CN102434008B - Opening reinforcing method implemented after punching hole on cast-in-place concrete plate - Google Patents

Opening reinforcing method implemented after punching hole on cast-in-place concrete plate Download PDF

Info

Publication number
CN102434008B
CN102434008B CN201010296376.3A CN201010296376A CN102434008B CN 102434008 B CN102434008 B CN 102434008B CN 201010296376 A CN201010296376 A CN 201010296376A CN 102434008 B CN102434008 B CN 102434008B
Authority
CN
China
Prior art keywords
hole
cast
place concrete
concrete plate
situ cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010296376.3A
Other languages
Chinese (zh)
Other versions
CN102434008A (en
Inventor
王慧莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201010296376.3A priority Critical patent/CN102434008B/en
Publication of CN102434008A publication Critical patent/CN102434008A/en
Application granted granted Critical
Publication of CN102434008B publication Critical patent/CN102434008B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an opening reinforcing method implemented after punching a hole on a cast-in-place concrete plate. The method comprises the following steps of: punching the hole (2) on the cast-in-place concrete plate (1) by using a traditional method; keeping a steel reinforcing bar (3) within partial original cast-in-place concrete plate (1) at a section of the hole (2) after the hole (2) is punched; bending the steel reinforcing bar (3) into an L shape; and then respectively fixing steel plates (6) on concrete beams of the cast-in-place concrete plate (1) at the two ends of the hole (2) by using chemical anchor bolts (5); welding channel steel (7) on the steel reinforcing bar (3) bent into the L shape; respectively welding the two ends of the channel steel (7) on the steel plates (6); and then filling a gap between the channel steel (7) and the cast-in-place concrete plate (1) by using fine stone concrete with a higher cement grade than the cast-in-place concrete plate (1). According to the opening reinforcing method implemented after punching the hole on the cast-in-place concrete plate, disclosed by the invention, the advantages of simple structure, convenience in construction, higher structural strength, lower manufacturing cost and shorter construction period are achieved.

Description

A kind of reinforcing method after In-situ cast concrete board punches
Technical field
The present invention relates to a kind of reinforcing method after In-situ cast concrete board punches, belong to building In-situ cast concrete board and to punch a mouthful reinforcing technique field.
Background technology
In the design of industrial premises, often due to the needs of technique or Specialty Design, larger hole must be newly outputed on the In-situ cast concrete board of the building of having constructed, for the reinforcing at the hole that these newly output on In-situ cast concrete board, method the most frequently used be at present on limit, hole more again pouring reinforcement concrete side bar reinforce, the problem that the method that this pouring reinforcement concrete side bar carries out reinforcing not only also exists long in time limit, constructional difficulties, wastes time and energy, but also also exist that cost of manufacture is high, the less-than-ideal problem of consolidation effect.Therefore, existing punch on In-situ cast concrete board after reinforcing method or not ideal enough.
Summary of the invention
The object of the invention is: provide that a kind of structure is simple, easy construction, structural strength is higher, cost of manufacture is lower, the duration is shorter In-situ cast concrete board punches after reinforcing method, to overcome the deficiencies in the prior art.
The present invention is achieved in that the reinforcing method after a kind of In-situ cast concrete board of the present invention punches, comprise and adopt conventional method to output hole on In-situ cast concrete board, after outputing hole, retain the reinforcing bar in one section of former In-situ cast concrete board of hole part, and by this section of reinforcing bar bending l-shaped, the concrete beam of the In-situ cast concrete board then at two ends, hole adopt chemical anchor bolts to fix a block plate respectively, channel-section steel is welded on the reinforcing bar of bending l-shaped, and the two ends of channel-section steel are welded on steel plate respectively, then adopt and than the cement grade of In-situ cast concrete board higher leveled fine-stone concrete, the gap between channel-section steel and In-situ cast concrete board to be tamped.
Above-mentioned chemical anchor bolts are the chemical anchor bolts of M16, and are no less than 180 millimeters in concrete beam chemical anchor bolts being implanted In-situ cast concrete board.
The thickness of above-mentioned steel plate is not less than 8 millimeters.
Owing to have employed technique scheme, the present invention does not need to carry out pouring reinforcement concrete side bar at outputed hole, and directly utilize original reinforcing bar and concrete beam, add and channel-section steel is connected as one as the side bar at hole and original reinforcing bar and concrete beam, not only enormously simplify construction technology and construction cost, but also substantially increase the structural strength at former hole, and the present invention is once after construction, can come into operation in its hole, substantially reduce the duration.Therefore, compared with prior art, the present invention not only has that structure is simple, the advantage of easy construction, but also has the advantage that structural strength is higher, cost of manufacture is lower, the duration is shorter in the present invention.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is A-A sectional structure schematic diagram of Fig. 1;
Fig. 3 is B-B sectional structure schematic diagram of Fig. 1.
Description of reference numerals: 1-In-situ cast concrete board, 2-hole, 3-reinforcing bar, 4-concrete beam, 5-chemical anchor bolts, 6-steel plate, 7-channel-section steel.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is described in further detail.
Embodiments of the invention: the structure at the hole 2 after adopting the reinforcing method after a kind of In-situ cast concrete board of the present invention punches to reinforce as shown in FIG. 1 to 3, during construction, after outputing hole 2 by existing conventional method on In-situ cast concrete board 1, retain the reinforcing bar 3 in one section of former In-situ cast concrete board 1 of hole 2 part, and this section of reinforcing bar 3 is bent l-shaped, then on the concrete beam 4 of the In-situ cast concrete board 1 at two ends, hole 2, adopt chemical anchor bolts 5 to fix a block plate 6 respectively, chemical anchor bolts 5 can adopt the model that market is sold to be the chemical anchor bolts of M16, concrete beam 4 planted agent chemical anchor bolts 5 being implanted In-situ cast concrete board 1 is no less than 180 millimeters, the thickness of its steel plate 6 should be not less than 8 millimeters, then channel-section steel 7 is welded on the reinforcing bar 3 of bending l-shaped, and the two ends of channel-section steel 7 are also welded on steel plate 6 respectively, then adopt and than the cement grade of In-situ cast concrete board 1 higher leveled fine-stone concrete the gap between channel-section steel 7 and In-situ cast concrete board 1 to be tamped and all reinforcing bars 3 are all wrapped.

Claims (3)

1. the reinforcing method after an In-situ cast concrete board punching, comprise and adopt conventional method to output hole (2) on In-situ cast concrete board (1), it is characterized in that: after outputing hole (2), retain the reinforcing bar (3) in one section of hole (2) part In-situ cast concrete board (1), and by this section of reinforcing bar (3) bending l-shaped, then on the concrete beam (4) of the In-situ cast concrete board (1) at hole (2) two ends, chemical anchor bolts (5) are adopted to fix a block plate (6) respectively, channel-section steel (7) is welded on the reinforcing bar (3) of bending l-shaped, and the two ends of channel-section steel (7) are welded on steel plate (6) respectively, then adopt and than the cement grade of In-situ cast concrete board (1) higher leveled fine-stone concrete, the gap between channel-section steel (7) and In-situ cast concrete board (1) to be tamped.
2. the reinforcing method after In-situ cast concrete board according to claim 1 punching, is characterized in that: the chemical anchor bolts that chemical anchor bolts (5) are M16, and is no less than 180 millimeters in the concrete beam (4) of chemical anchor bolts (5) implantation In-situ cast concrete board (1).
3. the reinforcing method after In-situ cast concrete board according to claim 1 punching, is characterized in that: the thickness of steel plate (6) is not less than 8 millimeters.
CN201010296376.3A 2010-09-29 2010-09-29 Opening reinforcing method implemented after punching hole on cast-in-place concrete plate Expired - Fee Related CN102434008B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010296376.3A CN102434008B (en) 2010-09-29 2010-09-29 Opening reinforcing method implemented after punching hole on cast-in-place concrete plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010296376.3A CN102434008B (en) 2010-09-29 2010-09-29 Opening reinforcing method implemented after punching hole on cast-in-place concrete plate

Publications (2)

Publication Number Publication Date
CN102434008A CN102434008A (en) 2012-05-02
CN102434008B true CN102434008B (en) 2015-02-25

Family

ID=45982336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010296376.3A Expired - Fee Related CN102434008B (en) 2010-09-29 2010-09-29 Opening reinforcing method implemented after punching hole on cast-in-place concrete plate

Country Status (1)

Country Link
CN (1) CN102434008B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060849A (en) * 2014-07-05 2014-09-24 刘广义 Punching, stacking and reinforcing method of concrete hollow slab
CN104763161B (en) * 2014-09-24 2017-05-31 温州振华建设有限公司 Punched after a kind of reinforced concrete floor and add the construction method of beam reinforced structure
CN105672690B (en) * 2016-03-02 2017-11-28 叶香竹 Load bearing wall reinforcing method
CN109763668A (en) * 2019-01-24 2019-05-17 铜陵有色金属集团铜冠建筑安装股份有限公司 A kind of roof boarding aperture and reperforating method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1804339A (en) * 2005-12-16 2006-07-19 贵阳铝镁设计研究院 Method for fixing connection steel plate on concrete column surface
CN2861365Y (en) * 2005-12-31 2007-01-24 中国矿业大学 Device for digging hole in wall
CN101638920A (en) * 2008-07-29 2010-02-03 贵阳铝镁设计研究院 Cave mouth structure on bearing wall and method for forming cave mouth thereon

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2764252B2 (en) * 1995-04-11 1998-06-11 西武ポリマ化成株式会社 Underground concrete structure repair material and repair method
JPH10220029A (en) * 1997-02-07 1998-08-18 Taisei Corp Method for joining member to frame in existing steel encased reinforced concrete structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1804339A (en) * 2005-12-16 2006-07-19 贵阳铝镁设计研究院 Method for fixing connection steel plate on concrete column surface
CN2861365Y (en) * 2005-12-31 2007-01-24 中国矿业大学 Device for digging hole in wall
CN101638920A (en) * 2008-07-29 2010-02-03 贵阳铝镁设计研究院 Cave mouth structure on bearing wall and method for forming cave mouth thereon

Also Published As

Publication number Publication date
CN102434008A (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN105908862B (en) A kind of production method of masonry shell in 3D printing reinforced masonry shear wall
CN102434008B (en) Opening reinforcing method implemented after punching hole on cast-in-place concrete plate
CN107663903B (en) Connecting structure of assembled concrete shear wall and connecting beam and prefabricating and assembling method
CN105672139A (en) Hollow bridge pier capping construction method
CN202969628U (en) Hole reinforcing node for shear wall
CN202831249U (en) Embedded column type connection joint of prefabricated part
CN105625198A (en) Reinforced rigid-framed arch bridge
CN201794316U (en) Hole reinforcing structure after the formation of holes on cast-in-place concrete plate
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN107891511B (en) Separated prefabricated bay window die
CN103669878A (en) Method for connecting steel bars of core tube
CN204530749U (en) A kind of fixed structure of power press with fixed bed base
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN201730107U (en) Pile foundation of electric steel tube tower
CN110130582B (en) Novel combined structure anchor lower backing plate
CN212331354U (en) Fixing device for embedded channel
CN108149843A (en) A kind of one concrete combination beam of diamond shape multi-cavity steel plate
CN203393739U (en) Forming mold for reserved holes of equipment foundations
CN202308992U (en) Reinforcing structure for H-beam
CN203113526U (en) Temporary fixing structure of rubber waterstop
CN102116049A (en) Drainage channel and method for pouring same
CN109252711A (en) Precast splice type steel bar meter field and its manufacturing method
CN207988332U (en) A kind of one concrete combined floor of circle multi-cavity steel plate
CN213703848U (en) Precast beam steel base
CN220953558U (en) Basement outer wall post-pouring strip advanced plugging structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

Termination date: 20150929