CN102424049A - Superhigh-speed maglev train shuttle - Google Patents

Superhigh-speed maglev train shuttle Download PDF

Info

Publication number
CN102424049A
CN102424049A CN2011103552594A CN201110355259A CN102424049A CN 102424049 A CN102424049 A CN 102424049A CN 2011103552594 A CN2011103552594 A CN 2011103552594A CN 201110355259 A CN201110355259 A CN 201110355259A CN 102424049 A CN102424049 A CN 102424049A
Authority
CN
China
Prior art keywords
speed
motor
pole
shuttle
per hour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103552594A
Other languages
Chinese (zh)
Inventor
罗能全
罗教
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011103552594A priority Critical patent/CN102424049A/en
Publication of CN102424049A publication Critical patent/CN102424049A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The invention relates to a superhigh-speed maglev train shuttle which belongs to the field of rail traffic. The invention aims at improving the current speed per hour by one time and reducing the derailing coefficient to the minimum on the basis of the coupled running of Harmony CRH2C maglev trains. A top rail is fixed by an annular sleeper, two groups of constant-height top wheels on each compartment roll under the guide of the top rail through grooves, and the jump stress of the compartment is counteracted to avoid derailing. An YQ365 type traction motor is changed into a 4/2 variable-pole double-speed motor, poles are changed by the operation of a 4/2 variable-pole relay during the running of a maglev train, and all motor rated rotating speed is synchronously doubled. The original 4-pole running speed per hour (300-350km per hour) is increased to the current 2-pole running speed which is more than or equal to 612km per hour. During brake, an electromagnetic cross beam coil is electrified to magnetize a concentric brake shoe and enable the brake shoe and two rails to be pulled in, and the brake force can be adjusted through the adjustment of current intensity. A pneumatic brake element is arranged on the concentric brake shoe in an overlaying manner, and the original direct-acting pneumatic brake manner of the train is reserved in a matching manner, so that the maglev train can be ensured to be directly braked by the rails under power-off non-voltage emergency conditions.

Description

Hyper-speed motor-car shuttle
Denomination of invention: hyper-speed motor-car shuttle belongs to field of track traffic.
The heavy joint group of two row motor train unit closes, and outward appearance utmost point picture carries passenger's the shuttle that flies separately, and the design speed per hour is more than or equal to 612km; Hyper-speed worthy of the name (0.5 Mach); Add the motor-car that derails of exempting under the head track convoy at double track, shuttle back and forth between the big city, so claim hyper-speed motor-car shuttle.
A kind of ultrahigh speed motor-car shuttle comprises: 1. head track, 2. ring pillow, 3. the top wheel support, 4. the top wheel, 5. the load pillar, 6. go up the cylinder sleeve piston, 7. descend cylinder sleeve piston, 8. contact net, 9. pantograph, 10. cross force bearing plate on insulator, 11. bogies, 12. electromagnetism crossbeams, the 13. back-shaped brake shoes, 14., 15. times cross force bearing plates, 16. rail, 17. compartments, 18.4/2 pole-changing relay etc.
Hyper-speed motor-car shuttle of the present invention is the basis with Harmony CRH2C motor train unit (heavily joining), rests the head on ring on the special line 2Fixing newly-increased head track 1, a group is installed in the top wheel of roof 4, rely on groove at head track 1Following leading rolls, and mediates the stress of offsetting the take-off of motor-car shuttle, and the guarantee car body is exempted from derailing.
Existing motor-car, the high ferro coefficient that generally derails is 0.34-0.72, and the object of the invention: for hyper-speed motor-car shuttle derailing coefficient is reduced to below 0.01, the speed per hour multiplication really can ensure maximum personal safety as well as the property safety.
Figure of description is a hyper-speed motor-car shuttle scheme drawing, specifies with regard to its embodiment.
Exempt from derailing operation specific embodiments:
Existing track train, the outer rail that removes bend is higher, uses tapering wheel footpath and uses its edge, acts on two rails 16The inboard prevent the derailing outside, still do not have the device of exempting to derail and can ensure the operation of not derailing.Therefore design has added the 3rd track-head track 1, be fixed in be in the heart empty, the ring pillow 2" 12 point " (shape when finger ring pillow points at 12 as clock pointer) transversal end face of center pillar on, intercepting highly equals rail level to top wheel 4Add the rail height, rail level is downward.Both sides fixed suspension insulator 10, as setting up the two-way contact system 8Netting twine is done subsequent use mutually.
The ring pillow 2With reinforced concrete prefabricated, transport for ease and set up, therefrom to cut open to next be two one-tenth two fans post center with " 12 point " annular sleeper.A plurality of bolt eyelets are reserved on top, use bolt during assembling.The ring pillow 2The corresponding square hole of track plate is inserted in the bottom, makes the projection sign around the part that puts in place, reserves the circular hole of a plurality of diameters for pillow wide 1/2, waters to be solidified as one among being embedded in the track board concrete.To replace contact system 8Electric pole and annex.
Sleeper adopts the reason of annular: make fulcrum for all there is sleeper in the take-off force that makes every joint compartment, the ring pillow 2The former electric pole number of density ratio double, for montant stood in great numbers, the passenger was difficult for producing visual fatigue to circular arc far away; Circular arc is stressed well-balanced than right-angle structure strain insulator power more, helps mediating the stress of motor-car shuttle take-off.
The ring pillow 2Spacing is a car two bogie trucks 11Between distance.
Pantograph is set up in front and back 9Each one, with former pantograph flat raft, all should be biased to and contact the position that netting twine hangs down mutually, about bend interlocking: when Home Network cut off the power supply, folding should bow, lifts to be equipped with again and bends, from subsequent use contact system 8On receive.The probability that stops of avoiding cutting off the power supply doubles.
Last cross force bearing plate 14Be fixed on the compartment 17On the end face, its center and bogie 11The cartridge extended axis of the horse overlaps, and laterally is longer than the compartment 17The width in passageway, vertically two cylinder sleeve pedestals can be put in front and back, fix two and go up the cylinder sleeve pistons 6, the two-piston top is connecting side by side is equipped with three flat raft top wheels 4The top wheel support 3, supporting top wheel 4Be wider than the compartment with relative constant altitude and race 17Swing spoke degree is a prerequisite, and leading rolls in head track 1Under.Put motor-car shuttle smooth operation in three track-frames.Realize that the derailing of exempting from that the derailing coefficient is reduced to below 0.01 ensures.
The permanent high embodiment of top wheel:
Divide front and back to be fixed on (bogie truck in the stand of the left and right sides two cross-arms 11Front and back are as back-shaped brake shoe is installed 13Stand).Two cross arm in the middle of each fixed a lower cylinder piston 7 , the respective outer cylinder sleeve plus reset spring, one from the top end of the piston plate so that two Pistons remain, respectively, and lower cross bearing plate 15 longitudinal ends close together, train 17 at the bottom of the outer Cross bearing fixed lower plate 15 Ditto cross bearing plate 14 cross? long to wait for a fixed upper and lower cross brace between the two bearing plates bearing hollow pillar 5 , two columns aisle between the compartments, two high pressure fluid through pipes in a respective bearing pillars , the two are then threaded directly connected pair of upper and lower cylinder, and are filled with hydraulic fluid.Work as the compartment 17After having gone up passenger's load-bearing, or, make the compartment because of vehicle pitching causes the damping spring compression 17Sink to pressing the piston in two lower cylinder bodies, the hydraulic fluid that row pressure goes out is injected in two upper cylinder bodies, two upper pistons in the cylinder body of jacking simultaneously, interlock top wheel support 3With the top wheel 4Rise, because of upper and lower cylinder piston specification is identical, so the compartment thereupon 17The decline size equals the top wheel 4The rising size, vice versa.Both made the top wheel 4Hydraulic shock-absorption can keep top wheel again 4The substantially constant of height, otherwise top wheel 4Can fiercely impact even break away from head track 1
Hyper-speed motor-car shuttle of the present invention still keeps outside original speed regulator, has particularly transformed traction electric machine, cooperates 4/2 pole-changing relay 18Regulation and control, realize the pole-changing speed-raising.Same phase asynchronous cage rotor YQ365 (365kw) the type traction electric machine that uses.The few cost of maintenance is low.Just be difficult to the double as regenerative brake.
Heavily couplet with Harmony CRH2C motor train unit (6M+2T+2T+6M) is configured to the basis; Carry out the enhanced feature design: set up one group of power supply unit, substitute 4 trailers, advance to rise into 8M+8M with 4 motor-cars; But increase the power supply source bicycle or many cars are switched on flexibly, so that regulate power and brownout.Total tractive output increases by 33.33 percent, and more convenient starting and speed-raising easily reach speed per hour 350km, and this only is the initial base speed of hyper-speed motor-car shuttle, passes through 4/2 pole-changing relay in advancing 18To controlling of traction electric machine, become 4 very 2 extremely after, rated speed of rotation improves nearly one turns over, and realizes the operation of motor-car shuttle hyper-speed.
Pole-changing speed-raising specific embodiments:
Control near the 4/2 pole-changing relay that is installed in the traction electric machine with accessory feed 18The a plurality of single utmost point that earlier the traction electric machine stator coil is decomposed into 4 utmost point windings is organized mutually, all wiring end to end by 4 utmost point motor orders of connection, insert the some of pole-changing relay successively on the break back contact; Take advantage of when the of short duration outage of traction electric machine; Relay power with 2 points that each moving contact links, is communicated with all corresponding break back contacies end to end with moving contact and break back contact adhesive respectively; Recover 4 utmost point motors and treat state fully, the traction electric machine of switching on again promptly is 4 utmost point motor rotations.The unified regulation and control of complete each traction electric machine of row.Still adopt rated frequency 140HZ.The class of insulation 200.
When the relay decompression was broken off, each break back contact only was connected with a certain the end of a thread of stator winding, does not disturb mutually.
In like manner, parallelly connected again 2 utmost point motor relays, different is must the single utmost point of 4 utmost points be organized with the single utmost point of another phase of facing mutually mutually and organize mutually, the series connection of para-electric flow path direction; 1 the single utmost point that is merged into 2 utmost point motors is organized mutually; (another will organize beginning from the next single utmost point that adjoins Zheng mutually mutually, by that analogy), and again by 2 utmost point motor orders of connection; Be connected on the break back contact successively end to end; When the relay power adhesive, become 2 utmost point motors to treat state fully, the traction electric machine of switching on this moment will be 2 utmost point motor rotations.Guarantee in the pole-changing relay that phase sequence is clearly demarcated, A, B, C, three tunnel 6 contacts are adopted in the contact, and circular configuration is vertically arranged.
Utilize retracing spring upwards all moving contacts to be upspring, be equivalent to moving contact and make break back contact be 4 utmost points to treat that fully state is closed, traction electric machine will be the running of 4 utmost points.Vacant 2 utmost point relevant contacts of while; If with the relay power adhesive, then closure 2 extremely is correlated with and is treated state contacts fully; Traction electric machine will be 2 utmost point motor rotations.Vacant 4 utmost point relevant contacts of while.Moving contact is placed in the middle, and 4 contacts of upper and lower surface are interconnected.All contacts are immersed in the transformer oil safer.
According to above-mentioned electrical equipment principle, design oil immersed type 4/2 pole-changing relay especially 18(above 4 utmost points described separately are become 2 grade of two relay to unite two into one)
All pole-changing blocked operations must carry out in of short duration cut-out traction electric machine power supply process.Deciliter all with, otherwise will produce a large amount of arc spark damage electrical equipment.
Traction electric machine has used the commutation pole changing method, cooperates controlling of pole-changing relay, realizes a machine double speed, increases and decreases rated speed of rotation at double.
Under the intervention and effect of inertia of speed regulator, the startup behind the pole-changing should be smoothly; This with under static state start with 2 utmost point motors, fundamental difference is arranged.Forbid treating fully state traction electric machine down, remain static or be lower than speed per hour 300km startup when following at the motor-car shuttle with 2 utmost points.Otherwise can damage traction electric machine or driving device.
4 utmost points become 2 utmost point rear haulage motor rated speed of rotation and promote one and turn over, and total in addition tractive output has increased by 1/3, are enough to reach the design speed per hour more than or equal to 612km for the speed-raising of motor-car shuttle.
Track is directly braked specific embodiments:
In the existing electromagnetic rail brake process, abrasion are big, adjusting is difficult, braking force descends faster with speed of a motor vehicle raising.Generally used only for emergency brake: linear dimming flow braking: a powerful vortex of the rail 16 is heated, affecting track stability; has large power consumption, electromagnetic interference devices Xin Road and other defects.Regenerative brake is responded slowly, is the major cause that stopping distance reaches 2000m.More be difficult to after the speed-raising at double adapt to.And the cage rotor motor can not the double as regenerative brake electrical generator.
The motor-car shuttle keeps original brake mode: straight-through empty ' ' only changes ' ' (regeneration) braking into electromagnetic path and directly brakes.
Straight-through empty electrical regenerative braking belongs to indirect braking together, rely on wheel in braking procedure with rail 16Produce friction braking, particularly overcome car load inertia and more show weak.Major cause is to receive and rail 16The restriction of the payload space of friction takes place, and also involves because of wheel, all very smooth institute of track surface.
Hyper-speed motor-car shuttle design track of the present invention is directly braked embodiment:
At bogie truck 11Front and back, the fixedly double as stand of chute up and down, (column is made material with the corrosion-resistant steel that or not influenced by magnetic line of force) is stressed greatly because of glancing impact stand rear portion, should link to each other in vertical nearby front and back that leave the right or normal track with pull bar to reinforce stand.Make the back-shaped brake shoe in the left and right sides 13Can in chute, slide and shift to double track, push up the face that leaves the right or normal track by retracing spring at ordinary times.
The iron core that silicon steel sheet changes across the road heart, is formed the electromagnetism crossbeam around solenoid outward 12, two magnetic poles respectively turn 90 degrees downwards over against double track, and cover respectively with the eddy current copper ring, together insert the back-shaped brake shoe of double track top 13Fixing in the square hole, back-moving spring and in-plant rail level adhesive are depressed in the brake shoe magnetization of energising back.Direct forced brake.Leave the right or normal track during decompression and reset.Regulate magnet coil voltage or intensity of current and also can effectively regulate the braking dynamics.
Brake shoe hardness is not as good as rail, so main abrasion on brake shoe, should in time be overhauled replacing.It is more practical to add silicon steel powder as cast brake shoe with abrasion resistant alloy.
At back-shaped brake shoe 13With the electromagnetism crossbeam 12Top and left and right sides rail 16Over against the force on, the air-pressure brake element is installed in stack, with guarantee no electric also can auxiliary braking when critical.
Transform existing line, realize hyper-speed operation specific embodiments:
Though hyper-speed motor-car shuttle must move on private siding, from the economic pursuit benefit, particularly from the reality of China's actual conditions; Hyper-speed motor-car shuttle of the present invention can also at first be selected area with good conditionsi except that newly-built special line, after existing line is done to rationalize transformation; The operation of enforcement hyper-speed can be saved huge earth and rock works, can avoid overlapping construction again; Thereby promote line quality with getting twice the result with half the effort, utilize existing resource developing china formula ultra high speed railway.
Implementation method is following:
1, generally comparatively between the flat region, renovation utilizes original ballast aggregate, is used as concrete main raw material(s), and reinforcing bar is filled up on the roadbed upper strata, on the track plate, lays new rail, and the installation ring pillow 2With fixing head track 1Reconstruction two-way contact system 8Can be transformed into the inexpensive special line.
2, need only rest the head at Ying Lihuan in the tunnel 2Part is installed special-shaped ring-type sleeper, suits measures to local conditions to adapt to extreme terrain.Bridge should be reinforced and overhaul, and the ballast aggregate rubble is made the way of concrete foundations major ingredient, and is identical with the level tangent track processing method.
Existing line generally all is by long line heavy duty design, and the motor-car shuttle is short relatively and light, and most bridges all can be continued to employ after assessment.
3, emphasis is transformed bend, although there is the guarantee of exempting to derail still need guarantee enough radius of curve.
4, avoidance is made track remodelling in the great slope zone as far as possible, and relocating in case of necessity detours exchanges mild cut-off for.The existing line transformation is carried out in first-selected Plain and interval, non-mountain area, makes full use of existing resource.

Claims (1)

1. the permanent high wheel that pushes up of a group of installing on the carriage top relies on groove leading under head track and rolls, and offsets compartment take-off stress, and guarantee hyper-speed motor-car shuttle is exempted from the derailing operation in three track-frames; Special design 4/2 pole-changing relay is transformed into the change pole double speed motor with YQ365 type cage rotor traction electric machine, and becoming 2 utmost point rated speed of rotation by 4 utmost points increases nearly one and turn over; (motor-car shuttle speed per hour is brought up to more than the 612km by 350km) changes regenerative brake is that electromagnetic path is directly braked, to adapt to the safe operation of hyper-speed motor-car shuttle.
CN2011103552594A 2011-11-11 2011-11-11 Superhigh-speed maglev train shuttle Pending CN102424049A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103552594A CN102424049A (en) 2011-11-11 2011-11-11 Superhigh-speed maglev train shuttle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103552594A CN102424049A (en) 2011-11-11 2011-11-11 Superhigh-speed maglev train shuttle

Publications (1)

Publication Number Publication Date
CN102424049A true CN102424049A (en) 2012-04-25

Family

ID=45958114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103552594A Pending CN102424049A (en) 2011-11-11 2011-11-11 Superhigh-speed maglev train shuttle

Country Status (1)

Country Link
CN (1) CN102424049A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105711598A (en) * 2016-01-27 2016-06-29 广州道动新能源有限公司 Novel vertically parallel dual track transportation tool and layout method
CN108528462A (en) * 2018-03-29 2018-09-14 西京学院 A kind of wheeled vehicle seabed vacuum pipe traffic system with side directive wheel
CN108545087A (en) * 2018-04-02 2018-09-18 西京学院 Gravitational equilibrium wheeled vehicle vacuum pipe traffic system suitable for straits channel
CN109179162A (en) * 2018-11-01 2019-01-11 浙江华夏电梯有限公司 A kind of horizontal elevator with carriage side arm

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB502136A (en) * 1937-06-01 1939-03-13 Steiner Rudolf Monorail railway and car driven by air propellers
GB1156538A (en) * 1965-10-01 1969-06-25 Westinghouse Air Brake Co Vehicle Speed Control Apparatus
US4027596A (en) * 1975-10-17 1977-06-07 Nardozzi Jr Michael A Rapid transit system
WO1999029551A1 (en) * 1997-12-05 1999-06-17 Quentin Sholto Grant Vehicle tracking systems
CN1408576A (en) * 2001-10-02 2003-04-09 李孝龙 Overhead quick traffic system between cities
CN1413857A (en) * 2001-10-23 2003-04-30 李孝龙 Intercity high-speed light railway traffic
CN1522912A (en) * 2003-09-07 2004-08-25 李孝龙 High speed rail vehicle capable of adjusting pressure on ground
CN1702002A (en) * 2005-07-01 2005-11-30 李孝龙 Low-floor high-speed train
CN101407220A (en) * 2007-10-11 2009-04-15 董禹全 Multi-track combination technology for flying in air

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB502136A (en) * 1937-06-01 1939-03-13 Steiner Rudolf Monorail railway and car driven by air propellers
GB1156538A (en) * 1965-10-01 1969-06-25 Westinghouse Air Brake Co Vehicle Speed Control Apparatus
US4027596A (en) * 1975-10-17 1977-06-07 Nardozzi Jr Michael A Rapid transit system
WO1999029551A1 (en) * 1997-12-05 1999-06-17 Quentin Sholto Grant Vehicle tracking systems
CN1408576A (en) * 2001-10-02 2003-04-09 李孝龙 Overhead quick traffic system between cities
CN1413857A (en) * 2001-10-23 2003-04-30 李孝龙 Intercity high-speed light railway traffic
CN1522912A (en) * 2003-09-07 2004-08-25 李孝龙 High speed rail vehicle capable of adjusting pressure on ground
CN1702002A (en) * 2005-07-01 2005-11-30 李孝龙 Low-floor high-speed train
CN101407220A (en) * 2007-10-11 2009-04-15 董禹全 Multi-track combination technology for flying in air

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周镜等: "《风驰电掣走世界 高速铁路工程》", 30 September 1999, 浙江科学技术出版社 *
沈世郁: "现代城市轻轨(独轨)设计技术_", 《城市道桥与防洪》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105711598A (en) * 2016-01-27 2016-06-29 广州道动新能源有限公司 Novel vertically parallel dual track transportation tool and layout method
CN108528462A (en) * 2018-03-29 2018-09-14 西京学院 A kind of wheeled vehicle seabed vacuum pipe traffic system with side directive wheel
CN108545087A (en) * 2018-04-02 2018-09-18 西京学院 Gravitational equilibrium wheeled vehicle vacuum pipe traffic system suitable for straits channel
CN109179162A (en) * 2018-11-01 2019-01-11 浙江华夏电梯有限公司 A kind of horizontal elevator with carriage side arm

Similar Documents

Publication Publication Date Title
Steimel Electric traction-motive power and energy supply: basics and practical experience
CN109056431B (en) Suspension type permanent magnetism magnetic levitation track traffic machinery structure
CN100554029C (en) Linear induction motor traction carrying device
CN102149588B (en) Eddy current rail brake
US5953996A (en) System and method for magnetic levitation guideway emplacement on conventional railroad line installations
CN103181068A (en) Permanent magnet motor with outer spiral rotor and wheel-rail vehicle road system with permanent magnet suspension
US4142469A (en) Magnetic suspension system for railway vehicle with lifting force control
CN105073480A (en) Regenerative energy system for ground transportation vehicles
CN205295820U (en) Heavy load type monorail train
CN102424049A (en) Superhigh-speed maglev train shuttle
JP2011109763A (en) Single track, straight track, and large depth tunnel high-speed underground electric railway
CN105256674A (en) Heavy-duty type air train
CN103129562A (en) Monorail magnetic suspension electric car
CN204875389U (en) Pillar track girder system all
DE2710156C2 (en) Maglev
CN107380008A (en) A kind of Auxiliary support guidance method of wheel track vehicle
CN109910630A (en) Magnetic suspension logistic car applied to underground pipe gallery logistics system
CN201419703Y (en) Direct drive type multi-tanker vehicle inclined shaft conveying device
CN102874261A (en) Travelling mechanism of linear motor train
CN110126851A (en) Intelligence is straight to drive straddle-type mid-air-bus
Singh Efficient Utilization of Regenerative Braking in Railway Operations
CN103290746A (en) Permanent-magnet-driven maglev track
CN207106238U (en) A kind of Auxiliary support guide device of wheel track vehicle
CN2871610Y (en) Pathway unit with auxiliary rail
DE10106233C2 (en) Linear drive for cranes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425