CN102434875A - Method for treating high-temperature smoke at opening of waste heat boiler of converter - Google Patents

Method for treating high-temperature smoke at opening of waste heat boiler of converter Download PDF

Info

Publication number
CN102434875A
CN102434875A CN2011102808230A CN201110280823A CN102434875A CN 102434875 A CN102434875 A CN 102434875A CN 2011102808230 A CN2011102808230 A CN 2011102808230A CN 201110280823 A CN201110280823 A CN 201110280823A CN 102434875 A CN102434875 A CN 102434875A
Authority
CN
China
Prior art keywords
water
collection case
waste heat
heat sink
converter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102808230A
Other languages
Chinese (zh)
Inventor
何网秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Hailu Heavy Industry Co Ltd
Original Assignee
Suzhou Hailu Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Hailu Heavy Industry Co Ltd filed Critical Suzhou Hailu Heavy Industry Co Ltd
Priority to CN2011102808230A priority Critical patent/CN102434875A/en
Publication of CN102434875A publication Critical patent/CN102434875A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Abstract

The invention discloses a method for treating high-temperature smoke at an opening of a waste heat boiler of a converter, and the method can be used for well using the high temperature-smoke at the opening of the waste heat boiler of the converter. A movable smoke cover is arranged at the opening of the waste heat boiler of the converter; the movable smoke cover comprises a water inlet header and a water outlet header; a heat absorption device is arranged between the water inlet header and the water outlet header; a heat absorption pipe in the heat absorption device is connected with the water inlet header and the water outlet header respectively through branch pipes; the upper end of the heat absorption device is provided with a plurality of gas spray pipes connected with an external gas source; the nozzles of the gas spray pipes are positioned on the inner side of the upper end of the heat absorption device; water circulation adopts a low-pressure forced circulation mode; circulation cooling water is from a deoxidized water tank; and after a low-pressure circulation water pump conveys the cooling water to the movable smoke cover to absorb the heat, a formed steam and water mixture returns to the deoxidized water tank or is used for other purposes. The method has the advantages that the heat absorption area of the movable smoke cover is increased, the sealing property of the movable smoke cover is improved and the utilization rate of the high-temperature smoke is increased.

Description

The processing method of converter waste heat boiler fire door place high-temperature flue gas
Technical field
The present invention relates to the processing method of a kind of converter waste heat boiler fire door place high-temperature flue gas.
Background technology
The operating condition of converter waste heat boiler is periodicity, variation sharp with the smelting process of converter.When bessemerizing, the great amount of high-temperature flue gas flows through waste heat boiler, and the thermic load of waste heat boiler sharply increases; When blowing stopped, the thermic load of waste heat boiler sharply reduced.This thermic load about 30min period of waves (being equivalent to the converter smelting cycle), abominable service condition must exert an influence to the service life of waste heat boiler.At present, the service life of converter waste heat boiler is very short, and the average life span of epimere cooling stack is about 6 years, and the life-span of hypomere cooling stack is 2~3 years, and the service condition of fire door movable gas hood is more abominable, and the life-span had only about 1 year.Accident rate is also very high in the lifetime, must often overhaul, and has both influenced output of steel, influences security of operation again.Therefore, the converter waste heat boiler particularly design of fire door movable gas hood is most important, and it directly influences the ordinary production of converter.As shown in Figure 1, movable gas hood commonly used comprises: water inlet collection case 1, be positioned at the water outlet collection case 2 of water collection case 1 top into and be connected some heat exchanger tubes 3 of water inlet collection case 1 and water outlet collection case 2, the top of water outlet collection case 2 is provided with annular water tank 4, tank 4 interior filled with water.When movable gas hood uses in reality; The top also has an epimere cooling stack 5 cylindraceous; Reduce the utilization rate of flue gas in order to prevent to spill the gap of partial fume between tank 4 and epimere cooling stack 5; In tank 4, be provided with the sealing plate 6 that the cross section is the shape of falling L, an end of sealing plate 6 is positioned at tank 4, and the outer wall of the other end and epimere cooling stack 5 offsets.Above-mentioned movable gas hood adopts the circulation of nature water usually, and its shortcoming is following: a. petticoat pipe and converter bell place clearance control are not tight, causes and leaks out seriously, has influenced the recovery of coal gas; B. petticoat pipe is near fire door, and operating mode is abominable, and heating surface is short.Adopt the reaction of nature water cyclic force slow, relatively poor in blowing initial stage hydrodynamic force, pipe often can not get reliable cooling.Therefore, the service life of movable gas hood is all about 1 year; C. petticoat pipe and fire door section adopt the water seal sealing.When blowing, there is a large amount of lime-ash to fall into the water tank on the movable gas hood, after use a period of time, a large amount of lime-ash have been full of water tank, and movable gas hood can't be gone up and down; D. the drum voltage-stabilizing system moves the undesired frequent fluctuation that causes carburetion system, and the continuous variation of internal pressure stress causes the heat pipe fatigue rupture, and the simultaneity factor pressure oscillation has also influenced the Water Circulation Characteristic in the movable gas hood heat pipe too greatly.
Summary of the invention
Technical problem to be solved by this invention is: the processing method that the converter waste heat boiler fire door place high-temperature flue gas of a kind of good use converter waste heat boiler fire door place high-temperature flue gas is provided.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the processing method of a kind of converter waste heat boiler fire door place high-temperature flue gas is provided with movable gas hood at converter waste heat boiler fire door; This movable gas hood comprises into water collection case and water outlet collection case; Be provided with heat sink between water inlet collection case and the water outlet collection case, heat sink is formed by stacking several annular endothermic tubes, and heat sink integral body is truncated cone-shaped; Weld together through annular round steel between the adjacent endothermic tube; Endothermic tube in the heat sink links to each other with water outlet collection case with water inlet collection case through arm respectively, and the upper end of heat sink is provided with the some air jet pipes that link to each other with extraneous source of the gas, and the spout of air jet pipe is positioned at the inboard, upper end of heat sink; The low force endless form is adopted in the water circulation; Recirculated cooling water is from the deoxygenation water tank, and after the low pressure recycle water pump was delivered to the movable gas hood heat absorption with cooling water, the steam water interface of formation was got back to the deoxygenation water tank again or used it for anything else in addition.
The invention has the beneficial effects as follows: increased movable gas hood endotherm area, improved the sealing property of movable gas hood and improved the utilization rate of high-temperature flue gas.
Description of drawings
Fig. 1 is the structure diagram of the processing method of converter waste heat boiler fire door place high-temperature flue gas in the background technology;
Fig. 2 is the structure chart of the processing method of converter waste heat boiler fire door of the present invention place high-temperature flue gas;
Fig. 3 is the partial enlarged drawing between A place endothermic tube and the round steel among Fig. 2.
Among Fig. 1: 1, water inlet collection case, 2, water outlet collection case, 3, heat exchanger tube, 4, tank, 5, the epimere cooling stack, 6, sealing plate.
Among Fig. 2 to Fig. 3: 1, water inlet collection case, 2, water outlet collection case, 5, the epimere cooling stack, 7, endothermic tube, 8, arm, 9, air jet pipe, 10, round steel.
The specific embodiment
Below in conjunction with accompanying drawing, describe specific embodiments of the present invention in detail.
Like Fig. 2, shown in Figure 3; The processing method of a kind of converter waste heat boiler fire door place high-temperature flue gas is provided with movable gas hood at converter waste heat boiler fire door, and this movable gas hood comprises into water collection case 1 and water outlet collection case 2; Be provided with heat sink between water inlet collection case 1 and the water outlet collection case 2; Heat sink is formed by stacking several annular endothermic tubes 7, and heat sink integral body is truncated cone-shaped, and the endothermic tube 7 in the heat sink links to each other with water outlet collection case 2 through arm 8 and water inlet collection case 1 respectively; The upper end of heat sink is provided with the some air jet pipes 9 that link to each other with extraneous source of the gas, and the spout of air jet pipe 9 is positioned at the inboard, upper end of heat sink.Weld together through annular round steel 10 between the adjacent endothermic tube 7.The low force endless form is adopted in the water circulation; Recirculated cooling water is from the deoxygenation water tank; The low pressure recycle water pump is sent into cooling water the endothermic tube 7 from water inlet collection case 1; Cooling water absorbs the high temperature at converter waste heat boiler fire door places through endothermic tube 7, and the steam water interface of formation, this steam water interface are got back to the deoxygenation water tank from water outlet collection case 2 and the water in the deoxygenation water tank is carried out deoxygenation or used it for anything else in addition; The deoxygenation water tank links to each other with cooling water system in the whole afterheat boiler system, can provide enough cooling waters to supply movable gas hood to use.So both reduced the temperature of converter waste heat boiler fire door, prolonged the service life of waste heat boiler, also saved the energy, reduced production costs, enhanced productivity.Adopt low force water endless form, the water circulation that the assurance system is good prevents and has improved endothermic tube 7 and damaged because of the bad hot-spot that causes that circulates; System's operating pressure is lower, and the petticoat pipe tube wall is reduced by the stress that interior pressure causes greatly; Reduced when movable gas hood and drum composition natural cycle system, because the undesired internal pressure stress alternation fatigue rupture that causes of drum voltage-stabilizing system operation.

Claims (1)

1. the processing method of converter waste heat boiler fire door place high-temperature flue gas; It is characterized in that: at converter waste heat boiler fire door movable gas hood is set, this movable gas hood comprises into water collection case and water outlet collection case, is provided with heat sink between water inlet collection case and the water outlet collection case; Heat sink is formed by stacking several annular endothermic tubes; And heat sink integral body is truncated cone-shaped, welds together through annular round steel between the adjacent endothermic tube, and the endothermic tube in the heat sink links to each other with water outlet collection case with water inlet collection case through arm respectively; The upper end of heat sink is provided with the some air jet pipes that link to each other with extraneous source of the gas; The spout of air jet pipe is positioned at the inboard, upper end of heat sink, and the low force endless form is adopted in the water circulation, and recirculated cooling water is from the deoxygenation water tank; After the low pressure recycle water pump was delivered to the movable gas hood heat absorption with cooling water, the steam water interface of formation was got back to the deoxygenation water tank again or is used it for anything else in addition.
CN2011102808230A 2011-09-21 2011-09-21 Method for treating high-temperature smoke at opening of waste heat boiler of converter Pending CN102434875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102808230A CN102434875A (en) 2011-09-21 2011-09-21 Method for treating high-temperature smoke at opening of waste heat boiler of converter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102808230A CN102434875A (en) 2011-09-21 2011-09-21 Method for treating high-temperature smoke at opening of waste heat boiler of converter

Publications (1)

Publication Number Publication Date
CN102434875A true CN102434875A (en) 2012-05-02

Family

ID=45983098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102808230A Pending CN102434875A (en) 2011-09-21 2011-09-21 Method for treating high-temperature smoke at opening of waste heat boiler of converter

Country Status (1)

Country Link
CN (1) CN102434875A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331250A (en) * 2019-07-17 2019-10-15 联峰钢铁(张家港)有限公司 A kind of Converter Residual Heat Boiler movable gas hood
CN112662837A (en) * 2020-12-08 2021-04-16 苏州海陆重工股份有限公司 Skirt cover in converter waste heat boiler
CN114540572A (en) * 2022-02-25 2022-05-27 重庆钢铁股份有限公司 Converter waste heat boiler steam self-using system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1519530A (en) * 2003-01-25 2004-08-11 徐宝安 Equipment of water box in condensator contaning many media for heat recovery as well as installation method
CN201059897Y (en) * 2007-06-08 2008-05-14 王云龙 Vacuum phase inversion heat device
CN201103886Y (en) * 2007-11-28 2008-08-20 中国恩菲工程技术有限公司 Exhaust-heating boiler
US20090272339A1 (en) * 2004-10-27 2009-11-05 Andritz Oy Cooling system for ports in a boiler
CN101639213A (en) * 2009-09-03 2010-02-03 杨益明 Row tube type normal-pressure coal economizer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1519530A (en) * 2003-01-25 2004-08-11 徐宝安 Equipment of water box in condensator contaning many media for heat recovery as well as installation method
US20090272339A1 (en) * 2004-10-27 2009-11-05 Andritz Oy Cooling system for ports in a boiler
CN201059897Y (en) * 2007-06-08 2008-05-14 王云龙 Vacuum phase inversion heat device
CN201103886Y (en) * 2007-11-28 2008-08-20 中国恩菲工程技术有限公司 Exhaust-heating boiler
CN101639213A (en) * 2009-09-03 2010-02-03 杨益明 Row tube type normal-pressure coal economizer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331250A (en) * 2019-07-17 2019-10-15 联峰钢铁(张家港)有限公司 A kind of Converter Residual Heat Boiler movable gas hood
CN110331250B (en) * 2019-07-17 2024-04-16 联峰钢铁(张家港)有限公司 Movable smoke hood for converter waste heat boiler
CN112662837A (en) * 2020-12-08 2021-04-16 苏州海陆重工股份有限公司 Skirt cover in converter waste heat boiler
CN114540572A (en) * 2022-02-25 2022-05-27 重庆钢铁股份有限公司 Converter waste heat boiler steam self-using system and method

Similar Documents

Publication Publication Date Title
CN102787874A (en) Device and method for power generation by waste heat of blast furnace slag
CN101671761B (en) Vaporization cooling device
CN103672833B (en) quenching waste heat boiler
CN103657329A (en) Yellow phosphorus exhaust gas centralized control, recycling and purifying device
CN102434875A (en) Method for treating high-temperature smoke at opening of waste heat boiler of converter
CN206638061U (en) A kind of HP boiler water deflection bar type preheater and chemical reaction equipment
CN201652315U (en) Boiler sewage-discharge residual heat utilizing device
CN102980166A (en) Steam-water circulating system utilizing waste heat of high-temperature calcined coke generated by pot calciner
CN111536514B (en) Device and method for recovering heat energy from anaerobic treatment process of wastewater
CN103102993B (en) Non-chilling anti-slagging radiant waste heat boiler and its application
CN210030593U (en) Waste heat recovery waste boiler mechanism of gasification furnace
CN202253695U (en) Movable smoke hood for waste heat boiler
CN203836922U (en) Waste heat recycling equipment applied to coal gasification device
CN108587695B (en) Biomass tar pyrolysis device
CN203384953U (en) Novel shock-cooling type waste heat boiler
CN102345872A (en) Movable gas hood for exhaust-heat boiler
CN206430186U (en) A kind of waste heat boiler fire door water-cooling wall
CN2898032Y (en) High-pressure conical jacket gas generator and high-pressure conical aqueous jacket
CN205261499U (en) Vertical fire tube boiler of high temperature
CN204151277U (en) Waste and old organic glass cracker
CN208222820U (en) A kind of Novel asymmetric flag facial canal structure boiler
CN201634448U (en) Dissolved mineral slurry preheater by acid method
CN201065415Y (en) Double-layer overflow water sealing trough
CN201795470U (en) Boiler body with water-cooled wall
CN208871639U (en) A kind of vertical liquid waste incineration waste heat boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120502