CN102444420A - 一种薄煤层破碎顶板拖管式充填方法 - Google Patents
一种薄煤层破碎顶板拖管式充填方法 Download PDFInfo
- Publication number
- CN102444420A CN102444420A CN2011104577090A CN201110457709A CN102444420A CN 102444420 A CN102444420 A CN 102444420A CN 2011104577090 A CN2011104577090 A CN 2011104577090A CN 201110457709 A CN201110457709 A CN 201110457709A CN 102444420 A CN102444420 A CN 102444420A
- Authority
- CN
- China
- Prior art keywords
- filling
- pipe
- hydraulic support
- goaf
- gob
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
一种薄煤层拖管式充填方法,包括在顺槽中布置充填主管,将高压胶管通过变径三通连接到充填主管上,将高位充填钢管连接到充填主管上;将多根充填管并联连接到高压胶管上,同时各充填管固定连接在采空区和煤层之间的工作面液压支架上,充填管的充填口伸入到采空区中;高位充填钢管的充填口穿过巷帮充填墙伸入到采空区中,其充填口的高度高于各充填管充填口的高度;开始充填采空区,直到采空区充填完毕,结束该采空区的充填工作;当工作面向前推移时,充填管跟随液压支架向前移动,进入新的采空区中,手动调整高位充填钢管的位置,使其向前移动的距离与液压支架向前移动的移动步距相同;重复充填,直到采掘结束。
Description
技术领域
本发明涉及一种煤矿充填方法,尤其涉及一种适用于薄煤层破碎顶板的拖管式充填方法。
背景技术
薄煤层煤田在我国的煤矿中非常常见,如黄河北薄煤田就属于典型的薄基岩、厚表土层煤层。其薄煤层主要指七、十层煤,基岩厚度一般为30~40米,表土层厚度一般为200m左右,煤层厚度仅为1.2m左右,倾角小,瓦斯高,涌水量大,顶板异常破碎,地表为黄河北冲积平原,井田内地势平坦,潜水位在地表以下1.5米左右,开采后地表下沉系数达0.82,地面建筑物比较密集,井下开采对地表及建筑物影响较大,吨煤利润仅为50元/吨。目前应用的几种充填方式,如膏体充填、高效架后落矸充填、高水充填等,由于充填成本相对较高,膏体充填成本在120元/吨、高效架后落矸充填成本在100元/吨,高水充填成本160元/吨,矿方不能接受。
发明内容
本发明针对薄煤层特殊的地质条件,直接顶随采随冒且异常破碎,老顶来压步距在12~14m左右,即老顶(基本顶)有一定运动的时间和空间,设计一种利用煤层开采后破碎的直接顶作为堵漏墙的“拖管”式充填工艺方法。该方法可以把掘进产生的矸石经过破碎后和一定量的粉煤灰、水泥形成充填料,利用间歇式混凝土泵和管道充填到采空区,达到控制岩层沉陷的目的。
其技术解决方案是:
一种薄煤层拖管式充填方法,其特征在于包括以下步骤:
①在工作面顺槽中布置充填主管,将高压胶管通过变径三通连接到充填主管上,将高位充填钢管连接到充填主管上;
②将多根充填管并联连接到高压胶管上,同时各充填管固定连接在采空区和煤层之间的工作面液压支架上,充填管的充填口伸入到采空区中;
③高位充填钢管的充填口穿过巷帮充填墙伸入到采空区中,其充填口的高度高于各充填管充填口的高度;
④开始充填采空区,直到采空区充填完毕,结束该采空区的充填工作;
⑤当工作面向前推移时,充填管跟随液压支架向前移动,进入新的采空区中,手动调整高位充填钢管的位置,使其向前移动的距离与液压支架向前移动的移动步距相同,充填口的高度高于各充填管充填口的高度;
⑥重复步骤④-⑤,直到该工作面采掘结束。
所述充填管的数量与工作面液压支架的数量相同,每架液压支架上设置一根充填管。
每根充填管均设置有阀门和流量、压力传感器。
所述充填主管上设置有阀门和流量、压力传感器。
所述高位充填钢管的充填口贴近采空区底板设置。
所述高位充填钢管的直径大于充填管的直径。
本发明的有益效果是:在不需要改造支架和构造堵漏墙的情况下,直接向采空区充填,减少了上覆岩层的运动,达到了控制地表沉陷的目的;充填管随工作面的推进直接跟随支架向前移动,提高了充填效率;通过高位注浆管,直接充填采空区顶板冒落带,使冒落带与破碎的上覆岩层通过注浆粘接在一起,减小了上覆岩层对巷帮充填墙的压力,保护了巷帮充填墙。
附图说明
附图1为实施本发明所述薄煤层拖管式充填方法的充填系统的结构示意图。
具体实施方式
参见附图1,一种薄煤层拖管式充填系统,包括布置在工作面顺槽中充填主管、高位充填钢管、高压胶管和多根充填管,充填主管和高位充填钢管可以选用普通钢管,直径根据井下充填需要自由选取,高压胶管的耐压性能要能满足充填压力的需要,充填管选用井下普通的充填花管即可,充填主管上的中部设置变径三通,高压胶管通过变径三通连接到充填主管上,多根充填管并联连接在高压胶管上,同时充填管固定连接在采空区和煤层之间的工作面液压支架上,随液压支架的移动而移动,形成“拖管式”充填系统,充填管的充填口(花管端)伸入到采空区中,优选充填管的数量与工作面液压支架的数量相同,即每架液压支架上设置一根充填管;高位充填钢管的一端连接在所述充填主管上,另一端,也就是充填口端穿过巷帮充填墙伸入到采空区中,高位充填钢管的充填口的高度要高于充填管充填口的高度,优选其紧贴采空区顶板设置,也就是说尽可能的靠近采空区顶板,为保证顶板的充填效果,可以设置高位充填钢管的直径大于充填管的直径。
为检测充填量和充填速度,可以在每根充填管和充填主管上设置流量、压力传感器,通过控制系统,如计算机、PLC等设备监控充填状况,同时还可以在每根充填管和充填主管上设置阀门,当需要停止某处的充填时,关闭相关位置的充填管上的阀门即可,当需要停止整个充填时,则关闭充填主管上的阀门。
采用上述充填系统实施的充填方法,包括以下步骤:
①在工作面顺槽中布置充填主管,将高压胶管通过变径三通连接到充填主管上,将高位充填钢管连接到充填主管上;
②将多根充填管并联连接到高压胶管上,同时各充填管固定连接在采空区和煤层之间的工作面液压支架上,优选每架液压支架固定一根充填管,充填管的充填口伸入到采空区中;
③高位充填钢管的充填口穿过巷帮充填墙伸入到采空区中,其充填口的高度高于各充填管充填口的高度,优选贴近采空区的顶板;
④开始充填采空区,直到采空区充填完毕,结束该采空区的充填工作;
⑤当工作面向前推移时,充填管跟随液压支架向前移动,进入新的采空区中,手动调整高位充填钢管的位置,使其向前移动的距离与液压支架向前移动的移动步距相同,充填口的高度高于各充填管充填口的高度,优选贴近采空区的顶板;
⑥重复步骤④-⑤,直到该工作面采掘结束。
以上所述,仅为本发明专利较佳的具体实施方式,但本发明专利的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明专利揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明专利的保护范围之内。
Claims (6)
1.一种薄煤层拖管式充填方法,其特征在于包括以下步骤:
①在工作面顺槽中布置充填主管,将高压胶管通过变径三通连接到充填主管上,将高位充填钢管连接到充填主管上;
②将多根充填管并联连接到高压胶管上,同时各充填管固定连接在采空区和煤层之间的工作面液压支架上,充填管的充填口伸入到采空区中;
③高位充填钢管的充填口穿过巷帮充填墙伸入到采空区中,其充填口的高度高于各充填管充填口的高度;
④开始充填采空区,直到采空区充填完毕,结束该采空区的充填工作;
⑤当工作面向前推移时,充填管跟随液压支架向前移动,进入新的采空区中,手动调整高位充填钢管的位置,使其向前移动的距离与液压支架向前移动的移动步距相同,充填口的高度高于各充填管充填口的高度;
⑥重复步骤④-⑤,直到该工作面采掘结束。
2.如权利要求1所述的充填方法,其特征在于:所述充填管的数量与工作面液压支架的数量相同,每架液压支架上设置一根充填管。
3.如权利要求2所述的充填方法,其特征在于:每根充填管均设置有阀门和流量、压力传感器。
4.如权利要求3所述的充填方法,其特征在于:所述充填主管上设置有阀门和流量、压力传感器。
5.如权利要求4所述的充填方法,其特征在于:所述高位充填钢管的充填口贴近采空区底板设置。
6.如权利要求5所述的充填方法,其特征在于:所述高位充填钢管的直径大于充填管的直径。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110457709.0A CN102444420B (zh) | 2011-12-31 | 2011-12-31 | 一种薄煤层破碎顶板拖管式充填方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110457709.0A CN102444420B (zh) | 2011-12-31 | 2011-12-31 | 一种薄煤层破碎顶板拖管式充填方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102444420A true CN102444420A (zh) | 2012-05-09 |
CN102444420B CN102444420B (zh) | 2014-06-04 |
Family
ID=46007312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110457709.0A Expired - Fee Related CN102444420B (zh) | 2011-12-31 | 2011-12-31 | 一种薄煤层破碎顶板拖管式充填方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102444420B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103321678A (zh) * | 2013-06-26 | 2013-09-25 | 施爱文 | 提高充填钻孔使用寿命的采空区充填装置及方法 |
CN103452795A (zh) * | 2012-10-11 | 2013-12-18 | 飞翼股份有限公司 | 一种双泵合流提高充填泵充填量的方法及其装置 |
CN109882240A (zh) * | 2019-03-29 | 2019-06-14 | 中国矿业大学 | 一种露天端帮压煤充填开采系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PL161826B1 (pl) * | 1989-08-17 | 1993-08-31 | Kopalnia Wegla Kamiennego Mysl | Sposób odżużlania ciekłych stopów żelaza w kadzi odlewniczej I koagulator żużla dla stopów żelaza |
JPH11173100A (ja) * | 1997-12-11 | 1999-06-29 | Sumitomo Densetsu Co Ltd | トンネル埋め戻し方法 |
WO2003024624A1 (en) * | 2001-09-18 | 2003-03-27 | Neuco, Inc. | Method and apparatus for treating underground pipeline |
CN201173134Y (zh) * | 2007-12-29 | 2008-12-31 | 江西铜业集团公司 | 胶结充填装置 |
CN102230396A (zh) * | 2011-05-31 | 2011-11-02 | 大连大学 | 煤矿采空区随采随充充填方法 |
-
2011
- 2011-12-31 CN CN201110457709.0A patent/CN102444420B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PL161826B1 (pl) * | 1989-08-17 | 1993-08-31 | Kopalnia Wegla Kamiennego Mysl | Sposób odżużlania ciekłych stopów żelaza w kadzi odlewniczej I koagulator żużla dla stopów żelaza |
JPH11173100A (ja) * | 1997-12-11 | 1999-06-29 | Sumitomo Densetsu Co Ltd | トンネル埋め戻し方法 |
WO2003024624A1 (en) * | 2001-09-18 | 2003-03-27 | Neuco, Inc. | Method and apparatus for treating underground pipeline |
CN201173134Y (zh) * | 2007-12-29 | 2008-12-31 | 江西铜业集团公司 | 胶结充填装置 |
CN102230396A (zh) * | 2011-05-31 | 2011-11-02 | 大连大学 | 煤矿采空区随采随充充填方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452795A (zh) * | 2012-10-11 | 2013-12-18 | 飞翼股份有限公司 | 一种双泵合流提高充填泵充填量的方法及其装置 |
CN103321678A (zh) * | 2013-06-26 | 2013-09-25 | 施爱文 | 提高充填钻孔使用寿命的采空区充填装置及方法 |
CN109882240A (zh) * | 2019-03-29 | 2019-06-14 | 中国矿业大学 | 一种露天端帮压煤充填开采系统 |
CN109882240B (zh) * | 2019-03-29 | 2020-04-14 | 中国矿业大学 | 一种露天端帮压煤充填开采系统 |
Also Published As
Publication number | Publication date |
---|---|
CN102444420B (zh) | 2014-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444419A (zh) | 一种薄煤层破碎顶板拖管式充填系统 | |
CN105422170B (zh) | 一种建筑基础下中深采空区注浆加固处理方法 | |
CN103016053B (zh) | 一种采空区局部充填控制地表沉陷的方法 | |
CN108661705B (zh) | 条采采空区四位一体综合治理施工方法 | |
CN105240047A (zh) | 一种治理露天矿地下采空区的充填加固方法 | |
CN108222938A (zh) | 一种大倾角煤层采空区组合注浆充填开采方法 | |
CN104564137B (zh) | 双介质垛式支撑坚硬顶板的煤矿采空区处理方法及装置 | |
CN103821558A (zh) | 煤矿采空区充填采矿系统及沿空留巷充填工艺 | |
CN104775816B (zh) | 切眼侧局部压煤覆岩隔离注浆充填不迁村开采方法 | |
CN108194132B (zh) | 一种墩式连拱式采空区处理方法 | |
CN102392644A (zh) | 中厚以下煤层的条带式流体膨胀充填开采方法 | |
CN102230396A (zh) | 煤矿采空区随采随充充填方法 | |
CN109594990B (zh) | 一种复杂地层大断面顶管施工方法 | |
CN202467921U (zh) | 一种薄煤层破碎顶板拖管式充填系统 | |
CN103334770A (zh) | 一种长大反坡隧道超高水压富水破碎带施工方法 | |
CN108087021A (zh) | 一种充填采煤回收遗留煤柱并控制隔水关键层稳定的方法 | |
CN102071940A (zh) | 煤矿井筒穿越多层采空区的施工方法 | |
CN101050709A (zh) | 采区高水压疏堵开采方法 | |
CN101608552A (zh) | 煤层底板含水层加固并在加固过程中保护隔水层的方法 | |
CN105464700A (zh) | 综采-充填混合开采工作面充填段长度确定方法 | |
CN111734482A (zh) | 一种利用矸石胶结与囊袋注浆联合支撑减损方法 | |
CN106522981B (zh) | 穿越采空区隧道的支护方法 | |
CN103161498B (zh) | 急倾斜煤层区段煤柱巷旁充填方法 | |
CN103161467B (zh) | 一种水平中厚矿体厢式充填采矿方法 | |
CN102444420B (zh) | 一种薄煤层破碎顶板拖管式充填方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |