CN102392535B - 用作钢结构次结构的碳纤维加固毛竹的制作方法 - Google Patents
用作钢结构次结构的碳纤维加固毛竹的制作方法 Download PDFInfo
- Publication number
- CN102392535B CN102392535B CN 201110219660 CN201110219660A CN102392535B CN 102392535 B CN102392535 B CN 102392535B CN 201110219660 CN201110219660 CN 201110219660 CN 201110219660 A CN201110219660 A CN 201110219660A CN 102392535 B CN102392535 B CN 102392535B
- Authority
- CN
- China
- Prior art keywords
- mao bamboon
- carbon fiber
- moso bamboo
- preparation
- carbon cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开一种用作钢结构次结构的碳纤维加固毛竹的制作方法,包括以下步骤:选用经干燥处理后的毛竹,在毛竹的每两个竹节中间,用碳纤维布环绕一层粘贴,使碳纤维布对毛竹形成环箍约束,同时用碳纤维布加固毛竹的端头,在毛竹端头用碳纤维布环绕两层加固,提高毛竹接头处的强度,上述经加固处理后的毛竹在其端头局部打孔,用螺栓将其与其它毛竹或钢结构连接。本发明采用碳纤维布约束毛竹,显著提高了毛竹的抗压强度和抗弯强度,并且便于与其它毛竹或其它钢结构连接。
Description
技术领域
本发明涉及一种建筑工程用材料的制作方法,更具体地说,涉及一种用作钢结构次结构的碳纤维加固毛竹的制作方法。
背景技术
现有毛竹用作建筑材料,一般是将其用于替代钢筋,与混凝土一起工作。或者是制作竹纤维,拌于混凝土中使用。这些传统用法存在的问题是毛竹与混凝土的粘结问题,以及毛竹抗压强度或抗弯强度不足的问题。
毛竹的抗拉强度高达100~200Mpa,已经接近钢材的抗拉强度,而毛竹的抗压强度仅有30~60Mpa。与毛竹的抗拉强度比较,毛竹的抗压强度降低很多。主要原因是毛竹受压易于发生薄壁失稳,影响到毛竹作为绿色建材的应用范围。另一方面,毛竹与毛竹之间的连接,以及毛竹与其它结构构件的连接处,由于局部应力集中使得毛竹的连接节点易于破坏,也影响毛竹作为绿色高效建材的广泛应用。
碳纤维布材料的抗拉强度高达4000Mpa,已广泛应用于结构补强。但用碳纤维布来加固毛竹,存在如何使毛竹与碳纤维布材料高效结合的技术难题。
发明内容
本发明针对现有技术中存在的技术问题,提供一种用作钢结构次结构的碳纤维加固毛竹的制作方法,采用碳纤维布约束毛竹,显著提高了毛竹的抗压强度和抗弯强度,并且便于与其它毛竹或其它钢结构连接。
本发明是通过如下技术方案实现的:
一种用作钢结构次结构的碳纤维加固毛竹的制作方法,包括以下步骤:
(1)选用经干燥处理后的毛竹;
(2)在毛竹的每两个竹节中间,用碳纤维布环绕一层粘贴,使碳纤维布对毛竹形成环箍约束;
(3)同时用碳纤维布加固毛竹的端头,在毛竹端头用碳纤维布环绕两层加固,提高毛竹接头处的强度;
(4)上述经加固处理后的毛竹在其端头局部打孔,用螺栓将其与其它毛竹或钢结构连接。
所述碳纤维布采用材料为聚丙烯腈碳纤维布,其单位面积碳纤维含量为200克/㎡,单向抗拉强度大于2000 Mpa。
所述碳纤维粘贴胶采用双组分改性环氧类胶粘剂。
本发明技术方案,针对毛竹用碳纤维布进行局部加固,使其抗压强度提高30%,抗弯强度提高50~80%,节点强度提高80~100%,成为绿色高性能材料。加固后的毛竹可以用于钢结构次结构,比如屋面或墙面钢结构的檀条、斜支撑等,从而可以大大降低钢结构的用钢量,满足绿色建筑的低碳要求。
附图说明
图1 为本发明所公开的碳纤维加固毛竹的示意图;
图2 为图1所示毛竹用于钢结构次结构的示意图。
具体实施方式
下面结合附图对本发明的实施例作详细说明:本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,本发明实施例选用直径大约为6~10cm的毛竹1,干燥处理。选用建筑加固专用的碳纤维布,材料为聚丙烯腈碳纤维布,其单位面积碳纤维含量为200克/㎡,单向抗拉强度大于2000 Mpa。在毛竹1的每两个竹节2中间用宽为3~5cm的碳纤维布3环绕一层粘贴,粘贴采用建筑加固专用的碳纤维布配套专用胶,属双组分改性环氧类胶粘剂,使碳纤维布3对毛竹1形成环箍约束。同时用碳纤维布4加固毛竹1的端头,在毛竹1端头用宽为5~10cm碳纤维布4环绕两层加固,使得毛竹1接头处的强度显著增强。经加固处理后的毛竹1接头可以局部打孔5,使其与其它毛竹或钢结构6形成螺栓连接,从而使这种加固后的毛竹1可以用于替代钢结构的次结构,如钢结构的檀条和支撑,如图2所示。
Claims (3)
1.一种用作钢结构次结构的碳纤维加固毛竹的制作方法,其特征在于:包括以下步骤:
(1)选用经干燥处理后的毛竹;
(2)在毛竹的每两个竹节中间,用碳纤维布环绕一层粘贴,使碳纤维布对毛竹形成环箍约束;
(3)同时用碳纤维布加固毛竹的端头,在毛竹端头用碳纤维布环绕两层加固,提高毛竹接头处的强度;
(4)上述经加固处理后的毛竹在其端头局部打孔,用螺栓将其与其它毛竹或钢结构连接。
2.如权利要求1所述的用作钢结构次结构的碳纤维加固毛竹的制作方法,其特征在于:所述碳纤维布采用材料为聚丙烯腈碳纤维布,其单位面积碳纤维含量为200克/㎡,单向抗拉强度大于2000Mpa。
3.如权利要求1所述的用作钢结构次结构的碳纤维加固毛竹的制作方法,其特征在于:所述用碳纤维布环绕一层粘贴,具体是指采用双组分改性环氧类胶粘剂粘贴。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110219660 CN102392535B (zh) | 2011-08-02 | 2011-08-02 | 用作钢结构次结构的碳纤维加固毛竹的制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110219660 CN102392535B (zh) | 2011-08-02 | 2011-08-02 | 用作钢结构次结构的碳纤维加固毛竹的制作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102392535A CN102392535A (zh) | 2012-03-28 |
CN102392535B true CN102392535B (zh) | 2013-08-07 |
Family
ID=45859907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110219660 Expired - Fee Related CN102392535B (zh) | 2011-08-02 | 2011-08-02 | 用作钢结构次结构的碳纤维加固毛竹的制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102392535B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016189354A1 (en) | 2015-05-27 | 2016-12-01 | Tamas Horvath | Bamboo carbon fibre composite pipe structure primarily for bicycle frames and its production procedure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1074641A (zh) * | 1992-03-14 | 1993-07-28 | 北京航空航天大学 | 节管式三向复合材料承力构件的“三基圆”缠绕成型工艺 |
JP2008063758A (ja) * | 2006-09-05 | 2008-03-21 | Nippon Steel Composite Co Ltd | 構造物の補強方法 |
CN201195576Y (zh) * | 2007-10-30 | 2009-02-18 | 王文栋 | 竹制折叠自行车架 |
JP2010024620A (ja) * | 2008-07-15 | 2010-02-04 | Toray Ind Inc | 炭素繊維アンカーの接着構造およびその形成方法 |
CN101973352A (zh) * | 2010-09-21 | 2011-02-16 | 胡军 | 一种竹制自行车管架部件的制造方法 |
ES1074812U (es) * | 2011-04-20 | 2011-06-13 | Ismael Garrido Moreno | Cuadro para bicicleta. |
-
2011
- 2011-08-02 CN CN 201110219660 patent/CN102392535B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1074641A (zh) * | 1992-03-14 | 1993-07-28 | 北京航空航天大学 | 节管式三向复合材料承力构件的“三基圆”缠绕成型工艺 |
JP2008063758A (ja) * | 2006-09-05 | 2008-03-21 | Nippon Steel Composite Co Ltd | 構造物の補強方法 |
CN201195576Y (zh) * | 2007-10-30 | 2009-02-18 | 王文栋 | 竹制折叠自行车架 |
JP2010024620A (ja) * | 2008-07-15 | 2010-02-04 | Toray Ind Inc | 炭素繊維アンカーの接着構造およびその形成方法 |
CN101973352A (zh) * | 2010-09-21 | 2011-02-16 | 胡军 | 一种竹制自行车管架部件的制造方法 |
ES1074812U (es) * | 2011-04-20 | 2011-06-13 | Ismael Garrido Moreno | Cuadro para bicicleta. |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016189354A1 (en) | 2015-05-27 | 2016-12-01 | Tamas Horvath | Bamboo carbon fibre composite pipe structure primarily for bicycle frames and its production procedure |
Also Published As
Publication number | Publication date |
---|---|
CN102392535A (zh) | 2012-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100436740C (zh) | 一种纤维板材预应力张拉装置 | |
CN102561180B (zh) | 竹材桥面板 | |
CN103603462A (zh) | 一种frp、木与钢筋混凝土组合梁 | |
CN103556713A (zh) | 一种用碳纤维复合增强材料加固的钢管相贯节点 | |
CN101550767A (zh) | 混凝土柱的加固方法以及加固型混凝土柱 | |
CN103422682A (zh) | 一种自复位榫卯节点 | |
CN102926551B (zh) | 一种加固受弯混凝土构件的方法 | |
CN106760212A (zh) | 一种波纹复合管海水海砂混凝土结构 | |
CN103397702B (zh) | 一种复合材料网架连接节点及方法 | |
CN205116773U (zh) | 钢丝网混杂纤维增强混凝土加固结构 | |
CN112144910A (zh) | 钢筋混凝土框架节点hdc绕丝加固装置及其施工方法 | |
CN201809900U (zh) | 一种frp-竹-混凝土组合梁 | |
CN102392535B (zh) | 用作钢结构次结构的碳纤维加固毛竹的制作方法 | |
CN204370605U (zh) | 一种装配式带自攻螺钉增强的钢-木屈曲约束支撑 | |
CN105952182B (zh) | 一种复合加固木梁的方法 | |
CN104652702A (zh) | 一种增强木-混凝土组合梁的连接装置 | |
CN107700868A (zh) | 一种新型的锚栓钢板加固耐火系统及其加固方法 | |
CN203626231U (zh) | 浇筑混凝土用钢模板 | |
CN203440918U (zh) | 一种复合材料网架连接节点 | |
CN205276129U (zh) | 一种纤维增强复合材料-竹组合桥面板 | |
CN214885767U (zh) | 一种钢筋混凝土框架节点hdc绕丝加固装置 | |
CN206928518U (zh) | 纤维增强复合材料布约束的再生混合混凝土柱 | |
CN108673972A (zh) | 一种交错层积的复合木竹材料及其制备方法 | |
CN104499578B (zh) | 一种对穿螺栓的空间自由曲面木网壳装配式节点 | |
CN209942039U (zh) | 一种平行弦钢竹组合桁架结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130807 Termination date: 20200802 |
|
CF01 | Termination of patent right due to non-payment of annual fee |