CN102383610A - Construction method for sticking insulation board to wall surface - Google Patents

Construction method for sticking insulation board to wall surface Download PDF

Info

Publication number
CN102383610A
CN102383610A CN2011102602454A CN201110260245A CN102383610A CN 102383610 A CN102383610 A CN 102383610A CN 2011102602454 A CN2011102602454 A CN 2011102602454A CN 201110260245 A CN201110260245 A CN 201110260245A CN 102383610 A CN102383610 A CN 102383610A
Authority
CN
China
Prior art keywords
muscle
framed
sticking
insulation board
magazine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102602454A
Other languages
Chinese (zh)
Other versions
CN102383610B (en
Inventor
巢启
刘海锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110260245 priority Critical patent/CN102383610B/en
Publication of CN102383610A publication Critical patent/CN102383610A/en
Application granted granted Critical
Publication of CN102383610B publication Critical patent/CN102383610B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method for sticking an insulation board to the wall surface. Sticking the insulation board to the wall surface of an outer wall of a building is an effective measure to achieve energy saving and emission reduction in the building field. The measure has obvious effects and outstanding advantages. However, some technical bottlenecks, especially the unfirm attachment of the insulation board, exist in an existing construction method. The construction method utilizes a frame to position rib material boxes, cement plaster normally used on construction sites is directed fixed on the wall through material boxes to form sticking ribs, and the insulation board is then stuck on the sticking ribs. The construction method saves cost and has simple operation and high strength, and materials can be easily obtained. Compared with the traditional sticking method, the construction efficiency of the construction method for sticking the insulation board to the wall surface is improved by one time. The construction method for sticking the insulation board to the wall surface can be applied to site operation, strengthen on-site quality supervision, enable each construction step to achieve optimal effect and save construction cost simultaneously.

Description

A kind of on metope the job practices of paste heat-preserving plate
Technical field
The present invention relates to be a kind of on metope the job practices of paste heat-preserving plate, belong to technical field of buildings.
Background technology
Paste heat-preserving plate on the outer surface of wall of building is the effective measures of energy-saving and emission-reduction in the building field, because this measure effect is obvious, advantage is outstanding, and government has put into effect relevant policy to promote the use of.But at present in use the job practices, also exist some technical bottlenecks, make the technical optimal effect of also failing to reach.The most significantly example is pasted not strongly exactly in this respect, so that after each strong wind, all have warming plate on wall, to come off on the many buildings in the city, Beijing.Tracing it to its cause, is exactly the stickup problem of warming plate, and the stickup of warming plate at present all is to be employed in the stickup face of warming plate to starch the method for pasting on the naked wall with a frame cloth with dedicated mortar; The shortcoming of doing like this is that metope is uneven, when pasting thickness greater than 2cm, because of the bob of mortar stream forms empty sticking; In addition cement be dehydration after dry body of wall contacts; Cause adhesion strength not high, if whole metope is all used the floating paste heat-preserving again of cement mortar plate, effect certainly can be better; But such construction cost is too high, also increases the weight of metope gravity burden.The area of monolithic warming plate is bigger at present on the other hand, and difficulty of construction also just increases thereupon, pastes face at warming plate and is stained with the form that slurry is pasted again earlier, must exist the shortcoming that is pasted not strongly.Therefore, seeking a kind of job practices of reasonable science of paste heat-preserving plate, warming plate can be sticked on metope securely, is the technological progress of technical field of building construction.
Goal of the invention
The object of the invention just provide a kind of on metope the job practices of paste heat-preserving plate; It is unreasonable to overcome at present on building wall the job practices of paste heat-preserving plate; Make warming plate be pasted not strongly; Caducous deficiency through job practices of the present invention, makes warming plate can stick on building wall securely.
Be to realize above-mentioned purpose, the present invention has taked following technical proposals, a kind of on metope the job practices of paste heat-preserving plate, comprise the steps:
(1), to be benchmark, confirms a plane, and locate with locating pin as the directrix of pasting the muscle face apart from the minimum distance of metope in metope levelling location;
(2) be fixed on the metope framed; Framed bottom surface is equal with locating pin, adjacent two vertical framed in in distance promptly be the width of warming plate, do the lateral bond muscle again after the muscle that vertically bonds is carried out; The lateral bond muscle have a pair of in to middle distance promptly be the length of warming plate; Establish the lateral bond muscle in the middle of every insulation again, its number should satisfy bonding muscle area and be not less than 50% of warming plate area, framed length and width, thick be respectively 480-3500 millimeter x116-200 millimeter x30-80 millimeter; Preparing framed material is metal, plastics or wood materials;
(3) each framedly can put 1-10 magazine into, and magazine is a benchmark to put into framed just, in magazine, inserts conventional cement mortar and is stained with wall, and the last wall plane of cement mortar is equal with the framed end.Treat to shed magazine after mortar solidifies, remove framedly, again cement is pasted the muscle surface with the further equating of guiding ruler;
(4) cement is pasted muscle and is made vertical connection in length and breadth, avoiding forming channel cavity between warming plate and body of wall, pasting on the muscle water seasoning 3-7 days, pastes to be coated with on the muscle at cement again and spreads alite paste, sticks on warming plate and pastes on the muscle, fixingly promptly getting.
Take the present invention of above-mentioned measure, adopt framed positioning bar bar magazine, directly go up wall with the normally used cement mortar in building site through magazine and be shaped to the stickup muscle.This way slurry therewith only is equivalent to one of 5-6 part of above-mentioned way cost, and material be easy to get, simple to operate, intensity is higher.Adopt advantage performance of the present invention to be that efficiency of construction improves, compare with traditional method of attaching, efficiency of construction is doubled; Job practices of the present invention is a kind of component on site construction method, can strengthen on-the-spot quality monitoring, makes each construction link all reach optimum efficiency, has practiced thrift construction cost simultaneously.
The specific embodiment
Embodiment 1
(1) metope levelling location to be benchmark apart from the minimum distance of metope, is confirmed a plane as the directrix of pasting the muscle face, and is located with locating pin;
(2) vertical muscle of branch level and vertical horizontal bar, vertical muscle is established along warming plate plate length direction, and horizontal bar is established along the warming plate plate width direction, and vertical muscle is continuous length, and horizontal bar is the short muscle that withstands between the vertical muscle of two rows.Be fixed on the framed bottom of aluminium alloys on the metope with location ailing face height according to this;
(3) vertical muscle is manufactured: level vertically discharging adjacent two framed in to middle distance be 600 millimeters, framed size is long by 3000, wide by 116, thick 60 millimeters; Establish along the building level girth, can put 3 magazines in framed, magazine is a benchmark to put into framed just; In magazine, make and paste muscle, be packed into the ordinary Portland cement mortar in the magazine, and be stained with wall; The last wall plane of cement mortar is a benchmark with the plane of framed bottom surface; Treat to shed magazine after mortar solidifies, remove framedly, cement is pasted muscle surface with 2 meters further equatings of guiding ruler;
(4) horizontal bar is manufactured: vertically paste between the muscle at ready-made per two, by 900 millimeters of warming plate length be in to middle distance arrange two framed, evenly arrange betwixt again two framed, framed size is long by 480, wide by 116, thick 60 millimeters; With vertical muscle vertical connection.Put into magazine in framed, in magazine, make and paste muscle, be packed into the ordinary Portland cement mortar in the magazine; And being stained with wall, the last wall plane of cement mortar is a benchmark with the plane of framed bottom surface, treats to shed magazine after mortar solidifies; Remove framedly, pasting on the muscle water seasoning seven days;
(5) on cement stickup muscle, smear alite paste, stick on warming plate and paste on the muscle, fix promptly getting.
Embodiment 2
(1), to be benchmark, confirms a plane, and locate with locating pin as the directrix of pasting the muscle face apart from the minimum distance of metope in metope levelling location;
(2) vertical muscle of branch level and vertical horizontal bar, vertical muscle is established along warming plate plate length direction, and horizontal bar is established along the warming plate plate width direction, and vertical muscle is continuous length, and horizontal bar is the short muscle that withstands between the vertical muscle of two rows.Be fixed on the framed bottom of plastics on the metope with location ailing face height according to this;
(3) vertical muscle is manufactured: level vertically discharging adjacent two framed in to middle distance be 700 millimeters, framed size is long by 3000, wide by 150, thick 60 millimeters; Establish along the building level girth; Can put 3 magazines in framed, magazine is a benchmark to put into framed just, in magazine, makes and pastes muscle.The composite mortar that adds conventional cement mortar perlite and wood fibre is packed in the magazine; And being stained with wall, the last wall plane of cement mortar is a benchmark with the plane of framed bottom surface, treats to shed magazine after mortar solidifies; Remove framedly, cement is pasted muscle surface with 2 meters further equatings of guiding ruler;
(4) horizontal bar is manufactured: vertically paste between the muscle at ready-made per two, by 1000 millimeters of warming plate length be in to middle distance arrange two framed, evenly arrange betwixt again three framed, framed size is long by 550, wide by 150, thick 60 millimeters; With vertical muscle vertical connection.Put into magazine in framed, in magazine, make and paste muscle.The composite mortar that adds the ordinary Portland cement mortar perlite and wood fibre is packed in the magazine; And being stained with wall, the last wall plane of cement mortar is a benchmark with the plane of framed bottom surface, treats to shed magazine after mortar solidifies; Remove framedly, pasting on the muscle water seasoning seven days;
(5) on cement stickup muscle, smear alite paste, stick on warming plate and paste on the muscle, fix promptly getting.

Claims (1)

1. the job practices of a paste heat-preserving plate on metope is characterized in that described job practices comprises the steps:
(1), to be benchmark, confirms a plane, and locate with locating pin as the directrix of pasting the muscle face apart from the minimum distance of metope in metope levelling location;
(2) be fixed on the metope framed; Framed bottom surface is equal with locating pin; Adjacent two vertical framed in in distance promptly be the width of warming plate, do the lateral bond muscle again after the muscle that vertically bonds is carried out, the lateral bond muscle have a pair of in to middle distance promptly be the length of warming plate; The every middle lateral bond rib number of insulation should satisfy the bonding muscle gross area and be not less than 50% of warming plate area; Framed length and width, thick be respectively 480-3500 millimeter x116-200 millimeter x60 millimeter, preparing framed material is metal, plastics or wood materials;
(3) each framedly can put 1-10 magazine into, and magazine is a benchmark to put into framed just, in magazine, inserts conventional cement mortar and is stained with wall, and the last wall plane of cement mortar is equal with the framed end.Treat to shed magazine after mortar solidifies, remove framedly, again cement is pasted the muscle surface with the further equating of guiding ruler;
(4) cement is pasted muscle and is made vertical connection in length and breadth, avoiding forming channel cavity between warming plate and body of wall, pasting on the muscle water seasoning 3-7 days, pastes to be coated with on the muscle at cement again and spreads alite paste, sticks on warming plate and pastes on the muscle, fixingly promptly getting.
CN 201110260245 2011-09-04 2011-09-04 Construction method for sticking insulation board to wall surface Expired - Fee Related CN102383610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110260245 CN102383610B (en) 2011-09-04 2011-09-04 Construction method for sticking insulation board to wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110260245 CN102383610B (en) 2011-09-04 2011-09-04 Construction method for sticking insulation board to wall surface

Publications (2)

Publication Number Publication Date
CN102383610A true CN102383610A (en) 2012-03-21
CN102383610B CN102383610B (en) 2013-10-02

Family

ID=45823410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110260245 Expired - Fee Related CN102383610B (en) 2011-09-04 2011-09-04 Construction method for sticking insulation board to wall surface

Country Status (1)

Country Link
CN (1) CN102383610B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1904245A (en) * 2006-07-28 2007-01-31 许东奎 Net edge polyphenyl composite heat insulating board and technological method for external wall heat insulation thereof
JP2007170002A (en) * 2005-12-21 2007-07-05 Emaajii:Kk External heat insulation structure of building, and heat insulation panel mounting bracket for use therein
KR100867273B1 (en) * 2008-01-07 2008-11-10 주식회사 테크닉스디앤씨 Method of construction of building walls by using extruded cement panels and post-foaming heat-insulating material
CN102127934A (en) * 2011-01-30 2011-07-20 上海建工集团股份有限公司 Prefabricated outer wall external thermal insulation structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007170002A (en) * 2005-12-21 2007-07-05 Emaajii:Kk External heat insulation structure of building, and heat insulation panel mounting bracket for use therein
CN1904245A (en) * 2006-07-28 2007-01-31 许东奎 Net edge polyphenyl composite heat insulating board and technological method for external wall heat insulation thereof
KR100867273B1 (en) * 2008-01-07 2008-11-10 주식회사 테크닉스디앤씨 Method of construction of building walls by using extruded cement panels and post-foaming heat-insulating material
CN102127934A (en) * 2011-01-30 2011-07-20 上海建工集团股份有限公司 Prefabricated outer wall external thermal insulation structure and construction method thereof

Also Published As

Publication number Publication date
CN102383610B (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN102777040A (en) Installation process of stagger-joint dual-wallboard inner partition wall and dual-wallboard inner partition
CN202731101U (en) Groove profile aluminum alloy building composite square timber
CN203905374U (en) Hanging piece for hanging stones or tiles in wet hanging mode
CN201620509U (en) Heat insulating block for building
CN102383610B (en) Construction method for sticking insulation board to wall surface
CN109403520A (en) A kind of viscous anchor combination ceramic thin plate decoration wall and its installation method
CN104594529B (en) Steel-structure factory building exterior wall corner column is framed and external wall construction method
CN104675092A (en) Method for adhering face brick of building
CN204418425U (en) Steel-structure factory building exterior wall and steel-structure factory building exterior wall corner column framed
CN207260336U (en) The connection structure of roof truss and wall
CN209099756U (en) A kind of Quick Release customization aluminum alloy pattern plate component for architecture construction
CN208858174U (en) A kind of double-layer brick is laid bricks device
CN203475820U (en) Fireproof heat insulation formwork directly for outer wall formwork erecting
CN208473107U (en) A kind of assembly-type light partition
CN202831299U (en) Double-wallboard staggered joint internal partition
CN206902927U (en) Assembled light hollow cylinder wall
CN206625477U (en) A kind of novel wall rock wool heat-preservation decoration integrated board
CN208533847U (en) A kind of assembled architecture wall
CN206016201U (en) A kind of filling type wall, ground fast spreading system
CN206205253U (en) A kind of wall block
CN205153223U (en) Heat preservation template is exempted from to tear open by fast assembly's outer wall
CN211548400U (en) Integrated antique tile
CN219992703U (en) Novel precast concrete building structure
CN214658051U (en) Novel combination of cement side fascia and general fossil fragments device
CN201620577U (en) Composite ceramic tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20120321

Assignee: Guangxi Qili New Materials Science and Technology Co., Ltd.

Assignor: Chao Kai| Liu Haifeng

Contract record no.: 2014450000037

Denomination of invention: Construction method for sticking insulation board to wall surface

Granted publication date: 20131002

License type: Exclusive License

Record date: 20140620

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131002

Termination date: 20160904