CN103308799B - The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured - Google Patents
The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured Download PDFInfo
- Publication number
- CN103308799B CN103308799B CN201310211200.7A CN201310211200A CN103308799B CN 103308799 B CN103308799 B CN 103308799B CN 201310211200 A CN201310211200 A CN 201310211200A CN 103308799 B CN103308799 B CN 103308799B
- Authority
- CN
- China
- Prior art keywords
- line
- cable
- gis
- fastening bolt
- grounding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 9
- 238000005259 measurement Methods 0.000 claims abstract description 30
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims abstract description 17
- 229910052802 copper Inorganic materials 0.000 claims abstract description 17
- 239000010949 copper Substances 0.000 claims abstract description 17
- 238000012360 testing method Methods 0.000 claims abstract description 13
- 238000011112 process operation Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Landscapes
- Gas-Insulated Switchgears (AREA)
- Electric Cable Installation (AREA)
Abstract
The present invention relates to the equipment that a kind of cable-line parameter be connected with GIS is measured, comprise GIS, in this GIS, be provided with bus, line side disconnector, line-to-ground switch, cable line, insulating part, grounding switch guide rod and fastening bolt.In the present invention, utilize the existing circuit of GIS, first grounding copper bar is pulled down, then by fastening bolt, three-phase measurement circuit is installed, close line-to-ground switch, testing apparatus and cable line is made to form path, starting outfit carries out the measurement of cable-line parameter, after measurement completes, pull down three measurement circuits, reinstall grounding copper bar, solve the cable line connected with GIS cannot contact current-carrying part problem from outside, whole process operation is easy, safe and reliable, is applicable to use in site test.
Description
Technical field
The invention belongs to the cable-line parameter field of measuring technique that GIS connects, the Apparatus and method for that especially a kind of cable-line parameter be connected with GIS is measured.
Background technology
GIS is the abbreviation of GasInsulatedmetal-enclosedSwitchgear; be meant to gas-insulated metal enclosed switchgear; it is various control and protection electrical equipment; as isolating switch, disconnector, grounding switch, mutual inductor, lightning arrester and connection bus etc. are all encapsulated in the metal shell of ground connection; in housing, the gas of filling certain pressure is as insulation alternate and over the ground, and it has, and floor area is little, security performance is high, little, the multinomial feature such as installation and maintenance are convenient affected by environment.
The GIS of said structure is widely used in ultra-high-tension power transmission line; before these ultra-high-tension power transmission lines put into operation; various power frequency parameter value should be tested; as positive order parameter, Zero sequence parameter etc.; the result measured is as computing system short-circuit current, relay protection setting, the distribution of reckoning trend and the important evidence selecting the work such as the reasonable method of operation; the form of cable terminal is all adopted when this GIS is connected with cable line; connect safety and firmness; but cannot, at the current-carrying part of GIS external contact cable line, be that parameter measurement test cannot normally be carried out.
Summary of the invention
The equipment that the cable-line parameter the object of the invention is to overcome the deficiencies in the prior art, provide easy and simple to handle, utilizing a kind of of equipment wiring to be connected with GIS is measured.
The technical scheme that the present invention takes is:
The equipment that a kind of cable-line parameter be connected with GIS is measured, it is characterized in that: comprise GIS, bus is provided with in this GIS, line side disconnector, line-to-ground switch, cable line, insulating part, grounding switch guide rod and fastening bolt, line side disconnector is arranged on the branch road that bus is connected with cable line, one end of line-to-ground switch is connected in parallel between line side disconnector and cable line, grounding switch guide rod in line-to-ground switch to connect on GIS housing fill the fastening bolt installed in insulating part, this fastening bolt is by three-phase measurement circuit connecting test equipment.
Another object of the present invention is to provide a kind of method that cable-line parameter be connected with GIS is measured, comprise GIS, bus is provided with in this GIS, line side disconnector, line-to-ground switch, cable line, insulating part, grounding switch guide rod and fastening bolt, line side disconnector is arranged on the branch road that bus is connected with cable line, one end of line-to-ground switch is connected in parallel between line side disconnector and cable line, grounding switch guide rod in line-to-ground switch to connect on GIS housing fill the fastening bolt installed in insulating part, the outer rim that this fastening bolt is positioned at GIS outside is set with grounding copper bar, it is characterized in that: comprise the following steps:
(1) break line trackside disconnector, makes cable line and bus isolate;
(2) open-circuit line grounding switch, when preventing next step from removing grounding copper bar, line influence voltage jeopardizes personal safety;
(3) back out fastening bolt, grounding copper bar is pulled down, reconnect fastening bolt, three-phase measurement circuit is connected respectively on corresponding fastening bolt;
(4) close line-to-ground switch, and three-phase measurement circuit is communicated with cable line, starts the measurement that testing apparatus carries out cable-line parameter;
(5), after (4) step completes, open-circuit line grounding switch, pulls down three-phase measurement circuit;
(6) back out fastening bolt, grounding copper bar is put well, again tighten the measurement that namely fastening bolt completes cable-line parameter.
Advantage of the present invention and good effect are:
In the present invention, utilize the existing circuit of GIS, first grounding copper bar is pulled down, then by fastening bolt, three-phase measurement circuit is installed, close line-to-ground switch, testing apparatus and cable line is made to form path, starting outfit carries out the measurement of cable-line parameter, after measurement completes, pull down three measurement circuits, reinstall grounding copper bar, solve the cable line connected with GIS cannot contact current-carrying part problem from outside, whole process operation is easy, safe and reliable, is applicable to use in site test.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of GIS grounded part in prior art.
Embodiment
Below in conjunction with embodiment, the present invention is further described, and following embodiment is illustrative, is not determinate, can not limit protection scope of the present invention with following embodiment.
A kind of method that cable-line parameter be connected with GIS is measured, as Fig. 1, shown in 2, comprise GIS, bus 1 is provided with in this GIS, line side disconnector 6, line-to-ground switch 7, cable line 10, insulating part 9, grounding switch guide rod 8 and fastening bolt 11, bus bar side disconnector 2 connecting breaker 4 and line side disconnector 6 successively in parallel on bus, this line side disconnector connects cable line to be tested, isolating switch bus side joint ground switch 3 ground connection in parallel between bus bar side disconnector and isolating switch, isolating switch line side grounding switch 5 ground connection in parallel between isolating switch and line side disconnector, the line-to-ground switch ground connection of the parallel connection between line side disconnector and cable line, grounding switch guide rod in this line-to-ground switch to connect on GIS housing 12 fill the fastening bolt installed in insulating part, the outer rim that this fastening bolt is positioned at GIS outside is set with grounding copper bar 15, innovation of the present invention is: comprise the following steps:
(1) break line trackside disconnector, makes cable line and bus isolate;
(2) open-circuit line grounding switch, when preventing next step from removing grounding copper bar, line influence voltage jeopardizes personal safety;
(3) back out fastening bolt, grounding copper bar is pulled down, reconnect fastening bolt, three-phase measurement circuit 13 is connected respectively on corresponding fastening bolt;
(4) close line-to-ground switch, testing apparatus is communicated with cable line by three-phase measurement circuit, starts the measurement that testing apparatus 14 carries out cable-line parameter;
(5), after (4) step completes, open-circuit line grounding switch, pulls down three-phase measurement circuit;
(6) back out fastening bolt, grounding copper bar is put well, again tighten the measurement that namely fastening bolt completes cable-line parameter.
In the present invention, utilize the existing circuit of GIS, first grounding copper bar is pulled down, then by fastening bolt, three-phase measurement circuit is installed, close line-to-ground switch, testing apparatus and cable line is made to form path, starting outfit carries out the measurement of cable-line parameter, after measurement completes, pull down three measurement circuits, reinstall grounding copper bar, solve the cable line connected with GIS cannot contact current-carrying part problem from outside, whole process operation is easy, safe and reliable, is applicable to use in site test.
Claims (1)
1. the method measured of the cable-line parameter be connected with GIS, it is characterized in that: comprise GIS, bus is provided with in this GIS, line side disconnector, line-to-ground switch, cable line, insulating part, grounding switch guide rod and fastening bolt, line side disconnector is arranged on the branch road that bus is connected with cable line, one end of line-to-ground switch is connected in parallel between line side disconnector and cable line, grounding switch guide rod in line-to-ground switch to connect on GIS housing fill the fastening bolt installed in insulating part, this fastening bolt is by three-phase measurement circuit connecting test equipment,
The method comprises the following steps:
(1) break line trackside disconnector, makes cable line and bus isolate;
(2) open-circuit line grounding switch, when preventing next step from removing grounding copper bar, line influence voltage jeopardizes personal safety;
(3) back out fastening bolt, grounding copper bar is pulled down, reconnect fastening bolt, three-phase measurement circuit is connected respectively on corresponding fastening bolt;
(4) close line-to-ground switch, and three-phase measurement circuit is communicated with cable line, starts the measurement that testing apparatus carries out cable-line parameter;
(5), after (4) step completes, open-circuit line grounding switch, pulls down three-phase measurement circuit;
(6) back out fastening bolt, grounding copper bar is put well, again tighten the measurement that namely fastening bolt completes cable-line parameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310211200.7A CN103308799B (en) | 2013-05-31 | 2013-05-31 | The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310211200.7A CN103308799B (en) | 2013-05-31 | 2013-05-31 | The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103308799A CN103308799A (en) | 2013-09-18 |
CN103308799B true CN103308799B (en) | 2015-12-23 |
Family
ID=49134231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310211200.7A Active CN103308799B (en) | 2013-05-31 | 2013-05-31 | The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103308799B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102017215135A1 (en) | 2017-08-30 | 2019-02-28 | Siemens Mobility GmbH | Method and device for checking a contacting of a pantograph |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368995A (en) * | 2008-08-29 | 2009-02-18 | 齐齐哈尔电业局 | Non-head dismantling test method for GIS combined electrical apparatus and plug-pull type transformer |
CN201886101U (en) * | 2010-12-22 | 2011-06-29 | 江苏省电力公司无锡供电公司 | Tester for cable geographic information system (GIS) terminal |
CN102445643A (en) * | 2011-09-30 | 2012-05-09 | 云南电力试验研究院(集团)有限公司 | GIS (Gas Insulated Switchgear) test platform capable of adjusting electrode structure |
CN102879708A (en) * | 2012-09-21 | 2013-01-16 | 西安供电局 | Quick polarity testing method of 110kV gas insulated switchgear (GIS) of transformer substation |
-
2013
- 2013-05-31 CN CN201310211200.7A patent/CN103308799B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101368995A (en) * | 2008-08-29 | 2009-02-18 | 齐齐哈尔电业局 | Non-head dismantling test method for GIS combined electrical apparatus and plug-pull type transformer |
CN201886101U (en) * | 2010-12-22 | 2011-06-29 | 江苏省电力公司无锡供电公司 | Tester for cable geographic information system (GIS) terminal |
CN102445643A (en) * | 2011-09-30 | 2012-05-09 | 云南电力试验研究院(集团)有限公司 | GIS (Gas Insulated Switchgear) test platform capable of adjusting electrode structure |
CN102879708A (en) * | 2012-09-21 | 2013-01-16 | 西安供电局 | Quick polarity testing method of 110kV gas insulated switchgear (GIS) of transformer substation |
Non-Patent Citations (1)
Title |
---|
GIS出线套管下部连接螺栓发热分析与处理;骆桂英 等;《浙江电力》;20081231(第6期);第71-72、76页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103308799A (en) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103323751B (en) | A kind of high pressure stub cable insulation terminal local discharge test device and using method | |
CN103308832B (en) | A kind of high-voltage cable insulating transition joint local discharge test device and using method | |
CN104062526A (en) | Oil-oil bushing cable outlet transformer test method without head removing | |
CN103558527A (en) | Voltage withstand test analogue simulation method for ultra-high-voltage GIS standard lightning impulse voltage | |
CN104698311A (en) | System and method for electrically detecting DC arrester of DC circuit | |
WO2021052036A1 (en) | Gis partial discharge detecting device and method based on flange bolts | |
KR20130010619A (en) | Gas insulated switch-gear | |
CN102305903B (en) | Partial discharge detection method for pulse current of electrified operation single phase integrated gas insulated switchgear (GIS) | |
CN101907675B (en) | Method for finding out fault of distribution network circuit | |
CN104113002B (en) | A kind of high tension cable cross connection grounding system switching device | |
CN103308799B (en) | The Apparatus and method for that a kind of cable-line parameter be connected with GIS is measured | |
CN202330518U (en) | Anti-induction electric operation cabinet for parameter test of overhead power transmission lines | |
CN103743978A (en) | Multifunction testing device for gas-filled switch cabinet | |
CN103559358B (en) | Super-pressure GIS oscillation mode lightning impulse voltage pressure test simulation methods | |
CN203191414U (en) | Connection mode converter for transmission line parameter test | |
CN211651819U (en) | GIS generating line vibration condition monitoring devices | |
CN103944094A (en) | 10-kV handcart switch cabinet bus fixed contact ground method and special grounding device thereof | |
CN103812086A (en) | High voltage electromotor protection system | |
CN210514508U (en) | GIS cable equipment | |
CN204179559U (en) | A kind of GIS Direct Action Type manual operation isolation fracture | |
CN104426088A (en) | Voltage transformer handcart | |
CN105552770A (en) | Connection body between high-voltage sleeve pipe of transformer and gas insulated switchgear (GIS) device | |
JP2013029479A (en) | Insulation resistance measurement device and insulation resistance measurement system | |
CN202749310U (en) | Replaceable built-in voltage transformer high voltage alternating current dividing circuit breaker | |
CN106019022B (en) | Cover plate test device for connecting gas chamber between oil-gas type transformer and GIS and operation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |