US20070221112A1 - Solution mining to refloat and dispose of an offshore floating structure - Google Patents

Solution mining to refloat and dispose of an offshore floating structure Download PDF

Info

Publication number
US20070221112A1
US20070221112A1 US11/389,446 US38944606A US2007221112A1 US 20070221112 A1 US20070221112 A1 US 20070221112A1 US 38944606 A US38944606 A US 38944606A US 2007221112 A1 US2007221112 A1 US 2007221112A1
Authority
US
United States
Prior art keywords
ballast
slurry
tank
water
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/389,446
Inventor
James Haney
Shree Akhave
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
J Ray McDermott SA
Original Assignee
J Ray McDermott SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by J Ray McDermott SA filed Critical J Ray McDermott SA
Priority to US11/389,446 priority Critical patent/US20070221112A1/en
Assigned to J. RAY MCDERMOTT, S.A. reassignment J. RAY MCDERMOTT, S.A. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: AKHAVE, SHREE R., HANEY, JAMES A.
Priority to NO20071293A priority patent/NO20071293L/en
Priority to MX2007003412A priority patent/MX2007003412A/en
Publication of US20070221112A1 publication Critical patent/US20070221112A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B13/00Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B35/4406Articulated towers, i.e. substantially floating structures comprising a slender tower-like hull anchored relative to the marine bed by means of a single articulation, e.g. using an articulated bearing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/02Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses
    • B63B39/03Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by displacement of masses by transferring liquids

Definitions

  • the invention is generally related to offshore floating structures and more particularly to the refloating and removal of such structures.
  • a spar buoy is a floating structure that has been used to support drilling and production equipment for oil production in the offshore environment.
  • a superstructure 1 that contains the payload is supported on a vertical, buoyant cylinder known as a hard tank 2 .
  • a truss 3 extends downward to support a tank that is known as a soft tank 4 (also known as a fixed ballast tank).
  • the function of the soft tank is to carry fixed ballast, which improves the stability and reduces the motions of the spar buoy in response to the action of the waves.
  • the hard tank, truss, and soft tank are fabricated as a unit 5 lying on its side. The superstructure is built elsewhere in the upright position.
  • the unit 5 is loaded out onto a transporter vessel and transported to the vicinity of the installation site.
  • the transporter vessel ballasts down and the unit 5 floats off the transporter vessel, which departs leaving the unit floating horizontally in the water, as seen in FIG. 2 .
  • the soft tank is flooded. With the loss of buoyancy at the bottom end of the unit, the unit becomes unstable and rotates into a stable vertical position, as seen in FIG. 3 .
  • the name fixed ballast refers to the fact that the fixed ballast cannot be moved, once it is installed.
  • the fixed ballast is a slurry of particles of a dense material and water. The slurry is introduced into a pipe above the water surface. This pipe extends downward to a compartment in the soft tank. The slurry runs down the pipe and enters the compartment, displacing sea water from the flooded compartment through an opening at the top of the compartment. As water decants off the slurry, the particles sink to the bottom of the compartment leaving room for more slurry, if needed.
  • the superstructure can be lifted and set on the unit to obtain the completed spar, as seen in FIG. 1 .
  • the soft tank 4 can be divided into compartments so that different quantities of the fixed ballast can be placed in each compartment.
  • FIG. 4 shows a soft tank 4 that is divided into eight compartments.
  • the square in the central region of the soft tank 4 is not a compartment, but is really a square opening, or center well through the soft tank 4 .
  • the position of the center of gravity of the fixed ballast is chosen to produce a combined center of gravity of the entire spar buoy platform that is at the center of the structure in plan.
  • the legs of the truss are indicated by numeral 6 .
  • the weights supported by the spar are divided into three categories when center of gravity issues are considered. There are the weights that will never move because they are part of the structure, or there will be no reason to move them. These fixed weights have a known center of gravity that can be compensated by the center of gravity of the fixed ballast. There are weights that are expected to move in normal operations. When these weights move the active ballast system in the hard tank is used to trim the spar. Finally, there are future equipment weights that will be added at a future time. These fixed weights that will be added in the future will cause the center of gravity of the spar to move. Since the fixed ballast cannot be moved, the design of the spar must include sufficient ballasting capability in the hard tank 2 to trim the spar when the future weight is added.
  • the dense material that is ground up into particles and slurried is usually an enriched iron ore that is chosen because it is economical, dense, and is benign to the environment. If there is a spill during installation of the slurry, or a leak during service, it is essential that the fixed ballast material not be toxic to marine life. Once the water has decanted out of the fixed ballast particle matrix, the fixed ballast will conglomerate into a weak solid mass.
  • the present invention addresses the problem of removing fixed ballast and then refloating a floating offshore structure that uses fixed ballast.
  • a fixed ballast material is chosen that can be removed by operations conducted above the water surface. Operations are conducted through pipes that are preinstalled during fabrication of the structure. The pipes are used during installation and removal of the fixed ballast.
  • the material used for the ballast may be a dense liquid that is pumped into the soft tank compartments during ballasting and forced out of the tank during refloating.
  • the material may also be a soluble material that is ground up into particles and added to water. After a saturated solution is obtained, more particles are added to produce a slurry. The slurry is introduced into the soft tank through the pipes. Removal of the slurry is accomplished by pumping sea water through one of the pipes until all of the ballast material is dissolved and forced out of the tank.
  • FIG. 1 illustrates a spar structure in the normal operational position.
  • FIG. 2 illustrates a truss type spar structure in a horizontal floating orientation.
  • FIG. 3 illustrates a truss type spar in the vertical floating position with the added detail of flow pipes to the soft tank compartments.
  • FIG. 4 is a view taken along lines 4 - 4 in FIG. 3 .
  • FIG. 3 illustrates a floating offshore structure (spar type) wherein pipes 7 and 8 are installed on the unit 5 and run from above the water surface into the soft tank 4 .
  • One of the pipes (pipe 7 ) extends to a point that is near the bottom of the soft tank 4 .
  • the other pipe (pipe 8 ) enters the soft tank 4 and terminates near the top of the soft tank 4 .
  • the tops of both pipes 7 and 8 extend above the water surface when the completed structure is in its normal operational position as illustrated in FIG. 1 .
  • the pipes 7 and 8 are preinstalled during construction of the structure.
  • the ballast material is pumped through pipe 7 into the soft tank 4 .
  • the ballast material which is heavier than water, displaces the water from the soft tank 4 and forces the water out of the soft tank 4 through pipe 8 .
  • the ballast material is pumped into the soft tank 4 until all of the water has been displaced from the soft tank 4 or until the desired ballast weight has been delivered into the soft tank 4 .
  • the ballast material may be a slurry that is formed as follows. A material that is soluble in water is ground up into particles and added to water until a saturated solution is obtained. More of the ground particles are then added to the saturated solution to form a slurry, which produces a ballast material.
  • a slurry of calcium chloride is an example of a suitable slurry material. It is dense enough, soluble in water, and benign to the environment.
  • Another option for ballast material is a liquid that is dense enough to provide the desired ballast effect. The liquid must be denser than water, soluble in water, and benign to the environment. Cesium formate is an example of a liquid that meets these requirements.
  • Ballasting is carried out as follows.
  • the slurry option When the slurry option is used, the slurry is delivered into the soft tank 4 through the pipe (pipe 7 ) that terminates near the bottom of the soft tank 4 .
  • the slurry entering the bottom of the soft tank 4 displaces sea water out of the soft tank 4 through pipe 8 .
  • the suspended material in the slurry is allowed to settle. Then more of the slurry material can be added if additional ballast weight is needed.
  • the dense liquid option the dense liquid is delivered into the soft tank 4 through the pipe (pipe 7 ) that terminates near the bottom of the soft tank 4 .
  • the dense liquid displaces sea water out of the soft tank 4 through pipe 8 .
  • the tops of pipes 7 and 8 are capped after the desired amount of ballast material has been delivered into the soft tank 4 .
  • compressed air is introduced into the soft tank 4 through pipe 8 .
  • the compressed air displaces the dense liquid through pipe 7 .
  • the structure may be floated into a horizontal position once the dense ballast material has been forced from the soft tank 4 .
  • the invention provides another advantage.
  • the invention allows the removal of fixed ballast from the soft tank. Instead of providing extra ballast capacity in the hard tank to trim the structure after additional future equipment is added, the ballast in the soft tank 4 can be moved to trim the structure. Weight can be removed or added to the soft tank compartments to move the center of gravity of the fixed ballast to the desired location.
  • the invention is applicable to all types of floating offshore structures that use fixed ballast and will encounter the problem of refloating for disassembly as referenced above.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physical Water Treatments (AREA)
  • Revetment (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

