CN102431628A - 立柱式平台硬舱加载舱分时加载系统 - Google Patents
立柱式平台硬舱加载舱分时加载系统 Download PDFInfo
- Publication number
- CN102431628A CN102431628A CN2011103137426A CN201110313742A CN102431628A CN 102431628 A CN102431628 A CN 102431628A CN 2011103137426 A CN2011103137426 A CN 2011103137426A CN 201110313742 A CN201110313742 A CN 201110313742A CN 102431628 A CN102431628 A CN 102431628A
- Authority
- CN
- China
- Prior art keywords
- load
- loading
- load chamber
- control box
- cabin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
一种深海油气采集技术领域的立柱式平台硬舱加载舱分时加载系统,包括:硬舱的三个加载舱、三个加载泵、三个传感器、一个储水箱、一个控制箱以及电源,其中:每个加载舱中装有对应的传感器,传感器分别与控制箱相连,加载舱与各自对应的加载泵相连,加载泵分别与储水箱的三个出水口连接,加载泵的控制端与控制箱的输出端相连,电源的输出端与控制箱相连并提供电力。本装置能够在海洋工程的实际工程操作和模型实验模拟中完成立柱式平台的扶正过程。
Description
技术领域
本发明涉及的是一种深海油气采集技术领域的装置及方法,具体是一种立柱式平台硬舱加载舱分时加载系统。
背景技术
立柱式平台是一种应用于深海油气开发的顺应式浮式平台,是新一代深海油气开发的平台。立柱式平台通常是从建造地水平拖至安装水域的,当平台被送至作业位置时,需要将其扶正,也就是将其由水平状态变为竖直状态的过程。无论是在实际工程领域的扶正过程,还是对扶正过程的实验模拟,其中一个重要的步骤就是向硬舱中进行加载,因此需要专门设计出一套相应的立柱式平台硬舱加载系统。
经对现有技术文献以及专利文献的检索,尚未发现与本发明主题相同或类似的文献报道。
发明内容
本发明的目的在于弥补现有技术的空缺,提供一种立柱式平台硬舱加载舱分时加载系统,能够在海洋工程的实际工程操作和模型实验模拟中完成立柱式平台的扶正过程。
本发明是通过以下技术方案实现的,本发明包括:硬舱的三个加载舱、三个加载泵、三个传感器、一个储水箱、一个控制箱以及电源,其中:每个加载舱中装有对应的传感器,传感器分别与控制箱相连,加载舱与各自对应的加载泵相连,加载泵分别与储水箱的三个出水口连接,加载泵的控制端与控制箱的输出端相连,电源的输出端与控制箱相连并提供电力。
所述的三个加载舱中,两个加载舱位于平台横剖面的两侧,另一个加载舱位于平台横剖面的底部。当进行加载时,位于平台横剖面的两侧的加载舱先进行加载,当这两个舱中的加载量达到要求时,再开始向另外一个舱中加载,直至所有加载舱中的加载量都达到设计要求。
本装置具体工作过程如下:当加载过程开始后,打开电源,并打开储水箱中连接三个加载泵的出水口上的水阀,控制箱则会根据预先设定好的程序对三个加载泵的开关顺序进行控制,即:先打开连接于位于平台横剖面两侧加载舱的加载泵,其中的传感器会将加载舱中的加载情况通过信号传输线传输给控制箱,控制箱根据接收到的信号对加载泵进行控制,当某一个加载的加载舱中的加载量达到要求时,控制箱则关闭连接该舱加载泵的电源,当两个加载舱中的加载量都达到要求时,则开始向另外一个加载舱加载,传感器会将测得的加载量通过信号传输线传输给控制箱,当该加载舱中的加载量达到要求时,控制箱则关闭连接该舱加载泵的电源停止向该舱继续加载,至此,硬舱的加载过程结束。
在本发明前尚未有类似的加载系统能够实现立柱式平台硬舱加载舱分时加载,而经试验验证,本发明能够很好地实现对立柱式平台硬舱加载舱分时加载。
附图说明
图1为本发明硬舱加载舱示意图。
图2为本发明硬舱加载舱剖面示意图。
图3为本发明硬舱加载舱分时加载系统结构图。
图4为本发明硬舱加载舱分时加载流程图。
具体实施方式
下面对本发明的实施例作详细说明,本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
实施例
如图1和图2所示,本实施例包括:硬舱1的三个加载舱2、三个加载泵3、三个传感器4、一个储水箱5、一个控制箱6以及电源7,其中:每个加载舱2中装有对应的传感器4,传感器4分别与控制箱6相连,加载舱2与各自对应的加载泵3相连,加载泵3分别与储水箱5的三个出水口连接,加载泵3的控制端与控制箱6的输出端相连,电源7的输出端与控制箱6相连并提供电力。
如图4所示,为硬舱1加载舱2分时加载流程图,可以看出:
开始加载时,先向1号加载舱2和2号加载舱2加载,其中的传感器4会将加载舱2中的加载情况通过信号传输线传输给控制箱6,控制箱6根据接收到的信号对加载舱2中的加载量是否已经达到预计值进行判断进而对加载泵3进行控制,当某一个加载舱2中的加载量达到要求时,控制箱6则关闭连接该舱加载泵3,当两个加载舱2中的加载量都达到要求时,则开始向3号加载舱2加载,传感器4会将测得的加载量通过信号传输线传输给控制箱6,当控制箱6判断该加载舱2中的加载量达到要求时,控制箱6则关闭连接该舱的加载泵3,至此,硬舱1加载舱2分时加载过程结束。
现有技术中尚未有类似的装置能够实现立柱式平台硬舱分舱分时加载,而经试验验证,本装置能够很好地实现这一过程;其次,通过向立柱式平台不同分舱分时注水,满足了在扶正过程中平台稳性和压载的需要;另外,本发明可以根据设定的不同压载目标值,实现多个压载方案。
Claims (3)
1.一种立柱式平台硬舱加载舱分时加载系统,其特征在于,包括:硬舱的三个加载舱、三个加载泵、三个传感器、一个储水箱、一个控制箱以及电源,其中:每个加载舱中装有对应的传感器,传感器分别与控制箱相连,加载舱与各自对应的加载泵相连,加载泵分别与储水箱的三个出水口连接,加载泵的控制端与控制箱的输出端相连,电源的输出端与控制箱相连并提供电力。
2.根据权利要求1所述的立柱式平台硬舱加载舱分时加载系统,其特征是,所述的三个加载舱中,两个加载舱位于平台横剖面的两侧,另一个加载舱位于平台横剖面的底部。
3.根据权利要求2所述的立柱式平台硬舱加载舱分时加载系统,其特征是,位于平台横剖面的两侧的加载舱先进行加载,当这两个舱中的加载量达到要求时,再开始向另外一个舱中加载,直至所有加载舱中的加载量都达到设计要求。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110313742.6A CN102431628B (zh) | 2011-10-17 | 2011-10-17 | 立柱式平台硬舱加载舱分时加载系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110313742.6A CN102431628B (zh) | 2011-10-17 | 2011-10-17 | 立柱式平台硬舱加载舱分时加载系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102431628A true CN102431628A (zh) | 2012-05-02 |
CN102431628B CN102431628B (zh) | 2015-02-25 |
Family
ID=45980064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110313742.6A Active CN102431628B (zh) | 2011-10-17 | 2011-10-17 | 立柱式平台硬舱加载舱分时加载系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102431628B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102717878A (zh) * | 2012-06-07 | 2012-10-10 | 中国海洋石油总公司 | 线控脱落式深水平台软舱加载系统 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020040904A1 (en) * | 2000-10-11 | 2002-04-11 | Hyundai Heavy Industries Co., Ltd. | Bottomless spar-type oil storage tank |
US20030165361A1 (en) * | 1996-11-12 | 2003-09-04 | H. B. Zachry Company | Method of constructing precast modular marine structures |
US20070221112A1 (en) * | 2006-03-24 | 2007-09-27 | Haney James A | Solution mining to refloat and dispose of an offshore floating structure |
US20080044235A1 (en) * | 2006-08-15 | 2008-02-21 | Horton Edward E | Floating offshore drilling/producing structure |
CN101475048A (zh) * | 2009-01-13 | 2009-07-08 | 中国海洋大学 | 一种新型海洋深水浮筒平台 |
WO2009131826A2 (en) * | 2008-04-23 | 2009-10-29 | Principle Power, Inc. | Column-stabilized offshore platform with water-entrapment plates and asymmetric mooring system for support of offshore wind turbines |
CN101618757A (zh) * | 2008-07-02 | 2010-01-06 | 中船重工船舶设计研究中心有限公司 | 一种spar平台硬舱 |
CN201580542U (zh) * | 2009-12-02 | 2010-09-15 | 中国海洋大学 | 一种三角形桁架单柱平台 |
CN102117363A (zh) * | 2011-01-19 | 2011-07-06 | 中国海洋石油总公司 | 浮式Spar平台的扶正分析方法 |
-
2011
- 2011-10-17 CN CN201110313742.6A patent/CN102431628B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030165361A1 (en) * | 1996-11-12 | 2003-09-04 | H. B. Zachry Company | Method of constructing precast modular marine structures |
US20020040904A1 (en) * | 2000-10-11 | 2002-04-11 | Hyundai Heavy Industries Co., Ltd. | Bottomless spar-type oil storage tank |
US20070221112A1 (en) * | 2006-03-24 | 2007-09-27 | Haney James A | Solution mining to refloat and dispose of an offshore floating structure |
US20080044235A1 (en) * | 2006-08-15 | 2008-02-21 | Horton Edward E | Floating offshore drilling/producing structure |
WO2009131826A2 (en) * | 2008-04-23 | 2009-10-29 | Principle Power, Inc. | Column-stabilized offshore platform with water-entrapment plates and asymmetric mooring system for support of offshore wind turbines |
CN101618757A (zh) * | 2008-07-02 | 2010-01-06 | 中船重工船舶设计研究中心有限公司 | 一种spar平台硬舱 |
CN101475048A (zh) * | 2009-01-13 | 2009-07-08 | 中国海洋大学 | 一种新型海洋深水浮筒平台 |
CN201580542U (zh) * | 2009-12-02 | 2010-09-15 | 中国海洋大学 | 一种三角形桁架单柱平台 |
CN102117363A (zh) * | 2011-01-19 | 2011-07-06 | 中国海洋石油总公司 | 浮式Spar平台的扶正分析方法 |
Non-Patent Citations (4)
Title |
---|
刘琳: "Truss Spar平台湿拖与扶正性能数值与试验研究", 《上海交通大学2012届硕士学位论文》, 23 May 2012 (2012-05-23), pages 69 - 74 * |
刘琳等: "TrussSpar平台海上湿拖水动力性能模型实验研究", 《第十五届中国海洋(岸)学术讨论会论文集》, 3 August 2011 (2011-08-03), pages 100 - 103 * |
张帆等: "Spar平台的发展趋势及其关键技术", 《中国海洋平台》, vol. 20, no. 4, 30 April 2005 (2005-04-30) * |
彭翼: "Spar平台湿拖过程运动响应分析及湿拖方案选择", 《天津大学2010届硕士学位论文》, 15 February 2012 (2012-02-15), pages 26 - 42 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102717878A (zh) * | 2012-06-07 | 2012-10-10 | 中国海洋石油总公司 | 线控脱落式深水平台软舱加载系统 |
CN102717878B (zh) * | 2012-06-07 | 2014-09-17 | 中国海洋石油总公司 | 线控脱落式深水平台软舱加载系统 |
Also Published As
Publication number | Publication date |
---|---|
CN102431628B (zh) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041271B (zh) | 一种降压式海洋天然气水合物开采方法与海底开采系统 | |
CN103348130B (zh) | 水电涡轮机回收系统及其方法 | |
CN104364465A (zh) | 用于通过水力压裂抽取油气的系统和过程 | |
EP3161245B1 (en) | Subsea on-site chemical injection management system | |
EP2744970B1 (en) | Drilling fluid pump module coupled to specially configured riser segment and method for coupling the pump module to the riser | |
KR20200038945A (ko) | 부유식 생산설비 상부 공정모듈의 통합 시공 및 설치 방법 | |
US20200102813A1 (en) | Rapid deployment subsea chemical injection system | |
US10570719B2 (en) | Integrated compact station of subsea separation and pumping systems | |
CN104674784A (zh) | 超重力条件下的边坡潮汐水位调控装置 | |
CN103603339A (zh) | 长螺旋钻机注浆护壁成孔法及其系统 | |
WO2018019468A1 (en) | Subsea control module system | |
CN106703761B (zh) | 全干式水中油气生产系统及其工作方法 | |
CN102431628A (zh) | 立柱式平台硬舱加载舱分时加载系统 | |
CN104088266A (zh) | 采用浮托法安装的标准化可搬迁式井口平台 | |
Knodt et al. | Development and engineering of offshore mining systems-State of the art and future perspectives | |
CN206174871U (zh) | 一种自安装模块化海洋钻井装置 | |
CN104290866A (zh) | 一种自升式生产储卸油平台的分体式船坞建造法 | |
CN103790528B (zh) | 基于fpga的海底泥浆举升泵控制技术 | |
CN203822220U (zh) | 水平井测试仪器可控式注水推进器 | |
CN104691715A (zh) | 一种海上综合平台及最佳靠船位置选取方法 | |
CN105089528A (zh) | 一种用于控压钻井的井口压力控制方法和装置 | |
CN102454163A (zh) | 超大型海洋石油平台上部组块循环同步液压提升工艺 | |
CN104405310A (zh) | 一种便携钻机的箱式自循环供水系统 | |
CN104878777B (zh) | 市政基础设施管线临时建设用的管线连接箱及施工方法 | |
Russell et al. | The challenges of extending the life of UK offshore installations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |