CN102425139A - 深水江河流水中建设水坝的方法 - Google Patents

深水江河流水中建设水坝的方法 Download PDF

Info

Publication number
CN102425139A
CN102425139A CN2011103093841A CN201110309384A CN102425139A CN 102425139 A CN102425139 A CN 102425139A CN 2011103093841 A CN2011103093841 A CN 2011103093841A CN 201110309384 A CN201110309384 A CN 201110309384A CN 102425139 A CN102425139 A CN 102425139A
Authority
CN
China
Prior art keywords
dam
water
key
upstream face
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103093841A
Other languages
English (en)
Inventor
杨清太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103093841A priority Critical patent/CN102425139A/zh
Publication of CN102425139A publication Critical patent/CN102425139A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)
  • Barrages (AREA)

Abstract

一种简易经济安全的在深水江河流水中建设水坝的方法。本发明涉及的水坝由主坝和副坝(即挡石坝和挡水坝)两部分组成;1、主坝(即挡石坝)的建设方法是:在待建水坝上游逐层制造积木型带有放水孔的、预制单层主坝积块(主坝的顶视图成弓形,弓背对来水)。2、通过浮子使预制单层主坝漂浮并逐层拖动于基础坚固平整的、两侧坚固耐用的主坝支撑点就位,同时在主坝迎水面填充副坝材料。3、副坝(即挡水坝)的建设方法是:在预制主坝的迎水面堆积石块等比重大的粒度由大变小变细到尽量不渗水的堆积物并压实。4、在尽量不渗水的迎水面外粘贴不渗水的防水膜,同时在防水膜迎水面加保护层;这样,一种在深水江河流水中建设的水坝就成功了。

Description

深水江河流水中建设水坝的方法
所属技术领域
本发明涉及一种简易、经济、安全的水坝建设方法,一种在深水江河流水中建设水坝的方法。
背景技术
目前,公知的水坝建设形式还没有这种水坝建设方法。
发明内容
为了填补本领域简易、经济、安全水坝建设方法的不足和空白、降低水坝造价、提高水坝安全性能、创造人类在不截断流水的恶劣水环境下建设水坝的可能性,本发明提供一种在深水江河流水中建设水坝的方法。
本发明涉及的水坝由主坝和副坝(即挡石坝和挡水坝)两部分组成;1、主坝(即挡石坝)的建设方法是:在待建水坝上游逐层制造积木型带有放水孔的、预制单层主坝积块(主坝的顶视图成弓形,弓背对来水);2、通过浮子使预制单层主坝漂浮并逐层拖动使之漂浮于基础坚固平整的、两侧坚固耐用的主坝支撑点就位,同时在主坝迎水面填充副坝材料。3、副坝(即挡水坝)的建设方法是:在预制主坝的迎水面堆积石块等比重大的不溶解于水的粒度由大变小变细到尽量不渗水的堆积物并压实。4、在尽量不渗水的迎水面外粘贴不渗水的防水膜,同时在防水膜迎水面加保护层;这样,一种在深水江河流水中建设的水坝就成功了。水坝的放水管路可以从主坝(即挡石坝)的预留孔通过,放水管路由副坝(即挡水坝)定位。
本发明涉及的水坝,主坝(即挡石坝)纵断面可以做成梯阶形,为了方便鱼类洄游,每个梯阶断面可以做成水槽型,当水坝溢流时流水逐级流入下级水槽,鱼类可以逐级跃入上一级梯阶水槽最后跃入坝顶水域。

Claims (3)

1.一种在深水江河流水中建设水坝的方法,其水坝由主坝和副坝(即挡石坝和挡水坝)两部分组成;(1)、主坝(即挡石坝)的建设方法是:在待建水坝上游逐层制造积木型带有放水孔的、预制单层主坝积块(主坝的顶视图成弓形,弓背对来水);(2)、通过浮子使预制单层主坝漂浮并逐层拖动使之漂浮于基础坚固平整的、两侧坚固耐用的主坝支撑点就位,同时在主坝迎水面填充副坝材料;(3)、副坝(即挡水坝)的建设方法是:在预制主坝的迎水面堆积石块等比重大的不溶解于水的粒度由大变小变细到尽量不渗水的堆积物并压实;(4)、在尽量不渗水的迎水面外粘贴不渗水的防水膜,同时在防水膜迎水面加保护层。
2.根据权利要求1所述的一种在深水江河流水中建设水坝的方法,其特征在于:水坝的放水管路可以从主坝(即挡石坝)的预留孔通过,放水管路由副坝(即挡水坝)定位。
3.根据权利要求1所述的一种在深水江河流水中建设水坝的方法,其特征在于:主坝(即挡石坝)纵断面可以做成梯阶形,每个梯阶断面可以做成水槽型,当水坝溢流时流水逐级流入下级水槽,鱼类可以逐级跃入上一级梯阶水槽最后跃入坝顶水域。
CN2011103093841A 2011-10-13 2011-10-13 深水江河流水中建设水坝的方法 Pending CN102425139A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103093841A CN102425139A (zh) 2011-10-13 2011-10-13 深水江河流水中建设水坝的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103093841A CN102425139A (zh) 2011-10-13 2011-10-13 深水江河流水中建设水坝的方法

Publications (1)

Publication Number Publication Date
CN102425139A true CN102425139A (zh) 2012-04-25

Family

ID=45959165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103093841A Pending CN102425139A (zh) 2011-10-13 2011-10-13 深水江河流水中建设水坝的方法

Country Status (1)

Country Link
CN (1) CN102425139A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845631A (en) * 1970-08-26 1974-11-05 G Malan Dam building system
CN1139722A (zh) * 1995-01-13 1997-01-08 西部隆公司 水下建造水利设施的不透水保护层
CN1217406A (zh) * 1997-11-11 1999-05-26 杨锡福 一种江河截流大坝合龙时的施工方法
CN2400497Y (zh) * 1999-11-18 2000-10-11 赵永 江河截流用栅网
CN1324971A (zh) * 2000-05-19 2001-12-05 武汉水利电力大学 一种漂堵截流法
CN101705668A (zh) * 2009-11-09 2010-05-12 中国水电顾问集团华东勘测设计研究院 可在动水中修建的壅水水工建筑物结构及其施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3845631A (en) * 1970-08-26 1974-11-05 G Malan Dam building system
CN1139722A (zh) * 1995-01-13 1997-01-08 西部隆公司 水下建造水利设施的不透水保护层
CN1217406A (zh) * 1997-11-11 1999-05-26 杨锡福 一种江河截流大坝合龙时的施工方法
CN2400497Y (zh) * 1999-11-18 2000-10-11 赵永 江河截流用栅网
CN1324971A (zh) * 2000-05-19 2001-12-05 武汉水利电力大学 一种漂堵截流法
CN101705668A (zh) * 2009-11-09 2010-05-12 中国水电顾问集团华东勘测设计研究院 可在动水中修建的壅水水工建筑物结构及其施工方法

Similar Documents

Publication Publication Date Title
CN211368589U (zh) 一种复合型生态护岸结构
CN101736717B (zh) 一种清淤疏浚治理江河的方法
Baba et al. Developments in water dams and water harvesting systems throughout history in different civilizations
CN104452674A (zh) 一种组合式生态透水坝
CN113136845A (zh) 洄游式生态鱼道及施工方法
CN107761668B (zh) 一种滨海滨库造地型护岸结构及其建筑方法
CN104074166A (zh) 一种恢复干枯河流的方法
CN205224164U (zh) 一种水的生态系统整治结构
CN205205916U (zh) 一种水库泥沙沉积区水系改造系统
CN209873714U (zh) 城市山区河道护岸结构
CN110777880A (zh) 一种利用岩溶洼地蓄水的方法
CN207193880U (zh) 一种自然原型的石笼驳岸结构
CN107687155B (zh) 一种库盆防渗抗抬动结构及布置方法
CN105401614A (zh) 一种水的生态系统整治结构
CN102425139A (zh) 深水江河流水中建设水坝的方法
KR101062728B1 (ko) 필터층과 너울제어구조체를 이용한 해안 양빈 및 이의 시공방법
RU153378U1 (ru) Грунтовая дамба для рек с высоким паводком
RU2377363C1 (ru) Грунтовая неоднородная насыпная плотина
CN114481937A (zh) 用于海水入侵综合防治的建筑设施及建筑设施配置方法
CN102561250A (zh) 一种水资源输送与存储方法及虹吸系统
CN107740379A (zh) 一种适应江湖连通的生态水利枢纽设施
CN207553243U (zh) 一种雨水调蓄系统
Zhao et al. Application of gabion slope protection of Nanyang River channel regulation in Tianzhen County
CN207988083U (zh) 戈壁地区太阳能光热场区的正交防排洪结构
CN201933602U (zh) 磷石膏堆场的雨污分流系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120425