CN102433161A - 一种分段分区域的富氧气化煤气发生方法 - Google Patents

一种分段分区域的富氧气化煤气发生方法 Download PDF

Info

Publication number
CN102433161A
CN102433161A CN2011103247816A CN201110324781A CN102433161A CN 102433161 A CN102433161 A CN 102433161A CN 2011103247816 A CN2011103247816 A CN 2011103247816A CN 201110324781 A CN201110324781 A CN 201110324781A CN 102433161 A CN102433161 A CN 102433161A
Authority
CN
China
Prior art keywords
gas
coal
oxygen
steam
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103247816A
Other languages
English (en)
Inventor
蒋远华
杨晓勤
卢昀
周游天
张道红
何原
武丽华
卢光胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Shuanghuan Science And Technology Stock Co ltd
Original Assignee
Hubei Shuanghuan Science And Technology Stock Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Shuanghuan Science And Technology Stock Co ltd filed Critical Hubei Shuanghuan Science And Technology Stock Co ltd
Priority to CN2011103247816A priority Critical patent/CN102433161A/zh
Publication of CN102433161A publication Critical patent/CN102433161A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Supply (AREA)

Abstract

本发明提供了一种分段分区域的富氧气化煤气发生方法,它是将氧气和蒸汽从煤气炉水夹套中间段圆周部位直接入炉,连续式气化煤气炉膛内部外环区域煤炭后,生成的煤气按上、下行煤气线路输送出煤气炉;同时,空气和蒸汽按上、下行路线入煤气炉,间歇式气化煤气炉膛内剩余区域煤炭,生成的煤气按上、下行煤气线路输送出煤气炉。本发明通过外环区域的连续式煤气化和剩余区域间歇式煤气化相结合的方式,提高了蒸汽分解率,降低了煤气出口温度,回收了煤气高温显热,节能降耗效果明显,与环境友好。

Description

一种分段分区域的富氧气化煤气发生方法
技术领域
本发明属于煤气化的生产方法技术领域,具体是指一种分段分区域的富氧气化煤气发生方法。
背景技术
现有用于富氧气化的煤气发生炉工艺,是从中氮肥间歇炉工艺转变而来,中氮肥间歇炉煤气出口温度550-700℃,富氧气化炉煤气出口温度≤700℃,而小氮肥间歇炉煤气出口温度280-350℃,如果完全照搬中氮肥工艺指标,小氮肥间歇炉的设备就承受不了,降低富氧气化煤气出口温度,是开好小氮肥富氧气化炉一个急需解决的问题。
中国专利申请(专利)号为201110053424.0的专利“一种分区域富氧气化的煤气发生方法”提出了“将煤气炉的中、上部通过隔墙分隔成两个以上气化区域”的方法,降低了富氧气化煤气出口温度,回收了煤气高温显热,节能降耗效果明显。但是因为改造环节多、任务大,推广工作进展缓慢。
发明内容
本发明的目的是根据上述不足提供一种分段分区域的富氧气化煤气发生方法,它提高了蒸汽分解率,降低了煤气出口温度,回收了煤气高温显热,节能降耗效果明显。
本发明是通过如下技术方案实现的:一种分段分区域的富氧气化煤气发生方法,它是将氧气和蒸汽从煤气炉水夹套中间段圆周部位直接入炉,连续式气化煤气炉膛内部外环区域煤炭后,生成的煤气按上、下行煤气线路输送出煤气炉;同时,空气和蒸汽按上、下行路线入煤气炉,间歇式气化煤气炉膛内剩余区域煤炭,生成的煤气按上、下行煤气线路输送出煤气炉。
所述炉渣堆积在炉膛内部外环区域后输送出炉。
煤气炉水夹套中间段圆周部位安装有多组气化剂喷嘴。
本发明采用氧气、蒸汽不经过制取富氧的过程直接入炉,进行连续式煤气化煤气炉膛内部外环区域的煤炭,蒸汽分解率高,煤气质量好,产气量大,灰渣中残炭低,节能降耗效果明显。同时,空气和蒸汽按上、下行路线入煤气炉中,进行间歇式气化煤气炉膛内剩余区域煤炭,这样由于高温煤气导出时放热,蒸汽导入时吸热,因此煤气出口温度低,煤气高温显热回收效率高。炉渣堆积在炉膛内部外环区域后输送出炉可以保证煤气化持续进行。在煤气炉水夹套中间段圆周部位安装有多组气化剂喷嘴可以使喷气效率更高。本发明通过外环区域的连续式煤气化和剩余区域间歇式煤气化相结合的方式,提高了蒸汽分解率,降低了煤气出口温度,回收了煤气高温显热,节能降耗效果明显,与环境友好。
附图说明
图1为本发明的工艺示意图;
图2为本发明的A-A向的剖视图;
1.煤气炉、2.水夹套、3.氧气阀、4.蒸汽阀、5.煤炭、6.喷嘴、7.炉渣。
具体实施方式
以下结合附图来进一步说明本发明:
如图1和图2所示,在煤气炉1的水夹套2中间段圆周部位安装有多组气化剂喷嘴6,氧气和蒸汽分别通过氧气阀3和蒸汽阀4输送进喷嘴6,然后进入煤气炉1连续气化炉膛内部的外环区域的煤炭5。得到的煤气按上、下行煤气线路输送出煤气炉1,而炉渣7则堆积在炉膛内部的外环区域。同时,将空气和蒸汽按上、下行煤气线路输送进煤气炉1中,间歇式气化煤气炉1内剩余区域的煤炭5,得到的煤气按上、下行煤气线路输送出煤气炉1,炉渣7堆积在炉膛内部的外环区域。堆积的炉渣7直接从炉底输送出炉。
本发明通过外环区域的连续式煤气化和剩余区域间歇式煤气化相结合的方式,提高了蒸汽分解率,降低了煤气出口温度,回收了煤气高温显热,节能降耗效果明显,与环境友好。

Claims (3)

1.一种分段分区域的富氧气化煤气发生方法,它是将氧气和蒸汽从煤气炉水夹套中间段圆周部位直接入炉,连续式气化煤气炉膛内部外环区域煤炭后,生成的煤气按上、下行煤气线路输送出煤气炉;同时,空气和蒸汽按上、下行路线入煤气炉,间歇式气化煤气炉膛内剩余区域煤炭,生成的煤气按上、下行煤气线路输送出煤气炉。
2.根据权利要求1所述的以煤为原料的合成氨中处理污水的方法,其特征在于:所述炉渣堆积在炉膛内部外环区域后输送出炉。
3.根据权利要求1所述的以煤为原料的合成氨中处理污水的方法,其特征在于:煤气炉水夹套中间段圆周部位安装有多组气化剂喷嘴。
CN2011103247816A 2011-10-24 2011-10-24 一种分段分区域的富氧气化煤气发生方法 Pending CN102433161A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103247816A CN102433161A (zh) 2011-10-24 2011-10-24 一种分段分区域的富氧气化煤气发生方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103247816A CN102433161A (zh) 2011-10-24 2011-10-24 一种分段分区域的富氧气化煤气发生方法

Publications (1)

Publication Number Publication Date
CN102433161A true CN102433161A (zh) 2012-05-02

Family

ID=45981509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103247816A Pending CN102433161A (zh) 2011-10-24 2011-10-24 一种分段分区域的富氧气化煤气发生方法

Country Status (1)

Country Link
CN (1) CN102433161A (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5858033A (en) * 1994-03-10 1999-01-12 Ebara Corporation Method of and apparatus for fluidized-bed gasification and melt combustion
CN201087187Y (zh) * 2007-08-10 2008-07-16 陈常乐 环形气化剂布控煤气发生炉
CN102154026A (zh) * 2011-03-07 2011-08-17 湖北双环科技股份有限公司 一种固定床分区域煤气化的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5858033A (en) * 1994-03-10 1999-01-12 Ebara Corporation Method of and apparatus for fluidized-bed gasification and melt combustion
CN1492027A (zh) * 1994-03-10 2004-04-28 株式会社荏原制作所 流化床气化和熔融燃烧的方法及装置
CN201087187Y (zh) * 2007-08-10 2008-07-16 陈常乐 环形气化剂布控煤气发生炉
CN102154026A (zh) * 2011-03-07 2011-08-17 湖北双环科技股份有限公司 一种固定床分区域煤气化的方法

Similar Documents

Publication Publication Date Title
WO2021042699A1 (zh) 一种双熔浴有机固废喷吹气化装置
CN103436296B (zh) 一种加压固定床熔渣气化炉
CN102277202B (zh) 一种高温裂解垃圾和生物质制煤气的方法
CN102260537B (zh) 一种等离子热解及富氧助燃物料制取可燃气的装置
US11220642B2 (en) Pulverized coal gasification device and process for producing high heating value coal gas with low carbon residue content
CN103666580A (zh) 一种耦合式生物质加压热解工艺及系统
CN103589459B (zh) 采用等离子体炬加热技术的煤气化方法及装置
CN106244239B (zh) 垃圾气化生产合成天然气的工艺方法
CN204074682U (zh) 一种废旧线路板等离子处理能效系统
CN203079923U (zh) 水冷壁废锅流程的水煤浆加压气化装置
CN204981160U (zh) 一种氧/煤喷吹制备电石及乙烯的系统
CN103113923A (zh) 四段沫煤富氧气化方法
CN104192799B (zh) 高温冶金渣颗粒催化气化生物质制取富氢气体装置及方法
CN102433161A (zh) 一种分段分区域的富氧气化煤气发生方法
CN102399592A (zh) 一种固定床分段、分区域煤气化的工艺
CN202369558U (zh) 富氧鼓风连续气化双筒煤气发生炉
CN201626942U (zh) 等离子体煤气化设备
CN102399590B (zh) 一种富氧气化的生产方法
CN204897846U (zh) 一种旋流式气化炉
CN202688283U (zh) 一种高灰熔点煤的气化装置
CN102154026A (zh) 一种固定床分区域煤气化的方法
CN202214336U (zh) 无制氧粉煤超常压无激冷气化装置
CN204714762U (zh) 高硫无烟块煤的常压固定床间歇气化装置
CN203582820U (zh) 一种耦合式生物质加压热解系统
CN204356289U (zh) 一种煤化工零排放加压气化炉装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120502