Summary of the invention
The technical problem that the present invention will solve provide a kind ofly do not cut off the power supply when changing isolating switch, the processing time is short, the 10kV on-load of high efficiency is changed the isolator operation method, to guarantee power supply reliability, reduces electric quantity loss.
The present invention is achieved in that
A kind of 10kV on-load is changed the isolator operation method, and its special character is that concrete steps are following:
According to the position of isolating switch and near environment bucket arm vehicle is parked near the isolating switch so that electrician's operation, selected up-down direction and path are decontroled the bucket arm vehicle supporting leg bucket arm vehicle car body are adjusted to level, beat ground stud, even good bucket arm vehicle earth connection;
2. go up safety barrier and working signal all around at bucket arm vehicle and instrument putting position, inspection, the various insulating protection apparatus of test are also guaranteed that it is qualified, can normally be used;
3. the operation bucket arm vehicle is convenient to operating position near rising to the depression belt electric lead, the low pressure live part that in bucket arm vehicle insulation bucket goes up and down, possibly touch is insulated cover;
4. operation bucket arm vehicle, raise the insulation bucket also adjustment insulation bucket to being fit to job position; To in health nearest limit phase conductor, isolating switch and working range live part, the grounded parts that might touch insulate and cover;
5. get the insulation drainage thread, on the insulation drainage thread, connect crowbar switch;
6. the insulation drainage thread that will connect crowbar switch is connected the position of being convenient to connect in the isolating switch both sides and forms by-pass line, and this moment, crowbar switch was in off-state, rapidly insulation is recovered in the contact both sides after connection is accomplished and covers;
7. closed crowbar switch, the conducting by-pass line, whether through-flow normal, as undesired, pull down by-pass line and repeated for the 5th, 6,7 steps if detecting the by-pass line electric current with galvanometer, show normal up to galvanometer;
8. take the two ends lead-in wire of isolating switch apart, the two ends lead-in wire can be guaranteed that with covering to be fixed on after apparatus covers distance to the ground is convenient to the position that connects again;
9. under electroless state, change isolating switch;
10. change finish after, the isolating switch after changing is carried out insulation covers, the two ends lead-in wire of opening isolating switch covers apparatus, the two ends lead-in wire of isolating switch is installed on the new isolating switch, and recovers insulation and cover;
11. whether the isolating switch after the electrician detect to change with galvanometer is through-flow normal, after galvanometer shows that index is normal, removes insulation drainage thread and crowbar switch, and recovers insulation and cover;
12. after all replacing finishes, remove all insulation and cover apparatus;
Struggle against near the depression belt electric lead 13. move insulation, remove the mask on the low pressure live part;
14. behind the masking device complete removal, the insulation bucket returns ground, site clearing and instrument, and the inspection process of work confirms that errorless recession is from on-the-spot.
Above-mentioned 10kV on-load is changed the isolator operation method, the electrician to when the nearest limit phase conductor of health is installed the lead mask, the opening directed towards ground of the mask that is inserted in, and move edge near isolating switch, with the insulating blanked clamper clamping with slip-off preventing.
The invention has the beneficial effects as follows:
1, owing to be provided with by-pass line, avoided the power failure that causes because of maintenance, electric quantity loss is little, has reduced economic loss; Improved power supply reliability, little to the influence of resident living; The request that need not has a power failure and permits, has shortened the operating time, has improved efficient.
2, owing to adopted disconnection, the conducting control device of crowbar switch as by-pass line, more convenient to operate, step is simpler, the functional promotion of the elimination electric arc of itself coefficient of safety of operation.
3, because the length of insulation drainage thread is significantly shorter than the length of cable, replace cable, dwindled electrician's job area, improved operating efficiency with the insulation drainage thread; Insulation drainage thread two ends have connector, and connection procedure is simple, has reduced operation easier, has promoted the fail safe of operation; Simultaneously, insulation drainage thread cost is low, be convenient to transportation, reduced maintenance cost.
4, cover comprehensively, fail safe is good.
Embodiment
It is following that this 10kV on-load is changed isolator operation method concrete steps:
According to the position of isolating switch 1 and near environment bucket arm vehicle 2 is parked near the isolating switch 1; So that electrician's operation, selected up-down direction and path are decontroled bucket arm vehicle 2 supporting legs bucket arm vehicle 2 car bodies are adjusted to level; Beat ground stud, connect good bucket arm vehicle earth connection.
2. go up safety barrier and working signal all around at bucket arm vehicle 2 and instrument putting position, inspection, the various insulating protection apparatus of test also guarantee that it is qualified, handy.
3. operation bucket arm vehicle 2 is convenient to operating position near rising to depression belt electric lead 6, the low pressure live part that in the insulation bucket goes up and down, possibly touch is insulated cover.
4. operate bucket arm vehicle 2, the insulation bucket that raises is also adjusted the bucket that insulate to being fit to job position; By far away from closely extremely, from big to small, from low to high; The principle of grounded parts behind elder generation's live part; To in the nearest limit phase conductor 5 of health, isolating switch 1 and working range live part, the grounded parts that might touch insulate and cover, wherein, the opening of the mask that when the nearest limit phase conductor 5 of health is installed the lead masks, is inserted in is wanted directed towards ground the electrician; And move edge near isolating switch 1, clamp with slip-off preventing with insulating blanked clamper.
5. get insulation drainage thread 4, on insulation drainage thread 4, connect crowbar switch 3.
6. the insulation drainage thread 4 that will connect crowbar switch 3 is connected the position of being convenient to connect in isolating switch 1 both sides and forms by-pass line, and this moment, crowbar switch 3 was in off-state, rapidly insulation is recovered in the contact both sides after connection is accomplished and covers.
7. closed crowbar switch 3, the conducting by-pass line, whether through-flow normal, pull down by-pass line and repeated for the 5th, 6,7 steps up to the galvanometer demonstration normally as undesired with galvanometer if detecting the by-pass line electric current.
8. take the two ends lead-in wire of isolating switch 1 apart, the two ends lead-in wire can be guaranteed that with covering to be fixed on after apparatus covers distance to the ground is convenient to the position that connects again.
9. under electroless state, change isolating switch 1.
10. change finish after, the isolating switch 1 after changing is carried out insulation covers, the two ends lead-in wire of opening isolating switch 1 covers apparatus, the two ends lead-in wire of isolating switch 1 is installed on the new isolating switch 1, and recovers insulation and cover.
11. whether the electrician is through-flow normal with the isolating switch 1 that galvanometer detects after changing, and after galvanometer demonstration index is normal, remove insulation drainage thread 4 and crowbar switch 3, and the recovery insulation covered.
12. after all replacing finishes, remove all insulation and cover apparatus.
13. mobile insulation struggles against near be convenient to electrician's operation the depression belt electric lead 6 position, by far away from closely extremely, from big to small, from low to high, the principle of grounded parts behind the first live part is removed the mask on the low pressure live part.
14. behind the masking device complete removal, the insulation bucket returns ground, site clearing and instrument, and the inspection process of work confirms that errorless recession is from on-the-spot.