CN102403788B - Test system applicable to southern power grid communication guaranteeing system - Google Patents

Test system applicable to southern power grid communication guaranteeing system Download PDF

Info

Publication number
CN102403788B
CN102403788B CN201110108606.3A CN201110108606A CN102403788B CN 102403788 B CN102403788 B CN 102403788B CN 201110108606 A CN201110108606 A CN 201110108606A CN 102403788 B CN102403788 B CN 102403788B
Authority
CN
China
Prior art keywords
communication
test
substation
unit
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110108606.3A
Other languages
Chinese (zh)
Other versions
CN102403788A (en
Inventor
王峰
贺春
陈志光
任春梅
张冉
倪云玲
张智锐
焦邵麟
袁亮荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Ketop Testing Research Institute Co ltd
XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
XUCHANG KETOP ELECTRIC TESTING INSTITUTE
GUANGDONG CENTER OF ELECTRIC DISPATCHING AND TRANSFORMING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG KETOP ELECTRIC TESTING INSTITUTE, GUANGDONG CENTER OF ELECTRIC DISPATCHING AND TRANSFORMING filed Critical XUCHANG KETOP ELECTRIC TESTING INSTITUTE
Priority to CN201110108606.3A priority Critical patent/CN102403788B/en
Publication of CN102403788A publication Critical patent/CN102403788A/en
Application granted granted Critical
Publication of CN102403788B publication Critical patent/CN102403788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a test system applicable to a southern power grid communication guaranteeing system. The test system comprises a human machine interface, test case database, a communication message and device information database, a main station simulating tool, a preposed communication machine and a communication interface, wherein in the test system, all-around substation test schemes are prestored in a test database; when a substation is tested, only a corresponding command is required to be input into the human machine interface; a corresponding test scheme is retrieved by the main station simulating tool and sent to a substation to be tested by the preposed communication machine; responding communication message data of the substation is read by the preposed communication machine and is compared with prestored standard information; and the comparison result is transferred to the human machine interface so as to improve the automatic degree of the test; the configuration correctness and the information integrality of a substation with failure information are automatically judged; the consistency between configuration information in the substation and read information in a main substation is not required to be checked manually; thereby effectively improving the test efficiency.

Description

Be applicable to south electric network and protect the test macro of communication system
Technical field
The present invention is applicable to the field tests that a kind of electrical network is protected communication system, especially relates to a kind of test macro that south electric network is protected communication system that is applicable to.
Background technology
Relay protection of power system and failure information system (hereinafter to be referred as protecting communication system) comprise main website, substation two parts.At plant stand end; the intelligent electronic devices (IED) such as the substation of protecting communication system and relaying protection, fault oscillograph, automatic safety device are communicated by letter; collect normal operation, abnormality alarming and the fault message of these devices, on after preliminary treatment, deliver to the main website that is positioned at dispatching terminal.For configuration information, in order correctly to transmit and explain information, to protect communication system main website, substation and it must be understood that consistent for the implication of device information amount, form etc.Generally speaking, usual manner is that main website, substation require to determine unified information table according to user, inputs separately its database, this way inefficiency, and easily there is mistake.South electric network is protected communication system and is adopted south electric network 103 stipulations standards, has realized substation configuration information and has automatically read and download function, does not need manually to repeat input, has guaranteed the consistency of information definition.
At present, the test of protecting communication system substation for south electric network is mainly to adopt the mode of interoperation test to carry out, that is to say the main website that needs guarantor's communication system substation of test to be linked into move or the emulation main website of some producers, according to specific acceptance criteria and acceptance requirement, substation function is tested one by one, its Typical Disposition is shown in Fig. 1, the typical figure of protection fault message substation test is by fault message main website, tested substation, oscillograph, protective device, disconnected control unit and relay-protection tester form, relay-protection tester provides voltage to protective device and disconnected control unit, current data, oscillograph gathers protective device and the state information of the control unit that breaks and analog quantity etc., tested substation gathers oscillograph information, Bing Yu fault message main website communicates, fault message main website will be delivered in information.This class standard is as < < Guangdong Power Grid relay protection fault and information system sub-station technical specification > >.This test needs tester to check all protection definite values and actuating signal etc. in record protection device place one by one conventionally; then at substation and main website place, check the consistency of relevant information and protective device raw information; workload is very great; and owing to adopting manually, Prudential Master is operated substation is tested; content measurement is unfixing; the content of testing may be done because of different people inconsistent; and each content measurement also may be inconsistent; very easily cause content measurement to omit, can not comprehensively test protecting communication system substation function.
In addition, to protecting the test of communication system substation, by the mode of main website and substation uniting and adjustment, carry out functional verification test in addition.This class testing is once convened a plurality of substation producers and producer of main website conventionally; for specific protective device and oscillograph; carry out scene access and function and concentrate test and appraisal, refer to < < relay > > magazine the 6th phase in 2006 " relay protection and fault information system construction experiences what is said or talked about " (Zhao Youcheng, Zhao Manyong, He Chunzhu) literary composition.Human cost and time cost that this test mode needs are all higher, and because producer's product is many, implementation is various, and neither one judgment criteria, and situation about running in test is many, poor operability.
Summary of the invention
The object of the present invention is to provide a kind of test macro that south electric network is protected communication system that is applicable to, the presumptive test project that completes of efficient, intelligence, automation, improves testing efficiency, reduces testing cost.
For achieving the above object, the technical solution used in the present invention is: be applicable to the test macro that south electric network is protected communication system, comprise man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface;
Wherein:
Man-machine interface is for the input of user command and the demonstration of communication message, data, test result and warning information;
Test cases database, for preserving preset test cases, and completes calling, edit and preserving of test cases according to the instruction of the instruction of main website emulation tool and prepositive communication computer;
Communication message and device information database, instruction for received communication front end processor, communication message between substation tester and tested device, data, substation configuration information and judged result are preserved, and respond the instruction of transferring of man-machine interface, according to the instruction of transferring of man-machine interface, return to corresponding message information, data message and object information;
Main website emulation tool, for the emulation of test command, for the functional requirement of south electric network failure information system, the main website order that emulation is all; After receiving the user command of man-machine interface input, according to the instruction of receiving, to carry out testing scheme editor, transfer, emulation is carried out in substation initialization and information point table is called in operation; Testing scheme that editor is completed is unique name and be deposited in test cases database after, to prepositive communication computer, send test and drive instruction;
Prepositive communication computer, the communication message that is used for the sending and receiving substation response of main website emulation command, after driving instruction, the test of the main website emulation tool receiving in real time communication message is resolved and data preparation, communication message form, communication process and the communication data of parsing and preset standard value are compared, and whether judged result is passed through; And communication message, device information, data and judged result are write in communication message and device information database; To man-machine interface, send idsplay order.
This programme is for the particularity of guarantor's communication system of south electric network, a kind of test macro is provided, this ties up to preset comprehensive substation testing scheme in test database, during test substation, only need in man-machine interface, input corresponding order, by main website emulation tool, transfer corresponding testing scheme and be sent to substation to be measured by prepositive communication computer, prepositive communication computer reads the responding communication message data of substation and preset standard information is compared, and result is passed to man-machine interface, improved the automaticity of test, realized the configuration correctness of automatic decision fault message substation, information integrity, the consistency to the configuration information in substation and the reading information in main website in the artificial stoning of needs not, effectively raise testing efficiency.
Accompanying drawing explanation
Figure
Figure 207669DEST_PATH_IMAGE001
the typical figure of protection fault message substation test;
Fig. 2 test macro fundamental diagram;
Fig. 3 main website emulation tool fundamental diagram;
Fig. 4 prepositive communication computer fundamental diagram.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
From accompanying drawing 2, the present invention includes man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface.Man-machine interface is for the input of user command and the demonstration of communication message, data, test result and warning information; In man-machine interface, shown the whole test commands of this test macro, user can need to select test command according to test, and this order reaches main website emulation tool.
Test cases database, for the preservation of preset test cases, and transfers unit instruction according to data in test cell instruction and prepositive communication computer in main website emulation tool and completes the calling of test cases, editor and hold function; Preset comprehensive substation testing scheme in this test cases database, testing scheme content mainly comprises in substation initialization test, time synchronized test, protection event/self check information/switching value displacement information/fault localization value to be sent test, reads analog quantity test, definite value functional test, always call test, fault recorder data test transmission, general file test transmission and calling device fault history information to test.
Wherein substation initialization procedure is correct for solving in guarantor's communication system specially in the communication of < < south electric network relay protection and fault information system and interface specification > >, fast, automatically transmit the monk station information of conciliating, as station arrangement, definite value, state/analog quantity, the title of circuit etc., numbering, the relevant parameters such as dimension, guarantee the consistency of main website end and the definition of substation client information, increase work efficiency, the dedicated process standard that reduces cost of labor and formulate, substation initialization procedure mainly comprises two aspects, read substation configuration and the configuration of lower dress substation.Reading substation configuration is mainly that main website obtains substation information by sending substation configuration read command; Lower dress substation configures main Shi Dang main website end while revising the configuration of a certain substation, and main website writes substation configuration order by transmission and completes the modification to substation information.Reading substation layoutprocedure mainly comprises: that reads substation configuration respectively organizes title, reads the description of whole entries of one group of information/be worth, read " attribute structure " of whole entries of one group of information, the value/attribute structure/description of reading single destination directory, reading single entry.Lower dress substation layoutprocedure mainly comprises: what pass down substation configuration respectively organizes title, the lower description of whole entries of one group of information, lower " attribute structure " that fills whole entries of one group of information of filling.
Time synchronization process is that main website issues time synchronized order, completes synchronous to the substation time.
In protection event/self check information/switching value displacement information/fault localization value, sending process has been mainly to occur that when electrical network breaks down or installs operation when abnormal, the action message of substation handle assembly or abnormal letter pass to main website.
Read analog quantity process and be all analog quantitys that value that main website regularly reads all entries in a group by generic service order obtains this device.
Definite value function comprises definite value inquiry, the inquiry of current operation definite value area code, fixed value modification, the current operation definite value of switching district.Main website obtains operation definite value and the current operation definite value district of certain device in substation by sending definite value querying command.Main website is revised definite value and is switched the order of definite value district by transmission and completes the modification to definite value.
Total calling process is that main website timed sending always calls order to complete obtaining all state informations in substation.
Fault recorder data transmitting procedure is when electrical network breaks down, substation is collected fault recorder data and is formed in brief analysis report and delivers to main website, in brief analysis report, contain fault relevant information and corresponding recorded wave file title, main website can directly obtain required recorded wave file by calling order.
General file transmitting procedure is generally main website calling substation listed files, the selected file that will call from list, substation will be sent in selected file packing again, complete general file on give.
Calling device fault history information process be main website by calling query history information, obtain the event information in fixed time section.
Content measurement in test cases storehouse has covered the repertoire of substation to be measured, and in test, user can transfer the testing scheme being preset in test database, also can need to update testing scheme according to test.
Communication message database, instruction for received communication front end processor, communication message between substation tester and tested device, data, substation configuration information and judged result are preserved, and respond the instruction of transferring of man-machine interface, according to the instruction of transferring of man-machine interface, return to corresponding message information, data message and object information.
As shown in Figure 3, main website emulation tool, for the emulation of test command, can be for the functional requirement of south electric network failure information system, the main website order that emulation is all; After receiving the user command of man-machine interface input, according to the instruction of receiving, carry out testing scheme editor, transfer, substation initialization emulation and information point table are called in operation; When receiving the edit commands of testing scheme, testing scheme that editor is completed is unique name and be deposited in test cases database after, to prepositive communication computer, send test and drive instruction.Main website emulation tool imports unit by command process unit, testing scheme unit, substation initialization unit, information point table and test driver element forms.Command process unit, after receiving the operational order of man-machine interface, is analyzed operational order, and then to corresponding unit, sends instruction according to the result of analyzing.
Operational order is divided into editor or the importing of testing scheme, and substation initialization command and information point table import order.If man-machine interface input is that information point table imports instruction, information point table imports unit after receiving the instruction of command process unit, to form corresponding information point table and import order, and drive instruction to pass to prepositive communication computer test, by prepositive communication computer, completed the further transmission of information.If man-machine interface input is substation initialization directive, substation initialization directive mainly comprises reads substation configuration and the configuration of lower dress substation, when main station system itself is putting into operation or having new substation to put Qian Huo main website into operation while revising the configuration of a certain substation, the consistency that has all needed main website end and substation client information, substation initialization procedure is exactly the consistency that completes correctly, quickly and automatically main website end and substation client information.Reading substation configuration is mainly that main website obtains substation information by sending substation configuration read command; Lower dress substation configures main Shi Dang main website end while revising the configuration of a certain substation, and main website writes substation configuration order by transmission and completes the modification to substation information.Reading substation layoutprocedure mainly comprises: that reads substation configuration respectively organizes title, reads the description of whole entries of one group of information/be worth, read " attribute structure " of whole entries of one group of information, the value/attribute structure/description of reading single destination directory, reading single entry.Lower dress substation layoutprocedure mainly comprises: what pass down substation configuration respectively organizes title, the lower description of whole entries of one group of information, lower " attribute structure " that fills whole entries of one group of information of filling.For example substation configuration order is read in man-machine interface input, command process unit receives after the substation initialization directive of man-machine interface, through Treatment Analysis, after drawing and being substation initialization directive, instruction is passed to substation initialization unit, substation initialization unit is after receiving the instruction of command process unit, what formation was read to substation configuration respectively organizes title command, read description/value order of whole entries of one group of information, read " attribute structure " order of whole entries of one group of information, value/attribute structure/description order of reading the directory command of single entry and reading single entry, and drive instruction to pass to prepositive communication computer test, by prepositive communication computer, completed the further transmission of information.If being testing scheme editor or transferring order of man-machine interface input, testing scheme comprises in time synchronized testing scheme, protection event/self check information/switching value displacement information/fault localization value and send testing scheme, reads analog quantity testing scheme, definite value functional test scheme, always calls testing scheme, fault recorder data test transmission scheme, general file test transmission scheme and calling device fault history information testing scheme.For each testing scheme, there is an instruction code, if man-machine interface input is to transfer definite value functional test scheme, man-machine interface will be by the code command command process unit of definite value functional test scheme, man-machine interface will be transferred definite value functional test scheme code and pass to command process unit, command process unit is after the instruction that receives man-machine interface, through Treatment Analysis, draw it is that definite value functional test scheme is transferred instruction, instruction is passed to testing scheme unit, testing scheme unit is after receiving the instruction of command process unit, compare analysis with the instruction of the local storage in testing scheme unit, identify is that definite value function scheme is transferred, carry out definite value function scheme and transfer operation, after testing scheme is transferred, if the modification order of man-machine interface input to this testing scheme, carry out testing scheme to modify, instruction after modification is carried out the editor of testing scheme or is transferred, testing scheme unit will carry out unique order to testing scheme, naming method can be for default name or is manually put name, and testing scheme is deposited into test cases database, then to prepositive communication computer, send test and drive instruction.In testing scheme unit, storing the instruction code identical with human and machine interface unit, for identifying the instruction of man-machine interface input.
As shown in Figure 4, prepositive communication computer, the communication message that is used for the sending and receiving tested substation response of main website emulation command, when receiving the test of main website emulation tool, drive after instruction, in real time communication message is resolved and data preparation, and communication message form, communication process and the communication data of parsing and preset standard value are compared, whether judged result is passed through; And communication message, device information, data and judged result are write in communication message and device information database; To man-machine interface, send idsplay order, the data that then man-machine interface is transferred in communication message and device information database are carried out the demonstration to information such as communication message, alarm and test results.Prepositive communication computer transfers unit, communication drivers unit, order and data analysis unit by the preposition command process unit of communicating by letter, data and result identifying unit forms, the test that the preposition command process of communicating by letter unit receives main website emulation tool drives after instruction, and instruction is analyzed.Afterwards instruction being passed to data and transfer unit or communication drivers unit, is that information point table imports unit instruction or substation initialization directive if the test of main website emulation tool drives instruction, and the preposition command process of communicating by letter unit sends instruction to communication drivers unit; If the test of main website emulation tool drive instruction be in time synchronized test, protection event/self check information/switching value displacement information/fault localization value, send test, read analog quantity test, definite value functional test, always call test, fault recorder data test transmission or general file test transmission or the test instruction of calling device fault history information; instruction code is passed to data and transfer unit; after testing scheme is transferred, data are transferred unit and are sent and transfer complete instruction to communication drivers unit.Communication drivers unit receives after instruction, to order and data analysis unit, result identifying unit, sends information analysis and result decision instruction, and sends communication message transmission instruction to communication interface.
The preposition command process of communicating by letter unit drives instruction for receiving the test of main website emulation tool, afterwards instruction is passed to data and transfers unit or communication drivers unit.If it is that information point table imports unit instruction that the test of main website emulation tool drives instruction, the preposition command process of communicating by letter unit sends information analysis instruction to communication drivers unit, communication drivers unit passes to order and data analysis unit by information analysis instruction afterwards, order and data analysis unit are after receiving instruction, start the information point table data analysis to importing, and analysis result is write in communication message and device information data and preserved, the substation configuration information that is used for reading with substation function of initializing compares, correctness with judgement substation initialization result, if it is substation initialization directive that the test of main website emulation tool drives instruction, instruction is passed to communication drivers unit, communication drivers unit sends to communication interface for the order simulation communication message that main website emulation tool is generated, for communicating with tested substation.Communication drivers unit sends information analysis instruction to order and data analysis unit simultaneously, order and data analysis unit are after receiving information analysis instruction, start the communication message between substation tester and substation to be measured to resolve, and the substation configuration information in communication message and data are extracted and calculated.Afterwards communication message and substation configuration information are written in communication message and device information database, after writing, order and data analysis unit send result decision instruction to result identifying unit, result identifying unit is after receiving instruction, the substation configuration information obtaining by substation initialization procedure in communication message and device information database and the substation configuration information that imports by information point table are compared, information is consistent, judge and pass through, if information is inconsistent, judges and do not pass through, if it is time synchronized test that the test of main website emulation tool drives instruction, in protection event/self check information/switching value displacement information/fault localization value, send test, read analog quantity test, definite value functional test, total calling test, fault recorder data test transmission or general file test transmission or the test instruction of calling device fault history information, instruction code is passed to data and transfer unit, data are transferred unit and are received after instruction, according to testing scheme code, complete from test cases database and transfer testing scheme, after testing scheme is transferred successfully, and to the instruction of communication drivers unit transmission communication drivers, and the simulation communication message commands in testing scheme is sent to communication drivers unit, communication drivers unit receives data and transfers after the communication drivers instruction of unit, beginning sends main website simulation communication message commands to communication interface, and to order and data analysis unit and result identifying unit transmission enabled instruction, order and data analysis unit and result identifying unit receive after enabled instruction, order and data analysis unit start the communication message between main website emulation tool and substation to resolve, then order and data analysis unit pass to result identifying unit by communication message and process and data, result identifying unit compares communication message and the standard procedure being preset in result identifying unit, and result is determined whether qualified.After result identifying unit judged result completes, communication message, device information, data and judged result are write in communication message and device information database; Meanwhile, to man-machine interface, send idsplay order, the data that then man-machine interface is transferred in communication message and device information database are carried out the demonstration to information such as communication message, alarm and test results.
Communication interface is for the communication between substation to be measured by prepositive communication computer, communication interface is after receiving the instruction of prepositive communication computer communication drivers unit communication, beginning sends corresponding main website emulation command to tested substation, and receive from the communication message of substation response, and the communication message of substation response is passed to order and data analysis unit.Communication interface is after completing the sending and receiving of communication message, and communication close interface is waited for the communication instruction of received communication front end processor communication drivers unit again.
On preferred version Zhong of the present invention main website emulation tool, be provided with a hardware encipher dog, hardware encipher dog, based on hardware-based cryptographic, its objective is by the encryption of software and data is prevented to intellectual property is illegally used.When main website emulation tool receives after the order of man-machine interface, first read the authorization information of hardware encipher dog, be verified and carry out further work, according to the order of man-machine interface, carry out testing scheme editor, transfer, substation initialization, emulation and the importing of information table point etc. are always done; If checking is not passed through, test stops.
The present invention has departed from single test specification, and test specification, testing process and testing equipment are combined together, by the leading test of tester, alleviates tester's workload; The edited change of test cases, facilitates tester to set tested object and test target, targetedly apparatus for checking function; Intellectual analysis judgement relaying protection configuration information, by design relay protection information point table and import feature thereof, has reduced tester's workload greatly, has saved the testing time, has improved the accuracy of testing result; The automated job of test overall process: from testing scheme has configured, results suggest, message analysis, data in test process show, arrive the automatic preservation of test data, all realize automation, improve testing efficiency, also strengthened the standardization of test.Test process can be realized man-machine interaction, also can artificially end, and is conducive to tester and holds content measurement and testing progress.

Claims (4)

1. be applicable to south electric network and protect a test macro for communication system, it is characterized in that, comprise man-machine interface, test cases database, communication message and device information database, main website emulation tool, prepositive communication computer and communication interface;
Wherein:
Man-machine interface is for the input of user command and the demonstration of communication message, data, test result and warning information;
Test cases database, for preserving preset test cases, and completes calling, edit and preserving of test cases according to the instruction of the instruction of main website emulation tool and prepositive communication computer;
Communication message and device information database, instruction for received communication front end processor, communication message between substation tester and tested device, data, substation configuration information and judged result are preserved, and respond the instruction of transferring of man-machine interface, according to the instruction of transferring of man-machine interface, return to corresponding message information, data message and object information;
Main website emulation tool, for the emulation of test command, for the functional requirement of south electric network failure information system, the main website order that emulation is all; After receiving the user command of man-machine interface input, according to the instruction of receiving, carry out testing scheme editor, transfer, substation initialization emulation and information point table are called in operation; Testing scheme that editor is completed is unique name and be deposited in test cases database after, to prepositive communication computer, send test and drive instruction;
Prepositive communication computer, the communication message that is used for the sending and receiving substation response of main website emulation command, after driving instruction, the test of the main website emulation tool receiving in real time communication message is resolved and data preparation, communication message form, communication process and the communication data of parsing and preset standard value are compared, and whether judged result is passed through; And communication message, device information, data and judged result are write in communication message and device information database; To man-machine interface, send idsplay order.
2. according to the test macro that is applicable to south electric network guarantor communication system claimed in claim 1, it is characterized in that, described main website emulation tool imports unit by command process unit, testing scheme unit, substation initialization unit, information point table and test driver element forms;
Command process unit, for receiving the operational order of man-machine interface, is analyzed operational order, according to the result of analyzing to corresponding testing scheme unit, substation initialization unit, information point table import unit and send instruction;
The corresponding units that receives instruction will receive instruction process by driving instruction to pass to prepositive communication computer by test.
3. according to the test macro that is applicable to south electric network guarantor communication system claimed in claim 1, it is characterized in that, described prepositive communication computer transfers unit, communication drivers unit, order and data analysis unit by the preposition command process unit of communicating by letter, data and result identifying unit forms;
The preposition command process of communicating by letter unit, drives instruction for receiving the test of main website emulation tool, and instruction is analyzed, and afterwards instruction is passed to data and transfers unit or communication drivers unit;
Data are transferred unit, for the instruction of the preposition command process of received communication unit, according to the instruction receiving, to test cases database, transfer test cases, after transferring, to communication drivers unit, send and transfer complete instruction;
Communication drivers unit, be used for received communication preposition command process unit and data and transfer the instruction of unit, to order and data analysis unit, result identifying unit, send information analysis and result decision instruction, and send communication message transmission instruction to communication interface, communicate with tested substation;
Order and data analysis unit, for the communication message between substation tester and substation to be measured is resolved, pass to result identifying unit by communication message and process and data; And the substation configuration information in communication message and data are extracted and calculated; Afterwards communication message and substation configuration information are written in communication message and device information database, after writing, to result identifying unit, send result decision instruction;
Result identifying unit, for the communication message receiving and the standard procedure that is preset at result identifying unit are compared, and result is determined whether qualified, after result has been judged, communication message, device information, data and judged result are write in communication message and device information database; Meanwhile, to man-machine interface, send idsplay order.
4. according to the test macro that south electric network is protected communication system that is applicable to described in any one in claim 1-3, it is characterized in that, described main website emulation tool is provided with a hardware encipher dog.
CN201110108606.3A 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system Active CN102403788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110108606.3A CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110108606.3A CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Publications (2)

Publication Number Publication Date
CN102403788A CN102403788A (en) 2012-04-04
CN102403788B true CN102403788B (en) 2014-03-26

Family

ID=45885696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110108606.3A Active CN102403788B (en) 2011-04-28 2011-04-28 Test system applicable to southern power grid communication guaranteeing system

Country Status (1)

Country Link
CN (1) CN102403788B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109001596A (en) * 2018-10-17 2018-12-14 广东电网有限责任公司 A kind of electric network failure diagnosis and transmission line parameter identification system

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102821010B (en) * 2012-08-23 2015-05-13 广东电网公司电力调度控制中心 Simulator for protector
CN103117598A (en) * 2013-01-28 2013-05-22 南京南瑞继保电气有限公司 Constant value remote setting maintenance-free system for transformer substation
CN103326467B (en) * 2013-06-03 2015-07-29 中国南方电网有限责任公司 A kind of protection act report implementation method based on Prudential Master device wave-record chart
CN103678119B (en) * 2013-10-31 2016-12-07 国家电网公司 Substation simulation software testing system and method for testing thereof towards power system
CN103675526B (en) * 2013-11-19 2017-02-15 广东电网公司电力调度控制中心 Prudential sub-station test system
CN103633742B (en) * 2013-12-10 2015-10-21 国家电网公司 Realize the means of communication of synchronous on-line analysis during fault recorder data transmission
CN105024874B (en) * 2014-04-29 2018-11-27 中国银联股份有限公司 Off-line emulation system based on trusted service management platform
CN105591467B (en) * 2014-10-24 2018-07-20 上海许继电气有限公司 Relay protection fault information main station system based on Service-Oriented Architecture Based
CN106291159B (en) * 2016-06-24 2021-06-25 国网江苏省电力公司南京供电公司 Intelligent acceptance device and acceptance method for main station side power distribution automatic signals
CN106909615B (en) * 2017-01-13 2022-09-23 中国电力科学研究院 Method and device for verifying data information consistency between master station and substation
CN107992019B (en) * 2017-10-31 2023-07-18 中国电力科学研究院有限公司 Main station and sub station integrated error-prevention system closed loop test method and system
CN108152684A (en) * 2018-01-12 2018-06-12 中国南方电网有限责任公司超高压输电公司检修试验中心 Relay protection information system pressure processing capacity automatic detection device and method
CN111176978B (en) * 2018-11-09 2023-09-29 通用电气航空系统有限公司 Tool verification system and method for verifying failed components
CN110286664B (en) * 2019-04-17 2022-04-12 许昌开普检测研究院股份有限公司 Automatic test system for remote measurement precision of measurement and control device of power system
CN110138602B (en) * 2019-04-28 2022-08-16 许昌开普检测研究院股份有限公司 Message simulation processing system
CN110851199B (en) * 2019-10-16 2023-07-11 许昌许继软件技术有限公司 Information protection system in electric power system and initialization method thereof
CN110932393B (en) * 2019-11-19 2021-04-02 许继集团有限公司 Substation information protection master station system and data initialization method thereof
CN115241978A (en) * 2022-08-15 2022-10-25 山西敬天继保电力有限公司 Remote monitoring system and method for power distribution network

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980417A (en) * 2010-11-02 2011-02-23 江西省电力科学研究院 Digital substation testing simulation method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09243696A (en) * 1996-03-08 1997-09-19 Hitachi Ltd Digital protective relay testing apparatus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101980417A (en) * 2010-11-02 2011-02-23 江西省电力科学研究院 Digital substation testing simulation method

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
JP特开平9-243696A 1997.09.19
应站煌等.继电保护装置自动测试系统研究和设计.《电力系统保护与控制》.2010,第38卷(第17期),
李忠安等.电力系统智能装置自动化测试系统的设计.《电力系统自动化》.2009,第33卷(第8期),
电力系统智能装置自动化测试系统的设计;李忠安等;《电力系统自动化》;20090425;第33卷(第8期);第77-80页 *
继电保护装置自动测试系统研究和设计;应站煌等;《电力系统保护与控制》;20100901;第38卷(第17期);第142-146页 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109001596A (en) * 2018-10-17 2018-12-14 广东电网有限责任公司 A kind of electric network failure diagnosis and transmission line parameter identification system
CN109001596B (en) * 2018-10-17 2021-06-29 广东电网有限责任公司 Power grid fault diagnosis and power transmission line parameter identification system

Also Published As

Publication number Publication date
CN102403788A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN102403788B (en) Test system applicable to southern power grid communication guaranteeing system
CN202533519U (en) Fully automatic closed loop test system of protective relaying device
CN101718841B (en) Automatic checking system and method of relaying protection device
CN108761313B (en) Extra-high voltage direct current protection device testing method and system based on fault inversion
CN103675526B (en) Prudential sub-station test system
CN105978159B (en) A kind of substation&#39;s remote control test is online to exempt to execute checking method
CN110568284B (en) Intelligent substation one-key sequential control automatic test verification method, device and system
CN102713652A (en) A method and a system for simulation in a substation
CN102298979A (en) Signal default value verification method for digital instrument control system of nuclear power plant and system
CN109541353A (en) Power distribution automation detection system
CN107257304B (en) Telecontrol point-aligning-free configuration test system
CN107666179B (en) Method and system for updating information of power distribution automation graph-model interaction point table
CN103869260A (en) Power supply test system and method
CN104076807B (en) The adjustment method of the automated system of intelligent substation
CN101158847A (en) Electric power substation software emulation platform building method and no power off upgrading improved method
CN106774237A (en) A kind of observing and controlling remote control sluggish detection method and its system
CN104391247A (en) Relay protection test method and system based on IEC61850 digital tester
CN1972287B (en) Communication protocol record analysis apparatus and its analysis method
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
CN105680441A (en) Simulated replacement technique-based simulated point-alignment device
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN109581098A (en) The intelligent O&amp;M test method of site protective device
CN105703479B (en) Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension
CN108492660A (en) Substation&#39;s peace arranges analogy method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee after: XUCHANG KETOP TESTING RESEARCH INSTITUTE CO.,LTD.

Patentee after: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address before: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee before: XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.

Patentee before: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address after: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee after: XUCHANG KETOP TESTING TECHNOLOGY CO.,LTD.

Patentee after: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER

Address before: 510600 Plum Blossom Road, Guangzhou, Guangdong, No. 75, No.

Co-patentee before: XUCHANG KETOP ELECTRICAL APPARATUS TESTING & Research Institute

Patentee before: GUANGDONG POWER GRID POWER DISPATCHING CONTROL CENTER