CN102400588A - Center tower post for vertical axis wind power generator and construction method thereof - Google Patents
Center tower post for vertical axis wind power generator and construction method thereof Download PDFInfo
- Publication number
- CN102400588A CN102400588A CN2011103130272A CN201110313027A CN102400588A CN 102400588 A CN102400588 A CN 102400588A CN 2011103130272 A CN2011103130272 A CN 2011103130272A CN 201110313027 A CN201110313027 A CN 201110313027A CN 102400588 A CN102400588 A CN 102400588A
- Authority
- CN
- China
- Prior art keywords
- post
- vertical axis
- center
- king
- axis aerogenerator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 239000004567 concrete Substances 0.000 claims abstract description 12
- 238000000465 moulding Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 230000010412 perfusion Effects 0.000 claims description 5
- 239000002002 slurry Substances 0.000 claims description 4
- 241000579971 Terebridae Species 0.000 claims description 3
- 208000002925 dental caries Diseases 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 239000008267 milk Substances 0.000 claims description 2
- 210000004080 milk Anatomy 0.000 claims description 2
- 235000013336 milk Nutrition 0.000 claims description 2
- 238000010248 power generation Methods 0.000 abstract 5
- 238000000034 method Methods 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 6
- 230000005611 electricity Effects 0.000 description 5
- 229910052742 iron Inorganic materials 0.000 description 4
- 238000009165 androgen replacement therapy Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D3/00—Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor
- F03D3/02—Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor having a plurality of rotors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D3/00—Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor
- F03D3/005—Wind motors with rotation axis substantially perpendicular to the air flow entering the rotor the axis being vertical
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/74—Wind turbines with rotation axis perpendicular to the wind direction
Abstract
The invention relates to a center tower post for a vertical axis wind power generator and a construction method thereof. The method comprises the following construction steps that: a foundation of the center tower post is built; an inner template and an outer template of the center tower post are built on the foundation, a filling cavity is formed between the inner template and the outer template, a steel component is pre-buried in the filling cavity, the inner template is in a tubular shape, more than two annular projected cavities which are used for forming and surrounding the center tower post and are used for installing an installing platform for installing the generator are arranged on the outer template, the annular projected cavities are communicated with the filling cavity, and concrete is filled between the inner template and the outer template. The intensity of the reinforced concrete center tower post is high, the stability is better, and in addition, the cost is low. The reinforced concrete center tower post can be made to be higher, a plurality of installing platforms can be arranged on the center tower post, power generation equipment can be arranged on the installing platform, the power generation equipment and a wind wheel form an independent power generation unit, and the power generation power of the whole vertical axis wind power generator can be increased through installing a plurality of power generation units on one center tower post.
Description
Technical field
The present invention relates to vertical axis aerogenerator, especially the central tower rod structure and the job practices thereof of vertical axis aerogenerator.
Background technology
At present, vertical axis aerogenerator has begun to replace gradually horizontal axis wind-driven generator with its remarkable advantages.On the king-post of vertical axis aerogenerator many generating sets can be installed, to improve wind-power electricity generation efficient.But existing king-post is generally steel tubular structure, and the pressure that the king-post of this structure can bear is very limited, and its stability is bad.Receive the restriction of this structure, the height of king-post generally can be De Taigao, so it is just fewer that the quantity of generating set can be installed on the king-post.For intensity and the height of strengthening king-post; Can draw steel wire earthward on the king-post of some vertical axis aerogenerators; Effect through steel wire makes standing on the ground that king-post can be more stable; On stable basis, the quantity of generating set on the height of suitable increased king-post and the king-post, but the shared surface area of this kind king-post is bigger.Also have some vertical axis aerogenerators to thicken the wall thickness of king-post, make its intensity reach requirement, but this kind king-post cost is high.In addition; The motor of existing vertical axis aerogenerator is generally directly established and is installed on the king-post, and the structure that the generator of main at present employing outer rotor is encircled king-post realizes that the motor of this structure need be done greatlyyer; Its Costco Wholesale is high, and the installation difficulty of motor is high.
Summary of the invention
One of technical problem to be solved by this invention provides a kind of center king-post of vertical axis aerogenerator, and the intensity of center king-post is high, and stability is better, and cost is low; The installation of generator is more convenient, can dwindle the volume of generator, can reduce the average price of vertical axis aerogenerator.
Two of technical problem to be solved by this invention provides a kind of job practices of center king-post of vertical axis aerogenerator, and the intensity of center king-post is higher, and stability is better, and cost is low; The installation of generator is more convenient, can dwindle the volume of generator, can reduce the average price of vertical axis aerogenerator.
For one of solving the problems of the technologies described above; Technical scheme of the present invention is: a kind of center king-post of vertical axis aerogenerator; Said center king-post is a reinforced concrete structure; The center of said center king-post is provided with the passage at the straight-through top from the bottom, and said center king-post is provided with the mounting platform that is used to install generator of encircling said center king-post more than two, said mounting platform and the king-post one slurry molding of said center.The center king-post of steel concrete has easy construction with respect to the center king-post of existing steel work, and Costco Wholesale is low, and intensity is high, the advantage of good stability; Because the mounting platform on the king-post of center and the center king-post of steel concrete are integrated; Has enough intensity; Can carry equipment such as generator, switch board, a whole set of generating equipment is installed on the mounting platform, change the mounting means of generator; Dwindle the volume of generator greatly, and the installation of generator is also more convenient simple; The central tower rod structure that this kind has many mounting platforms is adapted at laying on the vertical axis aerogenerator multilayer TRT; These TRTs can not disturb mutually; Can independently generate electricity, so help to improve the overall generated output of vertical axis aerogenerator; Therefore, central tower rod structure of the present invention is broken the bottleneck of vertical axis aerogenerator to the high power development.
As improvement, said mounting platform inside is provided with the steel member, makes the intensity of mounting platform higher, and supporting capacity is stronger.
As improvement, said steel member is horizontally disposed with and runs through said central tower post and forms distributed in grid, further increases the intensity and the supporting capacity of mounting platform.
As improvement, king-post interior architectural applications structure in said center extends in the said mounting platform with reinforcing bar, makes the intensity of mounting platform higher, and supporting capacity is stronger.
As improvement, said mounting platform is provided with the installation screw, and said generator is through being bolted on the said mounting platform.On the mounting platform on plane, generator is installed, is implemented very convenient.
As improvement; Said mounting platform is provided with protecting wall, and said protecting wall is around said mounting platform, and said protecting wall is provided with door and window and forms weather-proof house; Said generator is located in the said house; Be used to protect generating equipments such as generator, switch board to avoid the external environment influence, confirm that it operates in safe environment, can increase the application life of generating equipment.
As improvement, the distance between said adjacent two mounting platforms is used to install the wind wheel of said vertical axis aerogenerator.One of TRT composition on the corresponding mounting platform with it of center king-post windward wheel is generator unit independently, the generator unit generating that works alone.
Two of technical problem to be solved by this invention provides a kind of job practices of center king-post of vertical axis aerogenerator, may further comprise the steps:
(1) builds the ground of center king-post;
(2) on the basis of said ground, build the inner formword and the exterior sheathing of center king-post; Form the grouting cavity between the inside and outside template; Reinforcing bar is used in pre-buried steel member and architectural construction in said grouting cavity; Said inner formword is tubular, and said exterior sheathing is provided with and is used for moulding more than two and encircles the annular protrusion cavity that said center king-post is used to install the mounting platform of generator, and said annular protrusion cavity is communicated with said grouting cavity;
(3) grouted-aggregate concrete between inside and outside template.
As improvement, be provided with the steel member in the said annular protrusion cavity, said steel member stretches in the said perfusion cavity.
As improvement, the reinforcing bar in the said perfusion cavity extends in the said annular protrusion cavity.
As improvement, in the said step (3), adopt the mode of packer grouting to be in the milk.
As improvement, wait concrete in the inside and outside template fixedly after the moulding, remove inside and outside template, and on mounting platform the auger shell hole, said screw is used to install and fix the generator of said vertical axis aerogenerator.
As improvement, the distance between said adjacent two annular protrusion cavitys is greater than the wind wheel height of said vertical axis aerogenerator.
The beneficial effect that the present invention is compared with prior art brought is:
1, the center king-post intensity of steel concrete is high, and stability is better, and cost is low;
2, the center king-post of steel concrete can do more; On the king-post of center, a plurality of mounting platforms can be set; On the mounting platform generating equipment can be set; Form an independently generator unit at the wind wheel that adds correspondence, on the center king-post generated output that a plurality of generator units can increase whole vertical axis aerogenerator is set;
3, mounting platform and center king-post are formed in one; Mounting platform intensity is high, and supporting capacity is strong, makes generating equipments such as generator, switch board can be installed on the mounting platform; This kind structure helps to reduce the volume of generator, makes things convenient for the installation and the maintenance of generator.
Description of drawings
Fig. 1 is the structural representation of mounting platform on the king-post of center of the present invention.
Fig. 2 is the sectional view of Fig. 1.
Fig. 3 is the horizontal cross of mounting platform.
Fig. 4 is for having the structural representation of two mounting platforms on the king-post of center.
The structural representation that Fig. 5 combines with generator unit for center of the present invention king-post.
Fig. 6 is the A place enlarged drawing of Fig. 4.
The specific embodiment
Below in conjunction with Figure of description the present invention is described further.
As shown in Figure 4, a kind of vertical axis aerogenerator comprises center king-post 1, is arranged on the plural generator unit on the center king-post 1.Said generator unit mainly comprises generator 5, switch board 9, wind wheel 4.
Like Fig. 1,2, shown in 5; Said center king-post 1 is the reinforced concrete structure of hollow; Said center king-post 1 is provided with the mounting platform 2 that is used to install generator 5 of encircling said center king-post 1 more than two, said mounting platform 2 and the 1 one slurry molding of said center king-post; As shown in Figure 3; Said mounting platform 2 inside are provided with i iron 13; Said i iron 13 is horizontally disposed with and runs through said center king-post 1, and vertical interlaced forms distributed in grid each other, and the architectural construction in the center king-post 1 extends in the said mounting platform 2 with reinforcing bar 3.Said mounting platform 2 is provided with the installation screw, and generating equipments such as generator 5, switch board 9 are through being bolted on the said mounting platform 2; Said mounting platform 2 is provided with protecting wall; Said protecting wall is around said mounting platform 2; Said protecting wall is provided with door and window and forms weather-proof house 10, and said generator 5 is located in the said house 10, is used to protect generating equipments such as generator 5, switch board 9 to avoid the external environment influence; Confirm that it operates in safe environment, can increase the application life of generating equipment.Distance between said adjacent two mounting platforms 2 is used to install the wind wheel 4 of said vertical axis aerogenerator 5.For later easy to maintenance; Service ports (not indicating) can be set on the center king-post 1 lead to the passage 12 in the center king-post 1; The maintenance personal just can enter in the passage 12 of center king-post 1 through service ports; In passage 12, cage is set, the maintenance personal is very easily through the differing heights of cage arrival center king-post 1 to the vertical axis aerogenerator 5 with multilayer generator unit; The cable of the generator unit on upper strata can also connect up through this passage 12 in addition.
The construction sequence of said center king-post 1 is following:
(1) builds the ground of center king-post 1;
(2) on the basis of said ground, build the inner formword and the exterior sheathing of center king-post 1; Form the grouting cavity between the inside and outside template; Pre-buried steel member and architectural construction are with reinforcing bar 3 in said grouting cavity; Said inner formword is tubular; Said exterior sheathing is provided with and is used for moulding more than two and encircles the annular protrusion cavity that said center king-post 1 is used to install the mounting platform 2 of generator 5, and said annular protrusion cavity is communicated with said grouting cavity, and said adjacent two annulars protrude between the cavitys distance greater than the wind wheel 4 of said vertical axis aerogenerator 5 highly; Be provided with i iron 13 in the said annular protrusion cavity, said i iron is horizontally disposed with and runs through said center king-post 1 and forms distributed in grid, and other steel members in the annular protrusion cavity can also fuse with the steel member in the grouting cavity; Reinforcing bar in the said perfusion cavity extends in the said annular protrusion cavity;
(3) mode concrete placing between inside and outside template of employing packer grouting;
(4) etc. the concrete in the inside and outside template fixedly after the moulding, is removed inside and outside template, and on mounting platform 2 the auger shell hole.
As shown in Figure 6, said wind wheel 4 is a Φ shape wind wheel, and said wind wheel 4 is made up of two symmetrically arranged blades 41; Said wind wheel 4 upper ends are provided with first hinge device; Said wind wheel 4 lower ends are provided with second hinge device; In the present embodiment; Said first hinge device is a clutch shaft bearing 11, and the inner ring fixed cover of said clutch shaft bearing 11 is on said king-post, and the outer ring of said clutch shaft bearing 11 is fixedly connected with said wind wheel 4 upper ends through adpting flange; Said second hinge device is second bearing 8; The inner ring fixed cover of said second bearing 8 is on said king-post; Master gear 6 upper ends that are enclosed within on the center king-post 1 are fixedly connected with said wind wheel 4 lower ends through adpting flange, and said adpting flange is fixedly connected with second bearing, 8 outer rings.Said wind wheel 42 articulates with said center king-post 1 through the clutch shaft bearing 11 and second bearing 8, and said wind wheel 4 is through said second bearing 8 and said master gear 6 interlocks.
Said master gear 6 is connected with the rotating shaft of generator 5 on being arranged on mounting platform 2 through the set of gears transmission system respectively; In the present embodiment, said gear train assembly is a bevel gear 7, master gear 6 and said bevel gear 7 engagements; And said bevel gear 7 is enclosed within the rotating shaft of generator 5 of horizontal positioned; Therefore, wind wheel 4 is realized being transformed into horizontally rotating of generator 5 by the vertical rotation of wind wheel 4 through master gear 6 and the rotating shaft interlock of bevel gear 7 with said generator 5; For vertical axis aerogenerator 5, the installation of generator 5 is more simple and convenient.
Be provided with the tube connector that is evenly distributed on more than two on the same circumference between the said clutch shaft bearing 11 and second bearing 8; The tube connector upper end is fixedly connected with the outer ring of clutch shaft bearing 11; The lower end of tube connector is fixedly connected with the outer ring of second bearing 8, and clutch shaft bearing 11 outer rings are synchronous through said tube connector and the interlock of said second bearing 8 outer rings.The distribution of said steel pipe constitutes a cage-shaped structure; Because the wind speed of blade 41 upper ends and the wind speed of lower end are often different; The upper end wind speed generally the wind speed than the lower end is big, thereby can cause blade 41 when rotated the upper end speed faster than the speed of lower end, but since blade 41 are totals; The top and bottom of blade 41 must have synchronous rotating speed; So blade 41 might be distorted, thereby destroys the best front face area of blade 41, reduces the utilization ratio of wind energy of 41 pairs in blade.The design of mouse cage is arrived blade 41 lower ends for the moment of transmitting blade 41 upper ends just, makes blade 41 in rotary course, reduces the degreeof tortuosity of blade 41 as much as possible.
Be provided with the clutch (indicating) that the control gear transmission system is connected with master gear 6 between said master gear 6 and the bevel gear 7, the rotating shaft of said wind wheel 4 and generator 5 is provided with velocity sensor (indicating), and said velocity sensor is electrically connected with said clutch.When the rotating shaft rotating speed that detects wind wheel 4 or generator 5 when velocity sensor surpasses preset value, send a signal to clutch, make clutch break off being connected of gear train assembly and master gear 6; When velocity sensor detects wind wheel 4 rotating speeds and gets back in the preset value, send a signal to clutch, make clutch connection gear transmission system and master gear 6 again.
Because the center king-post 1 and the mounting platform 2 one slurry molding of steel concrete, mounting platform 2 intensity are high, and supporting capacity is strong, and generating equipments such as generator 5, switch board 9 can be installed on the mounting platform 2.As shown in Figure 4, on the same mounting platform 2 a plurality of generators 5 can be set, a wind wheel 4 is driven a plurality of generators 5 generate electricity simultaneously, to improve the generated output of whole wind power generator 5.Wind wheel 4 is rotated by wind, and its power is delivered to the rotating shaft of every generator 5 successively through master gear 6, gear train assembly, for each generator 5 provides mechanical energy, thereby generates electricity.Can change the rotating ratio of the rotating shaft of master gear 6 and generator 5 through gear train assembly; Although the rotating speed of wind wheel 4 is lower,, can export bigger rotating speed equally to the rotating shaft of generator 5 through after the adjustment of gear train assembly; Thereby can utilize high-revolving generator 5; High-revolving generator 5 is compared with prior art low-speed generator 5, and under same generated output, high-revolving generator 5 volumes are littler; The load of wind wheel 4 reduces, and it is littler to start wind speed, helps wind-driven generator 5 and when hanging down wind speed, also can generate electricity; Generator 5 volumes in every generator unit are less, its low cost of manufacture, and reduce maintenance maintenance difficulty; Installable generator unit is more on the king-post, has further improved the generated output of wind-driven generator 5.
Claims (13)
1. the center king-post of a vertical axis aerogenerator; It is characterized in that: said center king-post is a reinforced concrete structure; The center of said center king-post is provided with the passage at the straight-through top from the bottom; Said center king-post is provided with the mounting platform that is used to install generator of encircling said center king-post more than two, said mounting platform and the king-post one slurry molding of said center.
2. the center king-post of a kind of vertical axis aerogenerator according to claim 1, it is characterized in that: said mounting platform inside is provided with the steel member.
3. the center king-post of a kind of vertical axis aerogenerator according to claim 2 is characterized in that: said steel member is horizontally disposed with and runs through said central tower post and forms distributed in grid.
4. the center king-post of a kind of vertical axis aerogenerator according to claim 1 is characterized in that: king-post interior architectural applications structure in said center extends in the said mounting platform with reinforcing bar.
5. the center king-post of a kind of vertical axis aerogenerator according to claim 1, it is characterized in that: said mounting platform is provided with the installation screw, and said generator is through being bolted on the said mounting platform.
6. the center king-post of a kind of vertical axis aerogenerator according to claim 1; It is characterized in that: said mounting platform is provided with protecting wall; Said protecting wall is around said mounting platform, and said protecting wall is provided with door and window and forms weather-proof house, and said generator is located in the said house.
7. the center king-post of a kind of vertical axis aerogenerator according to claim 1, it is characterized in that: the distance between said adjacent two mounting platforms is used to install the wind wheel of said vertical axis aerogenerator.
8. the job practices of the center king-post of a vertical axis aerogenerator is characterized in that may further comprise the steps:
(1) builds the ground of center king-post;
(2) on the basis of said ground, build the inner formword and the exterior sheathing of center king-post; Form the grouting cavity between the inside and outside template; Reinforcing bar is used in pre-buried steel member and architectural construction in said grouting cavity; Said inner formword is tubular, and said exterior sheathing is provided with and is used for moulding more than two and encircles the annular protrusion cavity that said center king-post is used to install the mounting platform of generator, and said annular protrusion cavity is communicated with said grouting cavity;
(3) concrete placing between inside and outside template.
9. the job practices of the center king-post of a kind of vertical axis aerogenerator according to claim 8 is characterized in that: be provided with the steel member in the said annular protrusion cavity, said steel member stretches in the said perfusion cavity.
10. the job practices of the center king-post of a kind of vertical axis aerogenerator according to claim 8 is characterized in that: the reinforcing bar in the said perfusion cavity extends in the said annular protrusion cavity.
11. the job practices of the center king-post of a kind of vertical axis aerogenerator according to claim 8 is characterized in that: in the said step (3), adopt the mode of packer grouting to be in the milk.
12. the job practices of the center king-post of a kind of vertical axis aerogenerator according to claim 8; It is characterized in that: wait concrete in the inside and outside template fixedly after the moulding; Remove inside and outside template; And on mounting platform the auger shell hole, said screw is used to install and fix the generator of said vertical axis aerogenerator.
13. the job practices of the center king-post of a kind of vertical axis aerogenerator according to claim 8 is characterized in that: the distance between said adjacent two annular protrusion cavitys is greater than the wind wheel height of said vertical axis aerogenerator.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110313027.2A CN102400588B (en) | 2011-08-11 | 2011-10-14 | A kind of center king-post of vertical axis aerogenerator and construction method thereof |
PCT/CN2012/078424 WO2013020436A1 (en) | 2011-08-11 | 2012-07-10 | Central pylon for vertical axis wind turbine and construction method thereof |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102292674 | 2011-08-11 | ||
CN201110229267 | 2011-08-11 | ||
CN201110229267.4 | 2011-08-11 | ||
CN201110313027.2A CN102400588B (en) | 2011-08-11 | 2011-10-14 | A kind of center king-post of vertical axis aerogenerator and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102400588A true CN102400588A (en) | 2012-04-04 |
CN102400588B CN102400588B (en) | 2015-08-19 |
Family
ID=45513945
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110313027.2A Active CN102400588B (en) | 2011-08-11 | 2011-10-14 | A kind of center king-post of vertical axis aerogenerator and construction method thereof |
CN2011203958508U Expired - Lifetime CN202348569U (en) | 2011-08-11 | 2011-10-14 | Vertical axis wind generator |
CN201110313095.9A Active CN102338043B (en) | 2011-08-11 | 2011-10-14 | Vertical shaft wind driven generator |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203958508U Expired - Lifetime CN202348569U (en) | 2011-08-11 | 2011-10-14 | Vertical axis wind generator |
CN201110313095.9A Active CN102338043B (en) | 2011-08-11 | 2011-10-14 | Vertical shaft wind driven generator |
Country Status (2)
Country | Link |
---|---|
CN (3) | CN102400588B (en) |
WO (1) | WO2013020436A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102839819A (en) * | 2012-08-21 | 2012-12-26 | 中国能源建设集团广东省电力设计研究院 | Flexible attachment arranging and selecting method of ultra-large type cooling tower construction tower crane based on tower barrel safety |
WO2013020436A1 (en) * | 2011-08-11 | 2013-02-14 | Deng Yunhe | Central pylon for vertical axis wind turbine and construction method thereof |
CN103225441A (en) * | 2013-04-12 | 2013-07-31 | 中国能源建设集团广东省电力设计研究院 | Overhead cable terminal field with suspended and warped structure |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013053251A1 (en) * | 2011-10-14 | 2013-04-18 | Deng Yunhe | Verticalshaft wind motor |
CN102425529B (en) * | 2011-10-29 | 2013-12-11 | 邓允河 | Field installation method for vertical-shaft wind-driven generator |
CN103511198B (en) * | 2012-06-21 | 2016-08-03 | 广州雅图新能源科技有限公司 | A kind of construction method of vertical axis aerogenerator |
CN103511179B (en) * | 2012-06-21 | 2016-08-10 | 广州雅图新能源科技有限公司 | A kind of wind wheel structure of vertical-axis wind driven generator and installation method thereof |
CN102705170B (en) * | 2012-06-28 | 2015-04-15 | 东华理工大学 | Eccentric multi-power wind driven generator |
WO2014002118A1 (en) * | 2012-06-29 | 2014-01-03 | Valagam Rajagopal Raghunathan | Vertical axis wind turbine |
GB2523133B (en) * | 2014-02-13 | 2016-06-01 | X-Wind Power Ltd | Vertical axis wind turbine rotor and aerofoil |
CN104747379B (en) * | 2015-02-10 | 2023-05-30 | 连云港巨基岩土工程有限公司 | Horizontal rotation type wind driven generator device |
GB2536618B (en) * | 2015-03-09 | 2019-03-06 | Bell Gordon | Air capture turbine |
CN110500231A (en) * | 2019-09-25 | 2019-11-26 | 任锦波 | A kind of magnetic suspension multi-layer wind wheel generation unit |
CN111677627B (en) * | 2020-06-03 | 2022-02-25 | 河南恒聚新能源设备有限公司 | Turbine rotor assembly for vertical axis wind power generation system and power generation system |
CN112096578A (en) * | 2020-08-31 | 2020-12-18 | 河南恒聚新能源设备有限公司 | Foundation support roller thrust bearing and vertical axis wind power generation device |
CN112112470B (en) * | 2020-09-25 | 2021-06-15 | 广州互媒盈动文化传媒科技有限公司 | Information sharing system based on Internet security |
CN113606092B (en) * | 2021-07-16 | 2023-02-28 | 河南恒聚新能源设备有限公司 | Novel structure and manufacturing process of central support column of vertical axis wind power generation device |
CN114017252B (en) * | 2021-10-29 | 2023-12-05 | 国网山东省电力公司梁山县供电公司 | Suspension type wind power generation device and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT32180B (en) * | 1906-09-04 | 1908-03-10 | Cie Belge De Construction D Au | Coil spring friction clutch. |
ATA32180A (en) * | 1980-01-22 | 1982-11-15 | Czernik Roman Dipl Ing | CONCRETE POLE |
ATE32180T1 (en) * | 1983-07-29 | 1988-02-15 | Honicel Sa | COFFIN MATTRESS. |
CN2931679Y (en) * | 2006-05-10 | 2007-08-08 | 山东龙光银河杆塔有限公司 | New compressive resistance column of three columns tower |
EP1873331A2 (en) * | 2006-06-29 | 2008-01-02 | Pfleiderer Europoles GmbH & Co. KG | Overhead circuit pylon made of spun concrete |
CN201448192U (en) * | 2009-08-21 | 2010-05-05 | 广州雅图风电设备制造有限公司 | Tower column structure of vertical wind power generator |
CN202348590U (en) * | 2011-08-11 | 2012-07-25 | 邓允河 | Center tower for vertical shaft wind generator |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH668623A5 (en) * | 1986-06-13 | 1989-01-13 | Gemaro Ag | Wind power generator with stack of independent platforms - enables gps. of wind turbines stacked on common mast to be utilised selectively |
WO2009030069A1 (en) * | 2007-09-04 | 2009-03-12 | Thhair Sa | A high-power breeze generator assembly with reflective-type hemispherical wind vanes |
CN101280766B (en) * | 2008-05-30 | 2010-07-07 | 哈尔滨工程大学 | Changeable attack angle resistance force type vertical shaft wind-light complementary type electricity generator |
US20100233919A1 (en) * | 2009-03-12 | 2010-09-16 | Ersoy Seyhan | Check valve turbine |
CN101545452B (en) * | 2009-03-25 | 2011-04-20 | 广州雅图风电设备制造有限公司 | Vertical wind-powered generator |
CN101550918B (en) * | 2009-03-27 | 2012-05-23 | 邓允河 | Vertical wind power generator |
CN101526069B (en) * | 2009-04-17 | 2010-12-29 | 邓允河 | Vertical aerogenerator |
GB2471272A (en) * | 2009-06-22 | 2010-12-29 | Stephen Martin Redcliffe | Vertical axis magnus effect wind turbine |
CN101629549B (en) * | 2009-08-14 | 2011-10-05 | 广州雅图风电设备制造有限公司 | Vertical-axis wind driven generator |
CN101858316A (en) * | 2010-05-24 | 2010-10-13 | 何福群 | Construction engineering structure mode for tower wind power generation station |
CN102400588B (en) * | 2011-08-11 | 2015-08-19 | 邓允河 | A kind of center king-post of vertical axis aerogenerator and construction method thereof |
-
2011
- 2011-10-14 CN CN201110313027.2A patent/CN102400588B/en active Active
- 2011-10-14 CN CN2011203958508U patent/CN202348569U/en not_active Expired - Lifetime
- 2011-10-14 CN CN201110313095.9A patent/CN102338043B/en active Active
-
2012
- 2012-07-10 WO PCT/CN2012/078424 patent/WO2013020436A1/en active Application Filing
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT32180B (en) * | 1906-09-04 | 1908-03-10 | Cie Belge De Construction D Au | Coil spring friction clutch. |
ATA32180A (en) * | 1980-01-22 | 1982-11-15 | Czernik Roman Dipl Ing | CONCRETE POLE |
ATE32180T1 (en) * | 1983-07-29 | 1988-02-15 | Honicel Sa | COFFIN MATTRESS. |
CN2931679Y (en) * | 2006-05-10 | 2007-08-08 | 山东龙光银河杆塔有限公司 | New compressive resistance column of three columns tower |
EP1873331A2 (en) * | 2006-06-29 | 2008-01-02 | Pfleiderer Europoles GmbH & Co. KG | Overhead circuit pylon made of spun concrete |
CN201448192U (en) * | 2009-08-21 | 2010-05-05 | 广州雅图风电设备制造有限公司 | Tower column structure of vertical wind power generator |
CN202348590U (en) * | 2011-08-11 | 2012-07-25 | 邓允河 | Center tower for vertical shaft wind generator |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013020436A1 (en) * | 2011-08-11 | 2013-02-14 | Deng Yunhe | Central pylon for vertical axis wind turbine and construction method thereof |
CN102839819A (en) * | 2012-08-21 | 2012-12-26 | 中国能源建设集团广东省电力设计研究院 | Flexible attachment arranging and selecting method of ultra-large type cooling tower construction tower crane based on tower barrel safety |
CN102839819B (en) * | 2012-08-21 | 2014-12-10 | 中国能源建设集团广东省电力设计研究院 | Flexible attachment arranging and selecting method of ultra-large type cooling tower construction tower crane based on tower barrel safety |
CN103225441A (en) * | 2013-04-12 | 2013-07-31 | 中国能源建设集团广东省电力设计研究院 | Overhead cable terminal field with suspended and warped structure |
Also Published As
Publication number | Publication date |
---|---|
CN102338043A (en) | 2012-02-01 |
CN202348569U (en) | 2012-07-25 |
WO2013020436A1 (en) | 2013-02-14 |
CN102338043B (en) | 2014-05-07 |
CN102400588B (en) | 2015-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102400588A (en) | Center tower post for vertical axis wind power generator and construction method thereof | |
CN102392795B (en) | Energy storing and generating system of vertical shaft wind-driven generator and method thereof | |
CN102425529B (en) | Field installation method for vertical-shaft wind-driven generator | |
EP2463513B1 (en) | Wind generating device | |
CN201781288U (en) | Solar energy/wind power plant grid generating system | |
US11225948B2 (en) | Wind energy farm with cable stayed wind turbines | |
KR20120000584U (en) | Wind power and solar hybrid generator | |
CN202348590U (en) | Center tower for vertical shaft wind generator | |
CN102889179B (en) | Vertical axis wind power generation device | |
CN201507398U (en) | Vertical natural wind generation wind tube | |
CN103452753A (en) | Trunk-free rotary table type vertical-axis wind turbine | |
CN202280576U (en) | Steel tube prefabricated vertical axis wind-driven generator tower column | |
CN201730752U (en) | Wind driven generator | |
CN202348589U (en) | Reinforced concrete prefabricated vertical axis wind driven generator tower column | |
WO2011063582A1 (en) | Grid-connected power generating system of solar energy and wind power plant | |
CN203548058U (en) | Main-rod-free rotating disc type vertical axis wind turbine | |
CN218093302U (en) | Giant array breeze field power generation tower pile | |
CN201106533Y (en) | Tower barrel structure of wind generator set installed with enclosed busbar | |
CN220849884U (en) | Electromechanical system structure with two groups of wind power generation in machine cabin | |
CN103557126B (en) | The erecting device of wind power plant and installation method | |
CN203584683U (en) | Stepless variable frequency speed regulation wind generator | |
CN202348584U (en) | Energy-storage power-generation system for vertical axis wind turbine | |
CN215408977U (en) | Wind driven generator with generator landing tower type combined with longitudinal arrangement | |
CN102606403A (en) | Wind power generator for driving multiple generators by magnetic suspension vertical wind blade rotating cage | |
CN112523967B (en) | Lattice type comprehensive shaft fan tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160712 Address after: 510800 Guangdong city of Guangzhou Province Ya Yao Zhen Ya Yuan Nan Lu, Huadu District Patentee after: GUANGZHOU YATU NEW ENERGY TECHNOLOGY CO., LTD. Address before: 510460 Guangdong city of Guangzhou Province Ya Yao Zhen Ya Yuan Nan Lu, Huadu District Patentee before: Deng Yunhe |