An improved fixed ballast for a floating offshore structure. The material used for the ballast may be a dense liquid that is pumped into the fixed ballast tank during ballasting and forced out of the tank during deballasting. The material may also be a soluble material that is ground up into particles and added to water. After a saturated solution is obtained, more particles are added to produce a slurry. The slurry is delivered into the ballast tanks. Removal of the slurry is accomplished by pumping sea water into the ballast tanks until all of the ballast material is dissolved and forced out of the tank.

Description

    FIELD AND BACKGROUND OF INVENTION
  • The invention is generally related to offshore floating structures and more particularly to the refloating and removal of such structures.
  • A spar buoy is a floating structure that has been used to support drilling and production equipment for oil production in the offshore environment. As seen in FIG. 1, a superstructure 1 that contains the payload is supported on a vertical, buoyant cylinder known as a hard tank 2. A truss 3 extends downward to support a tank that is known as a soft tank 4 (also known as a fixed ballast tank). The function of the soft tank is to carry fixed ballast, which improves the stability and reduces the motions of the spar buoy in response to the action of the waves. The hard tank, truss, and soft tank are fabricated as a unit 5 lying on its side. The superstructure is built elsewhere in the upright position. The unit 5 is loaded out onto a transporter vessel and transported to the vicinity of the installation site. The transporter vessel ballasts down and the unit 5 floats off the transporter vessel, which departs leaving the unit floating horizontally in the water, as seen in FIG. 2. To get the unit into the vertical position the soft tank is flooded. With the loss of buoyancy at the bottom end of the unit, the unit becomes unstable and rotates into a stable vertical position, as seen in FIG. 3.
  • In the vertical position seen in FIG. 3 the soft tank 4 is fully flooded, ready to receive the fixed ballast. The name fixed ballast refers to the fact that the fixed ballast cannot be moved, once it is installed. The fixed ballast is a slurry of particles of a dense material and water. The slurry is introduced into a pipe above the water surface. This pipe extends downward to a compartment in the soft tank. The slurry runs down the pipe and enters the compartment, displacing sea water from the flooded compartment through an opening at the top of the compartment. As water decants off the slurry, the particles sink to the bottom of the compartment leaving room for more slurry, if needed. Once the fixed ballast is in place the superstructure can be lifted and set on the unit to obtain the completed spar, as seen in FIG. 1.
  • The soft tank 4 can be divided into compartments so that different quantities of the fixed ballast can be placed in each compartment. As an example, FIG. 4 shows a soft tank 4 that is divided into eight compartments. The square in the central region of the soft tank 4 is not a compartment, but is really a square opening, or center well through the soft tank 4. By doing this the combined center of gravity of the fixed ballast can be moved to a desired position in plan that is not at the center of the soft tank 4. The position of the center of gravity of the fixed ballast is chosen to produce a combined center of gravity of the entire spar buoy platform that is at the center of the structure in plan. The legs of the truss are indicated by numeral 6.
  • The weights supported by the spar are divided into three categories when center of gravity issues are considered. There are the weights that will never move because they are part of the structure, or there will be no reason to move them. These fixed weights have a known center of gravity that can be compensated by the center of gravity of the fixed ballast. There are weights that are expected to move in normal operations. When these weights move the active ballast system in the hard tank is used to trim the spar. Finally, there are future equipment weights that will be added at a future time. These fixed weights that will be added in the future will cause the center of gravity of the spar to move. Since the fixed ballast cannot be moved, the design of the spar must include sufficient ballasting capability in the hard tank 2 to trim the spar when the future weight is added.
  • The dense material that is ground up into particles and slurried is usually an enriched iron ore that is chosen because it is economical, dense, and is benign to the environment. If there is a spill during installation of the slurry, or a leak during service, it is essential that the fixed ballast material not be toxic to marine life. Once the water has decanted out of the fixed ballast particle matrix, the fixed ballast will conglomerate into a weak solid mass.
  • In the prior art, at the end of the economic life of the spar buoy platform, the superstructure is taken off and the rest of the structure is stripped of anything useful and cleaned up. Then the structure is towed to deep water and sunk to get rid of it.
  • Due to potential environmental concerns there is an increasing interest in retrieving and salvaging entire spar structures instead of sinking them. This means that the unit 3 of FIG. 3 must be rotated into the horizontal floating position of FIG. 2. Thus, the uprighting procedure described above must be reversed. In other words, the unit 5 must be refloated. Once the unit is in the horizontal position it can be towed to shore and salvaged. The problem this presents is that the fixed ballast must be removed before it is possible to refloat the unit. Given that the fixed ballast conglomerates into a solid weak mass over years of service, the fixed ballast is not easily removed and the problem becomes very difficult to solve. Large spar structures have not been in operation for many years and, as a result, the known art has not addressed this problem. While the above discussion is directed to spar structures because the use of large spar structures is relatively new, it should be understood that the problem of removing fixed ballast in order to refloat a structure applies to any floating offshore structure that uses fixed ballast as described above.
  • SUMMARY OF INVENTION
  • The present invention addresses the problem of removing fixed ballast and then refloating a floating offshore structure that uses fixed ballast. For new structures, a fixed ballast material is chosen that can be removed by operations conducted above the water surface. Operations are conducted through pipes that are preinstalled during fabrication of the structure. The pipes are used during installation and removal of the fixed ballast. The material used for the ballast may be a dense liquid that is pumped into the soft tank compartments during ballasting and forced out of the tank during refloating. The material may also be a soluble material that is ground up into particles and added to water. After a saturated solution is obtained, more particles are added to produce a slurry. The slurry is introduced into the soft tank through the pipes. Removal of the slurry is accomplished by pumping sea water through one of the pipes until all of the ballast material is dissolved and forced out of the tank.
  • The various features of novelty which characterize the invention are pointed out with particularity in the claims annexed to and forming part of this disclosure. For a better understanding of the present invention, and the operating advantages attained by its use, reference is made to the accompanying drawings and descriptive matter, forming a part of this disclosure, in which a preferred embodiment of the invention is illustrated.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • In the accompanying drawings, forming a part of this specification, and in which reference numerals shown in the drawings designate like or corresponding parts throughout the same:
  • FIG. 1 illustrates a spar structure in the normal operational position.
  • FIG. 2 illustrates a truss type spar structure in a horizontal floating orientation.
  • FIG. 3 illustrates a truss type spar in the vertical floating position with the added detail of flow pipes to the soft tank compartments.
  • FIG. 4 is a view taken along lines 4-4 in FIG. 3.
  • DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • FIG. 3 illustrates a floating offshore structure (spar type) wherein pipes 7 and 8 are installed on the unit 5 and run from above the water surface into the soft tank 4. One of the pipes (pipe 7) extends to a point that is near the bottom of the soft tank 4. The other pipe (pipe 8) enters the soft tank 4 and terminates near the top of the soft tank 4. The tops of both pipes 7 and 8 extend above the water surface when the completed structure is in its normal operational position as illustrated in FIG. 1. The pipes 7 and 8 are preinstalled during construction of the structure.
  • During ballasting operations, the ballast material is pumped through pipe 7 into the soft tank 4. The ballast material, which is heavier than water, displaces the water from the soft tank 4 and forces the water out of the soft tank 4 through pipe 8. The ballast material is pumped into the soft tank 4 until all of the water has been displaced from the soft tank 4 or until the desired ballast weight has been delivered into the soft tank 4.
  • The ballast material may be a slurry that is formed as follows. A material that is soluble in water is ground up into particles and added to water until a saturated solution is obtained. More of the ground particles are then added to the saturated solution to form a slurry, which produces a ballast material. A slurry of calcium chloride is an example of a suitable slurry material. It is dense enough, soluble in water, and benign to the environment. Another option for ballast material is a liquid that is dense enough to provide the desired ballast effect. The liquid must be denser than water, soluble in water, and benign to the environment. Cesium formate is an example of a liquid that meets these requirements.
  • Ballasting is carried out as follows. When the slurry option is used, the slurry is delivered into the soft tank 4 through the pipe (pipe 7) that terminates near the bottom of the soft tank 4. The slurry entering the bottom of the soft tank 4 displaces sea water out of the soft tank 4 through pipe 8. Once the desired amount of slurry has been delivered into the soft tank 4, the suspended material in the slurry is allowed to settle. Then more of the slurry material can be added if additional ballast weight is needed. When the dense liquid option is used, the dense liquid is delivered into the soft tank 4 through the pipe (pipe 7) that terminates near the bottom of the soft tank 4. The dense liquid displaces sea water out of the soft tank 4 through pipe 8. For both options, the tops of pipes 7 and 8 are capped after the desired amount of ballast material has been delivered into the soft tank 4.
  • When removing the slurry ballast to deballast and refloat the structure, water is pumped into the soft tank 4 through either pipe 7 or 8. The water dissolves the slurry material and forces it up the other pipe. Water is pumped into the soft tank 4 until the salinity of the return liquid indicates that the slurry ballast material has been removed. The structure may then be floated into a horizontal position and removed.
  • When removing the dense liquid ballast, compressed air is introduced into the soft tank 4 through pipe 8. The compressed air displaces the dense liquid through pipe 7. The structure may be floated into a horizontal position once the dense ballast material has been forced from the soft tank 4.
  • The invention provides another advantage. The invention allows the removal of fixed ballast from the soft tank. Instead of providing extra ballast capacity in the hard tank to trim the structure after additional future equipment is added, the ballast in the soft tank 4 can be moved to trim the structure. Weight can be removed or added to the soft tank compartments to move the center of gravity of the fixed ballast to the desired location.
  • The invention is applicable to all types of floating offshore structures that use fixed ballast and will encounter the problem of refloating for disassembly as referenced above.
  • While specific embodiments and/or details of the invention have been shown and described above to illustrate the application of the principles of the invention, it is understood that this invention may be embodied as more fully described in the claims, or as otherwise known by those skilled in the art (including any and all equivalents), without departing from such principles.

Claims (9)

1. In a floating offshore structure having a ballast tank that receives fixed ballast, an improved fixed ballast material, said fixed ballast material comprising a slurry formed from a water soluble material that is benign to the environment.
2. A method for removing the slurry fixed ballast of claim 1, comprising pumping water into the ballast tank containing the slurry until the material has been dissolved and removed from the ballast tank.
3. In a floating offshore structure having a ballast tank that receives fixed ballast, an improved fixed ballast material, said fixed ballast material comprising a liquid that is denser than water and benign to the environment.
4. A method for removing the dense liquid ballast of claim 3, comprising pumping compressed air into the ballast tank to force the liquid from the ballast tank.
5. A method for removing the dense liquid ballast of claim 3, comprising pumping water into the ballast tank to force the liquid from the ballast tank.
6. A method for adding fixed ballast to a floating offshore structure, comprising:
a. dissolving a water soluble material in water to form a saturated solution;
b. forming a slurry by adding additional water soluble material to the saturated solution;
c. pumping the slurry into a ballast tank in the floating offshore structure; and
d. allowing suspended slurry material to settle in the ballast tank.
7. A method for adding fixed ballast to a floating offshore structure, comprising pumping a liquid that is denser than water and benign to the environment into a ballast tank in the floating offshore structure.
8. The improved ballast material of claim 1, comprising calcium chloride.
9. The improved ballast material of claim 3, comprising cesium formate.
US11/389,446 2006-03-24 2006-03-24 Solution mining to refloat and dispose of an offshore floating structure Abandoned US20070221112A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US11/389,446 US20070221112A1 (en) 2006-03-24 2006-03-24 Solution mining to refloat and dispose of an offshore floating structure
NO20071293A NO20071293L (en) 2006-03-24 2007-03-09 Load material to make an offshore structure fluid so that it can be removed
MX2007003412A MX2007003412A (en) 2006-03-24 2007-03-22 Solution mining to refloat and dispose of an offshore floating structure.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/389,446 US20070221112A1 (en) 2006-03-24 2006-03-24 Solution mining to refloat and dispose of an offshore floating structure

Publications (1)

Publication Number Publication Date
US20070221112A1 true US20070221112A1 (en) 2007-09-27

Family

ID=38531993

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/389,446 Abandoned US20070221112A1 (en) 2006-03-24 2006-03-24 Solution mining to refloat and dispose of an offshore floating structure

Country Status (3)

Country Link
US (1) US20070221112A1 (en)
MX (1) MX2007003412A (en)
NO (1) NO20071293L (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100024705A1 (en) * 2008-07-30 2010-02-04 Seahorse Equipment Corp. Drag-inducing stabilizer plates with damping apertures
US20110126750A1 (en) * 2008-07-30 2011-06-02 Seahorse Equipment Corp. Semisubmersible Offshore Platform with Drag-Inducing Stabilizer Plates
CN102390496A (en) * 2011-10-17 2012-03-28 中国海洋石油总公司 Water injection device for hard cabin during column platform righting process
CN102431628A (en) * 2011-10-17 2012-05-02 上海交通大学 Time-sharing loading system for loading cabins of hard cabin of column-type platform
JP2012201218A (en) * 2011-03-25 2012-10-22 Toda Constr Co Ltd Method for constructing offshore wind power generation facility
JP2012201217A (en) * 2011-03-25 2012-10-22 Toda Constr Co Ltd Method for constructing offshore wind power generation facility
GB2535494A (en) * 2015-02-18 2016-08-24 Acergy France SAS Lowering buoyant structures in water

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3318278A (en) * 1966-10-17 1967-05-09 Nat Lead Co Ballasting of ships
US3613623A (en) * 1968-08-05 1971-10-19 Mitsui Shipbuilding Eng Slurry tanker
US3812984A (en) * 1971-05-06 1974-05-28 J Cladingboel Transport of woodchips

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3318278A (en) * 1966-10-17 1967-05-09 Nat Lead Co Ballasting of ships
US3613623A (en) * 1968-08-05 1971-10-19 Mitsui Shipbuilding Eng Slurry tanker
US3812984A (en) * 1971-05-06 1974-05-28 J Cladingboel Transport of woodchips

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8418640B2 (en) 2008-07-30 2013-04-16 Seahorse Equipment Corp Semisubmersible offshore platform with drag-inducing stabilizer plates
US7900572B2 (en) * 2008-07-30 2011-03-08 Seahorse Equipment Corporation Drag-inducing stabilizer plates with damping apertures
US20110100280A1 (en) * 2008-07-30 2011-05-05 Seahorse Equipment Corp. Drag-inducing stabilizer plates with damping apertures
US20110126750A1 (en) * 2008-07-30 2011-06-02 Seahorse Equipment Corp. Semisubmersible Offshore Platform with Drag-Inducing Stabilizer Plates
US8291849B2 (en) 2008-07-30 2012-10-23 Seahorse Equipment Corp. Drag-inducing stabilizer plates with damping apertures
US20100024705A1 (en) * 2008-07-30 2010-02-04 Seahorse Equipment Corp. Drag-inducing stabilizer plates with damping apertures
JP2012201218A (en) * 2011-03-25 2012-10-22 Toda Constr Co Ltd Method for constructing offshore wind power generation facility
JP2012201217A (en) * 2011-03-25 2012-10-22 Toda Constr Co Ltd Method for constructing offshore wind power generation facility
CN102390496A (en) * 2011-10-17 2012-03-28 中国海洋石油总公司 Water injection device for hard cabin during column platform righting process
CN102431628A (en) * 2011-10-17 2012-05-02 上海交通大学 Time-sharing loading system for loading cabins of hard cabin of column-type platform
GB2535494A (en) * 2015-02-18 2016-08-24 Acergy France SAS Lowering buoyant structures in water
GB2535494B (en) * 2015-02-18 2018-04-11 Acergy France SAS Lowering buoyant structures in water
US10480685B2 (en) 2015-02-18 2019-11-19 Acergy France SAS Lowering buoyant structures in water

Also Published As

Publication number Publication date
MX2007003412A (en) 2008-10-28
NO20071293L (en) 2007-09-25

Similar Documents

Publication Publication Date Title
US20070221112A1 (en) Solution mining to refloat and dispose of an offshore floating structure
JP6208401B2 (en) Pumping system and pumping method
KR101998104B1 (en) Method for constructing offshore structure
JP4559633B2 (en) Work ship
CN109312552A (en) The unit and method of the sea bed support of shallow water probing terminal are provided
MX2013004327A (en) Offshore tower for drilling and/or production.
JPS59209579A (en) Floating modular device and constitution method thereof
CN103452086A (en) Mat-assisted driving movable platform
CN110382344A (en) The gravity substrate that can be floated for the autonomous type being connect with the offshore installations that can be floated
KR102630564B1 (en) Hexadecimal method
CN101545254A (en) Bottom-supported fixed type platform with seabed storage tank
EP2465764B1 (en) Spar hull load out method
CN113882451B (en) Dredger with flexible arm desilting
AU752766B2 (en) Method of dissolving water-soluble gas in sea for isolation into deep sea, device therefor, laying method for device
US9909274B2 (en) Wind turbine parts handling method and device
GB2385564A (en) Semi-submersible vessel having a concrete storage tank
CN103374905A (en) Movable self-installation platform
CN111232141A (en) Marine floating body with movable ballast tank
CN102635093A (en) Embedded-type split anchor with high-pressure spray orifice and broadtail structure
US2677935A (en) Submarine drilling platform
USRE24346E (en) dawson
US20150060137A1 (en) Tender Barge for Drillship Operating in Environmentally Sensitive Areas
US9022693B1 (en) Rapid deployable floating production system
CA1066523A (en) Platforms for sea-bottom exploitation
JP2021151799A (en) Assembly device and assembling method for floating body type on-water structure

Legal Events

Date Code Title Description
AS Assignment

Owner name: J. RAY MCDERMOTT, S.A., TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HANEY, JAMES A.;AKHAVE, SHREE R.;REEL/FRAME:018902/0392

Effective date: 20070219

STCB Information on status: application discontinuation

Free format text: EXPRESSLY ABANDONED -- DURING EXAMINATION