CN102392511B CN 201110325119 CN201110325119A CN102392511B CN 102392511 B CN102392511 B CN 102392511B CN 201110325119 CN201110325119 CN 201110325119 CN 201110325119 A CN201110325119 A CN 201110325119A CN 102392511 B CN102392511 B CN 102392511B
Authority
CN
China
Prior art keywords
sleeve
prefabricated units
grouting
lower member
branch sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110325119
Other languages
Chinese (zh)
Other versions
CN102392511A (en
Inventor
陈立生
葛以衡
黄永春
赵国强
叶可炯
孙维君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN 201110325119 priority Critical patent/CN102392511B/en
Publication of CN102392511A publication Critical patent/CN102392511A/en
Application granted granted Critical
Publication of CN102392511B publication Critical patent/CN102392511B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a sleeve pressure type grouting construction method for steel reinforcement connection. The method relates to the connection between a lower element assembled with a steel reinforcement and a precast element in which a plurality of connecting sleeves are pre-buried, wherein an overflow hole and a grouting hole below the overflow hole are formed on the side wall of each connecting sleeve. The invention is characterized in that the method comprises the following steps: selecting any of the connecting sleeves, connecting the grouting hole of the selected connecting sleeve with a grouting pipe in a sealed way, connecting the overflow hole of the selected connecting sleeve with a pressure gauge in a sealed way, and connecting the grouting hole and the overflow hole of each of the rest connecting sleeves with two one-way valves respectively in a sealed way; connecting the connecting parts of the precast element and the lower element into a whole in a sealed way through a sealing device; pumping slurry into the present connecting sleeve through the grouting pipe; and stopping grouting after the pressure gauge displays that the pressure reaches a threshold value. The method provided by the invention has the advantages that the structure is simple, the use is convenient, and the qualification rate of connecting sleeve grouting is greatly improved.

Description

Be used for the sleeve force due to centrifugal action formula grouting construction method that reinforcing bar connects
Technical field
The present invention relates to technical field of building construction, be specifically related to a kind of sleeve force due to centrifugal action formula grouting construction method for the reinforcing bar connection.
Background technology
In the prior art that building reinforced concrete is built, two reinforcing bars are connected one mainly contain following several mode: the mutual welding of reinforcing bar, sleeve pipe press joining method, crooked binding method.The construction of above-mentioned several connected modes is comparatively complicated, and must finish the reinforcing bar connection before concreting, is not suitable for the assembling construction of precast concrete.And in the construction of prefabricated reinforced concrete structure, adopt a kind of reinforcing steel bar connecting sleeve tube to connect usually.This connected mode principle is roughly as follows: see through the hollow type reinforcing steel bar connecting sleeve tube of casting, reinforcing bar penetrates sleeve inner from both ends open, does not need to overlap or fuse, and fills the structural mortar of high strength microdilatancy between reinforcing bar and sleeve, namely finishes the steel bar joining action.The mechanism of its connection mainly is subjected to the Shu Zuoyong that encloses of sleeve with mortar, add and itself have the microdilatancy characteristic, positive acting power between enhancing and reinforcing bar, sleeve inboard by this, reinforcing bar namely by the frictional force of this positive force and rough surface generation, transmits reinforcement stresses.Grout sleeve syndeton bonding strength is good, and easy to operate, is used widely in the prefabricated reinforced concrete structure.
But in the above-mentioned sleeve connected mode, usually adopt the mode that is positioned at the top of overfolw hole in the grout hole, grouting is to pour into the structural mortar of high strength microdilatancy from the grout hole of its sidewall, the slit that filled with mortar tube wall and reinforcing bar form, and under the effect of gravity, flow out from overfolw hole.Generally can not poured into slurries so be positioned at the grout hole superjacent air space in the sleeve cavity, reduced bonding strength.And in filling process, between the formed slit of tube wall and reinforcing bar, especially have certain proportion in the gap of two steel bar ends and hole occurs, cause the bonding strength of reinforcing bar to reduce.And when prefabricated building components was installed, whether the reinforced bar sleeve of grouting after finishing did not have plant and instrument can nondestructive testing qualified, and not with the method for its dismounting.In case resident air and then hole occurs in the slip casting will cause building potential safety hazard to occur.Still do not have at present and a kind ofly can guarantee branch sleeve grouting qualified constructure scheme fully.
Summary of the invention
The objective of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of sleeve force due to centrifugal action formula grouting construction method for the reinforcing bar connection is proposed, by elastomeric pad and Sealing formboard prefabricated units and lower member are constituted a sealed whole body, and at branch sleeve be tightly connected Grouting Pipe, pressure meter and one way valve, by the mode of pressure type slip casting, improved the qualification rate of grouting afterwards.
Purpose of the present invention is finished by following technical scheme:
A kind of sleeve force due to centrifugal action formula grouting construction method for the reinforcing bar connection, relate to the connection between the prefabricated units that have the lower member of assembling reinforcing bar and be embedded with some branch sleeves, offer overfolw hole on the described branch sleeve sidewall and be positioned at the grout hole of overfolw hole below, it is characterized in that this method has following steps:
In described some branch sleeves, select the grout hole of any one branch sleeve Grouting Pipe, the overfolw hole pressure meter that is tightly connected that is tightly connected, and will remain the grout hole of branch sleeve and the overfolw hole one way valve that all is tightly connected;
Adopt sealing device that described prefabricated units and lower member joint are tightly connected and be one;
Slurries are pumped in the current branch sleeve by Grouting Pipe;
Pressure meter stops slip casting after showing that pressure reaches threshold value.
Described method comprises that also mending slurry confirms step:
Treat described stop slip casting after, unload Grouting Pipe and pressure meter on the current branch sleeve, and the one way valve that on its grout hole and overfolw hole, is tightly connected;
In described residue branch sleeve, select any one, at its grout hole Grouting Pipe, overfolw hole pressure meter that is tightly connected that is tightly connected;
Slurries are pumped in the current branch sleeve by Grouting Pipe;
Pressure meter stops slip casting after showing that pressure reaches threshold value.
Described method also comprises the steps: before slip casting in described branch sleeve, adopts air pump to ventilate in branch sleeve by Grouting Pipe, to test the sealing performance of described branch sleeve and sealing device.
Described sealing device comprises elastomeric pad, Sealing formboard and connector, the concrete steps of its be tightly connected prefabricated units and lower member are: the surface in the nearly lower member of described prefabricated units place coats described elastomeric pad, and coats described elastomeric pad on surface, the nearly prefabricated units of lower member place; Suit Sealing formboard on elastomeric pad; Adopt connector that described Sealing formboard, elastomeric pad are fixed on described prefabricated units and lower member at last.
Described connector comprises bolt, and described bolt passes through described Sealing formboard, elastomeric pad and described prefabricated units and/or lower member bolt.
Described connector comprises the lock ring device, and described lock ring device is set in the Sealing formboard outside.
Described prefabricated units sidewall and described lower member upper surface join and constitute L shaped structure, in described some elastomeric pads some are coated on described prefabricated units sidewall and the end to end closed circular that is, the residual elasticity pad is covered in described lower member upper surface and is closed circular around described prefabricated units, described Sealing formboard shape and described prefabricated units form fit also are set with described elastomeric pad and prefabricated units, described Sealing formboard lower end is provided with flange, reaches flange in described lower member upper surface, the described elastomeric pad and stacks successively from the bottom to top.
Described grout hole and overfolw hole inwall are provided with internal thread, and all have been threaded and two lead to adapter, and described two lead to and take over the other end connection transition nuts that has been threaded, and described connection transition nuts thread seal connects described one way valve, pressure meter and Grouting Pipe.
Described grout hole is positioned at the bottom of described branch sleeve sidewall.
Term in the technique scheme " current branch sleeve " is defined as meaning the branch sleeve that is selected as current slip casting hereby, namely is connected with the branch sleeve of pressure meter and Grouting Pipe.
Advantage of the present invention is: simple in structure, easy to use; Improved the qualification rate of branch sleeve grouting greatly.
Description of drawings
Fig. 1 is embodiment 1 related device overall structure schematic diagram;
Fig. 2 is the local enlarged diagram of Fig. 1;
Fig. 3 is embodiment 1 formwork seal structural profile schematic diagram;
Fig. 4 is embodiment 2 formwork seal structural profile schematic diagrames.
The specific embodiment
Be described in further detail by the feature of the present invention of embodiment and other correlated characteristic below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
Shown in Fig. 1-4, mark 1-18 is respectively among the figure: prefabricated units 1, branch sleeve 2, lower member 3, elastomeric pad 4, Sealing formboard 5, adjust bolt 6, stirrup 7, precast reinforced 8, assembling reinforcing bar 9, flange 10, two lead to take over 11, transition attaching nut 12, grouting pressure table 13, one way valve 14, grouting pump 15, Grouting Pipe 16, grout hole 17, overfolw hole 18.
Embodiment 1:
Referring to accompanying drawing 1, the described a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar of present embodiment relates generally between prefabricated units 1 and the lower member 3 and is connected and fixed by branch sleeve 2 slip castings.Lower member 3 upper surfaces are raised with assembling reinforcing bar 9, and prefabricated units 1 are held on the lower member 3.Prefabricated units 1 are rectangular-shaped structure, and its four sidewalls join with lower member 3 upper surfaces respectively and constitute L shaped turning.Prefabricated units 1 inside is embedded with some precast reinforced 8 and some branch sleeves 2, and it is precast reinforced 8 that the opening of branch sleeve 2 upper ends is fitted with, and lower ending opening is fitted with assembling reinforcing bar 9.Offer grout hole 17 and overfolw hole 18 with its internal communication on the sidewall of branch sleeve 2, wherein overfolw hole 18 is positioned at the top of grout hole 17.Especially it should be noted that owing to adopt overfolw hole 18 to be positioned at the tube-in-tube structure of the top of grout hole 17 herein, be different from conventional mode from bottom to top and be in the milk, but adopt high pressure slip casting from lower to upper, so just need the formwork seal structure to seal.After branch sleeve 2 inside pour into slurries, precast reinforced 8 and assembling namely be connected and fixed by branch sleeve 2 between the reinforcing bar 9.But common grouting mode can't guarantee that its connection is all qualified, so guarantee its qualification rate by the mode of high pressure slip casting.For this reason, elastomeric pad 4 and Sealing formboard 5 have been set up.The concrete structure of above-mentioned related device is as follows:
Because prefabricated units 1 and lower member 3 have L shaped turning, so adopting, elastomeric pad 4 divides body structure, even some in the dry elasticity pad 4 are coated on the nearly lower member of prefabricated units 1 sidewall 3 places, and the end to end closed circular that is, 4 upper surfaces that place lower member 3 of remaining other elastomeric pads, and at prefabricated units 1 outer rim formation closed circular.The shape of Sealing formboard 5 main bodys and described prefabricated units 1 form fit have rectangular-shaped inner chamber, and its lower end horizontal-extending are provided with flange 10.The main part of Sealing formboard 5 is set in outside elastomeric pad 4 and the prefabricated units 1, and by stirrup 7 Sealing formboard, elastomeric pad 4 and prefabricated units 1 three is fixed.10 of flanges are pressed on the elastomeric pad 4 that is arranged on the lower member 3, and by adjusting flange 10, the elastomeric pad 4 and lower member 3 bolts that bolt 6 passes through described Sealing formboard 5.Thus, by elastomeric pad 4 and Sealing formboard 5 prefabricated units 1 and lower member 3 are sealed into one.The elastomeric material that elastomeric pad 4 can adopt intensity and elasticity to satisfy required performance is made, as vulcanized butyl rubber etc. not.
For pouring into slurries in the inner chamber that is implemented in branch sleeve 2, the side-walls of branch sleeve 2 nearly bottoms offers the grout hole 17 with its internal communication, and grout hole 17 is by the outward extending pipe shape of branch sleeve 2 sidewalls; The side-walls of nearly upper end offers the overfolw hole 18 with its internal communication on the branch sleeve 2, and overfolw hole 10 is equally by the outward extending pipe shape of branch sleeve 2 sidewalls; The internal diameter of grout hole 17 is greater than overfolw hole 18 internal diameters.Be similarly the effect of playing sealing, grout hole 17 and overfolw hole 18 inwalls are provided with internal thread 8, are connected with Grouting Pipe 16 parts such as grade by the mode that is threaded, and have guaranteed the sealing of grouting.
In conjunction with above-mentioned apparatus structure, the concrete steps that are used for the sleeve force due to centrifugal action formula grouting construction method that reinforcing bar connects are as follows:
Described prefabricated units 1 and lower member 3 butt joints are finished;
In described some branch sleeves in prefabricated units 1, select any one branch sleeve 2, and the Grouting Pipe 16 that on the grout hole 17 of this branch sleeve 2, is tightly connected, the overfolw hole 18 grouting pressure table 13 that is tightly connected, an one way valve 14 all is tightly connected on the grout hole 17 of residue branch sleeve 2 and the overfolw hole 18.Because lower member 3 and lower member 3 joints have the slit, branch sleeve 2 both ends open places have the slit equally, so be in the state of connection between the branch sleeve 2.Slurries can overflow from the lower ending opening of the branch sleeve 2 of current slip casting during slip casting, and enter in other branch sleeves 2, so need on the grout hole 17 of the branch sleeve 2 of slip casting and the overfolw hole 18 one way valve not to be set;
Surface at described prefabricated units 1 nearly lower member 3 places coats elastomeric pad 4, and coats elastomeric pad 4 on surface, lower member 3 nearly lower member 3 places.The described Sealing formboard 5 of suit on elastomeric pad 4.Adopt adjustment bolt 6 and/or stirrup 7 that described Sealing formboard 5, elastomeric pad 4 are fixed on described prefabricated units 1 and lower member 3 at last;
Adopt air pump by Grouting Pipe 16 ventilation in the branch sleeve 2, with the sealing performance at the connection of thread, elastomeric pad 4 and Sealing formboard 5 places that test described branch sleeve 2.During ventilation, the gas that pours in the branch sleeve 2 enters in the inside and both gaps of prefabricated units 1 and lower member 3 from both ends open, and by elastomeric pad 4 and Sealing formboard 5 shutoff.So work as grouting pressure table 13 reading just often, the said structure sealing performance is qualified, carries out next step; As undesired (pressure is less than normal value), then go wrong the test of ventilating again after inspection and the correction in the above-mentioned hermetically-sealed construction;
Drive by grouting pump 15, slurries are pumped in the current branch sleeve 2 by Grouting Pipe 16;
After grouting pressure table 13 shows that pressure reaches threshold value, stop slip casting.Threshold value described herein should be according to the concrete specification of grouting pump 15, Grouting Pipe 16, branch sleeve 2, and the sealing performance of hermetically-sealed construction is carried out concrete selection.Before practice of construction, should test repeatedly, reach how many times to determine that pressure in branch sleeve 2 and the member is minimum, can guarantee that its inside hole can not occur, manometric threshold value when this numerical value is slip casting.
After stopping slip casting, unload Grouting Pipe 16 and grouting pressure table 13 on this branch sleeve 2, and the one way valve 14 that on its grout hole 17 and overfolw hole 18, is tightly connected;
In above-mentioned residue branch sleeve 2, select any one, at its grout hole 17 Grouting Pipe 16, overfolw hole 18 grouting pressure table 13 that is tightly connected that is tightly connected;
Slurries are pumped in the current branch sleeve 2 by Grouting Pipe 16, because during first branch sleeve 2 grouting, slurries have entered in all the other branch sleeves 2, so this step reality is confirmed step for mending slurry, treat to stop slip casting after pressure meter demonstration pressure reaches threshold value.Successively residue branch sleeve 2 being mended slurry afterwards confirms;
After slip casting is finished, treat that slurries solidify back precast reinforced 8 on prefabricated units 1 and are connected with assembling reinforcing bar 9 on the lower member 3 and finish.
Embodiment 2:
Present embodiment is described in the job practices, remainder member and corresponding construction process are roughly the same, formwork seal under different building structure structure mainly is provided, referring to Fig. 4, lower member 3 has identical cross section with prefabricated units 1, so can adopt an elastomeric pad 4 that the two is sealed simultaneously.When namely Sealing formboard being installed, 4 times halves of elastomeric pad are coated on surface, lower member 3 nearly prefabricated units 1 place, its first half is coated on surface, prefabricated units 1 nearly lower member 3 place, and the whole end to end closed circular that is.Sealing formboard 5 then integral body compresses sealing by twice stirrup 7 afterwards with elastomeric pad 4 suits.
Although abovely be described in detail for embodiment of the present invention by numerous different embodiment, the scope of law that it will be appreciated by those skilled in the art that this description is limited by the words of appending claims of the present invention.It is exemplary that this detailed description should be construed as merely, rather than describe each possible embodiment.The structure of above elastomeric pad 4 and Sealing formboard 5 is applicable to that mainly lower member 3 and prefabricated units 1 joint have the situation at turning, so be equally applicable to the prefabricated units 1 of cylindric or prism-shaped.And for the sealing of using reinforcing steel bar connecting sleeve tube 2 positions in the architectural construction, because the variation of building structure, should according to the prefabricated units 1 that are embedded with branch sleeve 2 and with the concrete shape of the lower member 3 of prefabricated units 1 assembling, and the structure of the two joint, select the concrete structure of elastomeric pad 4 and Sealing formboard 5, and by suitable connector the two is pressed abd fixed on prefabricated units 1 and the lower member 3.

Claims (8)

1. one kind is used for the sleeve force due to centrifugal action formula grouting construction method that reinforcing bar connects, relate to the connection between the prefabricated units that have the lower member of assembling reinforcing bar and be embedded with some branch sleeves, offer overfolw hole on the described branch sleeve sidewall and be positioned at the grout hole of overfolw hole below, it is characterized in that this method has following steps:
In described some branch sleeves, select the grout hole of any one branch sleeve Grouting Pipe, the overfolw hole pressure meter that is tightly connected that is tightly connected, and will remain the grout hole of branch sleeve and the overfolw hole one way valve that respectively is tightly connected;
Adopt sealing device that described prefabricated units and lower member joint are tightly connected and be one, described sealing device comprises elastomeric pad, Sealing formboard and connector, the be tightly connected concrete steps of prefabricated units and lower member of described sealing device are: the surface in the nearly lower member of described prefabricated units place coats described elastomeric pad, and coats described elastomeric pad on surface, the nearly prefabricated units of lower member place; Suit Sealing formboard on elastomeric pad; Adopt connector that described Sealing formboard, elastomeric pad are fixed on described prefabricated units and lower member at last;
Slurries are pumped in the current branch sleeve by Grouting Pipe;
Pressure meter stops slip casting after showing that pressure reaches threshold value.
2. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1 is characterized in that also comprising that mending slurry confirms step:
Treat described stop slip casting after, unload Grouting Pipe and pressure meter on the current branch sleeve, and the one way valve that on its grout hole and overfolw hole, is tightly connected;
In described residue branch sleeve, select any one, at its grout hole Grouting Pipe, overfolw hole pressure meter that is tightly connected that is tightly connected;
Slurries are pumped in the current branch sleeve by Grouting Pipe;
Pressure meter stops slip casting after showing that pressure reaches threshold value.
3. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that described method also comprises the steps: before slip casting in described branch sleeve, adopt air pump to ventilate in branch sleeve by Grouting Pipe, to test the sealing performance of described branch sleeve and sealing device.
4. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that: described connector comprises bolt, and described bolt passes through described Sealing formboard, elastomeric pad and described prefabricated units and/or lower member bolt.
5. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that: described connector comprises the lock ring device, described lock ring device is set in the Sealing formboard outside.
6. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that: described prefabricated units sidewall and described lower member upper surface join and constitute L shaped structure, in described some elastomeric pads some are coated on described prefabricated units sidewall and the end to end closed circular that is, the residual elasticity pad is covered in described lower member upper surface and is closed circular around described prefabricated units, described Sealing formboard shape and described prefabricated units form fit also are set with described elastomeric pad and prefabricated units, described Sealing formboard lower end is provided with flange, described lower member upper surface, described elastomeric pad and flange stack from the bottom to top successively.
7. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that: described grout hole and overfolw hole inwall are provided with internal thread, and all be threaded and two led to adapter, described two lead to and take over the other end connection transition nuts that has been threaded, and described connection transition nuts thread seal connects described one way valve, pressure meter and Grouting Pipe.
8. a kind of sleeve force due to centrifugal action formula grouting construction method that connects for reinforcing bar according to claim 1, it is characterized in that: described grout hole is positioned at the bottom of described branch sleeve sidewall.
CN 201110325119 2011-10-24 2011-10-24 Sleeve pressure type grouting construction method for steel reinforcement connection Active CN102392511B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110325119 CN102392511B (en) 2011-10-24 2011-10-24 Sleeve pressure type grouting construction method for steel reinforcement connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110325119 CN102392511B (en) 2011-10-24 2011-10-24 Sleeve pressure type grouting construction method for steel reinforcement connection

Publications (2)

Publication Number Publication Date
CN102392511A CN102392511A (en) 2012-03-28
CN102392511B true CN102392511B (en) 2013-08-28

Family

ID=45859883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110325119 Active CN102392511B (en) 2011-10-24 2011-10-24 Sleeve pressure type grouting construction method for steel reinforcement connection

Country Status (1)

Country Link
CN (1) CN102392511B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314314B (en) * 2014-11-17 2016-05-11 中冶建筑研究总院有限公司 A kind of grouting connection construction method
CN106401191B (en) * 2016-10-26 2022-10-04 曲周县和盛新型建筑材料有限公司 Grouting device for steel shear structure assembly type building and construction method thereof
CN107338744B (en) * 2017-07-25 2023-06-02 江联重工集团股份有限公司 Intermittent sealing device for longitudinal steel bars of concrete pouring of hard shoulder
CN107476498B (en) * 2017-08-09 2019-06-14 上海宝冶工程技术有限公司 A kind of sleeve is vertically in the milk special fixture
CN108104376A (en) * 2017-11-29 2018-06-01 上海建工五建集团有限公司 Prefabricated components sleeve grouting metering control and method
CN109469265B (en) * 2018-11-02 2021-02-05 中民筑友建设科技集团有限公司 Plugging device of adjacent vertical component seam
CN109469264B (en) * 2018-11-02 2021-02-05 中民筑友建设科技集团有限公司 Plugging plate and plugging device of grouting sleeve communicating bin
CN109736573B (en) * 2018-12-14 2020-11-27 东南大学 Built-in vibrating device based on construction of sleeve post-grouting
CN111851865A (en) * 2019-04-25 2020-10-30 润弘精密工程事业股份有限公司 Reinforcing steel bar coupler and precast building structure with same
CN113668898B (en) * 2021-09-26 2022-08-16 昆山市建设工程质量检测中心 Filling and renovation method for defect of air pocket type grouting in middle of sleeve

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0796840B2 (en) * 1993-12-13 1995-10-18 株式会社淺沼組 Reinforcing bar joining method
CN101270576A (en) * 2008-03-25 2008-09-24 广厦建设集团有限责任公司 Secondary segmenting slip casting method for miniature pile
CN101338563B (en) * 2008-08-27 2010-06-02 中国水利水电第八工程局有限公司 Sleeve grouting method and grouting device thereof
CN102071776A (en) * 2009-11-23 2011-05-25 黑龙江宇辉新型建筑材料有限公司 Precast grouted steel bar connecting sleeve and construction method thereof
CN102071774A (en) * 2009-11-23 2011-05-25 黑龙江宇辉新型建筑材料有限公司 Insertion grouted reinforcing steel bar connecting sleeve and construction method thereof

Also Published As

Publication number Publication date
CN102392511A (en) 2012-03-28

Similar Documents

Publication Publication Date Title
CN102392511B (en) Sleeve pressure type grouting construction method for steel reinforcement connection
WO2018219196A1 (en) Precast column base joint and construction method therefor
CN108625536B (en) Precast concrete vertical member grouting channel design method
CN102359672B (en) Prestressed steel cylinder concrete push pipe
CN202266039U (en) Sleeve pressure type grout injection construction device for steel bar connection
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN105019558A (en) Steel bar anchoring connection structure and connection method for precast fabricated concrete components
CN202266018U (en) Template sealing structure for grouting of connecting sleeve
CN106015824A (en) Hydrostatic test plugging device and method for prestressed concrete cylinder pipe
CN103590541A (en) Grout sleeve for connecting prefabricated member steel bars and construction method of grout sleeve
CN106595991A (en) Hydraulic test device of prefabricated pipe rack joint and using method thereof
CN104196244B (en) Tandem circulation squeezing unit and mud jacking method
CN107288024B (en) Assembled beam body and construction method thereof
CN105014785A (en) Steel bar anchoring preformed hole forming device and method for prefabricated assembled type concrete members
CN203701436U (en) Lap joint structure of vertical reinforcements and steel sleeve of assembled wall
CN102425309B (en) Sleeve pressure type grouting construction device for connection of steel bars
CN202265941U (en) Connecting sleeve used for pressure grouting
CN112324055B (en) Prefabricated vertical component and sleeve grouting construction method thereof
CN201217889Y (en) Plug-in type grouting reinforced steel coupling sleeve
CN113187493A (en) Control method for preventing negative ring duct piece from floating upwards in steel sleeve of shield tunneling machine
CN210767339U (en) Sleeve goes out thick liquid pipe positioning die and is convenient for inspect wall body of grout quality
CN204944762U (en) PCCP steel cylinder sealing hydrostatic test machine
CN204844467U (en) Prefabricated assembled steel bar anchoring preformed hole pore -forming device for concrete member
CN108131494A (en) The construction method that a kind of steel pipe is connect with concrete prefabricated pipe
CN110374265A (en) A kind of connection of half grout sleeve of assembly concrete and construction control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Applicant after: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

Address before: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Applicant before: Shanghai No.2 Municipal Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD. TO: SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant