CN102359033A - 一种改进型crtsⅱ型轨道板及其预制工艺 - Google Patents
一种改进型crtsⅱ型轨道板及其预制工艺 Download PDFInfo
- Publication number
- CN102359033A CN102359033A CN2011102060709A CN201110206070A CN102359033A CN 102359033 A CN102359033 A CN 102359033A CN 2011102060709 A CN2011102060709 A CN 2011102060709A CN 201110206070 A CN201110206070 A CN 201110206070A CN 102359033 A CN102359033 A CN 102359033A
- Authority
- CN
- China
- Prior art keywords
- diameter
- long
- track plate
- crts
- reinforced mesh
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
一种改进型CRTS II型轨道板,由纵向配置的6根直径为20mm的精轧螺纹钢筋、多根普通钢筋和上、下层钢筋网片组成;上、下层钢筋网片分别设置在普通钢筋和精轧螺纹钢筋上、下层,上、下层钢筋网片采用塑料卡定位;轨道板侧面的为梯形,并且其上部有一倒角。该轨道板结构简单,可增强构件载荷能力和限制混凝土裂缝,提高混凝土的耐久性。
Description
技术领域
本发明涉及一种铁路施工用轨道板,特别涉及一种高速铁路用改进型CRTS II型轨道板及其预制工艺。
背景技术
CRTS II型轨道板是高速铁路CRTS II型轨道板无渣轨道系统中的核心部件之一,它是一种混凝土预制构件,轨道板结构尺寸(长×宽×高)为6450mm×2550mm×200mm,其上布置10个承轨单元,每个承轨单元宽65cm,相邻的承轨单元中间设一个预裂槽;轨道板横向配置60根直径10mm的预应力结构筋,每个承轨单元分布6根;每个板上设灌浆孔3个,分别布置于第2、5、8道预裂槽正中;在轨道板的两端还设有切槽各2个,每个切槽伸出用于轨道板纵向连接的∮20螺纹钢3根。
轨道板混凝土强度等级为C55,是一种高强度的混凝土预制构件。为了保证铺轨精度,需要用数控机床对承轨台进行打磨,使关节部位精度到达0.1mm级,因此,CRTS II型轨道板还是一种高精度的混凝土预制构件。
普通的CRTS II型轨道板的预制是在工厂里进行的,采用长线台座预制工艺,一次预制多块轨道板(一般在20~35之间),混凝土经热养护强度达到48MPa后,切断板与板之间的60根直径10mm的预应力结构筋和6根直径5mm的预应力定位筋,使用真空吸盘将板从模具中吊出,完成放张脱模工作。
为了达到模具每天周转一次的目的,混凝土必须在16小时内达到放张脱模强度,以前的强度要求在48MPa以上,一般需要采取热养护、掺早强型活性掺合料、采用早强型碱水剂、采用高强度水泥等促凝措施,这些措施不仅损害了混凝土的耐久性能,而且增加了成本,降低了效益。
发明内容
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种改进型CRTS II型轨道板,该轨道板结构简单,可增强构件载荷能力和限制混凝土裂缝,提高混凝土的耐久性。
如上构思,本发明的技术方案是:一种改进型CRTS II型轨道板,由纵向配置的六根直径为20mm精轧螺纹钢筋、多根普通钢筋和上、下层钢筋网片组成;上、下层钢筋网片分别配置在普通钢筋和精轧螺纹钢筋上、下层;上、下层钢筋网片采用塑料卡定位。
上述改进型CRTS II型轨道板的预制工艺,其特征在于:(1)选择任意数量的模具组成生产线,一个轨道板厂可将所有的模具集中在一条长生产线上,各工序在生产线上流动进行,可出现多种工序在一条生产线上同时出现的情况,也可将生产线改为流水线,分工不同的工人站在自己的工位上,模具在各工位间流动,流动一周即完成一块板的预制;(2)将轨道板侧面改为梯形,并且其上部有一倒角;(3)钢筋网片制作时,按设计图增加普通钢筋的数量;(4)下层钢筋网片入模,用塑料卡定位,然后上层钢筋网片入模,用塑料卡定位;(5)混凝土浇注;(6)混凝土强度达到20MPa后用真空吸盘起模。
上述上层钢筋网片采用五种尺寸的HRB500钢筋,它们分别为直径8mm,长2.45m;直径8mm,长1.13m;直径8mm,长6.20m;直径8mm,长6.30m;直径8mm,长6.34m。
上述下层钢筋网片采用四种尺寸的HRB500钢筋,它们分别为直径8mm,长2.45m;直径8mm,长1.10m;直径16mm,长6.18m;直径8mm,长6.18m。
本发明的有益效果是(1)将配备预应力筋的轨道板改为非预应力结构,简化了结构,简化了预制工艺;(2)现有轨道板的横向预应压力会使轨道板纵向产生拉应力,这会促使轨道板的预裂缝带产生裂纹,因此本设计取消了CRTS II型轨道板横向60根直径10mm的预应力结构筋和起下层钢筋网片定位作用的6根直径5mm的预应力工艺筋,同时增加了普通钢筋的数量,从而降低了轨道板预裂缝带产生裂纹的可能性;(3)本设计轨道板由于不存在预应力放张,因此可以将轨道板的脱模强度由48MPa降低至20MPa,可大幅度缩短混凝土养护时间,提高轨道板厂产能;(4)可部分取消轨道板混凝土的促凝措施,提高混凝土耐久性。
附图说明:
图1是上层钢筋网片示意图;
图2是下层钢筋网片示意图;
图3是轨道板横断面图。
图4是轨道板的侧视图。
具体实施方式:
