CN102398121B - Grouting hole plugging welding method for pressure steel pipe of hydropower station - Google Patents

Grouting hole plugging welding method for pressure steel pipe of hydropower station Download PDF

Info

Publication number
CN102398121B
CN102398121B CN 201110210297 CN201110210297A CN102398121B CN 102398121 B CN102398121 B CN 102398121B CN 201110210297 CN201110210297 CN 201110210297 CN 201110210297 A CN201110210297 A CN 201110210297A CN 102398121 B CN102398121 B CN 102398121B
Authority
CN
China
Prior art keywords
welding
packer
weldering
steel pipe
grout hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110210297
Other languages
Chinese (zh)
Other versions
CN102398121A (en
Inventor
杜天棕
敖然
潘立刚
温占营
郭华
马秀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIAONING PUSHIHE WATER-STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
LIAONING PUSHIHE WATER-STORAGE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING PUSHIHE WATER-STORAGE Co Ltd filed Critical LIAONING PUSHIHE WATER-STORAGE Co Ltd
Priority to CN 201110210297 priority Critical patent/CN102398121B/en
Publication of CN102398121A publication Critical patent/CN102398121A/en
Application granted granted Critical
Publication of CN102398121B publication Critical patent/CN102398121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses a grouting hole plugging welding method for a pressure steel pipe of a hydropower station. Welding work is completed by performing accumulated water clearing operation, preheating, positioned welding, plugging welding and an emergency after heating heat-preserving process. The method has the advantages of simple and practical process, reliable quality, readily-available welding materials, saving in work hour and cost, good plugging welding quality, and the like, and is particularly suitable for occasions with rich underground water.

Description

Grouting hole plugging welding method for pressure steel pipe of hydropower station
Technical field
What the present invention relates to isWelding technique is used in particular for the plugging welding method of pressure steel pipe of hydropower station grout hole.
The prior art situation
pressure steel pipe of hydropower station is the large-scale pipeline of transporting power station water, the employing plurality of sections of steel pipes is welded, be embedded in subterranean tunnel, must be between its outer wall and hole wall after penstock installation fill concrete, for eliminating concrete and steel pipe, gap between the wall of hole, offer some grout holes on the penstock wall, grout hole is by the perforate on steel pipe walls, to the stiffener that should the hole welds on outer wall of steel pipe, offering screw and plug screw on stiffener consists of, after grouting is completed, plug screw is arranged on grout hole, grout hole is welded shutoff, being about to plug screw and steel pipe shutoff welds together.But in the situation that the phenomenon that seeps water often appears in rich groundwater before grouting hole plugging welds, the very difficult quality that guarantees the complete shutoff of water and guarantee to weld of common welding method.So have, shutoff welding was divided into for two steps, completes grout hole plug screw shutoff postwelding, then add the weldering accessory plate and carry out soldering and sealing, construction is bothered.
Summary of the invention
The objective of the invention is the deficiency for above-mentioned pressure steel pipe of hydropower station grouting hole plugging welding unfavorable factor and existing shutoff solder technology, provide a kind of welding quality good grouting hole plugging welding method for pressure steel pipe of hydropower station.
Figure 872082DEST_PATH_IMAGE001
The penstock material is that Q345D, thickness are 34 ㎜, 44 ㎜ and 54 ㎜; The packer material is Q345D.
The stifled weldering of top seal new technology is as follows:
Welding material: with TS202, φ 3.2 ㎜ waterproof welding rod backing weldings, water shutoff.Remainder layer adopts J507RH, φ 2.5 or φ 3.2 ㎜ ㎜ welding rods.
(1) welding is prepared
After requiring routinely to assemble packer, if grout hole is positioned at bottom steel pipe, removes the ponding operation and carry throughout, to reduce the cooling effect of water.
(2) preheating
Packer and the scope in grout hole edge 50-70mm are carried out the preheating insulation heating, the preheating insulation temperature is 60 ℃ ~ 80 ℃, get temperature upper limit when the steel pipe thickness of slab is thicker, with the frequently mobile heating of fuel gas welding torch flame, make every effort to homogeneous heating, the preheating insulation heating keeps in full welding process, detects with some temperature meter;
(3) tack welding
Position weldering with the TS202 welding rod at packer with apart from little position, grout hole gap, to prevent welding deformation;
(4) shutoff welding
First use TS202, φ 3.2 ㎜ waterproof welding rods, adopt the pull-alongs arc manipulation, connect arc-welding, draw circle and receive arc, bevel for welding between packer and grout hole is carried out backing welding, and layer thickness is 2.5 ㎜ ~ 3 ㎜, thickness 2.5 ㎜ ~ 3 ㎜ can be best reach drawing effect to sublevel, can farthest drive hydrogen and improve tissue, if layer cross thin be unable to undergo shrinkage stress and when the weldering sublevel easily by burn-through;
After the scarfing cinder of backing welding layer, with J507RH, φ 2.5 ㎜ or φ 3.2 ㎜ welding rods, weld 2 ~ 3 layers, each layer thickness 2.5 ~ 3 ㎜. layer thickness 2.5 ~ 3 ㎜. be the optimum value of driving hydrogen and improving tissue, also avoided simultaneously producing the disadvantage of penetrability shortcoming, for make the fusion of weld seam both sides good, avoid undercut and reduce cross-direction shrinkage stress, the capping layer divides the twice weldering;
Not segmentation weldering is adopted in backing welding and second layer weldering, the segmentation weldering is adopted in all the other upper strata welderings, first weld 2/3 of circumferential length, weld again remaining 1/3, prevent prime coat because of the cooling contraction that causes that is subjected to water, avoided, received the shortcoming that arc causes, the prime coat that plasticity is poor is torn to prevent shrinkage stress, and all play, receive the arc place all needs polishing;
(5) urgent after heat insulation
More than with gas flame, packer and the scope in the grout hole edge 50-70mm being carried out Heat preservation 3min immediately after welding finishes.
(6) reconditioning:
Rotation installing handle on packer is cut off, carry out reconditioning together with weld seam, the stifled weldering of top seal finishes.
The present inventionThe advantages such as pressure steel pipe of hydropower station grout hole top seal blocking welding method has that simple for process, reliable in quality, wlding are easy to get, the saving working hour, reduces expenses, and the shutoff welding quality is good, the occasion that is particularly suitable for rich groundwater is used.
Description of drawings
Accompanying drawing 1 is pressure steel pipe of hydropower station grouting hole structure shape schematic diagram of the present invention.1-webmaster wherein, 2-stiffener, 3-packer, 4-screwed hole, 5-grouting hole plugging weld bond.
The specific embodiment
(1) welding is prepared
After requiring routinely to assemble packer, if grout hole is positioned at bottom steel pipe, removes the ponding operation and carry throughout;
(2) preheating
Packer and the scope in grout hole edge 50-70mm are carried out the preheating insulation heating, the preheating insulation temperature is 60 ℃ ~ 80 ℃, (gas welding torch flame leaves the numerical value after 20 seconds) when the steel pipe thickness of slab is thicker the preheating insulation heating-up temperature get higher ceiling temperature value, with the frequently mobile heating of combustion gas (oxy-acetylene) welding gun flame, make every effort to homogeneous heating, the preheating insulation heating keeps in full welding process, detects with some temperature meter;
(3) tack welding
Position weldering with the TS202 welding rod at packer with apart from little position, grout hole gap, to prevent welding deformation;
(4) shutoff welding
With TS202, φ 3.2 ㎜ waterproof welding rods, adopt the pull-alongs arc manipulation, connect arc-welding, draw circle and receive arc, the bevel for welding between packer and grout hole is carried out backing welding, layer thickness is 2.5 ㎜ ~ 3 ㎜;
After the scarfing cinder of backing welding layer, with J507RH, φ 2.5 ㎜ or φ 3.2 ㎜ welding rods, weld 2 ~ 3 layers, each layer thickness 2.5 ~ 3 ㎜, capping layer divide the twice weldering;
Not segmentation weldering is adopted in the weldering of backing welding and the second layer, and segmentations weldering is adopted in all the other upper stratas welderings, first welds 2/3 of circumferential length, then weld remaining 1/3, all play, receive the arc place all needs polishing;
(5) urgent after heat insulation
More than with gas flame, packer and the scope in the grout hole edge 50-70mm being carried out Heat preservation 3min immediately after welding finishes;
(6) reconditioning:
Rotation installing handle on packer is cut off, carry out reconditioning together with weld seam, the stifled weldering of top seal finishes.
For estimating shutoff Welding effect, to work out the soldering test program and simulate top water soldering test, result of the test shows, satisfies DL/T 5017-2007 code requirement fully.Test report is as follows:
The check result summary sheet
Figure 726905DEST_PATH_IMAGE003
Test plate (panel) assembling and joint visual examination record sheet
Figure 444326DEST_PATH_IMAGE005
The welding condition record sheet
Figure 794796DEST_PATH_IMAGE007

Claims (1)

1. grouting hole plugging welding method for pressure steel pipe of hydropower station is characterized in that:
(1) welding is prepared:
After requiring routinely to assemble packer, if grout hole is positioned at bottom steel pipe, removes the ponding operation and carry throughout;
(2) preheating:
Packer and the scope in grout hole edge 50-70mm are carried out the preheating insulation heating, the preheating insulation temperature is 60 ℃ ~ 80 ℃, when the steel pipe thickness of slab is thicker, the preheating insulation heating-up temperature is got higher ceiling temperature value, with the frequently mobile heating of fuel gas welding torch flame, make every effort to homogeneous heating, the preheating insulation heating keeps in full welding process, and Wen Jiyi detects with point;
(3) tack welding:
Position weldering with the TS202 welding rod at packer with apart from little position, grout hole gap, to prevent welding deformation;
(4) shutoff welding:
With TS202, φ 3.2 ㎜ waterproof welding rods, adopt the pull-alongs arc manipulation, connect arc-welding, draw circle and receive arc, the bevel for welding between packer and grout hole is carried out backing welding, layer thickness is 2.5 ㎜ ~ 3 ㎜;
After the scarfing cinder of backing welding layer, with J507RH, φ 2.5 ㎜ or φ 3.2 ㎜ welding rods, weld 2 ~ 3 layers, each layer thickness 2.5 ~ 3 ㎜, capping layer divide the twice weldering;
Not segmentation weldering is adopted in the weldering of backing welding and the second layer, and segmentations weldering is adopted in all the other upper stratas welderings, first welds 2/3 of circumferential length, then weld remaining 1/3, all play, receive the arc place all needs polishing;
(5) urgent after heat insulation:
More than with gas flame, packer and the scope in the grout hole edge 50-70mm being carried out Heat preservation 3min immediately after welding finishes;
(6) reconditioning:
Rotation installing handle on packer is cut off, carry out reconditioning together with weld seam, the stifled weldering of top seal finishes.
CN 201110210297 2011-07-26 2011-07-26 Grouting hole plugging welding method for pressure steel pipe of hydropower station Active CN102398121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110210297 CN102398121B (en) 2011-07-26 2011-07-26 Grouting hole plugging welding method for pressure steel pipe of hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110210297 CN102398121B (en) 2011-07-26 2011-07-26 Grouting hole plugging welding method for pressure steel pipe of hydropower station

Publications (2)

Publication Number Publication Date
CN102398121A CN102398121A (en) 2012-04-04
CN102398121B true CN102398121B (en) 2013-05-08

Family

ID=45880993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110210297 Active CN102398121B (en) 2011-07-26 2011-07-26 Grouting hole plugging welding method for pressure steel pipe of hydropower station

Country Status (1)

Country Link
CN (1) CN102398121B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372775A (en) * 2014-12-05 2015-02-25 国家电网公司 Pumped storage power station pressure steel tube slurry injection hole seal welding method and seal welding structure

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101862883A (en) * 2010-02-04 2010-10-20 哈尔滨工业大学 Fuel gas pipeline leakage pressurized blocking welding method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58192691A (en) * 1982-05-07 1983-11-10 Hitachi Ltd Welding method of piping
JPS59225899A (en) * 1983-06-07 1984-12-18 Nippon Steel Corp Welding method of tab plate in production of uo steel pipe

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101862883A (en) * 2010-02-04 2010-10-20 哈尔滨工业大学 Fuel gas pipeline leakage pressurized blocking welding method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
丁易等.小浪底水电站压力钢管灌浆孔封堵方法研究.《人民黄河》.1998,第20卷(第10期),
天生桥一级水电站压力钢管的制造、运输与安装;徐绍波;《四川水力发电》;20020330;第21卷(第01期);第27-32页 *
小浪底水电站压力钢管灌浆孔封堵方法研究;丁易等;《人民黄河》;19981020;第20卷(第10期);第34-35页 *
徐绍波.天生桥一级水电站压力钢管的制造、运输与安装.《四川水力发电》.2002,第21卷(第01期),

Also Published As

Publication number Publication date
CN102398121A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN108825269B (en) Mechanical method connecting channel T-shaped junction self-adaptive waterproof structure
CN102837107B (en) Welding technology for pipe head of 300MW and above high-voltage heater
CN104405975A (en) Steel pipe with bell and spigot joints
CN111411971A (en) Settlement control construction method for water-rich silt stratum shield underpass building group
CN102561405A (en) Opening treatment method for pipe-roofing continuous perforation
CN103624376A (en) Method for butt welding end parts of two double-metal composite pipes respectively with adapter ring on the end part
CN103521899A (en) Welding method for manufacturing composite pipe through composite plate
CN102398121B (en) Grouting hole plugging welding method for pressure steel pipe of hydropower station
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN102513712A (en) Manufacturing method for tantalum composite board equipment
CN104088500A (en) Method for laying anti-corrosion titanium lining on steel chimney of power plant
CN204312088U (en) A kind of pin-connected panel push pipe tunnel segment structure
CN107891644A (en) Terrace waterproof construction
CN202927358U (en) A steel liner repair structure of a large-diameter concrete non-bearing pipeline fissure
CN202756797U (en) Field connecting structure for titanium/steel compound pipeline
CN204729776U (en) A kind of floor waterproof construction
CN104372775A (en) Pumped storage power station pressure steel tube slurry injection hole seal welding method and seal welding structure
CN209162799U (en) Underground continuous wall connector leakage-resistant device
CN207598253U (en) A kind of prefabrication and assembly construction push pipe waterproof system
CN203948826U (en) A kind of prefabricated direct-buried thermal insulation pipe being connected by connection pipe fitting
CN109577565A (en) Using the pitched roof construction method of the high wave pressure shape steel plate of large span hyperbola
CN105040730A (en) Connection processing method for enclosure bored concrete pile and cellar structure floor slab in reversed foundation pit
CN103628899A (en) CRD middle partition wall reserving and water sealing flange welding construction technology
CN2887513Y (en) Mechanical composite pipeline welding chamfer
CN210860190U (en) Special-shaped internal thread copper-plated steel pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: LIAONING PUSHIHE WATER-STORAGE CO., LTD.

Effective date: 20131211

Owner name: STATE GRID XINYUAN CO., LTD. LIAONING PUSHIHE WATE

Effective date: 20131211

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 118216 DANDONG, LIAONING PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131211

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: State Grid Xinyuan Co., Ltd.

Patentee after: Liaoning Pushihe Water-Storage Co., Ltd.

Address before: 118216 Liaoning province Dandong City Zhen'an District Taiping Bay, Liaoning Pushihe Pumped Storage Power Co. Ltd.

Patentee before: Liaoning Pushihe Water-Storage Co., Ltd.