CN102389972A CN2011103686673A CN201110368667A CN102389972A CN 102389972 A CN102389972 A CN 102389972A CN 2011103686673 A CN2011103686673 A CN 2011103686673A CN 201110368667 A CN201110368667 A CN 201110368667A CN 102389972 A CN102389972 A CN 102389972A
Authority
CN
China
Prior art keywords
filling
screw rod
spacing screw
swing arm
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103686673A
Other languages
Chinese (zh)
Other versions
CN102389972B (en
Inventor
蒋其明
栾长平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Haili Precision Machinery Manufacturing Co Ltd
Original Assignee
Yangzhou Haili Precision Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Haili Precision Machinery Manufacturing Co Ltd filed Critical Yangzhou Haili Precision Machinery Manufacturing Co Ltd
Priority to CN201110368667.3A priority Critical patent/CN102389972B/en
Publication of CN102389972A publication Critical patent/CN102389972A/en
Application granted granted Critical
Publication of CN102389972B publication Critical patent/CN102389972B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a powder molding machine for molding a multi-layer powder product and a molding method thereof. The molding method comprises the following steps: 1) determining the filling depth of each section of powder in accordance with the requirements of the product, and adjusting the position of each filling adjustment spacing screw rod through a first filling adjustment mechanism, a second filling adjustment mechanism,..., and an n<th> filling adjustment mechanism; determining the position of each demolding swing arm in accordance with the position of each filling adjustment spacing screw rod, namely that the position of a first demolding swing arm is corresponding to the position of a first filling adjustment spacing screw rod,..., and the position of an (n-1)<th> demolding swing arm is corresponding to the position of an (n-1)<th> filling adjustment spacing screw rod; and locking each demolding swing arm; 2) driving a mold cavity mechanism to move upwards under the action of a resetting cylinder, and stopping the upward movement when the first filling adjustment spacing screw rod is reached, thus completing the first filling; 3) releasing the first demolding swing arm, driving the mold cavity mechanism to continue moving upwards under the action of the resetting cylinder, and stopping the upward movement when the second filling adjustment spacing screw rod is reached, thus completing the second filling; 4) repeating the step 3) until the n<th> filling is completed; and 5) after the filling is completed, moving an upper punch downwards to press and mold the product, and demolding to obtain the final product. The invention provides a powder molding machine capable of well molding a multi-layer powder product and a molding method thereof.

Description

Powder former and utilize the forming method of this make-up machine moulding multi-layer product
Technical field
The present invention relates to a kind of powder former and forming method thereof, relate in particular to a kind of powder former and forming method thereof of moulding multilayer powder goods.
Background technology
Along with the appearance of mechanical powder moulding machine, complicacy, small-sized, in enormous quantities high strength production of articles are become a reality, brought great chance to powder metallurgy industry, also created advantage for the development of powder metallurgy industry.
Now along with sintered metal product quality, goods complexity have been proposed more strict requirement; If such as goods require double-deck powder of oil-containing or multilayer powder in pressing process, just need twice feeding or repeatedly feeding, twice filling or repeatedly filling; The mode of producing this kind goods at present generally adopts the semi-hand mechanical mode to produce, but this kind mode of production one comes production efficiency low, and the two also is difficult to guarantee Products Quality because adopt semi-hand, half mechanical system production.
Summary of the invention
The present invention is directed to above-mentioned defective, the forming method that purpose is that the powder former of the good moulding multilayer of a kind of ability powder goods is provided and utilizes this make-up machine moulding multi-layer product.
The technical scheme that adopts of the present invention is for this reason: the present invention includes once filling adjusting mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism, powder feeding mechanism and die cavity mechanism; Said primary filling guiding mechanism comprises primary filling adjustment motor; Primary filling adjustment motor connects primary filling through transmission mechanism and adjusts spacing screw rod, and primary filling is adjusted spacing screw rod bottom and established the primary filling limited roller; Said secondary filling adjusting mechanism comprises secondary filling adjustment motor, and secondary filling adjustment motor connects the secondary filling through transmission mechanism and adjusts spacing screw rod, and the secondary filling is adjusted spacing screw rod bottom and established secondary filling limited roller; Said n filling adjusting mechanism comprises n filling adjustment motor, and n filling adjustment motor connects n filling through transmission mechanism and adjusts spacing screw rod, and n filling adjusted spacing screw rod bottom and established the filling limited roller n time; Said once adjust spacing screw rod, secondary adjust spacing screw rod ..., n the spacing screw rod of adjustment rise on lengthwise position successively; Said die cavity mechanism is arranged on the bottom of powder feeding mechanism; Die cavity mechanism bottom connects reset cylinder through a lifters; Reset cylinder top establish successively the demoulding swing arm of going up and down, secondary demoulding swing arm with the corresponding restriction lifters of each filling adjusting mechanism ..., n-1 demoulding swing arm, each demoulding swing arm all can appear the locking or movable two states.
The spacing piston of filling that said each demoulding swing arm top is established driving cylinder respectively and driven by driving cylinder, the firm driving direction of said driving is variable.
The present invention carries out according to the following steps:
1) at first require to confirm the depth of fill of each section powder according to goods, then through primary filling guiding mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism adjust the position that spacing screw rod is adjusted in each filling; The position of each demoulding swing arm is confirmed in the position of adjusting spacing screw rod according to each filling then; Promptly the corresponding primary filling in the position of a demoulding swing arm adjust spacing screw rod the position ..., n-1 demoulding swing arm corresponding this filling of n-1 in position adjust the position of spacing screw rod, and with each demoulding swing arm locking;
2) die cavity mechanism moves upward under the drive of reset cylinder, stops when primary filling is adjusted spacing screw rod until running into, and primary filling finishes;
3) remove a demoulding swing arm, die cavity mechanism continues to move upward under the drive of reset cylinder, stops the secondary sand off up to running into when spacing screw rod is adjusted in the secondary filling;
4) repeat 3) step, until n sand off;
5) after the sand off, on sweep away row compacting and make product molding, the back demoulding makes.
Advantage of the present invention is: the present invention can improve the production efficiency and the quality of item of multilayer pulverulent product greatly; Many drawbacks such as manual production multilayer pulverulent product inefficiency, unstable product quality have in the past been changed, for high efficiency, the production of high-quality multilayer pulverulent product are laid a good foundation.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the kinematic roadmap of feeding cam among Fig. 1.
Fig. 4 is the structural representation of material boots among Fig. 1.
1 is reset cylinder among the figure; 2 are primary filling adjustment motor; 3 are primary filling adjustment gear train; 4 is the primary filling limited roller; 5 adjust spacing screw rod for primary filling; 6 are secondary filling adjustment gear train; 7 are secondary filling adjustment motor; 8 are the spacing piston of filling; 9 are the material boots; 10 are the powder feeding swing arm; 11 are the powder feeding cam; 12 is mould bases; 13 are the spacing air cylinder group installing plate of filling; 14 are demoulding swing arm; 15 is secondary filling limited roller; 16 is lower pulling plate; 17 are following traveller; 18 is the gas-liquid conversion cylinder.
The specific embodiment
The present invention includes once filling adjusting mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism, powder feeding mechanism and die cavity mechanism; Said primary filling guiding mechanism comprises primary filling adjustment motor; Primary filling adjustment motor connects primary filling through transmission mechanism and adjusts spacing screw rod, and primary filling is adjusted spacing screw rod bottom and established the primary filling limited roller; Said secondary filling adjusting mechanism comprises secondary filling adjustment motor, and secondary filling adjustment motor connects the secondary filling through transmission mechanism and adjusts spacing screw rod, and the secondary filling is adjusted spacing screw rod bottom and established secondary filling limited roller; Said n filling adjusting mechanism comprises n filling adjustment motor, and n filling adjustment motor connects n filling through transmission mechanism and adjusts spacing screw rod, and n filling adjusted spacing screw rod bottom and established the filling limited roller n time; Said once adjust spacing screw rod, secondary adjust spacing screw rod ..., n the spacing screw rod of adjustment rise on lengthwise position successively; Said die cavity mechanism is arranged on the bottom of powder feeding mechanism; Die cavity mechanism bottom connects reset cylinder through a lifters; Reset cylinder top establish successively the demoulding swing arm of going up and down, secondary demoulding swing arm with the corresponding restriction lifters of each filling adjusting mechanism ..., n-1 demoulding swing arm, each demoulding swing arm all can appear the locking or movable two states.
The spacing piston of filling that said each demoulding swing arm top is established driving cylinder respectively and driven by driving cylinder, the firm driving direction of said driving is variable.
The present invention carries out according to the following steps:
1) at first require to confirm the depth of fill of each section powder according to goods, then through primary filling guiding mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism adjust the position that spacing screw rod is adjusted in each filling; The position of each demoulding swing arm is confirmed in the position of adjusting spacing screw rod according to each filling then; Promptly the corresponding primary filling in the position of a demoulding swing arm adjust spacing screw rod the position ..., n-1 demoulding swing arm corresponding this filling of n-1 in position adjust the position of spacing screw rod, and with each demoulding swing arm locking;
2) die cavity mechanism moves upward under the drive of reset cylinder, stops when primary filling is adjusted spacing screw rod until running into, and primary filling finishes;
3) remove a demoulding swing arm, die cavity mechanism continues to move upward under the drive of reset cylinder, stops the secondary sand off up to running into when spacing screw rod is adjusted in the secondary filling;
4) repeat 3) step, until n sand off;
5) after the sand off, on sweep away row compacting and make product molding, the back demoulding makes.
Come to set forth in detail the course of work of the present invention with secondary feeding, secondary filling below: 1) the present invention at first requires to confirm the depth of fill of one, two powder according to goods; Thereby adjust the position that spacing screw rod is adjusted in each filling through first and second time filling adjusting mechanism, and set the action of each gas, liquid, electric system; The airdraulic actuator epicoele normal open gas of the depth of fill of control one, two powder; So that the spacing piston of filling stops the come-up of demoulding swing arm at face bottom; Thereby the come-up of die face in the control; The realization filling needs, and the power that the pressure of gas-liquid conversion cylinder cylinder of the present invention should make the spacing piston of filling produce is slightly larger than the power that makes progress that reset cylinder produces;
2) after the machine demoulding began, along with going deep into of the demoulding, the feeding swing arm drove the material boots and moves forward under demoulding action of cam; The demoulding finishes; Goods are deviate from die cavity fully; This moment, feeding cam went to isometrical section 1-2 from 6, and expected that boots release goods and material boots chamber directly over die cavity this moment, and the filling first time begins; And middle die face is moved upward under the promotion of reset cylinder and runs into primary filling and adjust spacing screw rod and stop, and filling for the first time, feeding finish;
3) magnetic valve of control gas-liquid conversion cylinder commutates under the control of PLC; The spacing piston constraint relief of filling moves up; Demoulding swing arm moves up immediately, and middle die face moves up under the promotion of reset cylinder and stops until running into the secondary filling to adjust spacing screw rod; This moment, feeding cam went to 3-4 from isometrical section 1-2, and same feeding material boots chamber rollback carries out the feeding filling to middle die face die cavity top, the sand off of feeding for the second time;
4) last feeding cam is converted to isometrical section 5-6 from isometrical section 3-4, and the material boots can fall back on rear, on sweep away row and carry out pressed ware, the machine run demoulding again, feeding, filling, completion once circulate.
More than be the forming method of two layers of pulverulent product, the forming method principle of multilayer pulverulent product is the same.

Claims (4)

1. powder former; It is characterized in that; Include primary filling guiding mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism, powder feeding mechanism and die cavity mechanism; Said primary filling guiding mechanism comprises primary filling adjustment motor, and primary filling adjustment motor connects primary filling through transmission mechanism and adjusts spacing screw rod, and primary filling is adjusted spacing screw rod bottom and established the primary filling limited roller; Said secondary filling adjusting mechanism comprises secondary filling adjustment motor, and secondary filling adjustment motor connects the secondary filling through transmission mechanism and adjusts spacing screw rod, and the secondary filling is adjusted spacing screw rod bottom and established secondary filling limited roller; Said n filling adjusting mechanism comprises n filling adjustment motor, and n filling adjustment motor connects n filling through transmission mechanism and adjusts spacing screw rod, and n filling adjusted spacing screw rod bottom and established the filling limited roller n time; Said once adjust spacing screw rod, secondary adjust spacing screw rod ..., n the spacing screw rod of adjustment rise on lengthwise position successively; Said die cavity mechanism is arranged on the bottom of powder feeding mechanism; Die cavity mechanism bottom connects reset cylinder through a lifters; Reset cylinder top establish successively the demoulding swing arm of going up and down, secondary demoulding swing arm with the corresponding restriction lifters of each filling adjusting mechanism ..., n-1 demoulding swing arm, each demoulding swing arm all can appear the locking or movable two states.
2. powder former according to claim 1; It is characterized in that; Include primary filling guiding mechanism, secondary filling adjusting mechanism, powder feeding mechanism and die cavity mechanism; Said primary filling guiding mechanism comprises primary filling adjustment motor, and primary filling adjustment motor connects primary filling through transmission mechanism and adjusts spacing screw rod, and primary filling is adjusted spacing screw rod bottom and established the primary filling limited roller; Said secondary filling adjusting mechanism comprises secondary filling adjustment motor, and secondary filling adjustment motor connects the secondary filling through transmission mechanism and adjusts spacing screw rod, and the secondary filling is adjusted spacing screw rod bottom and established secondary filling limited roller; Said primary filling is adjusted spacing screw rod and is in the top that spacing screw rod is adjusted in the secondary filling; Said die cavity mechanism is arranged on the bottom of powder feeding mechanism, and die cavity mechanism bottom connects reset cylinder through a lifters, and the demoulding swing arm that a restriction lifters is gone up and down is established on reset cylinder top, and this demoulding swing arm can present locking or movable two states.
3. powder former according to claim 1 and 2 is characterized in that, the spacing piston of filling that said each demoulding swing arm top is established driving cylinder respectively and driven by driving cylinder, and the driving direction of said driving cylinder is variable.
4. utilize the forming method of power claim 1 or 2 moulding multi-layer products, it is characterized in that, carry out according to the following steps:
1) at first require to confirm the depth of fill of each section powder according to goods, then through primary filling guiding mechanism, secondary filling adjusting mechanism ..., n filling adjusting mechanism adjust the position that spacing screw rod is adjusted in each filling; The position of each demoulding swing arm is confirmed in the position of adjusting spacing screw rod according to each filling then; Promptly the corresponding primary filling in the position of a demoulding swing arm adjust spacing screw rod the position ..., n-1 demoulding swing arm corresponding this filling of n-1 in position adjust the position of spacing screw rod, and with each demoulding swing arm locking;
2) die cavity mechanism moves upward under the drive of reset cylinder, stops when primary filling is adjusted spacing screw rod until running into, and primary filling finishes;
3) remove a demoulding swing arm, die cavity mechanism continues to move upward under the drive of reset cylinder, stops the secondary sand off up to running into when spacing screw rod is adjusted in the secondary filling;
4) repeat 3) step, until n sand off;
5) after the sand off, on sweep away row compacting and make product molding, the back demoulding makes.
CN201110368667.3A 2011-11-20 2011-11-20 Powder former and utilize the forming method of the shaping multi-layer product of this forming machine Active CN102389972B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110368667.3A CN102389972B (en) 2011-11-20 2011-11-20 Powder former and utilize the forming method of the shaping multi-layer product of this forming machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110368667.3A CN102389972B (en) 2011-11-20 2011-11-20 Powder former and utilize the forming method of the shaping multi-layer product of this forming machine

Publications (2)

Publication Number Publication Date
CN102389972A true CN102389972A (en) 2012-03-28
CN102389972B CN102389972B (en) 2016-03-16

Family

ID=45857424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110368667.3A Active CN102389972B (en) 2011-11-20 2011-11-20 Powder former and utilize the forming method of the shaping multi-layer product of this forming machine

Country Status (1)

Country Link
CN (1) CN102389972B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105270881A (en) * 2015-11-17 2016-01-27 深圳市麦捷微电子科技股份有限公司 Powder feeder device
CN108213417A (en) * 2017-12-31 2018-06-29 扬州市海力精密机械制造有限公司 A kind of secondary powder filler structure for powder pressing forming
CN114951650A (en) * 2022-05-27 2022-08-30 扬州鼎隆机械有限公司 Lifting adjusting device and powder forming device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1231962A (en) * 1998-04-16 1999-10-20 朱锦忠 Powder shaping press
JP2003170298A (en) * 2001-09-28 2003-06-17 Mitsubishi Materials Corp Powder molding die and manufacturing method of powder- molded product
CN101323181A (en) * 2007-06-12 2008-12-17 朱锦忠 Multiple-layer powder feeder of powder formation press
JP2009291799A (en) * 2008-06-03 2009-12-17 Kohtaki Seiki Kk Powder molding press machine
JP2010047806A (en) * 2008-08-22 2010-03-04 Hitachi Powdered Metals Co Ltd Molding die device and method for molding molded body having female screw part-fitted shaft hole using the same
CN201471744U (en) * 2009-04-02 2010-05-19 南通锻压设备有限公司 Automatic molding hydraulic machine of double-layer friction material
CN201941226U (en) * 2010-12-24 2011-08-24 严培义 Secondary majority/minority filling mechanism of powder forming machine
CN202427940U (en) * 2011-11-20 2012-09-12 扬州市海力精密机械制造有限公司 Power forming machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1231962A (en) * 1998-04-16 1999-10-20 朱锦忠 Powder shaping press
JP2003170298A (en) * 2001-09-28 2003-06-17 Mitsubishi Materials Corp Powder molding die and manufacturing method of powder- molded product
CN101323181A (en) * 2007-06-12 2008-12-17 朱锦忠 Multiple-layer powder feeder of powder formation press
JP2009291799A (en) * 2008-06-03 2009-12-17 Kohtaki Seiki Kk Powder molding press machine
JP2010047806A (en) * 2008-08-22 2010-03-04 Hitachi Powdered Metals Co Ltd Molding die device and method for molding molded body having female screw part-fitted shaft hole using the same
CN201471744U (en) * 2009-04-02 2010-05-19 南通锻压设备有限公司 Automatic molding hydraulic machine of double-layer friction material
CN201941226U (en) * 2010-12-24 2011-08-24 严培义 Secondary majority/minority filling mechanism of powder forming machine
CN202427940U (en) * 2011-11-20 2012-09-12 扬州市海力精密机械制造有限公司 Power forming machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105270881A (en) * 2015-11-17 2016-01-27 深圳市麦捷微电子科技股份有限公司 Powder feeder device
CN108213417A (en) * 2017-12-31 2018-06-29 扬州市海力精密机械制造有限公司 A kind of secondary powder filler structure for powder pressing forming
CN114951650A (en) * 2022-05-27 2022-08-30 扬州鼎隆机械有限公司 Lifting adjusting device and powder forming device
CN114951650B (en) * 2022-05-27 2024-01-02 扬州鼎隆机械有限公司 Lifting adjusting device and powder forming device

Also Published As

Publication number Publication date
CN102389972B (en) 2016-03-16

Similar Documents

Publication Publication Date Title
CN101036935B (en) Double-station horizontal parting and removable flask shoot and squeeze molding machine
CN202448365U (en) Tablet press
CN201044937Y (en) Double-station horizontal parting flaskless shootsqueeze molding machine
CN1817630A (en) Split die and method for production of compacted powder metal parts
CN202427940U (en) Power forming machine
CN106239844B (en) A kind of oblique core pulling differential linkage stripper apparatus of the straight plunger tip of injection mold
CN102389972A (en) Powder molding machine and molding method for molding multi-layer product by using same
CN106142637B (en) A kind of automatic Powder forming press
CN103596712A (en) Method for manufacturing casting moulds, apparatus for carrying out said method, and apparatus for filling moulding sand into packing frame and moulding box
CN104085036A (en) Hydraulic press capable of conducting double-layer pressing and pressing method of hydraulic press
CN201456181U (en) Inorganic light heat-preservation wall tile forming machine
CN204892883U (en) Sandbox mould make -up machine
CN106113557A (en) A kind of movable extrusion forming device and method of work thereof
CN211990920U (en) Female die control mechanism adopting pneumatic control form
CN106976153B (en) Double-layer cloth brick making press machine
CN200977693Y (en) Double-die three-station filling and pressing device
CN102615701B (en) Automatic tile billet forming machine
JP2010214456A (en) Press-forming method
CN106424717A (en) Rare-earth powder high-pressure forming system
CN101693291B (en) Metal material forming die
CN206122694U (en) Tombarthite powder high pressure molding system
CN107696408A (en) Efficiently injection molding of the production with metal insert plastic
CN109016090B (en) Forming die for preventing ET and RT soft magnetic ferrite magnetic cores from cracking and working method thereof
CN209479039U (en) Fro hydraulic driving machinery formula powder former
CN202685053U (en) Automatic unbaked tile molding machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Powder molding machine and molding method for molding multi-layer product by using same

Effective date of registration: 20160912

Granted publication date: 20160316

Pledgee: Bank of China Limited by Share Ltd Yizheng branch

Pledgor: Yangzhou Haili Precision Machinery Manufacturing Co., Ltd.

Registration number: 2016320000013

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170328

Granted publication date: 20160316

Pledgee: Bank of China Limited by Share Ltd Yizheng branch

Pledgor: Yangzhou Haili Precision Machinery Manufacturing Co., Ltd.

Registration number: 2016320000013

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Powder molding machine and molding method for molding multi-layer product by using same

Effective date of registration: 20170401

Granted publication date: 20160316

Pledgee: Bank of China Limited by Share Ltd Yizheng branch

Pledgor: Yangzhou Haili Precision Machinery Manufacturing Co., Ltd.

Registration number: 2017320000007

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20181206

Granted publication date: 20160316

Pledgee: Bank of China Limited by Share Ltd Yizheng branch

Pledgor: Yangzhou Haili Precision Machinery Manufacturing Co., Ltd.

Registration number: 2017320000007

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Powder molding machine and molding method for molding multi-layer product by using same

Effective date of registration: 20181207

Granted publication date: 20160316

Pledgee: Bank of China Limited by Share Ltd Yizheng branch

Pledgor: Yangzhou Haili Precision Machinery Manufacturing Co., Ltd.

Registration number: 2018320000348

PE01 Entry into force of the registration of the contract for pledge of patent right