CN102394484A - Method for replacing isolating switch with 10kV load - Google Patents

Method for replacing isolating switch with 10kV load Download PDF

Info

Publication number
CN102394484A
CN102394484A CN2011104104010A CN201110410401A CN102394484A CN 102394484 A CN102394484 A CN 102394484A CN 2011104104010 A CN2011104104010 A CN 2011104104010A CN 201110410401 A CN201110410401 A CN 201110410401A CN 102394484 A CN102394484 A CN 102394484A
Authority
CN
China
Prior art keywords
isolating switch
insulation
switch
bucket
arm vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104104010A
Other languages
Chinese (zh)
Inventor
侯克文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd filed Critical Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
Priority to CN2011104104010A priority Critical patent/CN102394484A/en
Publication of CN102394484A publication Critical patent/CN102394484A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种10kV带负荷更换隔离开关的操作方法,其步骤包括:对在绝缘斗升降中可能触及的低压带电部件、对离身体最近的边相导线、隔离开关及工作范围内所有可能碰触的带电部件、接地部件进行绝缘遮蔽;取绝缘引流线,在绝缘引流线上连接消弧开关;将绝缘引流线连接在隔离开关两侧;闭合消弧开关,拆开隔离开关的两端引线;在无电状态下更换隔离开关;将隔离开关的两端引线安装到新隔离开关上;拆除所有绝缘遮蔽用具。优点是:更换隔离开关时不断电、处理时间短、工作效率高供电可靠性高,电量损失少。

Figure 201110410401

An operating method for replacing a 10kV isolating switch with load, the steps of which include: the low-voltage live parts that may be touched during the lifting of the insulating bucket, the side-phase wires closest to the body, the isolating switch, and all live parts that may be touched within the working range. Parts and grounding parts are insulated and shielded; take the insulated drain wire and connect the arc suppression switch to the insulated drain wire; connect the insulated drain wire to both sides of the isolating switch; Replace the isolating switch in the power state; install the leads at both ends of the isolating switch to the new isolating switch; remove all insulation and shielding appliances. The advantages are: uninterrupted power supply when the isolating switch is replaced, short processing time, high work efficiency, high power supply reliability, and less power loss.

Figure 201110410401

Description

The 10kV on-load is changed the isolator operation method
Technical field
The present invention relates to a kind of method of operation of live line working, relate in particular to a kind of 10kV on-load and change the isolator operation method.
Background technology
Isolating switch is in outdoor and load carrying for a long time as a kind of important current-carrying equipment in the 10kV distribution line, and failure rate is high.The requirement isolating switch can not be charged when changing isolating switch, and the method for existing replacing isolating switch is: the mode of 1, taking line outage---and the whole piece transmission line at isolating switch place is had a power failure, change isolating switch; 2, take not on-load live line working method---the circuit between isolating switch and the load is broken off, change isolating switch.The problem that said method exists has: 1, power failure scope is wide, and electric quantity loss is serious, and economic loss is big; 2, a large number of users outage in the power supply area, power supply reliability is poor; 3, request power failure permission formality is loaded down with trivial details, and the processing time is long, causes inefficiency.
Summary of the invention
The technical problem that the present invention will solve provide a kind ofly do not cut off the power supply when changing isolating switch, the processing time is short, the 10kV on-load of high efficiency is changed the isolator operation method, to guarantee power supply reliability, reduces electric quantity loss.
The present invention is achieved in that
A kind of 10kV on-load is changed the isolator operation method, and its special character is that concrete steps are following:
According to the position of isolating switch and near environment bucket arm vehicle is parked near the isolating switch so that electrician's operation, selected up-down direction and path are decontroled the bucket arm vehicle supporting leg bucket arm vehicle car body are adjusted to level, beat ground stud, even good bucket arm vehicle earth connection;
2. go up safety barrier and working signal all around at bucket arm vehicle and instrument putting position, inspection, the various insulating protection apparatus of test are also guaranteed that it is qualified, can normally be used;
3. the operation bucket arm vehicle is convenient to operating position near rising to the depression belt electric lead, the low pressure live part that in bucket arm vehicle insulation bucket goes up and down, possibly touch is insulated cover;
4. operation bucket arm vehicle, raise the insulation bucket also adjustment insulation bucket to being fit to job position; To in health nearest limit phase conductor, isolating switch and working range live part, the grounded parts that might touch insulate and cover;
5. get the insulation drainage thread, on the insulation drainage thread, connect crowbar switch;
6. the insulation drainage thread that will connect crowbar switch is connected the position of being convenient to connect in the isolating switch both sides and forms by-pass line, and this moment, crowbar switch was in off-state, rapidly insulation is recovered in the contact both sides after connection is accomplished and covers;
7. closed crowbar switch, the conducting by-pass line, whether through-flow normal, as undesired, pull down by-pass line and repeated for the 5th, 6,7 steps if detecting the by-pass line electric current with galvanometer, show normal up to galvanometer;
8. take the two ends lead-in wire of isolating switch apart, the two ends lead-in wire can be guaranteed that with covering to be fixed on after apparatus covers distance to the ground is convenient to the position that connects again;
9. under electroless state, change isolating switch;
10. change finish after, the isolating switch after changing is carried out insulation covers, the two ends lead-in wire of opening isolating switch covers apparatus, the two ends lead-in wire of isolating switch is installed on the new isolating switch, and recovers insulation and cover;
11. whether the isolating switch after the electrician detect to change with galvanometer is through-flow normal, after galvanometer shows that index is normal, removes insulation drainage thread and crowbar switch, and recovers insulation and cover;
12. after all replacing finishes, remove all insulation and cover apparatus;
Struggle against near the depression belt electric lead 13. move insulation, remove the mask on the low pressure live part;
14. behind the masking device complete removal, the insulation bucket returns ground, site clearing and instrument, and the inspection process of work confirms that errorless recession is from on-the-spot.
Above-mentioned 10kV on-load is changed the isolator operation method, the electrician to when the nearest limit phase conductor of health is installed the lead mask, the opening directed towards ground of the mask that is inserted in, and move edge near isolating switch, with the insulating blanked clamper clamping with slip-off preventing.
The invention has the beneficial effects as follows:
1, owing to be provided with by-pass line, avoided the power failure that causes because of maintenance, electric quantity loss is little, has reduced economic loss; Improved power supply reliability, little to the influence of resident living; The request that need not has a power failure and permits, has shortened the operating time, has improved efficient.
2, owing to adopted disconnection, the conducting control device of crowbar switch as by-pass line, more convenient to operate, step is simpler, the functional promotion of the elimination electric arc of itself coefficient of safety of operation.
3, because the length of insulation drainage thread is significantly shorter than the length of cable, replace cable, dwindled electrician's job area, improved operating efficiency with the insulation drainage thread; Insulation drainage thread two ends have connector, and connection procedure is simple, has reduced operation easier, has promoted the fail safe of operation; Simultaneously, insulation drainage thread cost is low, be convenient to transportation, reduced maintenance cost.
4, cover comprehensively, fail safe is good.
Description of drawings
Fig. 1 is an initial condition sketch map of the present invention;
Fig. 2 is that by-pass line of the present invention connects sketch map;
Fig. 3 is an inspecting state sketch map of the present invention.
Among the figure: 1-isolating switch, 2-bucket arm vehicle, 3-crowbar switch, the 4-drainage thread that insulate, 5-limit phase conductor, 6-depression belt electric lead.
Embodiment
It is following that this 10kV on-load is changed isolator operation method concrete steps:
According to the position of isolating switch 1 and near environment bucket arm vehicle 2 is parked near the isolating switch 1; So that electrician's operation, selected up-down direction and path are decontroled bucket arm vehicle 2 supporting legs bucket arm vehicle 2 car bodies are adjusted to level; Beat ground stud, connect good bucket arm vehicle earth connection.
2. go up safety barrier and working signal all around at bucket arm vehicle 2 and instrument putting position, inspection, the various insulating protection apparatus of test also guarantee that it is qualified, handy.
3. operation bucket arm vehicle 2 is convenient to operating position near rising to depression belt electric lead 6, the low pressure live part that in the insulation bucket goes up and down, possibly touch is insulated cover.
4. operate bucket arm vehicle 2, the insulation bucket that raises is also adjusted the bucket that insulate to being fit to job position; By far away from closely extremely, from big to small, from low to high; The principle of grounded parts behind elder generation's live part; To in the nearest limit phase conductor 5 of health, isolating switch 1 and working range live part, the grounded parts that might touch insulate and cover, wherein, the opening of the mask that when the nearest limit phase conductor 5 of health is installed the lead masks, is inserted in is wanted directed towards ground the electrician; And move edge near isolating switch 1, clamp with slip-off preventing with insulating blanked clamper.
5. get insulation drainage thread 4, on insulation drainage thread 4, connect crowbar switch 3.
6. the insulation drainage thread 4 that will connect crowbar switch 3 is connected the position of being convenient to connect in isolating switch 1 both sides and forms by-pass line, and this moment, crowbar switch 3 was in off-state, rapidly insulation is recovered in the contact both sides after connection is accomplished and covers.
7. closed crowbar switch 3, the conducting by-pass line, whether through-flow normal, pull down by-pass line and repeated for the 5th, 6,7 steps up to the galvanometer demonstration normally as undesired with galvanometer if detecting the by-pass line electric current.
8. take the two ends lead-in wire of isolating switch 1 apart, the two ends lead-in wire can be guaranteed that with covering to be fixed on after apparatus covers distance to the ground is convenient to the position that connects again.
9. under electroless state, change isolating switch 1.
10. change finish after, the isolating switch 1 after changing is carried out insulation covers, the two ends lead-in wire of opening isolating switch 1 covers apparatus, the two ends lead-in wire of isolating switch 1 is installed on the new isolating switch 1, and recovers insulation and cover.
11. whether the electrician is through-flow normal with the isolating switch 1 that galvanometer detects after changing, and after galvanometer demonstration index is normal, remove insulation drainage thread 4 and crowbar switch 3, and the recovery insulation covered.
12. after all replacing finishes, remove all insulation and cover apparatus.
13. mobile insulation struggles against near be convenient to electrician's operation the depression belt electric lead 6 position, by far away from closely extremely, from big to small, from low to high, the principle of grounded parts behind the first live part is removed the mask on the low pressure live part.
14. behind the masking device complete removal, the insulation bucket returns ground, site clearing and instrument, and the inspection process of work confirms that errorless recession is from on-the-spot.

Claims (2)

1. a 10kV on-load is changed the method for operation of isolating switch, it is characterized in that concrete steps are following:
1.1 according to the position of isolating switch and near environment bucket arm vehicle is parked near the isolating switch so that electrician's operation, selected up-down direction and path are decontroled the bucket arm vehicle supporting leg bucket arm vehicle car body are adjusted to level, beat ground stud, even good bucket arm vehicle earth connection;
1.2 go up safety barrier and working signal all around at bucket arm vehicle and instrument putting position, inspection, the various insulating protection apparatus of test are also guaranteed that it is qualified, can normally be used;
1.3 the operation bucket arm vehicle rises near the depression belt electric lead, the low pressure live part that in the insulation bucket goes up and down, possibly touch is insulated cover;
1.4 the operation bucket arm vehicle, raise insulation bucket and adjustment insulation bucket are to being fit to job position; Bucket in health nearest limit phase conductor, isolating switch and working range live part, the grounded parts that might touch insulate and cover;
1.5 get the insulation drainage thread, on the insulation drainage thread, connect crowbar switch;
Be connected the position formation by-pass line of being convenient to connect in the isolating switch both sides 1.6 will connect the insulation drainage thread of crowbar switch, this moment, crowbar switch was in off-state, was rapidly recovered to insulate in the contact both sides after connection is accomplished and covered;
1.7 closed crowbar switch, the conducting by-pass line, whether through-flow normal, as undesired, pull down by-pass line and repeated for the 5th, 6,7 steps if detecting the by-pass line electric current with galvanometer, show normal up to galvanometer;
1.8 take the two ends lead-in wire of isolating switch apart, the two ends lead-in wire can be guaranteed that with covering to be fixed on after apparatus covers distance to the ground is convenient to the position that connects again;
1.9 under electroless state, change isolating switch;
1.10 change finish after, the isolating switch after changing is carried out insulation covers, the two ends lead-in wire of opening isolating switch covers apparatus, the two ends lead-in wire of isolating switch is installed on the new isolating switch, and recovers insulation and cover;
1.11 whether the isolating switch after the electrician detect to change with galvanometer is through-flow normal, after galvanometer shows that index is normal, removes insulation drainage thread and crowbar switch, and recovers insulation and cover;
1.12 after all replacing finishes, remove all insulation and cover apparatus;
Struggle against near the depression belt electric lead 1.13 move insulation, remove the mask on the low pressure live part;
1.14 behind the masking device complete removal, the insulation bucket returns ground, site clearing and instrument, and the inspection process of work confirms that errorless recession is from on-the-spot.
2. 10kV on-load as claimed in claim 1 is changed the isolator operation method; It is characterized in that: the electrician to when the nearest limit phase conductor of health is installed the lead mask; The opening directed towards ground of the mask that is inserted in, and move edge near isolating switch, clamp with insulating blanked clamper.
CN2011104104010A 2011-12-12 2011-12-12 Method for replacing isolating switch with 10kV load Pending CN102394484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104104010A CN102394484A (en) 2011-12-12 2011-12-12 Method for replacing isolating switch with 10kV load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104104010A CN102394484A (en) 2011-12-12 2011-12-12 Method for replacing isolating switch with 10kV load

Publications (1)

Publication Number Publication Date
CN102394484A true CN102394484A (en) 2012-03-28

Family

ID=45861695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104104010A Pending CN102394484A (en) 2011-12-12 2011-12-12 Method for replacing isolating switch with 10kV load

Country Status (1)

Country Link
CN (1) CN102394484A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931609A (en) * 2012-09-03 2013-02-13 辽宁省电力有限公司鞍山供电公司 Operation method for replacing 10kV drop-out fuse in on-load manner
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN103326264A (en) * 2013-06-06 2013-09-25 国家电网公司 Single-pole perpendicularly-telescopic outdoor high-voltage alternating-current disconnector replacing method
CN103354325A (en) * 2013-07-03 2013-10-16 国家电网公司 Method for changing load switch in on-load manner
CN107946997A (en) * 2017-12-21 2018-04-20 国网山东省电力公司烟台供电公司 A kind of insulating bar method on-load isolates the operational method of switch in replacing
CN109346979A (en) * 2018-10-23 2019-02-15 国网四川省电力公司南充供电公司 A method for replacing insulation piercing wire clips with special-shaped wire hooking clips under load
CN114725827A (en) * 2022-02-28 2022-07-08 云南电网有限责任公司红河供电局 10kV line live-line breaker live-line voltage transformer disconnection and connection operation method
CN115085080A (en) * 2022-04-22 2022-09-20 广东德睿电气科技发展有限公司 Operation method for replacing 10kv disconnecting switch under load
CN115173304A (en) * 2022-07-13 2022-10-11 西安江夏电力设备制造有限公司 Automatic hot-line work operating platform and method for replacing high-voltage equipment in bypass hot-line mode

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201639190U (en) * 2009-12-30 2010-11-17 北京市电力公司 A charged arc suppression and drainage operation device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201639190U (en) * 2009-12-30 2010-11-17 北京市电力公司 A charged arc suppression and drainage operation device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张海胜: "带负荷10kv配电线路更换隔离开关作用的探讨与实施", 《天津大学硕士学位论文》, 25 March 2011 (2011-03-25), pages 27 - 39 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931609A (en) * 2012-09-03 2013-02-13 辽宁省电力有限公司鞍山供电公司 Operation method for replacing 10kV drop-out fuse in on-load manner
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN103326264A (en) * 2013-06-06 2013-09-25 国家电网公司 Single-pole perpendicularly-telescopic outdoor high-voltage alternating-current disconnector replacing method
CN103326264B (en) * 2013-06-06 2016-06-29 国家电网公司 Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options
CN103354325A (en) * 2013-07-03 2013-10-16 国家电网公司 Method for changing load switch in on-load manner
CN107946997A (en) * 2017-12-21 2018-04-20 国网山东省电力公司烟台供电公司 A kind of insulating bar method on-load isolates the operational method of switch in replacing
CN107946997B (en) * 2017-12-21 2019-07-19 国网山东省电力公司烟台供电公司 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method
CN109346979A (en) * 2018-10-23 2019-02-15 国网四川省电力公司南充供电公司 A method for replacing insulation piercing wire clips with special-shaped wire hooking clips under load
CN114725827A (en) * 2022-02-28 2022-07-08 云南电网有限责任公司红河供电局 10kV line live-line breaker live-line voltage transformer disconnection and connection operation method
CN115085080A (en) * 2022-04-22 2022-09-20 广东德睿电气科技发展有限公司 Operation method for replacing 10kv disconnecting switch under load
CN115173304A (en) * 2022-07-13 2022-10-11 西安江夏电力设备制造有限公司 Automatic hot-line work operating platform and method for replacing high-voltage equipment in bypass hot-line mode
CN115173304B (en) * 2022-07-13 2024-02-09 西安江夏电力设备制造有限公司 Automatic live working operation platform and bypass live replacement method for high-voltage equipment

Similar Documents

Publication Publication Date Title
CN102394484A (en) Method for replacing isolating switch with 10kV load
CN104062526A (en) Oil-oil bushing cable outlet transformer test method without head removing
CN103837798B (en) The quick diagnosis device of one-phase earthing failure in electric distribution network character
CN104914391A (en) Distribution network single-phase grounding fault simulation and positioning performance test platform and method
CN102931609B (en) On-load changes the operational method of 10kV fuse switch
CN104122484A (en) Distribution network fault line selection method based on correlation analysis of zero modal current wavelet coefficients
CN103441483A (en) Lightning arrester device
CN204391681U (en) Earth leakage protective device
CN105048132B (en) A kind of high-voltage earthing line apparatus
CN202886560U (en) Field detecting system for gas insulated switch mechanical faults
CN203396835U (en) Monitoring and alarming system for grounding current of single-core cable
CN204103196U (en) For the insulation shielding ground short circuit line of switch cubicle flash test
CN105954608B (en) A kind of direct-current arc detection method based on electromagnetic radiation characteristic
CN103354325A (en) Method for changing load switch in on-load manner
CN204694804U (en) Bottom shielding of bushing ejector
CN103208775A (en) Protection switch device for detecting fault current and control method
KR101520254B1 (en) Design Method for Reduction of 1-ph Fault Current Satisfying Effective Grounding Criterion Without Neutral Impedance Device in Transformer Substation
CN201600999U (en) Grounding transformer capable of detecting zero sequence transformer
CN201956609U (en) Improved built-in cabinet reformed aiming at harmonic elimination of power grid
CN106405391A (en) Detection and protection device for residual-current circuit breaker
CN110703133A (en) Outdoor signal source device
CN204927073U (en) A contact device and a circuit breaker using the contact device
CN104393426A (en) Method and apparatus for reducing potential difference between grounding conductors
CN203607681U (en) Electrical equipment cabinet with insulated protection cover added around bus
CN205003255U (en) Detection protection device of electric leakage circuit breaker

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20120928

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20120928

Address after: 121000 Guta District, Liaoning, Jiefang Road No. three, No. 9, No.

Applicant after: Jinzhou Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 121000 Guta District, Liaoning, Jiefang Road No. three, No. 9, No.

Applicant before: Jinzhou Power Supply Company of Liaoning Electric Power Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120328