CN102425439A - 预置钢绞线双向分阶段张拉的锚索加固方法 - Google Patents

预置钢绞线双向分阶段张拉的锚索加固方法 Download PDF

Info

Publication number
CN102425439A
CN102425439A CN2012100129070A CN201210012907A CN102425439A CN 102425439 A CN102425439 A CN 102425439A CN 2012100129070 A CN2012100129070 A CN 2012100129070A CN 201210012907 A CN201210012907 A CN 201210012907A CN 102425439 A CN102425439 A CN 102425439A
Authority
CN
China
Prior art keywords
anchor cable
hole
curtate
coal pillar
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100129070A
Other languages
English (en)
Other versions
CN102425439B (zh
Inventor
阚甲广
张农
姚亚虎
郑西贵
韩昌良
张志义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210012907.0A priority Critical patent/CN102425439B/zh
Publication of CN102425439A publication Critical patent/CN102425439A/zh
Application granted granted Critical
Publication of CN102425439B publication Critical patent/CN102425439B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种预置钢绞线双向分阶段张拉的锚索加固方法,该方法是在上区段采动影响前、采区侧面预置入锚索,注浆对待留设煤柱进行初次加固,并对锚索进行初次张拉;下区段沿空掘巷后,注浆对煤柱靠下区段侧进行加固,同时对锚索外露部分再次进行张拉,实现双向分阶段张拉。该预置钢绞线双向分阶段张拉的锚索加固方法利用锚索贯通煤柱,并在煤柱两侧分阶段张拉锚索、施工预紧力,使煤柱两个自由面相互约束,限制其变形,并通过注浆增强煤柱完整性,解决了传统沿空掘巷煤柱破碎、强度低的问题,提高煤柱整体稳定性和承载能力,能够显著减少巷道变形。

Description

预置钢绞线双向分阶段张拉的锚索加固方法
技术领域
本发明涉及煤矿沿空掘巷时的锚索加固技术,尤其是一种预置钢绞线双向分阶段张拉的锚索加固方法。
背景技术
留小煤柱沿空掘巷可大幅度提高采区煤炭回收率,在我国煤矿应用广泛。现有留小煤柱沿空掘巷是在临近工作面采完和采空区顶板岩层活动大体稳定以后,留设一定宽度煤柱后进行巷道掘进。巷道掘进前煤柱是没有加固的,故小煤柱产生松散变形,保持小煤柱稳定、控制其变形是沿空掘巷能否成功的关键之一。尤其是进入深部以后,小煤柱沿空掘巷围岩虽然处于应力低值区,但由于煤柱松软破碎,承载能力很低,在工作面受采动影响时,上覆基本顶岩层三角块结构旋转下沉,塑性区、破碎区迅速扩展,导致巷道变形剧烈,通常以米计算,该类巷道围岩的稳定性问题越来越突出,严重影响生产效率,造成安全隐患。
发明内容
为了解决目前小煤柱沿空掘巷过程中巷道围岩的稳定性差的问题,本发明提出了预置钢绞线双向分阶段张拉的锚索加固方法,该加固方法可以有效解决目前沿空掘巷小煤柱松散破碎、强度低的问题,提高煤柱整体稳定性和承载能力。
本发明解决其技术问题所采用的技术方案为:在图中,该预置钢绞线双向分阶段张拉的锚索加固方法的操作步骤为:
Figure 2012100129070100002DEST_PATH_IMAGE001
在上区段巷道的非回采侧喷射30~100mm的混凝土喷层,形成止浆层;
②混凝土凝结后,在上区段巷道的非回采侧施工锚索孔,锚索孔的深度需大于待留设煤柱宽度200~300mm;孔内放入中部带有挡环的锚索,锚索的长度大于待留设煤柱宽度400~600mm;
③在上区段巷道的非回采侧施工注浆孔,注浆孔的深度为煤柱宽度的一半,然后在孔内安装注浆管,并采用快硬水泥封孔;
④封孔完成后对其进行注浆,注浆浆液为水泥浆液或马丽散等化学浆液,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;
⑤待浆液凝固后安装托盘、锁具,张拉锚索;
⑥上区段采空区顶板岩层活动稳定后,留设5~8m宽煤柱沿上区段采空区掘下区段巷道;
⑦在下区段巷道的煤柱侧喷射30~100mm的混凝土喷层,形成下区段止浆层;
⑧在下区段巷道的煤柱侧施工下区段注浆孔,下区段注浆孔深为煤柱宽度的一半,然后在孔内安装注浆管,并采用快硬水泥封孔;
Figure 2012100129070100002DEST_PATH_IMAGE002
封孔完成后对其进行注浆,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;
⑩待浆液凝固后,对锚索在沿空掘巷中的露头安装下区段托盘、下区段锁具,在下区段巷道张拉锚索。
所述①~⑤需在上区段超前采动影响范围外进行,⑦~⑩需在下区段沿空掘巷工作面掘进影响范围外进行。
所述锚索在上区段采动前即预置入待留设煤柱内。
所述锚索在上区段采动影响前、上区段煤柱侧先张拉,在下区段巷道掘进后,在煤柱另一侧再次张拉,实现双向分阶段张拉。
本发明的有益效果是,该预置钢绞线双向分阶段张拉的锚索加固方法利用锚索贯通煤柱,并在煤柱两侧分阶段张拉锚索、施工预紧力,使煤柱两个自由面相互约束,限制其变形,并通过注浆增强煤柱完整性,解决了传统沿空掘巷煤柱破碎、强度低的问题,提高煤柱整体稳定性和承载能力,能够显著减少巷道变形。
附图说明
下面结合附图及实施例对本发明作进一步的说明。
图1为预置钢绞线双向分阶段张拉的锚索加固方法的本区段巷道施工示意图。
图2为预置钢绞线双向分阶段张拉的锚索加固方法的沿空掘巷施工示意图。
图中,1.上区段巷道,2.顶板岩层,3.止浆层,3-1.下区段止浆层,4.煤柱,5.挡环,6.锚索孔,7.锚索,8.上区段采空区,9.注浆孔,9-1.下区段注浆孔,10.注浆管,11.托盘,11-1.下区段托盘,12.锁具,12-1.下区段锁具,13.下区段巷道。
具体实施方式
在图中,该预置钢绞线双向分阶段张拉的锚索加固方法的操作步骤为:
Figure 436779DEST_PATH_IMAGE001
在上区段巷道1的非回采侧喷射30~100mm的混凝土喷层,形成止浆层3;
②混凝土凝结后,在上区段巷道1的非回采侧施工锚索孔6,锚索孔6的深度需大于待留设煤柱4宽度200~300mm;孔内放入中部带有挡环5的锚索7,锚索7的长度大于待留设煤柱4宽度400~600mm;
③在上区段巷道1的非回采侧施工注浆孔9,注浆孔9的深度为煤柱4宽度的一半,然后在孔内安装注浆管10,并采用快硬水泥封孔;
④封孔完成后对其进行注浆,注浆浆液为水泥浆液或马丽散等化学浆液,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;
⑤待浆液凝固后安装托盘11、锁具12,张拉锚索7;
⑥上区段采空区8顶板岩层2活动稳定后,留设5~8m宽煤柱4沿上区段采空区8掘下区段巷道13;
⑦在下区段巷道13的煤柱4侧喷射30~100mm的混凝土喷层,形成下区段止浆层3-1;
⑧在下区段巷道13的煤柱侧施工下区段注浆孔9-1,下区段注浆孔9-1深为煤柱4宽度的一半,然后在孔内安装注浆管10,并采用快硬水泥封孔;
Figure 416237DEST_PATH_IMAGE002
封孔完成后对其进行注浆,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;
⑩待浆液凝固后,对锚索在沿空掘巷中的露头安装下区段托盘11-1、下区段锁具12-1,在下区段张拉锚索。
所述①~⑤需在上区段超前采动影响范围外进行,⑦~⑩需在下区段沿空掘巷工作面掘进影响范围外进行。
所述锚索7在上区段采动前即预置入待留设煤柱内。
所述锚索7在上区段采动影响前、上区段煤柱4侧先张拉,在下区段巷道13掘进后,在煤柱4另一侧再次张拉,实现双向分阶段张拉。

Claims (3)

1.预置钢绞线双向分阶段张拉的锚索加固方法,在上区段巷道(1)的采区侧面喷射30~100mm的混凝土喷层,形成止浆层(3);混凝土凝结后,在上区段巷道(1)的非回采侧施工锚索孔(6),锚索孔(6)的深度需大于待留设煤柱(4)宽度200~300mm;孔内放入中部带有挡环(5)的锚索(7),锚索(7)的长度大于待留设煤柱(4)宽度400~600mm;其特征是:在上区段巷道(1)的非回采侧施工注浆孔(9),注浆孔(9)的深度为煤柱(4)宽度的一半,然后在孔内安装注浆管(10),并采用快硬水泥封孔;封孔完成后对其进行注浆,注浆浆液为水泥浆液或马丽散化学浆液,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;待浆液凝固后安装托盘(11)、锁具(12),张拉锚索(7);上区段采空区(8)顶板岩层(2)活动稳定后,留设5~8m宽煤柱(4)沿上区段采空区(8)掘下区段巷道(13);在下区段巷道(13)的煤柱4侧喷射30~100mm的混凝土喷层,形成下区段止浆层(3-1);在下区段巷道(13)的煤柱侧施工下区段注浆孔(9-1),下区段注浆孔(9-1)深为煤柱(4)宽度的一半,然后在孔内安装注浆管(10),并采用快硬水泥封孔;封孔完成后对其进行注浆,当注浆压力达到1.0~2.0MPa时,稳压3~5 min后停止注浆;待浆液凝固后,对锚索在沿空掘巷中的露头安装下区段托盘(11-1)、锁具(12-1),在下区段张拉锚索。
2.根据权利要求1所述预置钢绞线双向分阶段张拉的锚索加固方法;其特征是:所述锚索(7)在上区段采动前即预置入待留设煤柱(4)内。
3.根据权利要求1所述预置钢绞线双向分阶段张拉的锚索加固方法;其特征是:所述锚索(7)在上区段采动影响前、上区段煤柱(4)侧先张拉,在下区段巷道(13)掘进后,在煤柱(4)另一侧再次张拉,实现双向分阶段张拉。
CN201210012907.0A 2012-01-17 2012-01-17 预置钢绞线双向分阶段张拉的锚索加固方法 Expired - Fee Related CN102425439B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210012907.0A CN102425439B (zh) 2012-01-17 2012-01-17 预置钢绞线双向分阶段张拉的锚索加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210012907.0A CN102425439B (zh) 2012-01-17 2012-01-17 预置钢绞线双向分阶段张拉的锚索加固方法

Publications (2)

Publication Number Publication Date
CN102425439A true CN102425439A (zh) 2012-04-25
CN102425439B CN102425439B (zh) 2014-01-29

Family

ID=45959464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210012907.0A Expired - Fee Related CN102425439B (zh) 2012-01-17 2012-01-17 预置钢绞线双向分阶段张拉的锚索加固方法

Country Status (1)

Country Link
CN (1) CN102425439B (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704967A (zh) * 2012-05-21 2012-10-03 严红 一种防止交叉大断面硐室顶板垮冒结构及方法
CN103899342A (zh) * 2014-04-15 2014-07-02 中国矿业大学(北京) 沿空掘巷煤柱锚索对穿加固方法
CN104533482A (zh) * 2014-10-28 2015-04-22 淮浙煤电有限责任公司顾北煤矿分公司 一种提高沿空掘巷小煤柱稳定性的加固方法
CN105422128A (zh) * 2015-12-14 2016-03-23 山东科技大学 一种深井沿空掘巷防采空区瓦斯渗漏方法
CN105971640A (zh) * 2016-07-08 2016-09-28 西安科技大学 一种沿空掘巷窄煤柱的加固方法
CN106050282A (zh) * 2016-07-08 2016-10-26 西安科技大学 一种沿空留巷窄煤柱的锚固结构及加固方法
CN106089207A (zh) * 2016-06-23 2016-11-09 大同煤矿集团有限责任公司 特厚煤层工作面沿空掘巷窄煤柱留设方法
CN106401604A (zh) * 2016-12-12 2017-02-15 煤炭科学技术研究院有限公司 一种低强度裂隙发育大煤柱加固方法
CN106884655A (zh) * 2017-01-10 2017-06-23 山东建筑大学 一种沿空掘巷煤柱双向加固方法
CN108691559A (zh) * 2017-04-12 2018-10-23 中国矿业大学(北京) 一种用于沿空巷道煤柱帮刚柔协同控制方法
CN108868769A (zh) * 2018-06-07 2018-11-23 兖州煤业股份有限公司 一种基于胀锁式锚索加固煤柱的施工方法
CN108952715A (zh) * 2018-06-22 2018-12-07 太原理工大学 一种倾斜厚/特厚煤层巷顶沿空掘巷顶煤支护加固方法
CN109505639A (zh) * 2019-01-04 2019-03-22 山东科技大学 一种沿空掘巷煤柱加固系统及其使用方法
CN111535817A (zh) * 2020-04-09 2020-08-14 山东科技大学 一种工作面双巷掘进小煤柱加固施工方法
CN112922653A (zh) * 2021-03-16 2021-06-08 太原理工大学 一种小煤柱重叠型注浆对穿锚索

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2095308A (en) * 1981-03-24 1982-09-29 Willich F Gmbh & Co Method and apparatus for consolidating rock strata
CN201121521Y (zh) * 2007-11-30 2008-09-24 中国矿业大学 一种对拉锚索

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2095308A (en) * 1981-03-24 1982-09-29 Willich F Gmbh & Co Method and apparatus for consolidating rock strata
CN201121521Y (zh) * 2007-11-30 2008-09-24 中国矿业大学 一种对拉锚索

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
> 20111130 梅光发 锚杆锚索注浆加固联合支护技术在小煤柱沿空掘巷中的应用 30-31、45 1-3 第20卷, 第11期 *
周凯旋: "孤岛工作面窄煤柱喷注浆加固方案", 《科技资讯》 *
徐景武: "窄煤柱锚注联合加固技术的研究与应用", 《山西煤炭》 *
梅光发: "锚杆锚索注浆加固联合支护技术在小煤柱沿空掘巷中的应用", <<煤>> *

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704967B (zh) * 2012-05-21 2015-09-09 中国矿业大学 一种防止交叉大断面硐室顶板垮冒方法
CN102704967A (zh) * 2012-05-21 2012-10-03 严红 一种防止交叉大断面硐室顶板垮冒结构及方法
CN103899342A (zh) * 2014-04-15 2014-07-02 中国矿业大学(北京) 沿空掘巷煤柱锚索对穿加固方法
CN104533482A (zh) * 2014-10-28 2015-04-22 淮浙煤电有限责任公司顾北煤矿分公司 一种提高沿空掘巷小煤柱稳定性的加固方法
CN105422128A (zh) * 2015-12-14 2016-03-23 山东科技大学 一种深井沿空掘巷防采空区瓦斯渗漏方法
CN106089207A (zh) * 2016-06-23 2016-11-09 大同煤矿集团有限责任公司 特厚煤层工作面沿空掘巷窄煤柱留设方法
CN106089207B (zh) * 2016-06-23 2018-06-08 大同煤矿集团有限责任公司 特厚煤层工作面沿空掘巷窄煤柱留设方法
CN105971640A (zh) * 2016-07-08 2016-09-28 西安科技大学 一种沿空掘巷窄煤柱的加固方法
CN106050282A (zh) * 2016-07-08 2016-10-26 西安科技大学 一种沿空留巷窄煤柱的锚固结构及加固方法
CN105971640B (zh) * 2016-07-08 2018-08-03 西安科技大学 一种沿空掘巷窄煤柱的加固方法
CN106050282B (zh) * 2016-07-08 2018-08-03 西安科技大学 一种沿空留巷窄煤柱的锚固结构及加固方法
CN106401604A (zh) * 2016-12-12 2017-02-15 煤炭科学技术研究院有限公司 一种低强度裂隙发育大煤柱加固方法
CN106884655B (zh) * 2017-01-10 2019-02-22 山东建筑大学 一种沿空掘巷煤柱双向加固方法
CN106884655A (zh) * 2017-01-10 2017-06-23 山东建筑大学 一种沿空掘巷煤柱双向加固方法
CN108691559A (zh) * 2017-04-12 2018-10-23 中国矿业大学(北京) 一种用于沿空巷道煤柱帮刚柔协同控制方法
CN108868769A (zh) * 2018-06-07 2018-11-23 兖州煤业股份有限公司 一种基于胀锁式锚索加固煤柱的施工方法
CN108952715A (zh) * 2018-06-22 2018-12-07 太原理工大学 一种倾斜厚/特厚煤层巷顶沿空掘巷顶煤支护加固方法
CN109505639A (zh) * 2019-01-04 2019-03-22 山东科技大学 一种沿空掘巷煤柱加固系统及其使用方法
CN109505639B (zh) * 2019-01-04 2020-03-31 山东科技大学 一种沿空掘巷煤柱加固系统及其使用方法
CN111535817A (zh) * 2020-04-09 2020-08-14 山东科技大学 一种工作面双巷掘进小煤柱加固施工方法
CN112922653A (zh) * 2021-03-16 2021-06-08 太原理工大学 一种小煤柱重叠型注浆对穿锚索

Also Published As

Publication number Publication date
CN102425439B (zh) 2014-01-29

Similar Documents

Publication Publication Date Title
CN102425439B (zh) 预置钢绞线双向分阶段张拉的锚索加固方法
CN103161480B (zh) 主动支撑巷旁充填沿空留巷的方法
CA3022748C (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
CN105240013B (zh) 长壁开采n00工法
CN103321654B (zh) 柔性气囊处理煤矿巷道冒顶的方法
CN107701188A (zh) 一种用于沿空掘巷窄煤柱采空侧静态胀裂切顶卸压法
CN104533482B (zh) 一种提高沿空掘巷小煤柱稳定性的加固方法
CN203756206U (zh) 一种新型软岩巷道底臌治理结构
CN102230382B (zh) 一种底板渐进掩护增压式注浆加固技术
CN103899329B (zh) 一种大变形破碎围岩巷道的治理方法
CN106884655B (zh) 一种沿空掘巷煤柱双向加固方法
CN102900446B (zh) 碎裂介质向下套管成孔及锚注分步加固方法
CN105201528B (zh) 一种泥质软岩的硅溶胶慢渗加固方法
CN104763434B (zh) 一种无煤柱双巷掘进方法
CN102322273A (zh) 一种巷道底板锚注一体化加固方法
CN105351001B (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN104533452A (zh) 一种煤矿井下破碎煤体分段式注浆加固方法
CN106523003A (zh) 一种适于深部开采巷道的刚柔耦合吸能支护技术
CN105927243B (zh) 一种井下围岩断层支护装置及支护方法
CN105781597A (zh) 深井软岩沿空留巷巷内锚注加固方法
CN101509383A (zh) 巷道底脚锚注加固抗底臌的方法及施工工艺
CN104594926A (zh) 一种用于高应力导水溶洞群复合顶板巷道快速支护方法
CN105484763B (zh) 一种深部煤矿半封闭钢筋混凝土管片支护方法
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN201972707U (zh) 一种夹心锚筋混凝土沿空隔离墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140129

Termination date: 20160117

EXPY Termination of patent right or utility model