CN102373806B - Novel angle joint combined assembly method of concrete prefabricated part - Google Patents
Novel angle joint combined assembly method of concrete prefabricated part Download PDFInfo
- Publication number
- CN102373806B CN102373806B CN201010253264.XA CN201010253264A CN102373806B CN 102373806 B CN102373806 B CN 102373806B CN 201010253264 A CN201010253264 A CN 201010253264A CN 102373806 B CN102373806 B CN 102373806B
- Authority
- CN
- China
- Prior art keywords
- concrete prefabricated
- angle
- prefabricated element
- anchor plate
- combined assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a novel angle joint combined assembly method of a concrete prefabricated part, belonging to a combined assembly method of a concrete prefabricated part. In the invention, non-bonding prestressed tendons arranged in the concrete prefabricated parts are firmly connected together by a steel angular anchor backing plate and an anchoring tool, so that the concrete prefabricated parts can be connected at any angle. In the invention, the method makes full use of the angle formed between the tendon penetrating holes on the sides of the steel angular anchor backing plate, and the non-bonding prestressed tendons slide in the parts without bonding; and due to the tension locking property of the anchoring tool, the angle of the concrete prefabricated part pair is accurate, the building structure has high strength, and the combined assembly is fast.
Description
Technical field
The present invention relates to a kind of concrete prefabricated element combination assembly method.
Background technology
Be combined into various building structure with concrete prefabricated element, have the advantages that cost is low, speed is fast, easy to operate.But, due to combination method mainly concrete prefabricated element mutually overlap, prefabricated units built-in fitting is welded to each other, and prefabricated units bolt is interconnected.So its building structure combined strength is low, assembled dimension inaccuracy.In addition earthquake takes place frequently, more and more higher to the requirement of building structure, old concrete prefabricated element combination assembly method, the building structure requirement in inapplicable modern times.
Summary of the invention
The invention provides a kind of concrete prefabricated element and adopt corner connection combination assembling new method, to solve the problem doing the assembling of various angle combinations between existing concrete prefabricated element.
The present invention takes following technical scheme:
(1), unbonded prestressing tendon is set in concrete prefabricated element;
(2), angle anchor plate makes: make with angle and the anchor plate wearing muscle hole;
(3), by the unbonded prestressing tendon in each prefabricated units wear muscle hole through steel angle anchor plate, with the fastening presstressed reinforcing steel of ground tackle stretch-draw, make each concrete prefabricated element make certain angle each other and connect.
Concrete prefabricated element of the present invention is beam, post, wall, plate.
It is non-caked in concrete that technical scheme of the present invention makes full use of unbonded prestressing tendon, can slide.By very heavy stretch-draw, ground tackle is locked, and makes the unbonded prestressing tendon of concrete component produce powerful tensile stress.Reaction force that this power produces, acts on interface and the prefabricated units itself of prefabricated units combination assembling, makes it bear compressive stress.This power meets the stressed principle that concrete anti-compression is greater than tension.By ground tackle and very heavy accurate stretch-draw locking, can reach concrete prefabricated element combination fitted position accurate, error free, the intensity of its building structure combination assembling is high.
The present invention has abandoned concrete prefabricated element in the past and has relied on built-in fitting welding, and bolton and prefabricated units to overlap the backward technique waiting combination assembling mutually, but assemble concrete prefabricated element with corner connection Combination of Methods.
Accompanying drawing explanation
Fig. 1 is 4 concrete prefabricated element corner connections structure charts together;
Fig. 2 is the schematic diagram of bilateral angle anchor plate of the present invention;
Fig. 3 is the schematic diagrames of three corners of the present invention to anchor plate;
Fig. 4 is the schematic diagram of polygon angle anchor plate of the present invention;
Fig. 5 adopts the concrete prefabricated element angle connecting structure schematic diagram that shown in Fig. 3, three corners are done to anchor plate;
Fig. 6 is the anchor device structure schematic diagram that the present invention adopts.
Detailed description of the invention
(1), unbonded prestressing tendon is set in concrete prefabricated element;
(2), angle anchor plate makes: make with angle and the anchor plate wearing muscle hole;
(3), by the unbonded prestressing tendon in each prefabricated units wear muscle hole through steel angle anchor plate, with the fastening presstressed reinforcing steel of ground tackle stretch-draw, make each concrete prefabricated element make certain angle each other and connect.
Below 4 concrete prefabricated element corner connections are illustrated the present embodiment together:
1, first the unbonded prestressing tendon 6 at concrete prefabricated element 1 two ends is installed the bilateral angle anchor plate 5 of steel shown in two pieces of Fig. 2 and Fig. 6 ground tackle 7, stretch-draw is fastening;
2, two pieces of angle anchor plate correspondences that the unbonded prestressing tendon of Fig. 1 concrete prefabricated element 2, concrete prefabricated 4 respective one end is worn on concrete prefabricated element 1 are worn muscle hole;
3, concrete prefabricated element 2, concrete prefabricated element 4 are worn the unbonded prestressing tendon termination installation ground tackle that concrete prefabricated element 1 angle anchor plate correspondence wears muscle hole;
4, adopt operating procedure 1 method to install two pieces of angle anchor plates and ground tackle at concrete prefabricated element 3 two ends, stretch-draw is fastened to design stress;
5, the correspondence of concrete prefabricated element 3 liang of angle anchor plates is worn muscle hole and wear unbonded prestressing tendon corresponding to concrete prefabricated element 2, concrete prefabricated element 4, ground tackle is installed;
6, the ground tackle on the fastening concrete prefabricated element 2 of stretch-draw, concrete prefabricated element 4 two ends angle anchor plate is to design stress; Four Component compositions are assembled together;
7, concrete shutoff angle anchor plate and ground tackle.
As Fig. 5 be three prefabricated units with steel three corner to anchor plate corner connection schematic diagram.
1, the unbonded prestressing tendon 4 ' of concrete prefabricated element 1 ' is worn steel three corner to wear muscle hole ground tackle 6 ' to anchor plate 5 ' correspondence and fix, stretch-draw is fastened to design stress;
2, adopt same procedure concrete prefabricated element 2 ', concrete prefabricated element 3 ' to be worn on angle anchor plate other two and wear muscle hole, it is fastening to install ground tackle stretch-draw, and three Component compositions are assembled together.
Claims (3)
1. a concrete prefabricated element corner connection combination assembling new method, is characterized in that comprising the following steps:
(1), unbonded prestressing tendon is set in concrete prefabricated element;
(2), angle anchor plate makes: make with angle and the anchor plate wearing muscle hole;
(3), by the unbonded prestressing tendon in each prefabricated units wear muscle hole through steel angle anchor plate, with the fastening presstressed reinforcing steel of ground tackle stretch-draw, make each concrete prefabricated element make certain angle each other and connect.
2. concrete prefabricated element corner connection combination assembling new method according to claim 1, is characterized in that: concrete prefabricated element is beam, post, wall, plate.
3. concrete prefabricated element corner connection combination assembling new method according to claim 1, is characterized in that: angle anchor plate comprises steel bilateral angle anchor plate, three corners to anchor plate and polygon angle anchor plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010253264.XA CN102373806B (en) | 2010-08-11 | 2010-08-11 | Novel angle joint combined assembly method of concrete prefabricated part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010253264.XA CN102373806B (en) | 2010-08-11 | 2010-08-11 | Novel angle joint combined assembly method of concrete prefabricated part |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102373806A CN102373806A (en) | 2012-03-14 |
CN102373806B true CN102373806B (en) | 2015-03-04 |
Family
ID=45792978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010253264.XA Active CN102373806B (en) | 2010-08-11 | 2010-08-11 | Novel angle joint combined assembly method of concrete prefabricated part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102373806B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758528B (en) * | 2012-07-12 | 2013-06-19 | 江苏武进建筑安装工程有限公司 | Method for carrying out self-insulating construction on external silt-sintering insulating brick walls |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85202839U (en) * | 1985-07-12 | 1986-05-28 | 铁道部第三勘测设计公司职工铁道工程学院 | Assembled prefabricated components made of reinforced concrete |
CN86103738A (en) * | 1986-06-04 | 1986-10-01 | 中国建筑第一工程局建筑科学研究所 | Prestressed splice floor construction with hexagon column grid |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU898011A1 (en) * | 1979-12-07 | 1982-01-15 | Казахский Проектный Институт Организации Технологии Строительства "Казоргтехстрой" | Form for rendering monolithic corner joint of construction elements |
CN1096841A (en) * | 1993-06-16 | 1994-12-28 | 李大为 | A kind of Combinated shuttering for shaping reinforced concrete member |
CA2270083A1 (en) * | 1999-01-15 | 2000-07-15 | Plasti-Fab, A Division Of Pfb Corporation | Concrete wall forming system |
CN2447452Y (en) * | 2000-08-31 | 2001-09-12 | 吴方伯 | Rigid water-proofer |
CN2701914Y (en) * | 2004-10-18 | 2005-05-25 | 从卫民 | Concrete prefabricated and assembled multipurpose tower crane foundation |
-
2010
- 2010-08-11 CN CN201010253264.XA patent/CN102373806B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85202839U (en) * | 1985-07-12 | 1986-05-28 | 铁道部第三勘测设计公司职工铁道工程学院 | Assembled prefabricated components made of reinforced concrete |
CN86103738A (en) * | 1986-06-04 | 1986-10-01 | 中国建筑第一工程局建筑科学研究所 | Prestressed splice floor construction with hexagon column grid |
Also Published As
Publication number | Publication date |
---|---|
CN102373806A (en) | 2012-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032840B (en) | The prestressing force assembling frame node connecting structure of additional angle steel | |
KR101369998B1 (en) | Composite PC Column for Connecting Steel Column | |
CN102852244B (en) | Detachable self-resetting type energy-dissipation coupling beam | |
CN207620124U (en) | A kind of connecting node of new increasing steel beam and former beams of concrete | |
CN207525883U (en) | Connecting structure of beam column of prefabricated concrete structure | |
CN103147529A (en) | Assembly type energy dissipation and seismic mitigation shear wall structure system | |
CN111022072A (en) | Combined joint for reinforcing secondary lining of tunnel constructed by mining method and mounting method | |
CN102926483A (en) | Self-recovery, energy-consumption and easy-repair mixed assembly type concrete shear wall | |
CN103924680A (en) | Precast concrete beam and square-rectangular concrete-filled steel tube column combining joint employing unbonded prestressed and ordinary reinforcement for connection | |
KR101168876B1 (en) | SRC Joint Structure and Joint Method | |
CN204040209U (en) | A kind of syndeton of replaceable steel coupling beam | |
CN108691358B (en) | Combined anchor plate, buckling restrained brace connecting node and installation method thereof | |
CN103306215B (en) | The novel reinforced device of a kind of reinforced concrete bridge pier and construction method thereof | |
CN102373806B (en) | Novel angle joint combined assembly method of concrete prefabricated part | |
CN104032861B (en) | Mixing coupled wall steel column and non-energy dissipating beam connecting node structure and construction method thereof | |
CN209686579U (en) | A kind of steel structure earthquake-resistant beam-to-column joint structure | |
CN110952994A (en) | Bent bolt combined joint for secondary lining of mine method construction tunnel and reinforcing method | |
CN102635175A (en) | Multipurpose structural seismic resistance energy consumption connecting piece | |
CN113417371B (en) | Detachable cushion block reinforced high-strength bolt shear connector | |
CN103938731B (en) | Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars | |
JP2004003236A (en) | Structure of joint between steel-concrete composite structure and reinforced concrete structure | |
CN109958196B (en) | Prestressed hoop type swinging wall connecting assembly considering no damage and implementation method | |
CN203213347U (en) | Assembled energy dissipation and seismic mitigation shear wall structure system | |
CN209010959U (en) | A kind of prestressing force connecting structure of bridge pier and Extended chemotherapy | |
CN203569695U (en) | Beam-column joint reinforced by bent-up steel plate and angle steel wrapping column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 130021 Changchun workers and peasants Road, Jilin, No. 618 Patentee after: CHINA NORTHEAST MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE CO., LTD. Patentee after: Wang Zhile Address before: 130021 Changchun workers and peasants Road, Jilin, No. 618 Patentee before: China Northeast Centrol Design & Research Institute of Municipal Engineering Patentee before: Wang Zhile |