CN102465526A - 深厚松软土、软土层cfg桩施工方法 - Google Patents
深厚松软土、软土层cfg桩施工方法 Download PDFInfo
- Publication number
- CN102465526A CN102465526A CN2010105321693A CN201010532169A CN102465526A CN 102465526 A CN102465526 A CN 102465526A CN 2010105321693 A CN2010105321693 A CN 2010105321693A CN 201010532169 A CN201010532169 A CN 201010532169A CN 102465526 A CN102465526 A CN 102465526A
- Authority
- CN
- China
- Prior art keywords
- pile
- soil layer
- cfg
- soft soil
- deep
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种深厚松软土、软土层CFG桩施工方法,在CFG桩施工过程中,在施工桩的四周,按设计桩间距每隔三桩间距对一桩进行施工。本发明采用“隔三打一”的施工方法,避免了桩头下沉及窜、扩孔现象,加固效果较好,经载荷试验,按此方法完成的CFG桩均满足设计特征值要求,降低甚至消除施工桩对相邻成桩的影响。
Description
技术领域
本发明涉及一种CFG桩施工方法,特别是一种深厚松软土、软土层CFG桩施工方法。
背景技术
目前,CFG桩施工常用的方法都是采用“隔一打一”,即在施工时按设计桩间距每隔一桩对一CFG桩进行施工。这样在地质情况较好时,一般不会出现问题,但当遇到深厚松软土、软土层地基,特别是遇到流塑状饱和粉质黏土层时,CFG桩施工常用的隔一打一施工方法极易造成相邻桩的桩头下沉、扩孔、串孔等现象,严重影响CFG桩质量。
发明内容
本发明要解决的问题是,提供一种深厚松软土、软土层CFG桩施工方法,以解决桩头下沉、扩孔、串孔等对相邻成桩影响的技术问题。
本发明的技术方案:
在CFG桩施工过程中,在施工桩的四周,按设计桩间距每隔三桩间距对一桩进行施工。
泵送混凝土坍落度控制在160mm~200mm。
本发明采用“隔三打一”的施工方法,避免了桩头下沉及窜、扩孔现象,加固效果较好,经载荷试验,按此方法完成的CFG桩均满足设计特征值要求,降低甚至消除施工桩对相邻成桩的影响。
附图说明
图1为本发明的施工示意图。
具体实施方式
本发明的实施例:按设计1.5m桩间距进行隔三打一施工。钻机钻进时根据钻进的速度、电流值及出土情况,详细研究判断地基面以下的地质情况。地质情况较好时,可以按隔一打一或隔二打一的施工方法进行施工;地质情况较差,特别是存在流塑状饱和粉质黏土层时,采用隔三打一的施工方法进行施工。即在施工桩的四周,按设计桩间距每隔三桩间距对一桩进行施工。钻至设计标高后,开始灌注混凝土提管,混凝土泵送压力控制在3.5MPa(泵送压力最小值要求)左右。桩基灌桩时,泵送混凝土坍落度的要求为160mm~200mm,严格控制混凝土的坍落度。通过对桩的施工间距,泵送压力及提管速度的调整,可以控制桩头的下沉及混凝土的充盈系数。
Claims (2)
1.一种深厚松软土、软土层CFG桩施工方法,其特征在于:在CFG桩施工过程中,在施工桩的四周,按设计桩间距每隔三桩间距对一桩进行施工。
2.根据权利要求1所述的深厚松软土、软土层CFG桩施工方法,其特征在于:泵送混凝土坍落度控制在160mm~200mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105321693A CN102465526A (zh) | 2010-11-05 | 2010-11-05 | 深厚松软土、软土层cfg桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105321693A CN102465526A (zh) | 2010-11-05 | 2010-11-05 | 深厚松软土、软土层cfg桩施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102465526A true CN102465526A (zh) | 2012-05-23 |
Family
ID=46069614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105321693A Pending CN102465526A (zh) | 2010-11-05 | 2010-11-05 | 深厚松软土、软土层cfg桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102465526A (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006226064A (ja) * | 2005-02-21 | 2006-08-31 | Geotop Corp | 杭の構築方法及び杭構造 |
CN101250885A (zh) * | 2008-04-03 | 2008-08-27 | 上海市第一建筑有限公司 | 地铁车站一侧土体加固施工方法 |
-
2010
- 2010-11-05 CN CN2010105321693A patent/CN102465526A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006226064A (ja) * | 2005-02-21 | 2006-08-31 | Geotop Corp | 杭の構築方法及び杭構造 |
CN101250885A (zh) * | 2008-04-03 | 2008-08-27 | 上海市第一建筑有限公司 | 地铁车站一侧土体加固施工方法 |
Non-Patent Citations (1)
Title |
---|
杨宝生: "哈大铁路客运专线新营口站深厚软基CFG桩加固施工技术", 《高速铁路技术》, no. 04, 31 October 2010 (2010-10-31) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102162255B (zh) | 一种对湿陷性黄土地区既有桩基进行注浆加固的方法 | |
CN103321244B (zh) | 砂土地基既有建筑增设地下室的施工方法 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN103603379A (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺 | |
CN204185845U (zh) | 一种防水桩板墙支护结构 | |
CN102330436A (zh) | 一种用于半岩土层超深圆形旋流池的组合支护结构及方法 | |
CN201762702U (zh) | 钻孔咬合桩 | |
CN202644591U (zh) | 在富水流砂地质条件隧道施工中被加固的桥桩基 | |
CN103343534A (zh) | 基坑施工封闭降水方法 | |
CN207582471U (zh) | 一种设有深层预应力锚索的双排桩支护结构 | |
CN203613568U (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系 | |
CN105113492A (zh) | 一种适用于粘性土、砂土、粉土地基的组合桩施工方法 | |
CN105064352A (zh) | 建筑扩大头锚杆桩施工工艺及其锚杆桩 | |
CN102733380A (zh) | 套桩及其施工方法 | |
CN202247897U (zh) | 一种管桩基础的后注浆装置 | |
CN104372793A (zh) | 采用旋喷桩法预应力锚索用于既有地下室抗浮的方法 | |
CN103911986B (zh) | 一种组合复打钢管桩的施工方法 | |
CN102839647A (zh) | 搅拌桩-透水性混凝土桩复合地基及其处理方法 | |
CN102767177A (zh) | 具有块石层的软土地基混凝土灌注桩施工方法 | |
CN106337418A (zh) | 一种狭小区域深基坑的支护结构及支护方法 | |
CN106149726B (zh) | 动态压力水下迁移性沙层基土的充填稳定灌浆方法 | |
CN105484274B (zh) | 高压旋喷桩与集束式微型钢管桩相结合的浅层滑坡治理方法 | |
CN102465526A (zh) | 深厚松软土、软土层cfg桩施工方法 | |
CN205062809U (zh) | 一种端承型螺纹芯组合桩 | |
CN203977418U (zh) | 防止灌注桩混凝土流失装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120523 |