CN102397893A - 一种轧后冷却系统的供水装置 - Google Patents

一种轧后冷却系统的供水装置 Download PDF

Info

Publication number
CN102397893A
CN102397893A CN2011103883794A CN201110388379A CN102397893A CN 102397893 A CN102397893 A CN 102397893A CN 2011103883794 A CN2011103883794 A CN 2011103883794A CN 201110388379 A CN201110388379 A CN 201110388379A CN 102397893 A CN102397893 A CN 102397893A
Authority
CN
China
Prior art keywords
water
pump
tower
cooling system
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103883794A
Other languages
English (en)
Inventor
田勇
董占斌
王丙兴
王昭东
袁国
田鹏
汤恒
王国栋
韩毅
陈小林
苑达
王进
王隆江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Shougang Corp
Qinhuangdao Shouqin Metal Materials Co Ltd
Original Assignee
Northeastern University China
Shougang Corp
Qinhuangdao Shouqin Metal Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China, Shougang Corp, Qinhuangdao Shouqin Metal Materials Co Ltd filed Critical Northeastern University China
Priority to CN2011103883794A priority Critical patent/CN102397893A/zh
Publication of CN102397893A publication Critical patent/CN102397893A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种轧后冷却系统的供水装置,其包括水泵,其特征在于,所述水泵的出水口一路通过管路与冷却系统连接,另一路通过管路与高位水塔连接,所述高位水塔上设有溢流口。所述水泵的出水口与冷却系统连接的管路上,以及与高位水塔连接的管路上均设有阀门。正常工作时,管路中阀门(7)和阀门(8)均开启,当供水泵的流量大于超快冷的实际用水量时,多余的水流经阀门(7)回流向高位水塔,从高位水塔的溢流口溢出;当供水泵的流量小于超快冷的实际用水量时,高位水塔的水位随之下降以保证供水泵的供水能力大于超快冷的最大用水量,即可使整个供水系统压力始终保持恒定。

Description

一种轧后冷却系统的供水装置
技术领域
本发明属于轧制自动控制技术领域,尤其涉及中厚板轧制冷却系统的供水装置。
背景技术
水压调节是中厚板超快速冷却系统中的一个重要问题。水压调节过程中压力波动与压力调整时间缓慢的问题直接制约了中厚板超快速冷却系统的生产效率与效果。在实际生产中,往往由于水压调整没有达到要求而造成待冷钢板在冷却区前摆动,造成开冷温度下降,这就使得冷却后的钢板性能与板型得不到保证,而且长时间的摆动也大大降低了生产效率,加大了钢铁企业的生产成本。
目前国内超快速冷却控制系统普遍采用水泵供水,大体可分为:工频泵,变频泵,工频变频混合等三种控制方法。①工频泵:此种控制方法调节水压主要是通过冷却设备终端的调压阀,缺点是能耗高,且对终端设备的震动较大。②变频泵:此种方法是通过调节泵电机的频率调压,由于多泵参与闭环控制,调节较困难。③工变频混合:此种控制方式因调节区间小,也需调压阀辅助,故也存在设备震动的问题。
发明内容
本发明的目的就是针对现有技术存在的问题,提供一种轧后冷却系统的供水装置,其能够保持供水过程的水压稳定。
上述目的是通过下述方案实现的:
一种扎后冷却系统的供水装置,其包括水泵,其特征在于,所述水泵的出水口一路通过管路与冷却系统连接,另一路通过管路与高位水塔连接,所述高位水塔上设有溢流口。
    根据上述供水装置,其特征在于,所述水泵的出水口与冷却系统连接的管路上,以及与高位水塔连接的管路上均设有阀门。
根据上述供水装置,其特征在于,所述水塔为球型高位水塔。
本发明的有益效果:本发明利用高位水塔进行蓄能,从而可使整个供水系统压力始终保持恒定。
附图说明
图1是本发明的供水装置的结构示意图。
具体实施方式
参见图1,本发明的供水装置水泵1、供水管路和高位水塔2,水泵可以使用多个,高位水塔2可以使用球形水塔。供水管路包括水泵1的出口与高位水塔2连接的管路3,以及水泵的出水口与冷却系统连接的管路4。在管路3上安装有阀门7,在管路4上安装有阀门8。
正常工作时,管路中阀门7和阀门8均开启,当供水泵的流量大于超快冷的实际用水量时,多余的水流经阀门7回流向高位水塔,从高位水塔的溢流口溢出;当供水泵的流量小于超快冷的实际用水量时,高位水塔的水位随之下降以保证供水泵的供水能力大于超快冷的最大用水量,即可使整个供水系统压力始终保持恒定,压力最大波动约为0.02MPa。
在使用超快冷设备对钢板进行冷却时,首先根据需要启动水泵1,由于阀门7直接与高位水塔相连接且处于开启状态,因此可直接启动水泵,此时冷却水从高位水塔流入。接着开启阀门8,此时高位水塔、供水系统以及超快冷分流集水管共同组成了将球形高位水塔2做蓄能器的轧后冷却系统供水方式。此时,当球形水塔2迅速注入管路补充压力,以平衡整个水系统的水压降,反之,当超快冷分流集水管关闭时,三通管路的水回流,球形高位水塔2通过溢流释放掉多余的水压,实现了设备的水压稳定。

Claims (3)

1.一种扎后冷却系统的供水装置,其包括水泵,其特征在于,所述水泵的出水口一路通过管路与冷却系统连接,另一路通过管路与高位水塔连接,所述高位水塔上设有溢流口。
2.根据权利要求1所述的供水装置,其特征在于,所述水泵的出水口与冷却系统连接的管路上,以及与高位水塔连接的管路上均设有阀门。
3.根据权利要求1所述的供水装置,其特征在于,所述水塔为球型高位水塔。
CN2011103883794A 2011-11-30 2011-11-30 一种轧后冷却系统的供水装置 Pending CN102397893A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103883794A CN102397893A (zh) 2011-11-30 2011-11-30 一种轧后冷却系统的供水装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103883794A CN102397893A (zh) 2011-11-30 2011-11-30 一种轧后冷却系统的供水装置

Publications (1)

Publication Number Publication Date
CN102397893A true CN102397893A (zh) 2012-04-04

Family

ID=45880773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103883794A Pending CN102397893A (zh) 2011-11-30 2011-11-30 一种轧后冷却系统的供水装置

Country Status (1)

Country Link
CN (1) CN102397893A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805260A (zh) * 2015-04-10 2015-07-29 北京首钢股份有限公司 冷却供水系统及其缓冲供水方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56136918A (en) * 1980-03-28 1981-10-26 Ishikawajima Harima Heavy Ind Co Ltd Cooling device for high-temperature steel material
JPS61490A (ja) * 1984-06-12 1986-01-06 Kawasaki Steel Corp コ−ルドストリツプ用冷却水系の水処理方法
JPH02207911A (ja) * 1989-02-08 1990-08-17 Nippon Steel Corp 熱延鋼板冷却装置
CN2520956Y (zh) * 2001-12-20 2002-11-20 邱志红 连铸坯轧制冷却水缓冲供给装置
CN2797458Y (zh) * 2005-04-18 2006-07-19 崔家兴 环保节能供水装置
CN201676903U (zh) * 2009-12-21 2010-12-22 中冶南方工程技术有限公司 中厚板轧后冷却系统的供水装置
CN102009147A (zh) * 2009-09-09 2011-04-13 张建秋 一种连铸连轧装置的冷却供水系统
CN201852482U (zh) * 2010-08-25 2011-06-01 河北文丰钢铁有限公司 一种循环水冷却系统
CN202030792U (zh) * 2011-03-17 2011-11-09 南京钢铁股份有限公司 中厚板淬火线水处理装置
CN202411122U (zh) * 2011-11-30 2012-09-05 东北大学 一种轧后冷却系统的供水装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56136918A (en) * 1980-03-28 1981-10-26 Ishikawajima Harima Heavy Ind Co Ltd Cooling device for high-temperature steel material
JPS61490A (ja) * 1984-06-12 1986-01-06 Kawasaki Steel Corp コ−ルドストリツプ用冷却水系の水処理方法
JPH02207911A (ja) * 1989-02-08 1990-08-17 Nippon Steel Corp 熱延鋼板冷却装置
CN2520956Y (zh) * 2001-12-20 2002-11-20 邱志红 连铸坯轧制冷却水缓冲供给装置
CN2797458Y (zh) * 2005-04-18 2006-07-19 崔家兴 环保节能供水装置
CN102009147A (zh) * 2009-09-09 2011-04-13 张建秋 一种连铸连轧装置的冷却供水系统
CN201676903U (zh) * 2009-12-21 2010-12-22 中冶南方工程技术有限公司 中厚板轧后冷却系统的供水装置
CN201852482U (zh) * 2010-08-25 2011-06-01 河北文丰钢铁有限公司 一种循环水冷却系统
CN202030792U (zh) * 2011-03-17 2011-11-09 南京钢铁股份有限公司 中厚板淬火线水处理装置
CN202411122U (zh) * 2011-11-30 2012-09-05 东北大学 一种轧后冷却系统的供水装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805260A (zh) * 2015-04-10 2015-07-29 北京首钢股份有限公司 冷却供水系统及其缓冲供水方法
CN104805260B (zh) * 2015-04-10 2017-01-18 北京首钢股份有限公司 冷却供水系统及其缓冲供水方法

Similar Documents

Publication Publication Date Title
CN102102962B (zh) 一种工业冷却水上塔泵的节能调控方法和装置
CN204513882U (zh) 一种工艺冷却水恒温恒压控制装置
CN102619549B (zh) 可调压力的矿用高低压水能交换系统
CN109654887B (zh) 一种循环水冷却系统及其自动控制方法
CN216924023U (zh) 一种原油缓冲罐控制系统
CN203197017U (zh) 棒材穿水冷却装置的供水及回水系统
CN202411122U (zh) 一种轧后冷却系统的供水装置
CN104405731B (zh) 液压油液加热系统
CN102397893A (zh) 一种轧后冷却系统的供水装置
CN109119726A (zh) 电池包的温度控制装置和方法
CN104806881A (zh) 一种气冷罗茨液环闭式真空系统及其控制方法
CN202885387U (zh) 一种循环冷却装置
CN202531209U (zh) 可调压力的矿用高低压水能交换系统
CN203792693U (zh) 用于xlpe电缆料生产的往复机传动箱润滑冷却系统
CN205260458U (zh) 卸船机液压控制系统
CN201650893U (zh) 快速液压系统
CN204145267U (zh) 一种大功率变频器用液冷散热器
CN210399582U (zh) 一种可控喷油温度的冷却装置
CN203239688U (zh) 一种泵站自动冷却装置
CN103042053A (zh) 一种用于超快冷和层流冷却双系统并行的供水系统
CN106196226A (zh) 高层建筑直连供暖节能系统
CN203108949U (zh) 一种用于超快冷和层流冷却双系统并行的供水系统
CN206942979U (zh) 精确控制炼钢中压泵组水压流量的装置
CN203534244U (zh) 基于自流引水技术的电站循环水系统
CN203488983U (zh) 内压缩流程制氧机管网送出系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120404