CN107946997A - A kind of insulating bar method on-load isolates the operational method of switch in replacing - Google Patents

A kind of insulating bar method on-load isolates the operational method of switch in replacing Download PDF

Info

Publication number
CN107946997A
CN107946997A CN201711392786.6A CN201711392786A CN107946997A CN 107946997 A CN107946997 A CN 107946997A CN 201711392786 A CN201711392786 A CN 201711392786A CN 107946997 A CN107946997 A CN 107946997A
Authority
CN
China
Prior art keywords
switch
insulation
insulating bar
insulating
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711392786.6A
Other languages
Chinese (zh)
Other versions
CN107946997B (en
Inventor
闫同
李启江
许崇新
韩培庆
朱宏光
李红新
林令臣
郝京卫
于春来
周明亮
康宝华
李相辉
刁义鹏
刘波磊
赵阅群
张洪奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711392786.6A priority Critical patent/CN107946997B/en
Publication of CN107946997A publication Critical patent/CN107946997A/en
Application granted granted Critical
Publication of CN107946997B publication Critical patent/CN107946997B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Insulating Bodies (AREA)

Abstract

本发明涉及一种绝缘杆法带负荷更换隔离开关的作业方法,广泛应用于架空配电线路地电位法更换隔离开关的工作中,属于配电线路带电检修现场技术领域。包括以下步骤:使用绝缘操作杆将引线遮蔽挂板挂在边相导线及绝缘子球头上,完成对边相引线的绝缘遮蔽,使用绝缘操作杆挂设一体化遮蔽罩,完成对边相耐张绝缘子、线夹以及部分导线的绝缘遮蔽;断开中相隔离开关两侧引线,此时中相隔离开关便处于无电状态,作业人员更换新的隔离开关;使用绝缘操作杆将隔离开关两侧引线接入主导线。该方法在操作中无需停电,配合成套绝缘遮蔽防护用具,对带电体、接地体进行绝缘遮蔽与隔离,保障作业人员与带电设备保持足够的安全距离,安全系数高。

The invention relates to an operating method for on-load replacement of an isolating switch by an insulating rod method, which is widely used in the work of replacing an isolating switch by the ground potential method of an overhead power distribution line, and belongs to the technical field of on-site maintenance of power distribution lines. It includes the following steps: use the insulation operating rod to hang the lead wire shielding hanging plate on the side phase wire and the ball head of the insulator to complete the insulation shielding of the opposite side phase lead wire, use the insulation operating rod to hang the integrated shielding cover, and complete the opposite side phase tension Insulation and shielding of insulators, wire clips and some wires; disconnect the leads on both sides of the middle-phase isolating switch, and the middle-phase isolating switch is in a no-power state at this time, and the operator replaces a new isolating switch; The leads are connected to the main leads. This method does not require a power outage during operation, and it cooperates with a complete set of insulation shielding and protective equipment to insulate, shield and isolate the charged body and the grounded body, ensuring that the operator maintains a sufficient safe distance from the live equipment, and has a high safety factor.

Description

一种绝缘杆法带负荷更换中相隔离开关的作业方法An operating method for replacing a medium-phase isolating switch with load by the insulating rod method

技术领域technical field

本发明涉及一种绝缘杆法带负荷更换隔离开关的作业方法,广泛应用于架空配电线路地电位法更换隔离开关的工作中,属于配电线路带电检修现场技术领域。The invention relates to an operating method for on-load replacement of an isolating switch by an insulating rod method, which is widely used in the work of replacing an isolating switch by the ground potential method of an overhead power distribution line, and belongs to the technical field of on-site maintenance of power distribution lines.

背景技术Background technique

高压隔离开关广泛应用于10KV配电线路中,主要用于“隔离电源、倒闸操作、用以连通和切断小电路电流”,无灭弧功能。只有在没有负荷电流的情况下分、合电路,只能用其他设备将电路断开后再操作。因为应用广泛,隔离开关运行中的常见故障有:1、负荷过重,接触电阻增大造成接触部分过热;2、长期运行瓷质绝缘损坏和闪络放电;3、拒绝拉合闸;4、错误拉合闸。High-voltage isolating switch is widely used in 10KV power distribution lines, mainly used for "isolation of power supply, switching operation, connection and cut-off of small circuit current", without arc extinguishing function. Only when there is no load current, the circuit can be opened and closed, and the circuit can only be operated after disconnecting it with other equipment. Because of the wide range of applications, the common faults in the operation of the disconnector are: 1. The load is too heavy, and the contact resistance increases, causing the contact part to overheat; 2. Long-term operation of the porcelain insulation damage and flashover discharge; 3. Refusal to pull and close; 4. Wrong switch on.

停电更换隔离开关必然会中断某一区域的电力供应,影响大量用户的正常生产和生活,降低供电可靠性,对于提高优质服务和用户满意度极为不利。A power outage to replace an isolating switch will inevitably interrupt the power supply in a certain area, affect the normal production and life of a large number of users, and reduce the reliability of power supply, which is extremely detrimental to improving quality service and user satisfaction.

目前带负荷更换隔离开关工作主要通过中间电位作业法进行,即作业人员戴绝缘安全帽,穿全套绝缘服,操作绝缘斗臂车绝缘斗接近作业位置进行检修作业。中间电位作业法更换隔离开关存在如下不足:1、依赖地形条件,地形崎岖,场地狭窄无法满足车辆停靠需求;2、成本高,绝缘斗臂车出车费用和人员支出高于登杆作业;3、相较于中间电位作业,地电位作业主要通过操作杆完成,保证了人员与带电体的距离,安全系数高。At present, the work of replacing the isolating switch with load is mainly carried out through the intermediate potential operation method, that is, the operator wears an insulating helmet and a full set of insulating clothing, and operates the insulating bucket of the insulating bucket truck close to the working position for maintenance work. The replacement of the isolating switch by the intermediate potential operation method has the following disadvantages: 1. It depends on the terrain conditions, the terrain is rough, and the site is narrow and cannot meet the parking requirements of the vehicles; 2. The cost is high, and the cost of the insulated arm truck and the personnel expenditure are higher than that of the climbing pole operation; 3. 、Compared with the intermediate potential operation, the ground potential operation is mainly completed through the operating lever, which ensures the distance between the personnel and the electrified body, and has a high safety factor.

目前,亟待出现一种能解决上述技术问题的绝缘杆法带负荷更换中相隔离开关的作业方法。At present, there is an urgent need for an operating method for replacing the intermediate-phase isolating switch by the insulating rod method with load that can solve the above-mentioned technical problems.

发明内容Contents of the invention

本发明的目的旨在提供一种可以地电位进行的带负荷更换隔离开关作业方法,该方法在操作中无需停电,配合成套绝缘遮蔽防护用具,对带电体、接地体进行绝缘遮蔽与隔离,保障作业人员与带电设备保持足够的安全距离,操作简便,安全系数高。The purpose of the present invention is to provide a working method for replacing the isolating switch with load that can be carried out at the ground potential. This method does not need to be powered off during operation, and it cooperates with a complete set of insulation and shielding protective equipment to insulate and isolate the charged body and the grounded body to ensure The operator keeps a sufficient safe distance from the live equipment, the operation is simple and the safety factor is high.

一种绝缘杆法带负荷更换中相隔离开关的作业方法,其特殊之处在于包括以下步骤:An operating method for replacing a neutral-phase isolating switch with load by the insulating rod method, which is special in that it includes the following steps:

1、对线路及装置进行验电,验电合格后进行下一步操作;1. Carry out an electrical test on the lines and devices, and proceed to the next step after the electrical test is qualified;

2、将地电位滑车安装到横担上;2. Install the ground potential block on the cross arm;

3、安装电杆遮蔽罩,对电杆进行绝缘遮蔽;3. Install the pole shield to insulate and shield the pole;

4、在两边相上分别安装隔离开关绝缘隔板,对两边相隔离开关进行绝缘遮蔽;4. Install isolation switch insulation partitions on the phases on both sides to insulate and shield the phase isolation switches on both sides;

5、使用绝缘操作杆将引线遮蔽挂板22挂在边相导线及绝缘子球头上,完成对边相引线的绝缘遮蔽,使用绝缘操作杆挂设一体化遮蔽罩,完成对边相耐张绝缘子、线夹以及部分导线的绝缘遮蔽(使用四套遮蔽工具完成对两边相横担两侧带电设备的有效遮蔽);5. Use the insulation operating rod to hang the lead wire shielding hanging plate 22 on the side phase wire and the ball head of the insulator to complete the insulation shielding of the opposite side phase lead wires, and use the insulation operating rod to hang the integrated shielding cover to complete the opposite side phase tension insulator , wire clips and insulation shielding of some wires (use four sets of shielding tools to complete the effective shielding of the live equipment on both sides of the cross arm on both sides);

6、在两侧中相导线线夹外侧15-20cm处剥除导线绝缘层(剥除绝缘层的长度应满足安装临时引流线和接火线夹的长度要求);6. Strip the insulation layer of the wire at 15-20cm outside the middle-phase wire clamp on both sides (the length of the stripped insulation layer should meet the length requirements of the installation of temporary drainage wire and fire wire clamp);

7、使用绝缘操作杆同步安装临时绝缘引流线,将中相隔离开关旁路;7. Use the insulated operating rod to install the temporary insulated drain wire synchronously, and bypass the neutral phase isolating switch;

8、检测中相临时绝缘引流线通流情况,确认分流良好后,拉开中相隔离开关;8. Detect the current flow of the medium-phase temporary insulation drain wire, and after confirming that the shunt is good, pull the medium-phase isolating switch;

9、断开中相隔离开关两侧引线,此时中相隔离开关便处于无电状态,作业人员更换新的隔离开关;9. Disconnect the lead wires on both sides of the middle-phase isolating switch. At this time, the middle-phase isolating switch is in a state of no power, and the operator replaces a new isolating switch;

10、待新的隔离开关安装完毕且拉、合试验合格后,使用绝缘操作杆将隔离开关两侧引线接入主导线;10. After the new isolating switch is installed and the pulling and closing tests pass, use the insulating operating rod to connect the leads on both sides of the isolating switch to the main lead;

11、合上中相隔离开关,检测中相隔离开关通流情况良好后,使用绝缘操作杆同步拆除中相临时绝缘引流线;11. Close the middle phase isolating switch, and after detecting that the flow of the middle phase isolating switch is good, use the insulating operating lever to remove the middle phase temporary insulating drain wire synchronously;

12、使用绝缘操作杆按照与安装时相反的顺序分别拆除两边相一体化遮蔽罩和引线遮蔽挂板22,并拆除隔离开关绝缘隔板、拆除电杆遮蔽罩、拆除地电位滑车,作业结束。12. Use the insulating operating rod to remove the integrated shielding cover on both sides and the lead wire shielding hanging plate 22 in the reverse order of installation, and remove the insulating partition of the isolating switch, remove the pole shielding cover, and remove the ground potential block. The operation is over.

作为本发明一种优选的技术方案,所述引线遮蔽挂板22呈凹字形,引线遮蔽挂板22的顶部两端位置处分别安装有与绝缘子碗头相挂接的钩体Ⅰ23、与导线相挂接的钩体Ⅱ24,引线遮蔽挂板22上安装有连接头26,连接头26安装于引线遮蔽挂板22靠上位置处且位于引线遮蔽挂板22长度方向中间位置处,引线遮蔽挂板22上方开设有提手槽30,提手槽30位于连接头26正上方;As a preferred technical solution of the present invention, the lead wire shielding hanging plate 22 is in a concave shape, and the two ends of the top of the lead wire shielding hanging plate 22 are respectively equipped with a hook body I23 connected to the insulator bowl head, and a hook body I23 connected to the wire. The hook body II 24 that is hooked, the lead wire shielding hanging plate 22 is equipped with a connector 26, the connecting head 26 is installed at the upper position of the lead wire shielding hanging plate 22 and is located at the middle position of the lead wire shielding hanging plate 22 in the length direction, the lead wire shielding hanging plate A handle groove 30 is provided above the connector 22, and the handle groove 30 is located directly above the connector 26;

作为本发明一种优选的技术方案,所述一体化遮蔽罩的外壁上安装有连接头Ⅰ36,一体化遮蔽罩包括罩设于绝缘子外部的绝缘子外罩31及罩设于导线外部的导线外罩32,绝缘子外罩31与导线外罩32底部开口且二者为相贯通的一体结构,绝缘子外罩31的一侧设有与绝缘子碗头相卡接的卡槽Ⅰ33,导线外罩32的一侧设有用于穿过导线且与导线相卡接的卡槽Ⅱ34,绝缘子外罩31的横剖面呈n型,导线外罩32的横剖面呈凸字型,绝缘子外罩31的高度高于导线外罩32的高度,绝缘子外罩31的宽度与导线外罩32的罩底宽度相匹配,卡槽Ⅰ33与卡槽Ⅱ34均呈垂直条状,卡槽Ⅰ33的顶部设计为弧形、底部设计为八字形,卡槽Ⅱ34的顶部设计为一字型、底部设计为八字型,导线外罩32的顶部安装有提手35;As a preferred technical solution of the present invention, a connector I36 is installed on the outer wall of the integrated shielding cover, and the integrated shielding cover includes an insulator cover 31 covering the outside of the insulator and a wire cover 32 covering the outside of the wire, The bottom of the insulator cover 31 and the wire cover 32 are open and the two are integrated structures. One side of the insulator cover 31 is provided with a slot I33 that is engaged with the insulator bowl head, and one side of the wire cover 32 is provided. Conductor and the clamping slot II 34 that is clamped with the conductor, the cross section of the insulator cover 31 is n-shaped, the cross section of the conductor cover 32 is convex, the height of the insulator cover 31 is higher than the height of the conductor cover 32, and the height of the insulator cover 31 is The width matches the width of the bottom of the wire cover 32. Both the slot I33 and the slot II34 are in the shape of vertical strips. The top of the slot I33 is designed as an arc and the bottom is designed as a figure-eight. type, the bottom is designed as a figure-eight, and the top of the wire cover 32 is equipped with a handle 35;

作为本发明一种优选的技术方案,所述连接头26、连接头Ⅰ36均呈T型,包括水平安装件27,水平安装件27上安装有与其相垂直的固定件28,固定件28的底部安装有插接头29,固定件28的直径方向上安装有穿钉25,穿钉25的两端位于固定件28的外部;As a preferred technical solution of the present invention, the connecting head 26 and the connecting head I36 are both T-shaped, including a horizontal mounting part 27, and a fixing part 28 perpendicular to it is installed on the horizontal mounting part 27, and the bottom of the fixing part 28 A plug connector 29 is installed, and a nail 25 is installed on the diameter direction of the fixing member 28, and the two ends of the nail 25 are located outside the fixing member 28;

作为本发明一种优选的技术方案,所述绝缘操作杆包括与连接头26或连接头Ⅰ36相插接的金属头4,金属头4安装于绝缘传动杆6的端部,金属头4的外部套设有用于固定住连接头26或连接头Ⅰ36的中间环3,中间环3的外部套设有可升降的锁紧环1,沿着绝缘传动杆6外部长度方向上套设有相旋接的外管Ⅰ12、外管Ⅱ13,外管Ⅱ13的末端与绝缘传动杆6的末端相固定;As a preferred technical solution of the present invention, the insulating operating rod includes a metal head 4 plugged with the connector 26 or the connector I36, the metal head 4 is installed on the end of the insulating transmission rod 6, and the outside of the metal head 4 There is an intermediate ring 3 for fixing the connector 26 or the connector I36. The outer part of the intermediate ring 3 is provided with a lock ring 1 that can be lifted and lowered. Along the outer length direction of the insulating transmission rod 6, there is a phase rotation joint. The outer tube I12, the outer tube II13, the end of the outer tube II13 is fixed to the end of the insulating transmission rod 6;

作为本发明一种优选的技术方案,所述金属头4包括与插接头29相插接的插接端4-1及安装于绝缘传动杆6上的安装端4-2,插接端4-1与安装端4-2为一体结构,插接端4-1的外径大于安装端4-2的外径从而在二者连接处形成卡台Ⅰ14;As a preferred technical solution of the present invention, the metal head 4 includes a plug-in end 4-1 that is plugged in with the plug-in connector 29 and an installation end 4-2 installed on the insulating transmission rod 6. The plug-in end 4- 1 and the installation end 4-2 are integrally structured, and the outer diameter of the insertion end 4-1 is larger than the outer diameter of the installation end 4-2 so as to form a card platform I14 at the connection between the two;

作为本发明一种优选的技术方案,所述中间环3包括套设于金属头4外部的端头15、中间套管16、固定管17,端头15、中间套管16、固定管17为首尾相接的一体结构,且三者的外径及内径均依次递减从而在端头15与中间套管16的外壁连接处形成卡台Ⅱ18、在中间套管16与固定管17的内壁连接处形成卡台Ⅲ19,卡台Ⅲ19与卡台Ⅰ14相卡接;As a preferred technical solution of the present invention, the intermediate ring 3 includes an end head 15, an intermediate sleeve 16, and a fixed pipe 17 sleeved on the outside of the metal head 4, and the end head 15, the intermediate sleeve 16, and the fixed pipe 17 are An integrated structure connected end to end, and the outer diameter and inner diameter of the three are successively reduced to form a card platform II18 at the junction of the end 15 and the outer wall of the intermediate sleeve 16, and at the junction of the inner wall of the intermediate sleeve 16 and the fixed pipe 17 Form card station Ⅲ19, and card station Ⅲ19 is connected with card station Ⅰ14;

作为本发明一种优选的技术方案,所述固定管17上开设有穿钉孔Ⅰ5,外管Ⅰ12上开设有与穿钉孔Ⅰ5配合使用的穿钉孔Ⅱ10,外管Ⅱ13的末端设有穿钉孔Ⅲ21,绝缘传动杆6的末端设有与穿钉孔Ⅲ21配合使用的穿钉孔Ⅳ8;As a preferred technical solution of the present invention, the fixed tube 17 is provided with a nail-piercing hole I5, the outer tube I12 is provided with a nail-piercing hole II10 used in conjunction with the nail-piercing hole I5, and the end of the outer tube II13 is provided with a nail-piercing hole II10. Nail hole III21, the end of the insulating transmission rod 6 is provided with a nail piercing hole IV8 used in conjunction with the nail piercing hole III21;

作为本发明一种优选的技术方案,所述端头15靠近电力工具的一端开设有两个镂空卡槽20,两个镂空卡槽20以端头15的中心轴为轴心中心对称,镂空卡槽20包括从端头15靠近电力工具的一端一直延伸至端头15中间位置处的垂直镂空槽20-1、与垂直镂空槽21相贯通的水平镂空槽20-2,水平镂空槽20-2的末端设有向上延伸的弧形镂空槽20-3;As a preferred technical solution of the present invention, the end 15 close to the power tool is provided with two hollow card slots 20, the two hollow card slots 20 are symmetrical with the central axis of the end 15 as the axis center, and the hollow card slots The slot 20 includes a vertical hollow slot 20-1 extending from the end of the head 15 close to the power tool to the middle of the end 15, a horizontal hollow slot 20-2 connected with the vertical hollow slot 21, and a horizontal hollow slot 20-2 The end is provided with an upwardly extending arc-shaped hollow groove 20-3;

作为本发明一种优选的技术方案,所述垂直镂空槽20-1与水平镂空槽20-2相交处设计为斜坡状;As a preferred technical solution of the present invention, the intersection of the vertical hollow groove 20-1 and the horizontal hollow groove 20-2 is designed as a slope;

作为本发明一种优选的技术方案,所述锁紧环1包括部分设于锁紧环1内的弹簧9及抵于弹簧9尾部的底环2,锁紧环1的内壁上设有环形卡台Ⅳ11,环形卡台Ⅳ11与卡台Ⅱ18相卡接,环形卡台Ⅳ11的内径小于卡台Ⅱ18的的外径,弹簧9的一端顶部抵于环形卡台Ⅳ11上,另一端抵于底环2上,底环2的一侧抵于外管Ⅰ12上。As a preferred technical solution of the present invention, the locking ring 1 includes a spring 9 partly arranged in the locking ring 1 and a bottom ring 2 against the tail of the spring 9, and the inner wall of the locking ring 1 is provided with a ring clip. Stage IV11, ring card stage IV11 is engaged with card stage II18, the inner diameter of ring card stage IV11 is smaller than the outer diameter of card stage II18, the top of one end of spring 9 is against the ring card stage IV11, and the other end is against the bottom ring 2 One side of the bottom ring 2 abuts against the outer tube I12.

本发明的绝缘杆法带负荷更换中相隔离开关的作业方法,较常见中间电位作业的改进之处在于作业方式的改变和硬质绝缘遮蔽工具的应用,相较于中间电位作业法,绝缘杆法相对地主绝缘由绝缘斗臂车绝缘臂变为绝缘操作杆,相间主绝缘仍为空气间隙,绝缘杆法依靠硬质绝缘遮蔽用具实现对相邻两相带电体的绝缘隔离,起到辅助绝缘的作用,绝缘杆法作业过程中,关键在于绝缘遮蔽次序以及引流线的挂接及拆除,配合专用操作杆可以方便快捷的实现对带电体及可能触及的接地体的全方位遮蔽。本发明的绝缘杆法带负荷更换中相隔离开关作业法对作业环境要求限制小,作业工具方便携带运输,相较于绝缘斗臂车中间电位作业,具有场地适用性强,投资成本低,人员便于培训,安全系数高的优点,有助于扩大带电作业范围,提高电网可靠性,保障用户正常用电有着极大的社会效益。The operating method of the insulating pole method of the present invention for replacing the middle-phase isolating switch with load, the improvement of the common intermediate potential operation lies in the change of the operating mode and the application of hard insulating shielding tools. Compared with the intermediate potential operation method, the insulating pole The main insulation of the method is changed from the insulation arm of the insulating bucket truck to the insulation operation rod, and the main insulation between the phases is still an air gap. The insulation rod method relies on the hard insulation shielding tool to realize the insulation isolation of the adjacent two-phase charged bodies, which plays a role in auxiliary insulation. In the process of insulating rod method, the key lies in the sequence of insulation shielding and the connection and removal of drain wires. With the special operation rod, it can conveniently and quickly realize the all-round shielding of the live body and the grounding body that may be touched. The insulating rod method of the present invention for replacing the middle-phase isolating switch with load has little restrictions on the working environment, and the working tools are convenient to carry and transport. The advantages of easy training and high safety factor help to expand the scope of live work, improve the reliability of the power grid, and ensure the normal use of electricity by users, which has great social benefits.

附图说明Description of drawings

图1:引线遮蔽挂板的结构示意图;Figure 1: Schematic diagram of the structure of the lead wire shielding hanging plate;

图2:绝缘操作杆的结构示意图;Figure 2: Schematic diagram of the structure of the insulating operating rod;

图3:金属头、中间环、锁紧环、弹簧、底环在绝缘传动杆上的安装顺序示意图;Figure 3: Schematic diagram of the installation sequence of the metal head, intermediate ring, locking ring, spring, and bottom ring on the insulating transmission rod;

图4:中间环的结构示意图;Figure 4: Schematic diagram of the structure of the middle ring;

图5:金属头的结构示意图;Figure 5: Schematic diagram of the structure of the metal head;

图6:图5的A向结构示意图;Figure 6: A schematic diagram of the structure in Figure 5;

图7:锁紧环的结构示意图;Figure 7: Schematic diagram of the structure of the locking ring;

图8:图7的A-A剖结构示意图;Figure 8: A schematic diagram of the cross-sectional structure of A-A in Figure 7;

图9:锁紧环、弹簧、底环相配合的结构示意图;Figure 9: Schematic diagram of the cooperation of locking ring, spring and bottom ring;

图10:引线遮蔽挂板的安装结构示意图;Figure 10: Schematic diagram of the installation structure of the lead wire shielding hanging plate;

图11:一体化遮蔽罩的结构示意图;Figure 11: Schematic diagram of the structure of the integrated shield;

图12:图11的A-A剖结构示意图;Figure 12: A schematic diagram of the cross-sectional structure of A-A in Figure 11;

图13:图11的B-B剖结构示意图;Figure 13: a schematic diagram of the B-B section structure of Figure 11;

图14:图11的左视图;Figure 14: Left view of Figure 11;

图15:图11的右视图;Figure 15: Right view of Figure 11;

图16:遮蔽罩的安装结构示意图。Figure 16: Schematic diagram of the installation structure of the shield.

图中:1、锁紧环;2、底环;3、中间环;4、金属头;5、穿钉孔Ⅰ;6、绝缘传动杆;7、绝缘连接环;8、穿钉孔Ⅳ;9、卡台Ⅲ;10、穿钉孔Ⅱ;11、卡台Ⅳ;12、外管Ⅰ;13、外管Ⅱ;14、卡台Ⅰ;15、端头;16、中间套管;17、固定管;18、卡台Ⅱ;19、卡台Ⅲ;20、镂空卡槽;20-1、垂直镂空槽;20-2、水平镂空槽;20-3、弧形镂空槽;21、穿钉孔Ⅲ;22、引线遮蔽挂板;23、钩体Ⅰ;24、钩体Ⅱ;25、穿钉;26、连接头;27、水平安装件;28、固定件;29、插接头;30、提手槽;31、绝缘子外罩;32、导线外罩;33、卡槽Ⅰ;34、卡槽Ⅱ;35、提手;36、连接头Ⅰ。In the figure: 1. Locking ring; 2. Bottom ring; 3. Middle ring; 4. Metal head; 5. Nail piercing hole I; 6. Insulated transmission rod; 9. Cartridge III; 10. Nail piercing hole II; 11. Cartridge IV; 12. Outer tube I; 13. Outer tube II; 14. Cartridge I; 15. End; 16. Intermediate casing; 17. Fixing tube; 18, card table II; 19, card table III; 20, hollow card slot; 20-1, vertical hollow slot; 20-2, horizontal hollow slot; 20-3, arc hollow slot; 21, nail penetration Hole III; 22. Lead shielding hanging plate; 23. Hook body I; 24. Hook body II; 25. Nail penetration; 26. Connector; 27. Horizontal mounting piece; Handle slot; 31. Insulator cover; 32. Wire cover; 33. Card slot I; 34. Card slot II; 35. Handle; 36. Connector I.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例1Example 1

本实施例的绝缘杆法带负荷更换中相隔离开关的作业方法,参考附图1-16,本实施例的绝缘杆法带负荷更换中相隔离开关的作业方法中使用的工具主要包括以下部件:The working method of replacing the medium-phase isolating switch with load by the insulating rod method in this embodiment, referring to accompanying drawings 1-16, the tools used in the working method of replacing the medium-phase isolating switch with the load of the insulating rod method in this embodiment mainly include the following components :

锁紧环1、底环2、中间环3、金属头4、穿钉孔Ⅰ5、绝缘传动杆6、绝缘连接环7、穿钉孔Ⅳ8、卡台Ⅲ9、穿钉孔Ⅱ10、卡台Ⅳ11、外管Ⅰ12、外管Ⅱ13、卡台Ⅰ14、端头15、中间套管16、固定管17、卡台Ⅱ18、卡台Ⅲ19、镂空卡槽20、垂直镂空槽20-1、水平镂空槽20-2、弧形镂空槽20-3、穿钉孔Ⅲ21、引线遮蔽挂板22、钩体Ⅰ23、钩体Ⅱ24、穿钉25、连接头26、水平安装件27、固定件28、插接头29、提手槽30、绝缘子外罩31、导线外罩32、卡槽Ⅰ33、卡槽Ⅱ34、提手35、连接头Ⅰ36。Locking ring 1, bottom ring 2, middle ring 3, metal head 4, nail piercing hole Ⅰ5, insulating transmission rod 6, insulating connecting ring 7, nail piercing hole Ⅳ8, card table Ⅲ9, nail hole Ⅱ10, card table Ⅳ11, Outer tube Ⅰ12, outer tube Ⅱ13, card platform Ⅰ14, end 15, intermediate sleeve 16, fixed tube 17, card platform Ⅱ18, card platform Ⅲ19, hollow card slot 20, vertical hollow slot 20-1, horizontal hollow slot 20- 2. Arc-shaped hollow groove 20-3, nail penetration hole Ⅲ21, lead wire shielding hanging plate 22, hook body Ⅰ23, hook body Ⅱ24, nail penetration 25, connector 26, horizontal mounting piece 27, fixing piece 28, plug joint 29, Handle slot 30, insulator cover 31, wire cover 32, card slot I33, card slot II34, handle 35, connector I36.

本实施例的绝缘杆法带负荷更换中相隔离开关的作业方法,包括如下步骤:The working method of replacing the medium-phase disconnector with load by the insulating rod method in this embodiment includes the following steps:

1)工作准备:现场复勘、布置工作现场、执行工作许可制度、召开现场站班会、检测绝缘工器具、耐张绝缘子以及登杆前准备;1) Work preparation: on-site re-survey, layout of the work site, implementation of the work permit system, on-site station shift meeting, testing of insulation tools, tension insulators and preparations before climbing poles;

2)杆上作业人员甲登杆至作业位置,对线路及装置进行验电,验电合格后进行下一步操作;2) Operator A on the pole climbs to the working position, conducts an electrical test on the lines and devices, and proceeds to the next step after the electrical test is passed;

3)杆上作业人员甲使用绝缘操作杆将地电位滑车安装到横担上;3) Operator A on the pole installs the ground potential block on the cross arm with an insulating operating pole;

4)杆上作业人员甲、乙安装电杆遮蔽罩,对电杆进行绝缘遮蔽;4) Operators A and B on the pole install the pole shielding cover to insulate and shield the pole;

5)杆上作业人员甲、乙配合安装两块隔离开关绝缘隔板,对两边相隔离开关进行绝缘遮蔽;5) Operators A and B on the pole cooperate to install two isolation switch insulation partitions to insulate and shield the phase isolation switches on both sides;

6)杆上作业人员使用绝缘操作杆将引线遮蔽挂板挂在边相导线及绝缘子球头上,完成对边相引线的绝缘遮蔽;使用绝缘操作杆挂一体化遮蔽罩,完成对边相耐张绝缘子、线夹以及部分导线的绝缘遮蔽;(使用四套遮蔽工具完成对两边相横担两侧带电设备的有效遮蔽)6) The operator on the pole uses the insulating operating rod to hang the lead wire shielding hanging plate on the side phase wire and the insulator ball head to complete the insulation shielding of the opposite side phase lead wire; use the insulating operating rod to hang the integrated shielding cover to complete the opposite side phase resistance Insulation shielding of insulators, clamps and some wires; (use four sets of shielding tools to complete the effective shielding of the live equipment on both sides of the phase cross arm)

7)杆上作业人员甲、乙互相配合在两侧中相导线线夹外侧15cm处剥除导线绝缘层(剥除绝缘层的长度应满足安装临时引流线和接火线夹的长度要求);7) Operators A and B on the pole cooperate with each other to peel off the insulation layer of the wire at 15cm outside the middle phase wire clip on both sides (the length of the insulation layer to be stripped off should meet the length requirements of the temporary drainage wire and the fire wire clip);

8)甲、乙两名作业人员使用多功能绝缘操作杆同步安装临时绝缘引流线,将中相隔离开关旁路;8) Two operators, A and B, use the multi-functional insulating operating rod to install the temporary insulating drain wire synchronously, and bypass the intermediate phase isolating switch;

9)作业人员检测中相临时绝缘引流线通流情况,确认分流良好后,拉开中相隔离开关;9) The operator checks the flow of the medium-phase temporary insulated drain wire, and after confirming that the shunt is good, pulls the medium-phase isolation switch;

10)作业人员使用异形绝缘断线剪断开中相隔离开关两侧引线,此时中相隔离开关便处于无电状态,作业人员更换新的隔离开关;10) The operator cut off the lead wires on both sides of the middle-phase isolating switch with special-shaped insulating broken wires. At this time, the middle-phase isolating switch is in a state of no power, and the operator replaces a new isolating switch;

11)待新的隔离开关安装完毕,拉、合试验合格后,杆上作业人员使用多功能绝缘操作杆将隔离开关两侧引线接入主导线,11) After the installation of the new isolating switch is completed and the pulling and closing tests pass, the operator on the pole uses a multi-function insulating operating rod to connect the leads on both sides of the isolating switch to the main lead.

12)作业人员合上中相隔离开关,检测中相隔离开关通流情况良好后,杆上作业人员在合适位置,使用多功能绝缘操作杆同步拆除中相临时绝缘引流线。12) The operator closes the middle-phase isolating switch, and after checking that the flow of the middle-phase isolating switch is good, the operator on the pole is in a suitable position, and uses the multi-functional insulating operating rod to simultaneously remove the middle-phase temporary insulated drain wire.

13)杆上作业人员使用多功能绝缘操作杆按照与安装时相反的顺序分别拆除两边相一体化遮蔽罩和引线遮蔽挂板,并拆除隔离开关绝缘隔板,拆除电杆遮蔽罩,拆除滑车,离开作业区域,作业结束。13) The operator on the pole uses the multi-function insulating operating pole to remove the integrated shielding cover and the lead wire shielding hanging plate on both sides in the reverse order of the installation, and remove the insulation partition of the isolation switch, remove the pole shielding cover, and remove the pulley. Leave the work area and the work is over.

14)工作结束整理工器具和清理现场,召开收工会,办理工作终结手续。14) At the end of the work, organize the tools and equipment and clean up the site, hold a closing meeting, and handle the work termination procedures.

连接关系:本实施例的引线遮蔽挂板22高度为1.2米,宽度为0.9米,厚度为4毫米,引线遮蔽挂板呈凹字形,引线遮蔽挂板22的顶部安装有与绝缘子碗头相挂接的钩体Ⅰ23、与导线相挂接的钩体Ⅱ24,引线遮蔽挂板22上安装有连接头26,连接头26连接有可拆卸的绝缘操作杆,绝缘操作杆包括与插接头29相插接的金属头4,金属头4安装于绝缘传动杆6的端部,金属插头4的外部套设有用于固定住电力工具的中间环3,中间环3的外部套设有可升降的锁紧环1,沿着绝缘传动杆6外部长度方向上套设有相旋接的外管Ⅰ12、外管Ⅱ13,外管Ⅱ13的末端与绝缘传动杆6的末端相固定;Connection relationship: the lead wire shielding hanging plate 22 of the present embodiment has a height of 1.2 meters, a width of 0.9 meters, and a thickness of 4 millimeters. The lead wire shielding hanging plate is concave, and the top of the lead wire shielding hanging plate 22 is equipped with Connected hook body I 23, hook body II 24 connected with the wire, and a connector 26 is installed on the lead wire shielding hanging plate 22. Connected metal head 4, the metal head 4 is installed on the end of the insulating transmission rod 6, the outer part of the metal plug 4 is provided with an intermediate ring 3 for fixing the power tool, and the outer part of the intermediate ring 3 is provided with a lifting lock The ring 1 is provided with an outer tube I12 and an outer tube II13 which are screwed together along the outer length direction of the insulating transmission rod 6, and the end of the outer tube II13 is fixed to the end of the insulating transmission rod 6;

本实施例的一体化遮蔽罩包括罩设于绝缘子外部的绝缘子外罩31及罩设于导线外部的导线外罩32,绝缘子外罩31与导线外罩32底部开口且二者为相贯通的一体结构,绝缘子外罩31的一侧设有与绝缘子碗头相卡接的卡槽Ⅰ33,导线外罩32的一侧设有用于穿过导线且与导线相卡接的卡槽Ⅱ34,绝缘子外罩31与导线外罩32交汇处的外壁上安装有连接头Ⅰ36,连接头Ⅰ36连接有可拆卸的绝缘操作杆,绝缘操作杆包括与连接头26相插接的金属头4,金属头4安装于绝缘传动杆6的端部,金属头4的外部套设有用于固定住电力工具的中间环3,中间环3的外部套设有可升降的锁紧环1,沿着绝缘传动杆6外部长度方向上套设有相旋接的外管Ⅰ12、外管Ⅱ13,外管Ⅱ13的末端与绝缘传动杆6的末端相固定;The integrated shielding cover of this embodiment includes an insulator outer cover 31 covering the outside of the insulator and a wire cover 32 covering the outside of the wire. One side of 31 is provided with a card slot I33 that is engaged with the insulator bowl, and one side of the wire cover 32 is provided with a card slot II34 for passing through the wire and snapping with the wire. The intersection of the insulator cover 31 and the wire cover 32 A connector I36 is installed on the outer wall of the connector, and the connector I36 is connected with a detachable insulating operating rod. The insulating operating rod includes a metal head 4 plugged with the connector 26, and the metal head 4 is installed on the end of the insulating transmission rod 6. The outer part of the metal head 4 is provided with an intermediate ring 3 for fixing the power tool. The outer part of the intermediate ring 3 is provided with a liftable locking ring 1 , and a phase rotation joint is provided along the outer length direction of the insulating transmission rod 6 . The outer tube I12, the outer tube II13, the end of the outer tube II13 is fixed to the end of the insulating transmission rod 6;

本实施例的所述引线遮蔽挂板22呈凹字形,引线遮蔽挂板22的顶部两端位置处分别安装有钩体Ⅰ23、钩体Ⅱ24,连接头26安装于引线遮蔽挂板22靠上位置处且位于引线遮蔽挂板22长度方向中间位置处,引线遮蔽挂板22上方开设有提手槽31,提手槽31位于连接头26正上方,连接头26呈T型,包括固定于引线遮蔽挂板22上的水平安装件27,水平安装件27上安装有与其相垂直的固定件28,固定件28的底部安装有插接头29,固定件28的直径方向上安装有穿钉30,穿钉30的两端位于固定件28的外部;The lead wire shielding hanging plate 22 in this embodiment is in a concave shape, and the two ends of the top of the lead wire shielding hanging plate 22 are respectively installed with hook body I 23 and hook body II 24, and the connector 26 is installed on the upper position of the lead wire shielding hanging plate 22. and located in the middle of the length direction of the lead wire shielding plate 22, a handle groove 31 is provided above the lead wire shielding plate 22, and the handle groove 31 is located directly above the connector 26. The connector 26 is T-shaped, including The horizontal mounting part 27 on the hanging plate 22, the fixing part 28 perpendicular to it is installed on the horizontal mounting part 27, the bottom of the fixing part 28 is equipped with a plug connector 29, and the diameter direction of the fixing part 28 is equipped with a nail 30, which penetrates The two ends of the nail 30 are located outside the fixing member 28;

本实施例的绝缘子外罩31的横剖面呈n型,导线外罩32的横剖面呈凸字型,绝缘子外罩31的高度高于导线外罩32的高度,绝缘子外罩31的宽度与导线外罩32的罩底宽度相匹配,卡槽Ⅰ33与卡槽Ⅱ34均呈垂直条状,卡槽Ⅰ33的顶部设计为弧形、底部设计为八字形,卡槽Ⅱ34的顶部设计为一字型、底部设计为八字型,导线外罩32的顶部安装有提手35;The cross section of the insulator cover 31 of the present embodiment is n type, the cross section of the wire cover 32 is convex, the height of the insulator cover 31 is higher than the height of the wire cover 32, and the width of the insulator cover 31 is the same as the cover bottom of the wire cover 32. The width matches, the card slot Ⅰ33 and the card slot Ⅱ34 are both vertical strips, the top of the card slot Ⅰ33 is designed in an arc shape, and the bottom is designed in a figure-eight shape, the top of the card slot II34 is designed in a straight shape, and the bottom is designed in a figure-eight shape. A handle 35 is installed on the top of the wire cover 32;

本实施例的金属头4包括与插接头29相插接的插接端4-1及安装于绝缘传动杆6上的安装端4-2,插接端4-1与安装端4-2为一体结构,插接端4-1的外径大于安装端4-2的外径从而在二者连接处形成卡台Ⅰ14;The metal head 4 of this embodiment includes a plug-in end 4-1 that is plugged into the plug joint 29 and an installation end 4-2 installed on the insulating transmission rod 6, and the insertion end 4-1 and the installation end 4-2 are Integral structure, the outer diameter of the insertion end 4-1 is larger than the outer diameter of the installation end 4-2 so as to form a card platform I14 at the connection between the two;

本实施例的中间环3包括套设于金属头4外部的端头15、中间套管16、固定管17,端头15、中间套管16、固定管17为首尾相接的一体结构,且三者的外径及内径均依次递减从而在端头15与中间套管16的外壁连接处形成卡台Ⅱ18、在中间套管16与固定管17的内壁连接处形成卡台Ⅲ19,卡台Ⅲ19与卡台Ⅰ14相卡接,固定管17上开设有穿钉孔Ⅰ5,外管Ⅰ12上开设有与穿钉孔Ⅰ5配合使用的穿钉孔Ⅱ10,外管Ⅱ13的末端设有穿钉孔Ⅲ21,绝缘传动杆6的末端设有与穿钉孔Ⅲ21配合使用的穿钉孔Ⅳ8;The intermediate ring 3 of this embodiment includes an end 15, an intermediate sleeve 16, and a fixed pipe 17 sleeved on the outside of the metal head 4. The end 15, the intermediate sleeve 16, and the fixed pipe 17 are an integral structure connected end to end, and The outer diameters and inner diameters of the three are successively reduced, so that a card platform II18 is formed at the connection between the end 15 and the outer wall of the intermediate sleeve 16, and a card platform III19 is formed at the connection between the intermediate sleeve 16 and the inner wall of the fixed pipe 17, and card platform III19 is formed. It is clamped with the card table I14, the fixing tube 17 is provided with a nail hole I5, the outer tube I12 is provided with a nail hole II10 used in conjunction with the nail hole I5, and the end of the outer tube II13 is provided with a nail hole III21, The end of the insulating transmission rod 6 is provided with a nail-piercing hole IV8 used in conjunction with the nail-piercing hole III21;

本实施例的端头15靠近电力工具的一端开设有两个镂空卡槽20,两个镂空卡槽20以端头15的中心轴为轴心中心对称,镂空卡槽20包括从端头15靠近电力工具的一端一直延伸至端头15中间位置处的垂直镂空槽20-1、与垂直镂空槽21相贯通的水平镂空槽20-2,水平镂空槽20-2的末端设有向上延伸的弧形镂空槽20-3;垂直镂空槽20-1与水平镂空槽20-2相交处设计为斜坡状;In this embodiment, the end 15 close to the power tool is provided with two hollowed out slots 20, the two hollowed out slots 20 are symmetrical with the central axis of the end 15 as the axis center, and the hollowed out slots 20 include One end of the power tool extends to the vertical hollow groove 20-1 in the middle of the end 15, the horizontal hollow groove 20-2 connected with the vertical hollow groove 21, and the end of the horizontal hollow groove 20-2 is provided with an upwardly extending arc shaped hollow groove 20-3; the intersection of vertical hollow groove 20-1 and horizontal hollow groove 20-2 is designed as a slope;

本实施例的锁紧环1包括部分设于锁紧环1内的弹簧9及抵于弹簧9尾部的底环2,锁紧环1的内壁上设有环形卡台Ⅳ11,环形卡台Ⅳ11与卡台Ⅱ18相卡接,环形卡台Ⅳ11的内径小于卡台Ⅱ18的的外径,弹簧9的一端顶部抵于环形卡台Ⅳ11上,另一端抵于底环2上,底环2的一侧抵于外管Ⅰ12上。The locking ring 1 of the present embodiment includes a spring 9 partly arranged in the locking ring 1 and a bottom ring 2 which abuts against the tail of the spring 9. The inner wall of the locking ring 1 is provided with an annular locking platform IV11, and the annular locking platform IV11 is connected with the locking ring 1. Card stage Ⅱ18 is snapped together, the inner diameter of ring card stage Ⅳ11 is smaller than the outer diameter of card stage Ⅱ18, the top of one end of spring 9 is against the ring card stage Ⅳ11, the other end is against bottom ring 2, one side of bottom ring 2 Arrives on the outer tube I12.

引线遮蔽挂板22及一体化遮蔽罩的工作原理:本实施例是采用绝缘操作杆将引线遮蔽挂板22挂至导线上,钩体Ⅰ23挂在绝缘子的碗头上,钩体Ⅱ24挂于导线上,再反方向旋转操作杆将连接头26解锁取下操作杆,完成引线遮蔽挂板的安装,挂设时注意将耐张绝缘子串置于引线遮蔽挂板22凹口处,本实施例采用绝缘操作杆将遮蔽罩挂至导线上,遮蔽罩的绝缘子外罩31罩设于绝缘子外部,导线外罩32罩设于导线外部,遮蔽罩的两端分别挂在绝缘子的碗头和导线上,挂设完毕后,反方向旋转操作杆将连接头26解锁取下操作杆,完成遮蔽罩的安装,具体过程如下:The working principle of the lead wire shielding hanging plate 22 and the integrated shielding cover: In this embodiment, the lead wire shielding hanging plate 22 is hung on the wire by using the insulating operating rod, the hook body I23 is hung on the bowl head of the insulator, and the hook body II24 is hung on the wire , and then rotate the operating lever in the opposite direction to unlock the connector 26 and take off the operating lever to complete the installation of the lead wire shielding hanging plate. When hanging, pay attention to place the strain insulator string on the notch of the lead wire shielding hanging plate 22. This embodiment adopts The insulating operating rod hangs the shielding cover on the wire, the insulator outer cover 31 of the shielding cover is arranged on the outside of the insulator, the wire outer cover 32 is arranged on the outside of the wire, and the two ends of the shielding cover are respectively hung on the bowl head of the insulator and on the wire, and the hanging After completion, rotate the operating lever in the opposite direction to unlock the connector 26 and take off the operating lever to complete the installation of the shield. The specific process is as follows:

本实施例的金属头4位于中间环3内,金属头4的卡台Ⅰ14卡接于中间环3内的卡台Ⅲ19上,中间环3部分位于锁紧环1内,中间环3外部的卡台Ⅱ18卡接于锁紧环1内部的卡台Ⅳ11上,中间环3上的部分镂空卡槽20被锁紧环1遮挡住,使用时,杆上电工登杆至适当位置,与周围带电体保持0.4m以上的安全距离,地面电工通过绳索将绝缘操作杆和引线遮蔽挂板22上传至杆上电工,杆上电工将金属头4与插接头29相插接,然后下压锁紧环1,使镂空卡槽20全部暴露,从而使穿钉25插入垂直镂空槽20-1内,然后转动中间环3,将穿钉25移动至水平镂空槽20-2内,进而移动至弧形镂空槽20-3内,此时,锁紧环1在弹簧9的作用下复位,锁紧环1的顶部将穿钉25紧紧卡于弧形镂空槽20-3内,从而将绝缘操作杆的一端与引线遮蔽挂板22固定为一体,此时,工作人员通过绝缘操作杆将引线遮蔽挂板22挑起,钩体Ⅰ23挂在绝缘子的碗头上,钩体Ⅱ24挂于导线上,挂设完毕后,再反方向旋转外管Ⅱ13,将连接头26解锁取下绝缘操作杆,完成引线遮蔽挂板的安装,挂设遮蔽罩同理,工作人员通过绝缘操作杆将遮蔽罩挑起,遮蔽罩的卡槽Ⅰ33一侧挂在绝缘子碗头上,卡槽Ⅱ34一侧挂于导线上,挂设完毕后,再反方向旋转外管Ⅱ13,将连接头26解锁取下绝缘操作杆,完成遮蔽罩的安装,使用非常方便,工作效率高,效果好,安全系数高。The metal head 4 of this embodiment is located in the middle ring 3, and the card platform I14 of the metal head 4 is clamped on the card platform III19 in the middle ring 3. Platform Ⅱ18 is clamped on the clamping platform Ⅳ11 inside the locking ring 1, and the part of the hollow card slot 20 on the intermediate ring 3 is covered by the locking ring 1. Keeping a safe distance of more than 0.4m, the electrician on the ground uploads the insulating operating rod and the lead wire shielding hanging plate 22 to the electrician on the pole through the rope, and the electrician on the pole inserts the metal head 4 and the plug connector 29, and then presses down the locking ring 1 , so that the hollow card slot 20 is fully exposed, so that the nail 25 is inserted into the vertical hollow slot 20-1, and then the middle ring 3 is rotated to move the nail 25 to the horizontal hollow slot 20-2, and then to the arc hollow slot 20-3, at this time, the locking ring 1 resets under the action of the spring 9, and the top of the locking ring 1 firmly clamps the piercing nail 25 in the arc-shaped hollow groove 20-3, so that one end of the insulating operating rod It is fixed together with the lead wire shielding hanging plate 22. At this time, the staff lifts the lead wire shielding hanging plate 22 through the insulating operating rod, the hook body I23 is hung on the bowl head of the insulator, and the hook body II24 is hung on the wire. The hanging is completed Finally, rotate the outer tube II 13 in the opposite direction, unlock the connector 26 and take off the insulating operating rod to complete the installation of the lead wire shielding hanging plate. The same is true for hanging the shielding cover. One side of the card slot Ⅰ33 is hung on the insulator bowl head, and the side of the card slot Ⅱ34 is hung on the wire. After the hanging is completed, turn the outer tube Ⅱ13 in the opposite direction, unlock the connector 26 and take off the insulating operating rod to complete the shielding cover. Easy to install and use, high work efficiency, good effect and high safety factor.

本发明的绝缘杆法带负荷更换中相隔离开关作业法对作业环境要求限制小,作业工具方便携带运输,相较于绝缘斗臂车中间电位作业,具有场地适用性强,投资成本低,人员便于培训,安全系数高的优点,有助于扩大带电作业范围,提高电网可靠性,保障用户正常用电有着极大的社会效益。The insulating rod method of the present invention for replacing the middle-phase isolating switch with load has little restrictions on the working environment, and the working tools are convenient to carry and transport. The advantages of easy training and high safety factor help to expand the scope of live work, improve the reliability of the power grid, and ensure the normal use of electricity by users, which has great social benefits.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (10)

1. a kind of insulating bar method on-load isolates the operational method of switch in replacing, it is characterized in that comprising the following steps:
1), electrical verification is carried out to circuit and device, carry out next step operation after electrical verification qualification;
2), ground potential coaster is installed on cross-arm;
3), installation electric pole mask, insulation masking is carried out to electric pole;
4), isolation switch insulation partition plate is installed respectively in the phase of both sides, both sides are isolated with switch and carries out insulation masking;
5), using insulating bar lead is covered into hanging plate(22)Hang on side phase conductor and insulator pin, complete opposite side phase The insulation masking of lead, hangs integrated mask using insulating bar, completes opposite side phase strain insulator, wire clamp and portion The insulation masking of intraphase conductor;
6), in both sides divest wire insulation at 15-20cm on the outside of phase conductor wire clamp;
7), using insulating bar interim insulation lead wire is synchronously installed, switch bypass is isolated by;
8), it is adjacent in detection when the through-flow situation of insulation lead wire, after confirming that shunting is good, switch is isolated in pulling open;
9), switch both sides lead is isolated in disconnection, at this time in isolate switch and be just in electroless state, operating personnel more renews Disconnecting switch;
10), install and draw after new disconnecting switch, close pass the test after, using insulating bar by disconnecting switch both sides Lead accesses main traverse line;
11), close in isolate switch, be isolated in detection switch it is through-flow it is all right after, synchronously torn open using insulating bar Insulation lead wire when adjacent in removing;
12), using insulating bar remove both sides mutually integrated mask and lead respectively according to opposite order during installation Cover hanging plate(22), and remove isolation switch insulation partition plate, remove electric pole mask, remove ground potential coaster, the end of job.
2. a kind of insulating bar method on-load described in accordance with the claim 1 isolates the operational method of switch in replacing, feature exists Hanging plate is covered in the lead(22)In concave shape, lead masking hanging plate(22)Top end positions at be separately installed with absolutely The coupler body I that edge bowl head mutually mounts(23), the coupler body II that mutually mounts with conducting wire(24), lead masking hanging plate(22)On the company of being provided with Connector(26), connector(26)It is installed on lead masking hanging plate(22)At upper position and positioned at lead masking hanging plate(22)Length Direction middle position, lead masking hanging plate(22)Top offers handle groove(30), handle groove(30)Positioned at connector(26) Surface.
3. a kind of insulating bar method on-load described in accordance with the claim 1 isolates the operational method of switch in replacing, feature exists In being provided with connector I on the outer wall of the integrated mask(36), integrated mask is including covering at exterior insulator Insulator outer cover(31)And cover at conducting wire outer cover outside conducting wire(32), insulator outer cover(31)With conducting wire outer cover(32)Bottom Portion's opening and the two be the integrative-structure to connect, insulator outer cover(31)Side be equipped with the card that is mutually clamped with insulator bowl head Groove I(33), conducting wire outer cover(32)Side be equipped with the card slot II for being used for mutually being clamped through conducting wire and with conducting wire(34), outside insulator Cover(31)Cross section be in N-shaped, conducting wire outer cover(32)Cross section be in convex, insulator outer cover(31)Height be higher than conducting wire Outer cover(32)Height, insulator outer cover(31)Width and conducting wire outer cover(32)Cover bottom width degree match, card slot I(33)With Card slot II(34)Perpendicular strip, card slot I(33)Top design be designed as splayed, card slot II for arc, bottom(34) Top design be designed as splayed configuration, conducting wire outer cover for yi word pattern, bottom(32)Top handle is installed(35).
4. the operational method of switch, feature are isolated in being replaced according to a kind of insulating bar method on-load described in Claims 2 or 3 It is the connector(26)Or connector I(36)It is T-shaped, including it is horizontally mounted part(27), it is horizontally mounted part(27)Upper peace Equipped with the fixing piece perpendicular with it(28), fixing piece(28)Bottom connection-peg is installed(29), fixing piece(28)Diameter Drift bolt is installed on direction(25), drift bolt(25)Both ends be located at fixing piece(28)Outside.
5. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 4, feature exists Include and connector in the insulating bar(26)Or connector I(36)The ferrule plugged(4), ferrule(4)Installation In insulating driving rod(6)End, ferrule(4)Outer cover be equipped be used for fix connector(26)Or connector I(36) Middle ring(3), middle ring(3)Outer cover be equipped with liftable retaining ring(1), along insulating driving rod(6)Outer length The outer tube I being mutually screwed on is arranged with direction(12), outer tube II(13), outer tube II(13)End and insulating driving rod(6)End End is mutually fixed.
6. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 5, feature exists In the ferrule(4)Including with connection-peg(29)The inserted terminal plugged(4-1)And it is installed on insulating driving rod(6)On peace Fill end(4-2), inserted terminal(4-1)With installation end(4-2)It is structure as a whole, inserted terminal(4-1)Outside diameter be more than installation end(4-2) Outside diameter so as to the two junction formed chuck I(14).
7. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 5, feature exists In the middle ring(3)Including being sheathed on ferrule(4)Exterior termination(15), intermediate casing(16), fixing pipe(17), termination (15), intermediate casing(16), fixing pipe(17)For end to end integrative-structure, and the outside diameter of three and internal diameter successively decrease successively So as in termination(15)With intermediate casing(16)Outer wall junction formed chuck II(18), in intermediate casing(16)With fixing pipe (17)Inner wall junction formed chuck III(19), chuck III(19)With chuck I(14)Mutually it is clamped.
8. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 7, feature exists In the fixing pipe(17)On offer drift bolt hole I(5), outer tube I(12)On offer and drift bolt hole I(5)What is be used cooperatively wears Nail II(10), outer tube II(13)End be equipped with drift bolt hole III(21), insulating driving rod(6)End be equipped with and drift bolt hole III (21)The drift bolt hole IV being used cooperatively(8).
9. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 7, feature exists In the termination(15)Two hollow out card slots are offered close to one end of electric power tool(20), two hollow out card slots(20)With termination (15)Central shaft for eccentric axial it is symmetrical, hollow out card slot(20)Including from termination(15)Prolong always close to one end of electric power tool Extend termination(15)The vertical hollow slots of middle position(20-1), with vertical hollow slots(21)The horizontal hollow slots to connect (20-2), horizontal hollow slots(20-2)End be equipped with the arc hollow slots that upwardly extend(20-3), vertical hollow slots(20-1) With horizontal hollow slots(20-2)Intersection is designed as ramped shaped.
10. isolating the operational method of switch in being replaced according to a kind of insulating bar method on-load described in claim 7, feature exists In the retaining ring(1)Retaining ring is arranged on including part(1)Interior spring(9)And it is butted on spring(9)The base ring of afterbody(2), lock Tight ring(1)Inner wall be equipped with annular chuck IV(11), annular chuck IV(11)With chuck II(18)Mutually it is clamped, annular chuck IV (11)Internal diameter be less than chuck II(18)Outside diameter, spring(9)One end at the top of be butted on annular chuck IV(11)On, the other end It is butted on base ring(2)On, base ring(2)Side be butted on outer tube I(12)On.
CN201711392786.6A 2017-12-21 2017-12-21 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method Expired - Fee Related CN107946997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711392786.6A CN107946997B (en) 2017-12-21 2017-12-21 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711392786.6A CN107946997B (en) 2017-12-21 2017-12-21 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method

Publications (2)

Publication Number Publication Date
CN107946997A true CN107946997A (en) 2018-04-20
CN107946997B CN107946997B (en) 2019-07-19

Family

ID=61941620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711392786.6A Expired - Fee Related CN107946997B (en) 2017-12-21 2017-12-21 An operating method for replacing a middle-phase isolating switch with load by an insulating rod method

Country Status (1)

Country Link
CN (1) CN107946997B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094495A (en) * 2021-12-08 2022-02-25 云南电网有限责任公司临沧供电局 Method for mounting molded line clamp device with insulating shield without power outage

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5742000A (en) * 1993-11-03 1998-04-21 Carolina Power & Light Company Device and method for preventing arcing and resultant flashing during repairs performed inside pad-mounted transformers
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101728786A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Protective measure for replacing beeline pole side-phase post insulator in 20kV circuit in charged state
CN102394484A (en) * 2011-12-12 2012-03-28 辽宁省电力有限公司锦州供电公司 Method for replacing isolating switch with 10kV load
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203932760U (en) * 2014-06-04 2014-11-05 国家电网公司 Isolating switch insulating barrier on a kind of post
CN105429031A (en) * 2015-12-02 2016-03-23 国网新疆电力公司乌鲁木齐供电公司 Special insulating barrier for changing pole-mounted circuit breaker
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN205985893U (en) * 2016-09-07 2017-02-22 国网浙江淳安县供电公司 Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN207765879U (en) * 2018-01-08 2018-08-24 国网辽宁省电力有限公司鞍山供电公司 10kV rigid combined double-piece suspension insulator shield

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5742000A (en) * 1993-11-03 1998-04-21 Carolina Power & Light Company Device and method for preventing arcing and resultant flashing during repairs performed inside pad-mounted transformers
CN101728786A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Protective measure for replacing beeline pole side-phase post insulator in 20kV circuit in charged state
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN102394484A (en) * 2011-12-12 2012-03-28 辽宁省电力有限公司锦州供电公司 Method for replacing isolating switch with 10kV load
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203932760U (en) * 2014-06-04 2014-11-05 国家电网公司 Isolating switch insulating barrier on a kind of post
CN105429031A (en) * 2015-12-02 2016-03-23 国网新疆电力公司乌鲁木齐供电公司 Special insulating barrier for changing pole-mounted circuit breaker
CN205985893U (en) * 2016-09-07 2017-02-22 国网浙江淳安县供电公司 Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN207765879U (en) * 2018-01-08 2018-08-24 国网辽宁省电力有限公司鞍山供电公司 10kV rigid combined double-piece suspension insulator shield

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094495A (en) * 2021-12-08 2022-02-25 云南电网有限责任公司临沧供电局 Method for mounting molded line clamp device with insulating shield without power outage
CN114094495B (en) * 2021-12-08 2023-10-31 云南电网有限责任公司临沧供电局 Installation method of wire clamp device with insulation shield type without power outage

Also Published As

Publication number Publication date
CN107946997B (en) 2019-07-19

Similar Documents

Publication Publication Date Title
CN110752536B (en) Gas insulated metal enclosed neutral point complete device
CN115097168B (en) Multifunctional wiring device for live test of lightning arrester
CN203385761U (en) Wiring clamp for loop resistor measuring and overpressure resistant test
CN104535804A (en) Portable current transformer test clamp
CN103532047A (en) Operating method and device for replacing 10kV pole-mounted drop-out fuse
CN107946997A (en) A kind of insulating bar method on-load isolates the operational method of switch in replacing
CN202535016U (en) OPGW pull-in optical cable safety grounding fixing assembly
CN105789934A (en) Cable connector
CN203242776U (en) 10kV insulation-piercing electricity-testing grounding ring
WO2018196719A1 (en) Wiring device facilitating quick wiring
CN205985893U (en) Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN107910812A (en) A kind of insulating bar method on-load isolates the special isolation shading tool of switch in replacing
CN207165335U (en) Energy-conservation becomes platform pillar arrester
CN113839344B (en) An insulated drain wire fixing device
CN204332890U (en) Drop-out fuse with electrometric grounding device
CN204068041U (en) Insulation isolation fixtures for 10kV overhead power distribution equipment
CN203445075U (en) Line connector insulating separator
CN109994961B (en) Device and method for replacing pole-mounted switch of vertically arranged 10kV overhead line with load
CN102445592B (en) Vacuum switch and cable connection electricity testing device
CN205565709U (en) Intelligence remote control prevents built on stilts insulation protection device
CN103354325A (en) Method for changing load switch in on-load manner
CN2864716Y (en) Terminal joint case for optical fiber composite phase wire
CN217061893U (en) High-voltage switch suitable for being quickly connected in live working
CN207572820U (en) Special tool for oil and gas bushing transformer test
CN105610081B (en) A kind of Chinese character pin-shaped GIS outlets arrangement for being used for 500kV and following voltage class

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190719

Termination date: 20201221