CN102409672A - Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile - Google Patents

Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile Download PDF

Info

Publication number
CN102409672A
CN102409672A CN2011102369002A CN201110236900A CN102409672A CN 102409672 A CN102409672 A CN 102409672A CN 2011102369002 A CN2011102369002 A CN 2011102369002A CN 201110236900 A CN201110236900 A CN 201110236900A CN 102409672 A CN102409672 A CN 102409672A
Authority
CN
China
Prior art keywords
pile
pile body
hole
prestressing
posttensioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102369002A
Other languages
Chinese (zh)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011102369002A priority Critical patent/CN102409672A/en
Publication of CN102409672A publication Critical patent/CN102409672A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a tube pile provided with a posttensioned prestressing steel noose and a posttensioned prestressing pulling tube pile, comprising a tube pile body and a bearing platform board at the upper end of the pile body, a hole is arranged at a circle of coaxial line in the pile body, the lower end of the posttensioned prestressing steel noose is provided with the expanded head, the upper end penetrates through the hole arranged on the pile body, is tensioned and is connected and fixed by virtue of a connecting piece, and the upper end of the steel noose and the connecting piece thereof are arranged in the bearing platform board. By adopting the invention, application range of the tube pile is expanded, posttensioned prestressing is adopted, rigidity of the pile body is greatly improved, the pile body is extruded under the prestressing longitudinal action and is radially enlarged, soil body is extruded, and uplift resistance is improved, thus pile length can be shortened; and meanwhile cracking phenomenon as the pile body is tensioned is overcome.

Description

A kind of pile tube and post-tensioned prestressing resistance to plucking pile tube that is provided with post-tensioned prestressing steel strand cable hole
Technical field
The present invention relates to building field, be specifically related to pile tube.
Background technology
The pre-tensioned prestressing reinforced concrete pipe pile is widely used in the engineering constructions such as house, road, bridge with its superior performance.It mainly acts on is to be squeezed on the harder rock stratum, the end, ground by machinery to nail is the same, can better support the weight of buildings such as house, bridge.And pile tube can not use as uplift pile, and this has received limitation with regard to the application that makes pile tube.The intensity of post-tensioned prestressing steel strand cable then is 7-8 times of plain bars, substitutes the reinforcing bar of original pretensioning as adopting the steel strand cable, will practice thrift steel using amount.Also do not see at present the resistance to plucking pile tube of this structure.
Summary of the invention
The technical problem that the present invention will solve provides a kind of pile tube and post-tensioned prestressing resistance to plucking pile tube that is provided with post-tensioned prestressing steel strand cable hole, improves the resistance to plucking supporting capacity of pile tube, simultaneously, practices thrift the steel using amount of pile foundation.
The present invention realizes through following technical scheme:
A kind of pile tube that is provided with post-tensioned prestressing steel strand cable hole comprises the pile tube pile body, and all coaxial lines are provided with the hole in the said pile body.
Each Kong Xinyu pile body center of circle in said hole is equidistant, and said hole five equilibrium is arranged at a week in the pile body.
A kind of post-tensioned prestressing resistance to plucking pile tube; Comprise the pile tube pile body; The cushion cap face of pile body upper end, all coaxial lines are provided with the hole in the said pile body, and post-tensioned prestressing steel strand cable lower end is provided with enlarged footing; The upper end is fixed through the connector connection after passing the set hole of pile body, stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.
The further improvement project of the present invention is, each Kong Xinyu pile body center of circle in said hole is equidistant, and said hole five equilibrium is arranged at a week in the pile body.
The present invention further improvement project is that said enlarged footing is nut or extruding anchor or concrete precast element.Said connector is an anchor clamp.
The present invention compared with prior art has following obvious advantage:
Expand the pile tube range of application, made pile tube be used for uplift pile; Adopt post-tensioned prestressing to improve pile body rigidity greatly, under effect, pile body is squeezed at pre-stressed longitudinal, radially enlarges, and the soil body is squeezed, and increases uplift resistance, and it is long to shorten stake like this; Overcome pile body owing to drawn the cracking phenomena of generation.
Description of drawings
Fig. 1 is a cross-sectional schematic of the present invention.
Fig. 2 is Figure 1A-A cross-sectional schematic.
The specific embodiment
Embodiment 1
Like Fig. 1, shown in 2, a kind of pile tube that is provided with post-tensioned prestressing steel strand cable hole comprises pile tube pile body 1, and all coaxial lines are provided with hole 3 in the said pile body 1.Each Kong Xinyu pile body center of circle in said hole 3 is equidistant, and said hole 3 five equilibriums are arranged at a week in the pile body 1.
Embodiment 2
Like Fig. 1, shown in 2, the present invention includes pile tube pile body 1, the cushion cap face 2 that pile body 1 upper end is provided with.All coaxial lines are provided with hole 3 in pile body 1, and post-tensioned prestressing steel strand cable 4 lower ends are provided with enlarged footing 5, and the upper end connects fixing through connector 6 after passing the set hole 3 of pile body 1, stretch-draw.Steel strand cable 4 upper ends and the connector 6 that is provided with on it are embedded in the cushion cap face 2.
As shown in Figure 2, each Kong Xinyu pile body 1 center of circle in said hole 3 is equidistant, and said hole 3 five equilibriums are arranged at a week in the pile body 1.
In the present embodiment, connector 6 is selected anchor clamp for use, and enlarged footing 5 is selected the extruding anchor for use.
The present invention prepares process: when prefabricated tubular pile, reserve steel strand cable hole.During use, the steel strand cable is passed hole set on the pile body 3 (aperture, aperture Daewoo top in stomidium 3 exits under the pile body is with the enlarged footing coupling) from bottom to top; Drive piles by conventional method then, behind the arrival desired location, the cast-in-place cushion cap face in the upper end of pile tube; After the cushion cap face reaches setting intensity, said steel strand cable is carried out stretch-draw, fix with anchor clamp after the stretch-draw; And then with concrete the stretch-draw hole on the cushion cap face is tamped, steel strand cable and connector are embedded in the cushion cap face.

Claims (7)

1. a pile tube that is provided with post-tensioned prestressing steel strand cable hole comprises the pile tube pile body, it is characterized in that: all coaxial lines are provided with the hole in the pile body.
2. a kind of pile tube that is provided with post-tensioned prestressing steel strand cable hole as claimed in claim 1 is characterized in that: each Kong Xinyu pile body center of circle in said hole is equidistant, and said hole five equilibrium is arranged at a week in the pile body.
3. post-tensioned prestressing resistance to plucking pile tube; Comprise the pile tube pile body; The cushion cap face of pile body upper end is characterized in that: all coaxial lines are provided with the hole in the pile body, and post-tensioned prestressing steel strand cable lower end is provided with enlarged footing; The upper end is fixed through the connector connection after passing the set hole of pile body, stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.
4. a kind of post-tensioned prestressing resistance to plucking pile tube as claimed in claim 3 is characterized in that: each Kong Xinyu pile body center of circle in said hole is equidistant, and said hole five equilibrium is arranged at a week in the pile body.
5. a kind of post-tensioned prestressing resistance to plucking pile tube as claimed in claim 3 is characterized in that: steel strand cable upper end and the connector that is provided with on it are embedded in the cushion cap face.
6. like claim 3 or 5 described a kind of post-tensioned prestressing resistance to plucking pile tubes, it is characterized in that: said connector is an anchor clamp.
7. a kind of post-tensioned prestressing resistance to plucking pile tube as claimed in claim 3 is characterized in that: said enlarged footing is nut or extruding anchor or concrete precast element.
CN2011102369002A 2011-08-18 2011-08-18 Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile Pending CN102409672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102369002A CN102409672A (en) 2011-08-18 2011-08-18 Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102369002A CN102409672A (en) 2011-08-18 2011-08-18 Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile

Publications (1)

Publication Number Publication Date
CN102409672A true CN102409672A (en) 2012-04-11

Family

ID=45911992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102369002A Pending CN102409672A (en) 2011-08-18 2011-08-18 Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile

Country Status (1)

Country Link
CN (1) CN102409672A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256831A (en) * 2014-03-21 2016-01-20 刘献刚 Building structure of underground space
CN105256830A (en) * 2014-01-24 2016-01-20 刘献刚 Building structure of underground space
CN109518687A (en) * 2018-12-25 2019-03-26 江西联保工程咨询有限公司 A kind of destructing finite elements pin-connected panel prestressed pile suitable for stake bottom hammer piling
CN116220006A (en) * 2023-03-07 2023-06-06 广州市市政工程试验检测有限公司 Post Zhang Huan bonded prestressed combined rammed pile and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195933A (en) * 1983-04-18 1984-11-07 Ishikawajima Harima Heavy Ind Co Ltd Prestressed concrete pile
CN101220595A (en) * 2008-01-24 2008-07-16 广东水电二局股份有限公司 Application method of novel post-tensioned pre-stress soil blocking pile
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN202194133U (en) * 2011-07-21 2012-04-18 从卫民 Tubular pile provided with post-tensioning prestressed steel bowstring hole and post-tensioning prestressed anti-pulling tubular pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195933A (en) * 1983-04-18 1984-11-07 Ishikawajima Harima Heavy Ind Co Ltd Prestressed concrete pile
CN101220595A (en) * 2008-01-24 2008-07-16 广东水电二局股份有限公司 Application method of novel post-tensioned pre-stress soil blocking pile
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN202194133U (en) * 2011-07-21 2012-04-18 从卫民 Tubular pile provided with post-tensioning prestressed steel bowstring hole and post-tensioning prestressed anti-pulling tubular pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256830A (en) * 2014-01-24 2016-01-20 刘献刚 Building structure of underground space
CN105256831A (en) * 2014-03-21 2016-01-20 刘献刚 Building structure of underground space
CN109518687A (en) * 2018-12-25 2019-03-26 江西联保工程咨询有限公司 A kind of destructing finite elements pin-connected panel prestressed pile suitable for stake bottom hammer piling
CN116220006A (en) * 2023-03-07 2023-06-06 广州市市政工程试验检测有限公司 Post Zhang Huan bonded prestressed combined rammed pile and construction method thereof

Similar Documents

Publication Publication Date Title
WO2022011913A1 (en) Prestressed unbonded anchor bolt rebar, anchor bolt, and construction method
CN101298770B (en) Bottom enlarging prestress conical pipe pile and construction method thereof
CN109629403B (en) Concrete support column structure and manufacturing method thereof
CN206503150U (en) A kind of basalt composite reinforcing material anchor lattice beam retaining structure
CN102418385A (en) Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN102409672A (en) Tube pile provided with posttensioned prestressing steel noose hole and posttensioned prestressing pulling tube pile
CN102345291A (en) Partially prestressed supporting cantilever pile
CN107489144B (en) Reinforcing tubular pile
CN102363957B (en) A kind of post-tensioned prestressing composite uplift pile
CN202194129U (en) Composite prestress soil-blocking pile
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN202194130U (en) Compound pre-stressed anti-pulling pile with enlarged head
CN202194133U (en) Tubular pile provided with post-tensioning prestressed steel bowstring hole and post-tensioning prestressed anti-pulling tubular pile
CN202194131U (en) Partially prestressed cantilever soldier pile
CN201785867U (en) Novel reinforced-concrete prefabricated and integral-cast building structure system
CN202194136U (en) Steel rope-strand cable with expansion head/heads
CN202416305U (en) Anti-pulling out pipe pile
CN201794215U (en) Pretensioning method prestress reinforced concrete prefabricated beam
CN110863613B (en) Construction method of unbonded prestressed concrete filled steel tube giant column with built-in plastic drain pipe
CN202194144U (en) Ground pit inclined tension pile
CN209669861U (en) Prestressed reinforced concrete screw thread tubular pole
CN208701693U (en) The concrete-steel strand cage of deep basal pit pre-stressing force cantilever support pile
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN102322060A (en) Composite prestressing retaining pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120411