CN102442808A CN2010105076738A CN201010507673A CN102442808A CN 102442808 A CN102442808 A CN 102442808A CN 2010105076738 A CN2010105076738 A CN 2010105076738A CN 201010507673 A CN201010507673 A CN 201010507673A CN 102442808 A CN102442808 A CN 102442808A
Authority
CN
China
Prior art keywords
tailings
technology
mine
tailing
percent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105076738A
Other languages
Chinese (zh)
Inventor
侯运炳
魏书祥
杨宝贵
王炳文
薛黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANXING METALLURGICAL MINE ADMINISTRATION
China University of Mining and Technology Beijing CUMTB
Original Assignee
HANXING METALLURGICAL MINE ADMINISTRATION
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANXING METALLURGICAL MINE ADMINISTRATION, China University of Mining and Technology Beijing CUMTB filed Critical HANXING METALLURGICAL MINE ADMINISTRATION
Priority to CN2010105076738A priority Critical patent/CN102442808A/en
Publication of CN102442808A publication Critical patent/CN102442808A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The invention discloses an all tailing cementing and discharging technology for metal mines. The technology comprises the following steps of: thickening tailings discharged by a metal mine concentration plant into 35-65 percent by mass of thick tailing slurry with a thickener; injecting into a stirring pool with a sand supply pipe and adding 1-6 percent by mass of gelled materials for stirring uniformly; concentrating and dehydrating into a dry material of which the water content is 15-25 percent with filtering equipment; and transferring and piling in mine collapse pits or appropriate places on the ground surface by using conveying equipment. In the technology, tailings are piled without building any tailing pond after being cemented, so that the conventional tailing pond discharge way is changed, and the potential safety hazard and environmental damage of the tailing pond are eliminated; and the technology has great economic benefit and social benefit.

Description

The complete fixed draining technology of tailings
(1) technical field
The invention belongs to mine environment and administer the field, be specifically related to a kind of with the discharging of metallic ore dressing-works the tailings thickening and add the tailings draining technology that an amount of gelling material is stored up after fixed.
(2) background technology
Tailings belongs to the waste after the ore dressing, and is huge in the quantity discharged of China's tailings.Except that the minute quantity tailings was utilized, all the other overwhelming majority deposited in the mine tailing storehouse, the face of land.Using face of land mine tailing stock to put tailings deposits and wants a lot of problems: 1. take a large amount of soils; 2. directly cause environmental pollution; 3. the mine tailing stock is in potential safety hazards such as dam breaks.In addition, because the growing tension and the exhaustion of land resources suit to build the local fewer and feweri of mine tailing storehouse.
Hold not enough, tailings discharging difficulty for solving metal mine mine tailing Kuku; Eliminate potential safety hazard and environmental damage that the mine tailing library tape comes; For China's tailings processing provides a kind of new technological approaches; Propose the fixed draining technology of full tailings, the tailings that is about to the discharging of mine ore dressing factory utilizes the surface subsidence hole of mining formation to carry out the last person after thickening and consolidation process, or stores up other suitable places to the face of land; So just need not to build the mine tailing storehouse, also solved surface subsidence hole backfill simultaneously and also created condition for land reclamation.
(3) summary of the invention
(1) technological line and the technical process that the fixed row of the full tailings in a kind of mine stores up proposed
Technological line of the present invention: after thickening and consolidation process, backfill is cheated because of the surface subsidence that mining forms, or stores up other suitable places to the face of land with the tailings of mine ore dressing factory discharging.
Technical process of the present invention: it is the tailings underflow of 35%~65% (mass percent) to concentration that the tailings of mine ore dressing factory discharging at first adopts thickener dense; The tailings underflow stirs through the gelling material that supplies sandpipe and inject agitated pool and add 1%~6% (mass percent); Mixed slurry after the stirring is 15%~25% siccative by straining installation thickening to water ratio, changes draining into surface subsidence hole, mine or other suitable places are stored up again through handling equipment.
(2) confirm gelling material kind and minimum safe proportioning parameter thereof
The gelling material that the present invention adopted meets the requirement of general purpose portland cement among the GB175-2007, or adopts special-purpose full tailings cementing material to make gelling material; The gelling material volume is 1%~6% (mass percent), and tailings adhesive bond 28d intensity is 0.50MPa~2.0MPa.Bargh can guarantee to store up kind and the proportioning parameter thereof of confirming gelling material under the safe prerequisite as required.
(4) embodiment
(1) adopt thickener with the tailings of mine ore dressing factory discharging dense be the tailings underflow of 35%~65% (mass percent) to concentration;
(2) the tailings underflow stirs through supplying sandpipe and inject agitated pool and add the general purpose portland cement or the special-purpose complete fixed gelling material of tailings of 1%~6% (mass percent), forms mixed slurry;
(3) mixed slurry that stirs is 15%~25% siccative by straining installation (can adopt vacuum filter, automatic pressure filter or ceramic filter) thickening to water ratio;
(4) siccative after the thickening changes through handling equipment (can adopt endless belt conveyor, rail transportation equipment or trackless transportation equipment) and drains into surface subsidence hole, mine or other suitable places are stored up.

Claims (3)

1. the complete fixed draining technology of tailings is characterized in that: it is the mine tailing underflow of 35%~65% (mass percent) to concentration that the tailings of metallic ore dressing-works discharging at first adopts thickener dense; The mine tailing underflow stirs through the gelling material that supplies sandpipe and inject agitated pool and add 1%~6% (mass percent); Mixed slurry after the stirring is 15%~25% siccative by straining installation thickening to water ratio, changes draining into the face of land, mine and store up again through handling equipment.
2. the fixed draining technology of full tailings according to claim 1, it is characterized in that: said gelling material meets the requirement of general purpose portland cement among the GB175-2007, or adopts special-purpose full tailings cementing material to make gelling material.
3. the fixed draining technology of full tailings according to claim 1 is characterized in that: said mine tailing underflow straining installation can adopt belt vacuum filter, disc vacuum filter, automatic pressure filter or ceramic filter; Said siccative handling equipment can adopt endless belt conveyor, rail transportation equipment or trackless transportation equipment.
CN2010105076738A 2010-10-15 2010-10-15 All tailing cementing and discharging technology Pending CN102442808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105076738A CN102442808A (en) 2010-10-15 2010-10-15 All tailing cementing and discharging technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105076738A CN102442808A (en) 2010-10-15 2010-10-15 All tailing cementing and discharging technology

Publications (1)

Publication Number Publication Date
CN102442808A true CN102442808A (en) 2012-05-09

Family

ID=46005797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105076738A Pending CN102442808A (en) 2010-10-15 2010-10-15 All tailing cementing and discharging technology

Country Status (1)

Country Link
CN (1) CN102442808A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102976647A (en) * 2012-11-18 2013-03-20 金建工程设计有限公司 Wet discharge, consolidation and deposition method for tailings
CN107824318A (en) * 2017-11-15 2018-03-23 中冶北方(大连)工程技术有限公司 A kind of suspending magnetization roasting furnace feed preparation process
CN113171652A (en) * 2021-04-30 2021-07-27 矿冶科技集团有限公司 Tailing reverse filter material, preparation method and application thereof, reverse filter material seepage drainage structure and application thereof
CN113982683A (en) * 2021-10-28 2022-01-28 长沙矿山研究院有限责任公司 Solidifying and piling method and system for building material mine sand washing mud

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202569A (en) * 1997-06-16 1998-12-23 陈隆金 High concentrate paste-filling technology and equipment in mine
CN1521388A (en) * 2003-01-29 2004-08-18 陈隆金 Process and equipment for preparing and discharging high concentration and plaster mortar

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202569A (en) * 1997-06-16 1998-12-23 陈隆金 High concentrate paste-filling technology and equipment in mine
CN1521388A (en) * 2003-01-29 2004-08-18 陈隆金 Process and equipment for preparing and discharging high concentration and plaster mortar

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尹慰农: "全尾砂胶结充填技术的发展", 《长沙矿山研究院季刊》, vol. 12, 31 December 1992 (1992-12-31), pages 32 - 39 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102976647A (en) * 2012-11-18 2013-03-20 金建工程设计有限公司 Wet discharge, consolidation and deposition method for tailings
CN102976647B (en) * 2012-11-18 2015-06-24 金建工程设计有限公司 Wet discharge, consolidation and deposition method for tailings
CN107824318A (en) * 2017-11-15 2018-03-23 中冶北方(大连)工程技术有限公司 A kind of suspending magnetization roasting furnace feed preparation process
CN113171652A (en) * 2021-04-30 2021-07-27 矿冶科技集团有限公司 Tailing reverse filter material, preparation method and application thereof, reverse filter material seepage drainage structure and application thereof
CN113982683A (en) * 2021-10-28 2022-01-28 长沙矿山研究院有限责任公司 Solidifying and piling method and system for building material mine sand washing mud

Similar Documents

Publication Publication Date Title
Deng et al. A practice of ultra-fine tailings disposal as filling material in a gold mine
CN102155261B (en) Paste combined filling method utilizing solid wastes of mine
CN108035769B (en) A kind of modified filling coal mining method of microorganism
CN113101789B (en) Method and structure for sealing carbon dioxide by utilizing open pit and mining method
WO2019076061A1 (en) Disposal method for gold mine cyanide tailing paste
CN109496481A (en) Tailings Dam closes library and reclaims System and method for
CN102442808A (en) All tailing cementing and discharging technology
CN102101790A (en) Tailing-based fluid swelling filling material
CN102432234B (en) comprehensive treatment method for mud nonferrous metal oxidized ore dressing tailing water residue
CN108867712A (en) A kind of side slope based on tailing composite anti-penetrating material, hole bottom, substrate anti-seepage method
CN105780784B (en) A kind of method for being suitable to carry out fine tailings by level land or massif in dry heap
CN104763467B (en) Obturation and its placement method and system for Hazard in Deep Metal Mines goaf
CN108191365A (en) A kind of method using ardealite material cementing fill metal mine
CN108167017A (en) A kind of metal mine consolidated fill method of environmental protection cementitious material
RU2327873C1 (en) Method for comprehensive development of complex ore fields
CN209604078U (en) A kind of obturation water treatment plant
CN110645044A (en) Grouting filling system
CN105298539B (en) Method for preventing and treating waste water pollution of abandoned mine and avoiding water permeation accidents
CN105089694A (en) Method for injecting solidified tailings into collapse pit
CN204186399U (en) A kind of gunite material long distance delivery system
CN100506391C (en) Re-separating process for non-ferrous metal tailings
CN205929066U (en) Device of high efficiency preparation clay magma
CN103951360B (en) Mineral metal products exploitation tail ore pulp solidifying agent and application art thereof
CN215408754U (en) Water reducing agent applied to spraying wet type filling system
CN111140280A (en) Method for reinforcing and blocking water of gob-side roadway coal pillar slope pile-spraying concrete wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120509