CN102444278A - Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear - Google Patents

Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear Download PDF

Info

Publication number
CN102444278A
CN102444278A CN2011103216748A CN201110321674A CN102444278A CN 102444278 A CN102444278 A CN 102444278A CN 2011103216748 A CN2011103216748 A CN 2011103216748A CN 201110321674 A CN201110321674 A CN 201110321674A CN 102444278 A CN102444278 A CN 102444278A
Authority
CN
China
Prior art keywords
anchor ear
support system
carrying roller
roller
upper strata
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103216748A
Other languages
Chinese (zh)
Other versions
CN102444278B (en
Inventor
王新民
唐文喜
刘保亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN 201110321674 priority Critical patent/CN102444278B/en
Publication of CN102444278A publication Critical patent/CN102444278A/en
Application granted granted Critical
Publication of CN102444278B publication Critical patent/CN102444278B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an anchor ear with a lift carrier roller and a method for shifting a concrete placement support system by the anchor ear, wherein the anchor ear includes an anchor ear body and bearing wing plates arranged at the sides of the anchor ear body as well as carrier roller supports and carrier rollers. The carrier roller supports are connected with the side surfaces of the bearing wing plates, and vertical sliding slots are formed on the carrier roller supports; jacking bolts are arranged at the bottom part of the carrier roller supports and matched with threads of the carrier roller supports, and further vertically penetrate the vertical slots. The carrier rollers include roll shafts, and rollers externally sleeved on the roll shafts and matched with the roll shafts for rotation; the roll shafts are arranged along the bearing swing plates, and both ends of the roll shafts are erected in the vertical slots of the carrier roller supports; when the concrete placement support system is shifted, the carrier rollers are lifted above the upper surfaces of the bearing swing plates; an I-shaped steel beam of the support system is raised by the carrier rollers, and the support system is shifted vertically to a new construction position directly, so that repeated operation for hoisting and removal is simplified.

Description

Have the anchor ear of ascending/decending carrying roller and use this anchor ear to carry out the method for concrete pouring support system conversion
Technical field
The invention belongs to the synchronous cast-in-place support technology of bottom beam, the plate field in the large tracts of land building, be specifically related to a kind of anchor ear and use this anchor ear to carry out the method for concrete pouring support system conversion.
Background technology
The modern architecture major part is provided with the bottom parking lot; Adopt big template, beam, rod structure system, direct brace summer body on the general pillar, beam body and roof panel are together cast-in-place; Form large-area plate-girder cylinder system, be separated into corresponding building function zone need designing by function on it again.
At present, adopting maximum forms of construction work is to utilize full hall scaffold to carry out gross area to support, and carries out template and scaffold behind the formwork erection and removes.For preventing that surface settlement from influencing the construction quality of plate-girder system, often need in advance necessary sclerosis to be carried out on ground and reinforce, needing before the sclerosis has higher requirement to the sedimentation of ground backfill part.Simultaneously, adopt large tracts of land scaffold support system, consume a large amount of supporting rods, fastener, annex and manual work, time-consuming.
Bring negative effect for the garage roofing in order to prevent surface settlement; Reduce construction cost; Also there is the post of employing anchor ear method that vertical load is transferred on the pillar; Be connected with pillar with anchor ear at capital, the load-bearing wing plate of anchor ear both wings supports steel I-beam, on steel I-beam, sets up support systems such as roof girder, plate.Adopt capital anchor ear method, working load does not contact with ground, does not receive the influence of surface settlement.When adopting this method; Equipment such as available crane lifts steel I-beam and to anchor ear, installs before the fluid concrete; But after the concrete to be cast, can't adopt hanging device dismounting steel I-beams such as crane, need to cooperate with jack is artificial; Anchor ear reduced one by one moving to next construction section after removing behind the height and reinstall, time-consuming and have certain security risk.
Summary of the invention
In view of this; The invention provides and a kind ofly have the anchor ear of ascending/decending carrying roller and use this anchor ear to carry out the method for concrete pouring support system conversion; Can the steel I-beam of support system be held up; And directly support system is longitudinally moved to new construction location, simplify lifting and removing workload repeatedly, thereby improve work efficiency, reduction security risk, reduction construction cost.
The invention discloses a kind of anchor ear that has the ascending/decending carrying roller; Comprise anchor ear body and the load-bearing wing plate that is arranged on anchor ear body side; Also comprise roller rack and carrying roller; Said roller rack is connected with load-bearing wing plate side, has vertical chute on the said roller rack, and said roller rack bottom is provided with its threaded engagement and vertically penetrates the jacking bolt of vertical chute; Said carrying roller comprises roll shaft and the roller that is coated at roll shaft and is rotatably assorted with it, and said roll shaft is erected in the vertical chute of roller rack along load-bearing wing plate horizontally set and its two ends.
Further, the two ends of said roll shaft are respectively equipped with square slider, and said square slider is positioned at vertical chute and is slidingly matched with it;
Further, also be arranged with bearing between said roller and the roll shaft;
Further, said roller two ends are provided with annular lip.
The invention also discloses a kind of method of using the above-mentioned anchor ear that has the ascending/decending carrying roller to carry out the conversion of concrete pouring support system, may further comprise the steps:
1) lower floor's anchor ear is installed again on the pillar below the upper strata anchor ear of having born support system weight; To up and down through jack, two-layer anchor ear holds out against; The weight of sending out the upper strata anchor ear to make support system is all born by lower floor's anchor ear, discharges jack pressure upper strata anchor ear and support system are dropped to the appointment absolute altitude; Said upper strata anchor ear is the anchor ear that has the ascending/decending carrying roller;
2) on the anchor ear of upper strata, upwards slide in vertical chute in the roll shaft two ends that promote carrying roller through the jacking bolt, thereby carrying roller is risen from load-bearing wing plate upper surface, and carrying roller is held up the steel I-beam of support system;
3) on the pillar of next construction section, the anchor ear that has the ascending/decending carrying roller is installed, support system is moved to next construction section through longitudinal traction;
4) on the pillar of next construction section; Lower floor's anchor ear is installed below the upper strata anchor ear of having born support system weight again; Hold out against through two-layer anchor ear about the jack general, the weight of sending out the upper strata anchor ear to make support system is all born by lower floor's anchor ear, promotes jack pressure upper strata anchor ear and support system are increased to the appointment absolute altitude; Fastening once more upper strata anchor ear is all born the weight of support system by the upper strata anchor ear.
Further, in the said step 1), the template that support system drops to support system is lower than the beam body;
Further, in the said step 1), after support system drops to and specifies absolute altitude, with the form removable of support system;
Further, said step 2) in, the steel I-beam of support system is limited in the annular lip at carrying roller roller two ends.
Beneficial effect of the present invention is: the anchor ear that has the ascending/decending carrying roller of the present invention can promote roll shaft two ends upwards slip in vertical chute of carrying roller through the jacking bolt, thereby carrying roller is risen from load-bearing wing plate upper surface; Utilize this function of this anchor ear; When carrying out the conversion of concrete pouring support system; Use carrying roller that the steel I-beam of support system is held up; And directly support system is longitudinally moved to new construction location, simplified lifting and removing workload repeatedly, thereby improved work efficiency, reduced security risk, reduced construction cost.
Description of drawings
In order to make the object of the invention, technical scheme and advantage clearer, will combine accompanying drawing that the present invention is made further detailed description below, wherein:
Fig. 1 is the plan structure sketch map that has the anchor ear of ascending/decending carrying roller;
Fig. 2 is the longitudinal sectional view (carrying roller does not rise state) that has the anchor ear of ascending/decending carrying roller;
Fig. 3 is the longitudinal sectional view (carrying roller rise state) that has the anchor ear of ascending/decending carrying roller;
Fig. 4 is the structural representation of carrying roller;
Fig. 5 is support system transfer process sketch map (support system descends preceding or support system rising back);
Fig. 6 is support system transfer process sketch map (support system descends before back or the support system rising).
The specific embodiment
Below will carry out detailed description to the preferred embodiments of the present invention with reference to accompanying drawing.
Fig. 1 is the plan structure sketch map that has the anchor ear of ascending/decending carrying roller; Fig. 2 is the longitudinal sectional view (carrying roller does not rise state) that has the anchor ear of ascending/decending carrying roller; Fig. 3 is the longitudinal sectional view (carrying roller rise state) that has the anchor ear of ascending/decending carrying roller, and Fig. 4 is the structural representation of carrying roller; As shown in the figure; The anchor ear that has the ascending/decending carrying roller of the present invention; Comprise anchor ear body 1 and the load-bearing wing plate 2 that is arranged on anchor ear body 1 side, also comprise roller rack 3 and carrying roller 4, said roller rack 3 is connected with load-bearing wing plate 2 sides; Have vertical chute 3a on the said roller rack 3; Said roller rack 3 bottoms are provided with its threaded engagement and vertically penetrate the jacking bolt 5 of vertical chute 3a, and said carrying roller 4 comprises roll shaft 41 and the roller 42 that is coated at roll shaft 41 and is rotatably assorted with it, and said roll shaft 41 is erected in the vertical chute 3a of roller rack 3 along load-bearing wing plate 2 horizontally sets and its two ends; Upwards slide in vertical chute 3a in roll shaft 41 two ends that promote carrying roller 4 through jacking bolt 5, thereby with carrying roller 4 emersion load-bearing wing plates 2 upper surfaces, thereby can utilize carrying roller 4 that the steel I-beam 6 of support system is held up, as shown in Figure 3.
As further improvement of the present invention, the two ends of said roll shaft 41 are respectively equipped with square slider 43, and said square slider 43 is positioned at vertical chute 3a and is slidingly matched with it; Utilize being slidingly matched of square slider 43 and vertical chute 3a, make sliding up and down of roll shaft 41 more smooth and easy.
As further improvement of the present invention, also be arranged with bearing 44 between said roller 42 and the roll shaft 41; Roller 42 is rotatably assorted through bearing 44 and roll shaft 41, and it is more smooth and easy that roller 42 is rotated, the loss of reducing friction.
As further improvement of the present invention, said roller 42 two ends are provided with annular lip 45; After carrying roller 4 rose, annular lip 45 was used to limit steel I-beam 6, prevented that its teeter breaks away from carrying roller 4.
In the present embodiment, pillar 7 is a square column, so anchor ear body 1 also is square, and it is formed by connecting with high-strength bolt 8 the two halves anchor ear; Certainly, pillar also can be cylinder, and the anchor ear body also is circular accordingly.
When carrying out the large area concrete casting and constructing; After measuring absolute altitude; Anchor ear is fixed on capital with high-strength bolt, on the load-bearing wing plate of anchor ear, utilizes the lifting mechanical engagement to arrange that the roofing girder supports steel I-beam, the roofing secondary beam supports steel I-beam, primary and secondary beam forms and roofing template etc.When after roofing primary and secondary beam and the roof panel concrete pouring and when reaching form removal intensity, need carry out the conversion of concrete pouring support system, be about to support system and move to next construction section, carry out next works area section concrete cast then.
The above-mentioned anchor ear that has the ascending/decending carrying roller of use of the present invention carries out method such as Fig. 5, shown in Figure 6 of concrete pouring support system conversion, may further comprise the steps:
1) as shown in Figure 5; On the pillar 7 of the upper strata anchor ear of having born support system weight below 9, lower floor's anchor ear 10 is installed again; Hold out against through two-layer anchor ear about jack 11 generals, the weight of sending out upper strata anchor ear 9 to make support system is all born by lower floor's anchor ear 10; As shown in Figure 6, discharge jack pressure 11 upper strata anchor ear 9 and support system are dropped to the appointment absolute altitude; Said upper strata anchor ear 9 is for having the anchor ear of ascending/decending carrying roller; Support system drops to the template of specifying absolute altitude to be meant that support system drops to support system and is lower than the beam body; After support system drops to and specifies absolute altitude, with the form removable of support system, to alleviate support system weight;
2) as shown in Figure 6, on upper strata anchor ear 9, upwards slide in vertical chute in the roll shaft two ends that promote carrying roller 4 through the jacking bolt, thereby with carrying roller 4 emersion load-bearing wing plates 2 upper surfaces, carrying roller 4 is held up the steel I-beam 6 of support system; When carrying roller 4 holds up steel I-beam 6, steel I-beam 6 is limited in the annular lip at carrying roller 4 roller two ends, prevents that its teeter breaks away from carrying roller 4;
3) on the pillar 7 of next construction section, the anchor ear that has the ascending/decending carrying roller is installed, support system is moved to next construction section through longitudinal traction;
4) as shown in Figure 6; On the pillar 7 of next construction section; At the upper strata anchor ear of having born support system weight lower floor's anchor ear 10 is installed below 9 again, two-layer anchor ear holds out against about inciting somebody to action through jack 11, and the weight of sending out upper strata anchor ear 9 to make support system is all born by lower floor's anchor ear 10; As shown in Figure 5, promote jack pressure 11 upper strata anchor ear 9 and support system are increased to the appointment absolute altitude, fastening once more upper strata anchor ear 9 is all born the weight of support system by upper strata anchor ear 9.
After the concrete pouring support system converts, carry out next works area section concrete cast again, change normal constructions such as artificial mounting template, assembling reinforcement, fluid concrete over to.
After whole roofing constructions finish, can adopt the method that support system is reduced repeatedly conversion, support system is reduced to the position lower apart from ground, by auxiliary all support systems of removing of manual work.
The present invention has utilized the anchor ear that has the ascending/decending carrying roller to carry out the conversion of concrete pouring support system; Carrying roller emersion load-bearing wing plate upper surface holds up the steel I-beam of support system; Can directly support system be longitudinally moved to new construction location; Simplified lifting and removing workload repeatedly, thereby improved work efficiency, reduced security risk, reduced construction cost.
Explanation is at last; Above embodiment is only unrestricted in order to technical scheme of the present invention to be described; Although through invention has been described with reference to the preferred embodiments of the present invention; But those of ordinary skill in the art should be appreciated that and can make various changes to it in form with on the details, and the spirit and scope of the present invention that do not depart from appended claims and limited.

Claims (8)

1. anchor ear that has the ascending/decending carrying roller; Comprise anchor ear body (1) and be arranged on the load-bearing wing plate (2) of anchor ear body (1) side; It is characterized in that: also comprise roller rack (3) and carrying roller (4); Said roller rack (3) is connected with load-bearing wing plate (2) side; Have vertical chute (3a) on the said roller rack (3); Said roller rack (3) bottom is provided with its threaded engagement and vertically penetrates the jacking bolt (5) of vertical chute (3a), the roller (42) that said carrying roller (4) comprises roll shaft (41) and is coated at roll shaft (41) and is rotatably assorted with it, and said roll shaft (41) is erected in the vertical chute (3a) of roller rack (3) along load-bearing wing plate (2) horizontally set and its two ends.
2. the anchor ear that has the ascending/decending carrying roller according to claim 1 is characterized in that: the two ends of said roll shaft (41) are respectively equipped with square slider (43), and said square slider (43) is positioned at vertical chute (3a) and is slidingly matched with it.
3. the anchor ear that has the ascending/decending carrying roller according to claim 1 is characterized in that: also be arranged with bearing (44) between said roller (42) and the roll shaft (41).
4. the anchor ear that has the ascending/decending carrying roller according to claim 1 is characterized in that: said roller (42) two ends are provided with annular lip (45).
5. use any described anchor ear that has the ascending/decending carrying roller of claim 1 to 4 to carry out the method for concrete pouring support system conversion, it is characterized in that: may further comprise the steps:
1) on the pillar of having born below the upper strata anchor ear (9) of support system weight (7), lower floor's anchor ear (10) is installed again; To up and down through jack (11), two-layer anchor ear holds out against; The weight of sending out upper strata anchor ear (9) to make support system is all born by lower floor's anchor ear (10), discharges jack (11) pressure upper strata anchor ear (9) and support system are dropped to the appointment absolute altitude; Said upper strata anchor ear (9) is for having the anchor ear of ascending/decending carrying roller;
2) on upper strata anchor ear (9), upwards slide in vertical chute in the roll shaft two ends that promote carrying roller (4) through the jacking bolt, thereby with carrying roller (4) emersion load-bearing wing plate (2) upper surface, carrying roller (4) is held up the steel I-beam (6) of support system;
3) go up the anchor ear that installation has the ascending/decending carrying roller at the pillar (7) of next construction section, support system is moved to next construction section through longitudinal traction;
4) on the pillar (7) of next construction section; Below having born the upper strata anchor ear (9) of support system weight, lower floor's anchor ear (10) is installed again; To up and down through jack (11), two-layer anchor ear holds out against; The weight of sending out upper strata anchor ear (9) to make support system is all born by lower floor's anchor ear (10); Promote jack (11) pressure upper strata anchor ear (9) and support system are increased to the appointment absolute altitude, fastening once more upper strata anchor ear (9) is all born the weight of support system by upper strata anchor ear (9).
6. the method for concrete pouring support system conversion according to claim 5, it is characterized in that: in the said step 1), the template that support system drops to support system is lower than the beam body.
7. the method for concrete pouring support system conversion according to claim 5 is characterized in that: in the said step 1), after support system drops to and specifies absolute altitude, with the form removable of support system.
8. the method for concrete pouring support system according to claim 5 conversion is characterized in that: said step 2), the steel I-beam (6) of support system is limited in the annular lip at carrying roller (4) roller two ends.
CN 201110321674 2011-10-21 2011-10-21 Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear Active CN102444278B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110321674 CN102444278B (en) 2011-10-21 2011-10-21 Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110321674 CN102444278B (en) 2011-10-21 2011-10-21 Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear

Publications (2)

Publication Number Publication Date
CN102444278A true CN102444278A (en) 2012-05-09
CN102444278B CN102444278B (en) 2013-07-31

Family

ID=46007182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110321674 Active CN102444278B (en) 2011-10-21 2011-10-21 Anchor ear with lift carrier roller and method for shifting concrete placement support system by the anchor ear

Country Status (1)

Country Link
CN (1) CN102444278B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100734603B1 (en) * 2007-01-31 2007-07-03 (주)테마종합건축사사무소 A building concrete mold connecting apparatus
CN101200960A (en) * 2007-12-20 2008-06-18 北京建工集团有限责任公司 Anchor-ear node plate and construction method of ceiling joist
CN201128880Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Hold hoops and support integrated structure for circular single pier
CN201224869Y (en) * 2008-10-27 2009-04-22 中铁九局集团有限公司 Circular pier capping beam supporting device
CN101581073A (en) * 2008-07-10 2009-11-18 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN101694126A (en) * 2009-09-18 2010-04-14 上海市第四建筑有限公司 Mechanism for attaching building integral elevating scaffold to steel beam
CN201746838U (en) * 2010-06-17 2011-02-16 国鼎(南通)管桩有限公司 Concrete filled steel tube pile pump conveying equipment
CN201924594U (en) * 2010-12-07 2011-08-10 新疆建工集团第三建设工程有限责任公司 Support system structure of arc-shaped template

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100734603B1 (en) * 2007-01-31 2007-07-03 (주)테마종합건축사사무소 A building concrete mold connecting apparatus
CN201128880Y (en) * 2007-11-15 2008-10-08 中交第一公路工程局有限公司 Hold hoops and support integrated structure for circular single pier
CN101200960A (en) * 2007-12-20 2008-06-18 北京建工集团有限责任公司 Anchor-ear node plate and construction method of ceiling joist
CN101581073A (en) * 2008-07-10 2009-11-18 中铁大桥局股份有限公司 Downlink movable mould frame and walking method thereof
CN201224869Y (en) * 2008-10-27 2009-04-22 中铁九局集团有限公司 Circular pier capping beam supporting device
CN101694126A (en) * 2009-09-18 2010-04-14 上海市第四建筑有限公司 Mechanism for attaching building integral elevating scaffold to steel beam
CN201746838U (en) * 2010-06-17 2011-02-16 国鼎(南通)管桩有限公司 Concrete filled steel tube pile pump conveying equipment
CN201924594U (en) * 2010-12-07 2011-08-10 新疆建工集团第三建设工程有限责任公司 Support system structure of arc-shaped template

Also Published As

Publication number Publication date
CN102444278B (en) 2013-07-31

Similar Documents

Publication Publication Date Title
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN200975103Y (en) Hydraulic center top lifting framework apparatus
CN103195256B (en) Hanging column type steel structure jig frame construction method
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN106759845B (en) A kind of construction method of Steel corridor
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN103075025A (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN207903788U (en) A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN102733608A (en) Construction method for spray head layer of granulation tower
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN102049335A (en) Installation and construction method of large-sized ball mill
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN202064281U (en) Slip form frame
CN101177933B (en) Bridge rib hoisting and supporting rack integral construction method and device
CN110158486A (en) It is a kind of to set up the Bridge Erector and construction method for spelling wide beam
CN204455842U (en) Bridge precast beam plate plays roof beam structure
CN103061514A (en) Long-span steel structure corridor construction method
CN200971610Y (en) Guide lifting platform device for chimney
CN102041779A (en) Erection crane and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant