CN102366836A - Production method of high-performance titanium alloy blind pipe - Google Patents
Production method of high-performance titanium alloy blind pipe Download PDFInfo
- Publication number
- CN102366836A CN102366836A CN2011103283564A CN201110328356A CN102366836A CN 102366836 A CN102366836 A CN 102366836A CN 2011103283564 A CN2011103283564 A CN 2011103283564A CN 201110328356 A CN201110328356 A CN 201110328356A CN 102366836 A CN102366836 A CN 102366836A
- Authority
- CN
- China
- Prior art keywords
- jacket
- plug
- titanium alloy
- blind pipe
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Forging (AREA)
- Arc Welding In General (AREA)
- Metal Extraction Processes (AREA)
- Powder Metallurgy (AREA)
Abstract
The invention discloses a production method of a high-performance titanium alloy blind pipe. The production method comprises the following steps of: (a) coating a graphite coating on the surface of a core bar; (b) placing the core bar in a sheath cylinder and clamping the core bar at the centre of the sheath cylinder by using a core bar positioning tool; fixing the bottom end of the core bar on a sheath bottom cover, and welding the sheath bottom cover at the bottom end of the sheath cylinder; and then filling titanium alloy powder into a cavity which is formed by the sheath cylinder and the core bar; (c) welding a sheath top cover at the top of the sheath cylinder, reserving a space for placing a degasification pipeline, and vacuumizing the sheath cylinder; (d) fixing both ends of a sheath in a sheath hot isostatic pressing tool, and carrying out a thermal isostatic pressing process; (e) taking out the sheath, fixing both ends of the sheath on a hydraulic machine, and drawing out the core bar in the sheath; and (f) machining the core bar to obtain the titanium alloy blind pipe. According to the production method provided by the invention, because the core bar can be rapidly removed, the final size of the prepared high-performance thin and long titanium alloy blind pipe can be reached without machining an inner cavity, therefore, the production period is short, the yield is high, and the product performance and the internal quality are stable and reliable.
Description
Technical field
The present invention relates to a kind of manufacturing approach of titanium alloy slime blind-tube, be specifically related to a kind ofly be used for the method for fast mfg that percentage elongation such as titanium alloy, Intermatallic Ti-Al compound surpass 5% metal slime blind-tube, and the performance of material reaches or near the forging level.
Background technology
The supporting structure size of carrier rocket secondary inter-tank section is big, the locus is strict, and the slime blind-tube of requirement formation supporting structure possesses the characteristics of light weight, good rigidity and stable performance.
Titanium alloy is one of aerospace field common structural material, and the titanium alloy blind pipe is the critical component of supporting structure, its elongated, and length can be at 1~1.5 meter.In order to shorten the production cycle, common titanium alloy blind pipe is to adopt the method for hot investment casting to develop, but titanium alloy casting has defectives such as component segregation and microstructure segregation, gives the quality of product and the reliability aspect deleterious impact of performance.Utilizing forging processing is another kind of blind pipe manufacturing approach commonly used.The defective of this method is that the production cycle is long, and stock utilization is low, and characteristics such as material cost height, quality instability can't satisfy the needs that model is developed.
Summary of the invention
The object of the present invention is to provide a kind of manufacturing approach of Ti alloy with high performance blind pipe, the cycle of its manufacturing titanium alloy blind pipe is short, stock utilization is high, and steady quality is reliable, and the performance of pipe fitting reaches the level that is not less than forging.
Realize the technical scheme of the object of the invention: a kind of manufacturing approach of Ti alloy with high performance blind pipe, it adopts the high temperature insostatic pressing (HIP) near-net-shape method to make the titanium alloy blind pipe, specifically comprises the steps:
(a) apply the graphite-like coating as solder mask at mandrel surface; The diameter d of this plug=D-2 δ, wherein D is a titanium alloy blind pipe internal diameter, δ is the thickness of graphite-like coating on the plug;
(b) plug is placed in the jacket tube, plug is stuck in middle position in the jacket tube through the plug positioning tool, and the bottom of plug is fixed on the jacket bottom, and the jacket bottom is welded on jacket tube bottom; In the cavity that the outer wall by the inwall of jacket tube and plug forms, add the dress titanium alloy powder then;
After treating that titanium alloy powder installs to 1/2~2/3 place that requires height, take out the plug positioning tool, continue the jacket tube to be filled up with titanium alloy powder;
(c) at jacket tube welded top jacket top cover, reserve degasification line, the jacket tube is vacuumized, the vacuum in the jacket tube is higher than 3 * 10
-3During Pa, keep 6~8h, the sealing gas removing pipe;
The two ends of (d) step (c) gained being accomplished the jacket of degasification are fixed in the jacket high temperature insostatic pressing (HIP) frock; Carry out hip treatment then, the technology of high temperature insostatic pressing (HIP) is: 900~960 ℃, and 1~5h, P >=120MPa;
(e) take out the jacket of accomplishing hip treatment in the jacket high temperature insostatic pressing (HIP) frock, the two ends of machining jacket then are to expose plug and titanium alloy blind pipe blank is as the criterion; Process screw one and screw two then at the two ends of jacket respectively, be connected a bolt respectively in screw one and the screw two, be fixed on the hydraulic press with the two ends of bolt then, the plug in the jacket is extracted through hydraulic press with jacket;
(f) the titanium alloy blind pipe blank in the jacket is processed into the titanium alloy blind pipe.
The manufacturing approach of aforesaid a kind of Ti alloy with high performance blind pipe, its described plug positioning tool for can be placed on the jacket tube in, the cylinder coaxial with the jacket tube, outer, cylinder top is stuck on the jacket tube, the cylinder bottom is stuck in the top of plug; On the outer, top of plug positioning tool, have hole, in the cavity of jacket tube and plug formation, add the dress titanium alloy powder through these holes.
The manufacturing approach of aforesaid a kind of Ti alloy with high performance blind pipe; Its described jacket high temperature insostatic pressing (HIP) frock comprises a support tube; Jacket then is placed on the middle position of support tube, and jacket is fixing fixes top and the bottom that is separately positioned on support tube with bottom end cover with upper end cover and jacket, guarantees to be wrapped in to keep plumbness in the support tube; Jacket is fixing to be connected on the plug through bolt with upper end cover, and jacket is fixing to be connected on the jacket bottom through bolt with bottom end cover.
The manufacturing approach of aforesaid a kind of Ti alloy with high performance blind pipe, the described screw one of its step (e) is opened on the plug, and screw two is opened on the titanium alloy blind pipe blank.
The manufacturing approach of aforesaid a kind of Ti alloy with high performance blind pipe, its described plug adopts mild steel to make, and plug is cylindric and front end is a conehead.
The manufacturing approach of aforesaid a kind of Ti alloy with high performance blind pipe, the thickness δ value of its described graphite-like coating is: 2mm≤δ≤10mm.
Effect of the present invention is:
The present invention adopts the high temperature insostatic pressing (HIP) near-net-shape to make the titanium alloy slime blind-tube; With the titanium alloy pre-alloyed powder is raw material; Utilize the design of material such as low-carbon (LC) steel or stainless steel, make and be shaped, between 900~960 ℃, carry out hip treatment, remove jacket and plug then with jacket and plug; Obtain titanium alloy slime blind-tube blank, according to customer requirements blank is worked into final product appearance size at last.The method has good application prospects aspect the large scale titanium alloy supporting structure.
The plug that utilization of the present invention can be removed fast, the titanium alloy slime blind-tube inner chamber of formation need not machining and can reach the product final size, thereby can shorten the production cycle of product, and improves lumber recovery.The graphite-like coating that mandrel surface applies as the solder mask between plug and titanium alloy blind pipe blank, prevents that plug is connected through diffusion in isostatic with titanium alloy powder.In the process of assembling, welding jacket, design and utilize the plug positioning tool that the position of plug is limited.In isostatic, design and utilize the fixedly two ends of jacket of jacket high temperature insostatic pressing (HIP) frock, make to be wrapped in to keep vertical position in the isostatic, guarantee that the jacket behind the high temperature insostatic pressing (HIP) can not bend.
Utilize the material property of the titanium alloy slime blind-tube of the inventive method preparation to reach the level that is not less than forging.Tensile strength σ
b>=965MPa, yield strength σ
0.2>=890MPa, percentage elongation δ
5>=18%, ψ>=43%.The internal soundness of member reaches the A level of GJB 1580A-2004.The material property of product and internal soundness are stable, reliable.
Description of drawings
Fig. 1 uses sketch map for the plug positioning tool;
Fig. 2 uses sketch map for jacket with the high temperature insostatic pressing (HIP) frock;
Fig. 3 is a plug removing method sketch map;
1. plug positioning tools among the figure; 2. plug; 3. jacket tube; 4. titanium alloy powder; 5. jacket bottom; 6. jacket is fixed and is used upper end cover; 7. support tube; 8. jacket is fixed and is used bottom end cover; 9. screw one; 10. titanium alloy blind pipe blank; 11. screw two.
The specific embodiment
Further describe below in conjunction with accompanying drawing and specific embodiment manufacturing approach a kind of Ti alloy with high performance blind pipe of the present invention.
The concrete manufacturing step of a kind of TC4 titanium alloy blind pipe manufacturing approach of the present invention is following:
(a) in plug 2 surface-coated graphite-like coatings as solder mask, the thickness δ value of graphite-like coating is 4mm.
This plug 2 adopts the low-carbon (LC) steel or stainless steel to make, and plug 2 is a conehead for cylindric and front end.The diameter d of plug 2=D-2 δ, wherein D is a titanium alloy blind pipe internal diameter, δ is the thickness of graphite-like coating on the plug 2.
(b) as shown in Figure 1, plug 2 is placed in the jacket tube 3, plug 2 is stuck in middle position in the jacket tube 3 through plug positioning tool 1, and the bottom of plug 2 is fixed on the jacket bottom 5, and jacket bottom 5 is welded on jacket tube 3 bottoms.Described plug positioning tool 1 for can be placed in the jacket tube 3, the cylinder coaxial with the jacket tube, outer, cylinder top is stuck in jacket tube 3 upper ends, the cylinder bottom is stuck in the top of plug 2; On the outer, top of plug positioning tool 1, have hole, in the cavity that forms to outer wall, add dress titanium alloy powder 4 by the inwall of jacket tube 3 and plug 2 through these holes.
After treating that titanium alloy powder 4 installs to 2/3 place that requires height, take out plug positioning tool 1, continue jacket tube 3 to be filled up with titanium alloy powder 4.
(c) at jacket tube 3 welded top jacket top covers, reserve degasification line, the jacket tube is vacuumized, the vacuum in the jacket tube is higher than 3 * 10
-3During Pa, keep 7h, the sealing gas removing pipe;
(d) as shown in Figure 2, the two ends of step c gained being accomplished the jacket of degasification are fixed in the jacket high temperature insostatic pressing (HIP) frock.Described jacket high temperature insostatic pressing (HIP) frock comprises a support tube 7; Jacket then is placed on the middle position of support tube 7; Jacket is fixing with fixing top and the bottom that is separately positioned on support tube 7 with bottom end cover 8 of upper end cover 6 and jacket; Guarantee to be wrapped in maintenance plumbness in the support tube 7, jacket is fixing to be connected on the plug 2 through bolt with upper end cover 6, and jacket is fixing to be connected on the jacket bottom 5 through bolt with bottom end cover 8.
Carry out hip treatment then, the technology of high temperature insostatic pressing (HIP) is: 930 ℃, and 3h, P >=120MPa;
(e) in jacket high temperature insostatic pressing (HIP) frock, take out the jacket of accomplishing hip treatment, the two ends of machining jacket are as the criterion with titanium alloy blind pipe blank 10 to expose plug 2 then.As shown in Figure 3, process screw 1 and screw 2 11 then respectively at the two ends of jacket, screw 1 is opened on the plug 2, and screw 2 11 is opened on the titanium alloy blind pipe blank 10.Be connected a bolt respectively in screw 1 and the screw 21, be fixed on the hydraulic press with the two ends of bolt then, the plug in the jacket 2 is extracted through hydraulic press with jacket.
(f) the titanium alloy blind pipe blank 10 in the jacket is processed into the titanium alloy blind pipe.
The present invention is based on a kind of titanium alloy slime blind-tube Rapid Manufacturing Technology on the PM technique; Promptly on the plug that is used for near-net-shape slime blind-tube inner chamber, apply the graphite-like coating as solder mask; In the cavity of plug and jacket formation, add titanium alloy powder then, and utilize hot isostatic pressing technique shaping titanium alloy slime blind-tube blank.After accomplishing hip treatment, utilize the method for mechanical drawing to remove the inner plug of titanium alloy slime blind-tube, utilize machining to remove the outside surplus of titanium alloy slime blind-tube then, obtain the satisfactory titanium alloy slime blind-tube of size outward appearance.
The concrete manufacturing step of a kind of TC4 titanium alloy blind pipe manufacturing approach of the present invention is following:
(a) in plug 2 surface-coated graphite-like coatings as solder mask, the thickness δ value of graphite-like coating is 2mm.
This plug 2 adopts the low-carbon (LC) steel or stainless steel to make, and plug 2 is a conehead for cylindric and front end.The diameter d of plug 2=D-2 δ, wherein D is a titanium alloy blind pipe internal diameter, δ is the thickness of graphite-like coating on the plug 2.
(b) as shown in Figure 1, plug 2 is placed in the jacket tube 3, plug 2 is stuck in middle position in the jacket tube 3 through plug positioning tool 1, and the bottom of plug 2 is fixed on the jacket bottom 5, and jacket bottom 5 is welded on jacket tube 3 bottoms.Described plug positioning tool 1 is for being placed on the cylinder in the jacket tube 3, and outer, cylinder top is stuck in jacket tube 3 upper ends, and the cylinder bottom is stuck in the top of plug 2; On the outer, top of plug positioning tool 1, have hole, in the cavity that forms to outer wall, add dress titanium alloy powder 4 by the inwall of jacket tube 3 and plug 2 through these holes.
After treating that titanium alloy powder 4 installs to 1/2 place that requires height, take out plug positioning tool 1, continue jacket tube 3 to be filled up with titanium alloy powder 4.
(c) at jacket tube 3 welded top jacket top covers, reserve degasification line, the jacket tube is vacuumized, the vacuum in the jacket tube is higher than 3 * 10
-3During Pa, keep 6h, the sealing gas removing pipe;
(d) as shown in Figure 2, the two ends of step c gained being accomplished the jacket of degasification are fixed in the jacket high temperature insostatic pressing (HIP) frock.Described jacket high temperature insostatic pressing (HIP) frock comprises a support tube 7; Jacket then is placed on the middle position of support tube 7; Jacket is fixing with fixing top and the bottom that is separately positioned on support tube 7 with bottom end cover 8 of upper end cover 6 and jacket; Guarantee to be wrapped in maintenance plumbness in the support tube 7, jacket is fixing to be connected on the plug 2 through bolt with upper end cover 6, and jacket is fixing to be connected on the jacket bottom 5 through bolt with bottom end cover 8.
Carry out hip treatment then, the technology of high temperature insostatic pressing (HIP) is: 900 ℃, and 5h, P >=120MPa;
(e) in jacket high temperature insostatic pressing (HIP) frock, take out the jacket of accomplishing hip treatment, the two ends of machining jacket are as the criterion with titanium alloy blind pipe blank 10 to expose plug 2 then.As shown in Figure 3, process screw 1 and screw 2 11 then respectively at the two ends of jacket, screw 1 is opened on the plug 2, and screw 2 11 is opened on the titanium alloy blind pipe blank 10.Be connected a bolt respectively in screw 1 and the screw 21, be fixed on the hydraulic press with the two ends of bolt then, the plug in the jacket 2 is extracted through hydraulic press with jacket.
(f) the titanium alloy blind pipe blank 10 in the jacket is processed into the titanium alloy blind pipe.
The concrete manufacturing step of a kind of TC4 titanium alloy blind pipe manufacturing approach of the present invention is following:
(a) in plug 2 surface-coated graphite-like coatings as solder mask, the thickness δ value of graphite-like coating is 10mm.
This plug 2 adopts the low-carbon (LC) steel or stainless steel to make, and plug 2 is a conehead for cylindric and front end.The diameter d of plug 2=D-2 δ, wherein D is a titanium alloy blind pipe internal diameter, δ is the thickness of graphite-like coating on the plug 2.
(b) as shown in Figure 1, plug 2 is placed in the jacket tube 3, plug 2 is stuck in middle position in the jacket tube 3 through plug positioning tool 1, and the bottom of plug 2 is fixed on the jacket bottom 5, and jacket bottom 5 is welded on jacket tube 3 bottoms.Described plug positioning tool 1 is for being placed on the cylinder in the jacket tube 3, and outer, cylinder top is stuck in jacket tube 3 upper ends, and the cylinder bottom is stuck in the top of plug 2; On the outer, top of plug positioning tool 1, have hole, in the cavity that forms to outer wall, add dress titanium alloy powder 4 by the inwall of jacket tube 3 and plug 2 through these holes.
After treating that titanium alloy powder 4 installs to 2/3 place that requires height, take out plug positioning tool 1, continue jacket tube 3 to be filled up with titanium alloy powder 4.
(c) at jacket tube 3 welded top jacket top covers, reserve degasification line, the jacket tube is vacuumized, the vacuum in the jacket tube is higher than 3 * 10
-3During Pa, keep 8h, the sealing gas removing pipe;
(d) as shown in Figure 2, the two ends of step c gained being accomplished the jacket of degasification are fixed in the jacket high temperature insostatic pressing (HIP) frock.Described jacket high temperature insostatic pressing (HIP) frock comprises a support tube 7; Jacket then is placed on the middle position of support tube 7; Jacket is fixing with fixing top and the bottom that is separately positioned on support tube 7 with bottom end cover 8 of upper end cover 6 and jacket; Guarantee to be wrapped in maintenance plumbness in the support tube 7, jacket is fixing to be connected on the plug 2 through bolt with upper end cover 6, and jacket is fixing to be connected on the jacket bottom 5 through bolt with bottom end cover 8.
Carry out hip treatment then, the technology of high temperature insostatic pressing (HIP) is: 960 ℃, and 1h, P >=120MPa;
(e) in jacket high temperature insostatic pressing (HIP) frock, take out the jacket of accomplishing hip treatment, the two ends of machining jacket are as the criterion with titanium alloy blind pipe blank 10 to expose plug 2 then.As shown in Figure 3, process screw 1 and screw 2 11 then respectively at the two ends of jacket, screw 1 is opened on the plug 2, and screw 2 11 is opened on the titanium alloy blind pipe blank 10.Be connected a bolt respectively in screw 1 and the screw 21, be fixed on the hydraulic press with the two ends of bolt then, the plug in the jacket 2 is extracted through hydraulic press with jacket.
(f) the titanium alloy blind pipe blank 10 in the jacket is processed into the titanium alloy blind pipe.
Claims (6)
1. the manufacturing approach of a Ti alloy with high performance blind pipe is characterized in that: adopt the high temperature insostatic pressing (HIP) near-net-shape method to make the titanium alloy blind pipe, specifically comprise the steps:
(a) in plug (2) surface-coated graphite-like coating as solder mask; The diameter d of this plug (2)=D-2 δ, wherein D is a titanium alloy blind pipe internal diameter, δ is the thickness that plug (2) is gone up the graphite-like coating;
(b) plug (2) is placed in the jacket tube (3), plug (2) is stuck in the interior middle position of jacket tube (3) through plug positioning tool (1), and the bottom of plug (2) is fixed on the jacket bottom (5), and jacket bottom (5) is welded on jacket tube (3) bottom; In the cavity that the outer wall by the inwall of jacket tube (3) and plug (2) forms, add dress titanium alloy powder (4) then;
After treating that titanium alloy powder (4) installs to 1/2~2/3 place that requires height, take out plug positioning tool (1), continue jacket tube (3) to be filled up with titanium alloy powder (4);
(c) at jacket tube (3) welded top jacket top cover, reserve degasification line, the jacket tube is vacuumized, the vacuum in the jacket tube is higher than 3 * 10
-3During Pa, keep 6~8h, the sealing gas removing pipe;
The two ends of (d) step (c) gained being accomplished the jacket of degasification are fixed in the jacket high temperature insostatic pressing (HIP) frock; Carry out hip treatment then, the technology of high temperature insostatic pressing (HIP) is: 900~960 ℃, and 1~5h, P >=120MPa;
(e) take out the jacket of accomplishing hip treatment in the jacket high temperature insostatic pressing (HIP) frock, the two ends of machining jacket then are to expose plug (2) and titanium alloy blind pipe blank (10) is as the criterion; Process screw one (9) and screw two (11) then at the two ends of jacket respectively, be connected a bolt respectively in screw one (9) and the screw two (11), be fixed on the hydraulic press with the two ends of bolt then, the plug in the jacket (2) is extracted through hydraulic press with jacket;
(f) the titanium alloy blind pipe blank (10) in the jacket is processed into the titanium alloy blind pipe.
2. the manufacturing approach of a kind of Ti alloy with high performance blind pipe according to claim 1; It is characterized in that: described plug positioning tool (1) for can be placed in the jacket tube (3), the cylinder coaxial with the jacket tube; Outer, cylinder top is stuck in jacket tube (3) upper end, and the cylinder bottom is stuck in the top of plug (2); On the outer, top of plug positioning tool (1), have hole, in the cavity that jacket tube (3) and plug (2) form, add dress titanium alloy powder (4) through these holes.
3. the manufacturing approach of a kind of Ti alloy with high performance blind pipe according to claim 1; It is characterized in that: described jacket high temperature insostatic pressing (HIP) frock comprises a support tube (7); Jacket then is placed on the middle position of support tube (7); Jacket is fixing with upper end cover (6) and fixing top and the bottom that is separately positioned on support tube (7) with bottom end cover (8) of jacket; Guarantee to be wrapped in maintenance plumbness in the support tube (7), jacket is fixing to be connected on the plug (2) through bolt with upper end cover (6), and jacket is fixing to be connected on the jacket bottom (5) through bolt with bottom end cover (8).
4. the manufacturing approach of a kind of Ti alloy with high performance blind pipe according to claim 1 is characterized in that: the described screw one (9) of step (e) is opened on the plug (2), and screw two (11) is opened on the titanium alloy blind pipe blank (10).
5. the manufacturing approach of a kind of Ti alloy with high performance blind pipe according to claim 1 is characterized in that: described plug (2) adopts the low-carbon (LC) steel or stainless steel to make, and plug (2) is a conehead for cylindric and front end.
6. the manufacturing approach of a kind of Ti alloy with high performance blind pipe according to claim 1 is characterized in that: the thickness δ value of described graphite-like coating is: 2mm≤δ≤10mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103283564A CN102366836B (en) | 2011-10-25 | 2011-10-25 | Production method of high-performance titanium alloy blind pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103283564A CN102366836B (en) | 2011-10-25 | 2011-10-25 | Production method of high-performance titanium alloy blind pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102366836A true CN102366836A (en) | 2012-03-07 |
CN102366836B CN102366836B (en) | 2013-08-14 |
Family
ID=45759448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103283564A Active CN102366836B (en) | 2011-10-25 | 2011-10-25 | Production method of high-performance titanium alloy blind pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102366836B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103071791A (en) * | 2013-01-18 | 2013-05-01 | 航天材料及工艺研究所 | Forming method of TiAl pipe target material in large length-diameter ratio |
CN103212912A (en) * | 2013-04-22 | 2013-07-24 | 安泰科技股份有限公司 | Method for manufacturing nuclear-power-used thrust disc by means of hot isostatic pressing diffusion bonding |
CN104889398A (en) * | 2015-05-15 | 2015-09-09 | 安泰科技股份有限公司 | Anti-abrasion anti-etching alloy rod production method through powder metallurgy process |
CN104889399A (en) * | 2015-05-15 | 2015-09-09 | 安泰科技股份有限公司 | Anti-abrasion anti-etching alloy tube production method through powder metallurgy process |
CN105436505A (en) * | 2015-11-14 | 2016-03-30 | 华中科技大学 | Hot isostatic pressing forming method used for improving part surface quality |
CN106111992A (en) * | 2016-06-23 | 2016-11-16 | 航天材料及工艺研究所 | The evenness of wall thickness of a kind of high temperature insostatic pressing (HIP) powder metallurgy thin wall component controls frock and method |
CN109128155A (en) * | 2018-08-02 | 2019-01-04 | 重庆材料研究院有限公司 | Make the method for blind pipe with powder metallurgy isostatic pressing |
CN109158605A (en) * | 2018-08-24 | 2019-01-08 | 中国航空工业集团公司沈阳飞机设计研究所 | A kind of undercarriage outer cylinder and hound integral structure preparation method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58171505A (en) * | 1982-04-01 | 1983-10-08 | Toshiba Corp | Production of metallic tube having high melting point |
JPS60255904A (en) * | 1984-06-01 | 1985-12-17 | Hitachi Metals Ltd | Manufacture of shape memory alloy pipe |
CN1422717A (en) * | 2001-12-03 | 2003-06-11 | 北京有色金属研究总院 | Method for directly preparing TiNi shape memory alloy pipe joint from element powders |
CN101579741A (en) * | 2009-06-04 | 2009-11-18 | 航天材料及工艺研究所 | Manufacturing method of large size thin-walled titanium alloy cylindrical part and cylindrical mould |
CN102026752A (en) * | 2008-03-20 | 2011-04-20 | 先进交互式材料科学有限公司 | Net-shape or near net-shape powder isostatic pressing process |
-
2011
- 2011-10-25 CN CN2011103283564A patent/CN102366836B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58171505A (en) * | 1982-04-01 | 1983-10-08 | Toshiba Corp | Production of metallic tube having high melting point |
JPS60255904A (en) * | 1984-06-01 | 1985-12-17 | Hitachi Metals Ltd | Manufacture of shape memory alloy pipe |
CN1422717A (en) * | 2001-12-03 | 2003-06-11 | 北京有色金属研究总院 | Method for directly preparing TiNi shape memory alloy pipe joint from element powders |
CN102026752A (en) * | 2008-03-20 | 2011-04-20 | 先进交互式材料科学有限公司 | Net-shape or near net-shape powder isostatic pressing process |
CN101579741A (en) * | 2009-06-04 | 2009-11-18 | 航天材料及工艺研究所 | Manufacturing method of large size thin-walled titanium alloy cylindrical part and cylindrical mould |
Non-Patent Citations (4)
Title |
---|
《宇航材料工艺》 20110430 郎泽保、于峰、毕建勋、张绪虎、史金靓 粉末冶金gamma-TiAl系合金的性能及成形工艺 83-86 1-6 , 第2期 * |
王亮、史鸿培: "高性能钛合金粉末冶金技术研究", 《宇航材料工艺》, no. 3, 30 June 2003 (2003-06-30), pages 42 - 44 * |
王亮、吕宏军、郎泽保、许小静、史金靓: "粉末耐热钛合金组织性能及成形技术", 《宇航材料工艺》, no. 2, 30 April 2011 (2011-04-30), pages 90 - 94 * |
郎泽保、于峰、毕建勋、张绪虎、史金靓: "粉末冶金γ-TiAl系合金的性能及成形工艺", 《宇航材料工艺》, no. 2, 30 April 2011 (2011-04-30), pages 83 - 86 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103071791A (en) * | 2013-01-18 | 2013-05-01 | 航天材料及工艺研究所 | Forming method of TiAl pipe target material in large length-diameter ratio |
CN103212912A (en) * | 2013-04-22 | 2013-07-24 | 安泰科技股份有限公司 | Method for manufacturing nuclear-power-used thrust disc by means of hot isostatic pressing diffusion bonding |
CN104889398A (en) * | 2015-05-15 | 2015-09-09 | 安泰科技股份有限公司 | Anti-abrasion anti-etching alloy rod production method through powder metallurgy process |
CN104889399A (en) * | 2015-05-15 | 2015-09-09 | 安泰科技股份有限公司 | Anti-abrasion anti-etching alloy tube production method through powder metallurgy process |
CN105436505A (en) * | 2015-11-14 | 2016-03-30 | 华中科技大学 | Hot isostatic pressing forming method used for improving part surface quality |
CN106111992A (en) * | 2016-06-23 | 2016-11-16 | 航天材料及工艺研究所 | The evenness of wall thickness of a kind of high temperature insostatic pressing (HIP) powder metallurgy thin wall component controls frock and method |
CN109128155A (en) * | 2018-08-02 | 2019-01-04 | 重庆材料研究院有限公司 | Make the method for blind pipe with powder metallurgy isostatic pressing |
CN109128155B (en) * | 2018-08-02 | 2024-02-06 | 重庆材料研究院有限公司 | Method for manufacturing blind pipe by powder metallurgy isostatic pressing |
CN109158605A (en) * | 2018-08-24 | 2019-01-08 | 中国航空工业集团公司沈阳飞机设计研究所 | A kind of undercarriage outer cylinder and hound integral structure preparation method |
Also Published As
Publication number | Publication date |
---|---|
CN102366836B (en) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102366836B (en) | Production method of high-performance titanium alloy blind pipe | |
CN103170798B (en) | A kind of processing method of high-quality large-diameter thin-wall metal cylinder | |
CN101695739B (en) | Forging process of large tee and large skew tee | |
CN102463272A (en) | Short-flow preparation method of minor-caliber nickel-based alloy thin-wall tubes | |
CN105414430A (en) | Profiling forging method of large cylinder forge piece provided with internal and external steps | |
CN102345035B (en) | Production process for titanium and nickel shape memory alloy material | |
CN103668028B (en) | Preparation method of titanium and titanium alloy seamless tube blank | |
CN101767270B (en) | Sealing structure of vapor chamber and manufacturing method | |
CN102896220A (en) | Hot forming/hot sizing/heat treatment integrated forming method and die | |
CN106378456A (en) | Rapid densifying method for powder high-temperature alloy component | |
CN101987343B (en) | Forging method of conical cylinder body of nuclear power equipment | |
CN101716716B (en) | Method for expanding titanium T-shaped pipe | |
CN106584035B (en) | A kind of large-scale curved component forming ultra-wide aluminium alloy sheet preparation method | |
CN102773398A (en) | Method for forging slender and thick-walled pipe fittings | |
CN105033590A (en) | Machining process of valve body of large-flow cartridge valve | |
CN107774737A (en) | Ni-based composite bimetal pipe part moulding process | |
CN104723031B (en) | Radial-forging type strain induction semi-solid state extrusion technology for waveguide tube | |
CN104043677A (en) | Preparation method of carbon steel tube/stainless steel tube composite tube | |
EA201001527A1 (en) | METHOD OF ISOSTATIC PRESSING POWDER DEFINITELY OR CLOSE TO THE FINAL FORM | |
CN104174848A (en) | Powder hot isostatic pressing molding method of titanium alloy automobile connecting shaft rod | |
CN103331321A (en) | Preparation method of titanium alloy profile through extrusion | |
CN105127342A (en) | Titanium and titanium alloy billet and forging method thereof | |
CN117644204A (en) | Hot isostatic pressing forming sheath assembly and method for special-shaped conical titanium alloy component | |
CN104476128A (en) | Method of manufacturing high-temperature alloy pipe blanks | |
CN103157954B (en) | Forging suppressing manufacturing technique of semi-circle plate for oil drilling platform spud legs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |