooling and template (2) demoulding in the constant temperature steam curing in the intensification steam curing in the paulin, paulin, paulin; Detailed process is: go up mounting template (2) on pedestal basis (3); Track plate (1) is built when accomplishing temperature sensor (4) is inserted in track plate (1) core; Temperature sensor (6) is suspended on the paulin frame, and concrete leaves standstill plastic sheeting on the 4h bonnet (5) and tarpaulin (7), opens steam valve (8); Steam pipe (10) feeds steam, and the parameter that magnetic valve (9) pre-set according to the whole steam curing stage heats up, constant temperature, cooling are controlled automatically.
2. according to right 1 described fragment-free track slab steam curing construction method, it is characterized in that: adopt automatic temperature-adjusting control system control core temperature and intensification, rate of temperature fall in the whole steam curing stage, track plate (1) core temperature is no more than 55 OC, intensification, rate of temperature fall are controlled at 15 oIn the C/h.
3. according to right 1 described fragment-free track slab steam curing construction method, it is characterized in that: the time in constant temperature stage is 5h~6h, and the constant temperature phase temperature is set to 40 ℃~45 ℃ usually.
4. according to right 1 described fragment-free track slab steam curing construction method, it is characterized in that: tarpaulin in the temperature-fall period (7) is evenly opened.
5. according to right 1 described fragment-free track slab steam curing construction method; It is characterized in that: track plate (1) concrete test block intensity reaches behind the 40MPa can the demoulding, should guarantee before template (2) demoulding that the temperature difference of concrete core temperature and surface temperature, surface temperature and environment temperature all is no more than 15 OC
CN2011103895274A 2011-11-30 2011-11-30 Steam curing construction method for ballastless track plate Pending CN102490262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103895274A CN102490262A (en) 2011-11-30 2011-11-30 Steam curing construction method for ballastless track plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103895274A CN102490262A (en) 2011-11-30 2011-11-30 Steam curing construction method for ballastless track plate

Publications (1)

Publication Number Publication Date
CN102490262A true CN102490262A (en) 2012-06-13

Family

ID=46182144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103895274A Pending CN102490262A (en) 2011-11-30 2011-11-30 Steam curing construction method for ballastless track plate

Country Status (1)

Country Link
CN (1) CN102490262A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104109989A (en) * 2013-04-18 2014-10-22 中铁十一局集团第一工程有限公司 Method for curing double-block ballastless tracks in extreme environments
CN104493965A (en) * 2015-01-26 2015-04-08 三一汽车制造有限公司 Precast concrete curing and distribution device, production system and production method
CN105330210A (en) * 2015-11-20 2016-02-17 中信大锰矿业有限责任公司大新锰矿分公司 Steam curing method of baking-free manganese slag bricks
CN107283600A (en) * 2017-06-19 2017-10-24 中交二航局第四工程有限公司安徽分公司 A kind of prefabricated component preparation facilities
CN107283609A (en) * 2017-06-22 2017-10-24 中交二航局第四工程有限公司安徽分公司 Steam canopy is used in concrete prefabricated bridge plate hardening
CN107443568A (en) * 2017-06-22 2017-12-08 中交二航局第四工程有限公司安徽分公司 If cable wire rolls up the concrete prefabricated bridge plate producing device of support frame
CN107443569A (en) * 2017-06-22 2017-12-08 中交二航局第四工程有限公司安徽分公司 Concrete prefabricated bridge plate production equipment
CN108000694A (en) * 2018-01-05 2018-05-08 河北益铁机电科技有限公司 Pretensioning prestressed concrete track board assembly line curing system and its application
CN109366708A (en) * 2018-11-30 2019-02-22 四川升腾元创机电技术研究有限公司 The curing means and flowing water unit of unit flowing water method production track plates
CN109571735A (en) * 2019-02-22 2019-04-05 云南建投第十建设有限公司 Green bio low-voltage high-temperature steam press maintenance system
CN109702878A (en) * 2019-03-04 2019-05-03 河间市宝泽龙金属材料有限公司 Fragment-free track slab curing system
CN110434991A (en) * 2019-08-10 2019-11-12 江龙 A kind of precast concrete steam curing process
CN110483098A (en) * 2019-09-27 2019-11-22 中铁十六局集团北京轨道交通工程建设有限公司 A kind of method of type concrete steam maintenance in subway work
CN110962224A (en) * 2019-12-31 2020-04-07 天津中匠建筑科技有限公司 Test method and device for acquiring steam curing parameters of prefabricated part at low temperature and steam curing method
CN112248204A (en) * 2020-09-28 2021-01-22 北京星航机电装备有限公司 One-to-multiple fixed die table concrete precast slab maintenance system and maintenance method
CN114482012A (en) * 2022-01-28 2022-05-13 中国建筑第八工程局有限公司 Temperature-controlled maintenance system and method for buttress wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002069906A (en) * 2000-08-25 2002-03-08 Jet:Kk Track slab board separation construction method from concrete track bed on slab track, horizontal straightness correction construction method of slab track using it and slab mat cutting device used for them
CN1817598A (en) * 2006-03-09 2006-08-16 中铁八局集团有限公司 Maintenance for orbital plates
CN101758557A (en) * 2009-12-30 2010-06-30 中铁二十三局集团有限公司 Rapid circulation producing method of track slabs
CN201760959U (en) * 2010-09-07 2011-03-16 江南大学 Automatic temperature-control system for rail plate steam curing
CN102101319A (en) * 2010-04-26 2011-06-22 中建二局土木工程有限公司 Method for manufacturing CRTS (Cathode-Ray Tubes) II-type plate-type ballastless track plate by 33 long-line pedestals

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002069906A (en) * 2000-08-25 2002-03-08 Jet:Kk Track slab board separation construction method from concrete track bed on slab track, horizontal straightness correction construction method of slab track using it and slab mat cutting device used for them
CN1817598A (en) * 2006-03-09 2006-08-16 中铁八局集团有限公司 Maintenance for orbital plates
CN101758557A (en) * 2009-12-30 2010-06-30 中铁二十三局集团有限公司 Rapid circulation producing method of track slabs
CN102101319A (en) * 2010-04-26 2011-06-22 中建二局土木工程有限公司 Method for manufacturing CRTS (Cathode-Ray Tubes) II-type plate-type ballastless track plate by 33 long-line pedestals
CN201760959U (en) * 2010-09-07 2011-03-16 江南大学 Automatic temperature-control system for rail plate steam curing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
余会春: "冬季高性能混凝土搅拌及养护", 《工程机械与维修》 *
刘圣东: "浅谈轨道板的蒸汽养护工艺", 《科技促进发展(应用版)》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104109989A (en) * 2013-04-18 2014-10-22 中铁十一局集团第一工程有限公司 Method for curing double-block ballastless tracks in extreme environments
CN104493965A (en) * 2015-01-26 2015-04-08 三一汽车制造有限公司 Precast concrete curing and distribution device, production system and production method
CN105330210A (en) * 2015-11-20 2016-02-17 中信大锰矿业有限责任公司大新锰矿分公司 Steam curing method of baking-free manganese slag bricks
CN107283600A (en) * 2017-06-19 2017-10-24 中交二航局第四工程有限公司安徽分公司 A kind of prefabricated component preparation facilities
CN107283600B (en) * 2017-06-19 2019-05-14 中交二航局第四工程有限公司安徽分公司 A kind of prefabricated component preparation facilities
CN107443569A (en) * 2017-06-22 2017-12-08 中交二航局第四工程有限公司安徽分公司 Concrete prefabricated bridge plate production equipment
CN107443568A (en) * 2017-06-22 2017-12-08 中交二航局第四工程有限公司安徽分公司 If cable wire rolls up the concrete prefabricated bridge plate producing device of support frame
CN107443569B (en) * 2017-06-22 2019-05-14 中交二航局第四工程有限公司安徽分公司 Concrete prefabricated bridge plate production equipment
CN107443568B (en) * 2017-06-22 2019-05-14 中交二航局第四工程有限公司安徽分公司 If the concrete prefabricated bridge plate producing device of cable wire volume support frame
CN107283609B (en) * 2017-06-22 2019-05-14 中交二航局第四工程有限公司安徽分公司 Concrete prefabricated bridge plate hardening steam canopy
CN107283609A (en) * 2017-06-22 2017-10-24 中交二航局第四工程有限公司安徽分公司 Steam canopy is used in concrete prefabricated bridge plate hardening
CN108000694B (en) * 2018-01-05 2023-10-27 河北益铁机电科技有限公司 Pretensioned prestressed concrete track slab production line maintenance system and application thereof
CN108000694A (en) * 2018-01-05 2018-05-08 河北益铁机电科技有限公司 Pretensioning prestressed concrete track board assembly line curing system and its application
CN109366708A (en) * 2018-11-30 2019-02-22 四川升腾元创机电技术研究有限公司 The curing means and flowing water unit of unit flowing water method production track plates
CN109571735A (en) * 2019-02-22 2019-04-05 云南建投第十建设有限公司 Green bio low-voltage high-temperature steam press maintenance system
CN109702878A (en) * 2019-03-04 2019-05-03 河间市宝泽龙金属材料有限公司 Fragment-free track slab curing system
CN110434991A (en) * 2019-08-10 2019-11-12 江龙 A kind of precast concrete steam curing process
CN110483098A (en) * 2019-09-27 2019-11-22 中铁十六局集团北京轨道交通工程建设有限公司 A kind of method of type concrete steam maintenance in subway work
CN110962224A (en) * 2019-12-31 2020-04-07 天津中匠建筑科技有限公司 Test method and device for acquiring steam curing parameters of prefabricated part at low temperature and steam curing method
CN112248204A (en) * 2020-09-28 2021-01-22 北京星航机电装备有限公司 One-to-multiple fixed die table concrete precast slab maintenance system and maintenance method
CN114482012A (en) * 2022-01-28 2022-05-13 中国建筑第八工程局有限公司 Temperature-controlled maintenance system and method for buttress wall
CN114482012B (en) * 2022-01-28 2023-12-01 中国建筑第八工程局有限公司 Temperature control maintenance system and maintenance method for buttress wall

Similar Documents

Publication Publication Date Title
CN102490262A (en) Steam curing construction method for ballastless track plate
CN110259165A (en) A kind of mass concrete self-loopa temperature control maintaining system and maintenance process
CN101013327A (en) Automatic temperature control apparatus of mould
CN201856380U (en) Intelligent section temperature control system of wind-power blade mould
CN102346158B (en) Damp heat aging test device
CN201950720U (en) Box girder concrete steam curing device
CN110405929A (en) Large-diameter shield section of jurisdiction full-auto steaming-maintenance construction
CN106363790B (en) Concrete prefabricated element manufacture craft
CN105669246A (en) Underground side wall structure concrete temperature crack anticracking method
CN109235441B (en) Automatic circulating liquid temperature control process for mass concrete construction
CN109826651A (en) A kind of single-track tunnel two serves as a contrast concrete automation steam curing system and construction method
CN105619582A (en) Track board steam-curing system
CN106584642B (en) A kind of production method of high strength foam concrete product
CN209394950U (en) The curing means and flowing water unit of unit flowing water method production track plates
CN112248204A (en) One-to-multiple fixed die table concrete precast slab maintenance system and maintenance method
CN100336648C (en) Prestressed concrete track beam continuing steam curing process
CN103774905A (en) Novel pole producing technology
CN116330448A (en) Prefabricated part steam curing system and steam curing method thereof
CN215319473U (en) Concrete steam curing device for measuring and calculating temperature control through temperature difference between inside and outside of test piece
CN206507178U (en) A kind of wet Fu-brick tea drying room of full-automatic temperature-controlling control
CN202256329U (en) Damp-heat aging test device
CN212666348U (en) Automatic heating and humidifying system for prefabricated part in closed space
CN102726552A (en) Method for automatically controlling temperature and humidity in withering room
CN102529081B (en) Novel carbon fiber ice hockey rod thermal forming furnace and thermal forming method thereof
CN111360994A (en) Automatic heating and humidifying system for prefabricated part in closed space

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120613