一种改进型CRTS II型轨道板,由纵向配置的六根直径为20mm精轧螺纹钢筋、多根普通钢筋和上、下层钢筋网片组成。上、下层钢筋网片分别配置在普通钢筋和精轧螺纹钢筋上、下层。上、下层钢筋网片采用塑料卡定位。
图1是上层钢筋网片图,图中6根直径为20mm的精轧螺纹钢筋,其配置无变化,未做位置和尺寸标注。采用五种尺寸的HRB500钢筋,它们分别为:
1.HRB500钢筋,直径8mm,长2.45m;
2.HRB500钢筋,直径8mm,长1.13m;
3.HRB500钢筋,直径8mm,长6.20m;
4.HRB500钢筋,直径8mm,长6.30m;
5.HRB500钢筋,直径8mm,长6.34m。
图2是下层钢筋网片图。采用四种尺寸的HRB500钢筋,它们分别为:
6.HRB500钢筋,直径8mm,长2.45m;
7.HRB500钢筋,直径8mm,长1.10m;
8.HRB335钢筋,直径16mm,长6.18m;
9.HRB500钢筋,直径8mm,长6.18m。
图3是轨道板横断面图,此图反映了轨道板侧面形状的改变,除侧面形状改变外,轨道板其余部位形状不做改变。轨道板侧面的为梯形,并且其上部有一倒角10(如图4所示)。
本轨道板的预制工艺为:(1)将配备预应力筋的轨道板改为非预应力结构,简化了结构,取消预应力张拉工艺,取消预应力张拉设备,可选择任意数量的模具组成生产线,一个轨道板厂可将所有的模具集中在一条长生产线上,各工序在生产线上流动进行,可出现多种工序在一条生产线上同时出现的情况,如一端在养护,中部在布筋,另一端在浇注混凝土。也可将生产线改为流水线,分工不同的工人站在自己的工位上,模具在各工位间流动,流动一周即完成一块板的预制;(2)将轨道板侧面改为梯形,并且其上部有一倒角,取消侧模上半部分的安装与拆卸工艺;(3)钢筋网片制作时,取消普通钢筋上用于与预应力筋绝缘的热缩套管,按设计图增加普通钢筋的数量;(4)下层钢筋网片入模,用塑料卡定位,然后上层钢筋网片入模,用塑料卡定位;(5)混凝土浇注;(6)混凝土强度达到20MPa后用真空吸盘起模。
Claims (4)
1.一种改进型CRTS II型轨道板,由纵向配置的六根直径为20mm精轧螺纹钢筋、多根普通钢筋和上、下层钢筋网片组成;上、下层钢筋网片分别配置在普通钢筋和精轧螺纹钢筋上、下层;上、下层钢筋网片采用塑料卡定位。
2.一种根据权利要求1所述的改进型CRTS II型轨道板的预制工艺,其特征在于:(1)选择任意数量的模具组成生产线,一个轨道板厂可将所有的模具集中在一条长生产线上,各工序在生产线上流动进行,可出现多种工序在一条生产线上同时出现的情况,也可将生产线改为流水线,分工不同的工人站在自己的工位上,模具在各工位间流动,流动一周即完成一块板的预制;(2)将轨道板侧面改为梯形,并且其上部有一倒角;(3)钢筋网片制作时,按设计图增加普通钢筋的数量;(4)下层钢筋网片入模,用塑料卡定位,然后上层钢筋网片入模,用塑料卡定位;(5)混凝土浇注;(6)混凝土强度达到20MPa后用真空吸盘起模。
3.根据权利要求1所述的改进型CRTS II型轨道板,其特征在于:上述上层钢筋网片采用五种尺寸的HRB500钢筋,它们分别为直径8mm,长2.45m;直径8mm,长1.13m;直径8mm,长6.20m;直径8mm,长6.30m;直径8mm,长6.34m。
4.根据权利要求1所述的改进型CRTS II型轨道板,其特征在于:上述下层钢筋网片采用四种尺寸的HRB500钢筋,它们分别为直径8mm,长2.45m;直径8mm,长1.10m;直径16mm,长6.18m;直径8mm,长6.18m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102060709A CN102359033A (zh) | 2011-07-22 | 2011-07-22 | 一种改进型crtsⅱ型轨道板及其预制工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102060709A CN102359033A (zh) | 2011-07-22 | 2011-07-22 | 一种改进型crtsⅱ型轨道板及其预制工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102359033A true CN102359033A (zh) | 2012-02-22 |
Family
ID=45584408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102060709A Pending CN102359033A (zh) | 2011-07-22 | 2011-07-22 | 一种改进型crtsⅱ型轨道板及其预制工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102359033A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463947A (zh) * | 2015-12-31 | 2016-04-06 | 四川省成都普什机电技术研究有限公司 | 无砟轨道板 |
CN107618106A (zh) * | 2017-09-30 | 2018-01-23 | 中铁上海工程局集团第工程有限公司乐山制板场 | Crtsⅲ型普通钢筋混凝土轨道板制造方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1130162A2 (de) * | 2000-02-29 | 2001-09-05 | Pfleiderer Infrastrukturtechnik GmbH & Co. KG | Betonlose Schwelle |
CN1851127A (zh) * | 2006-04-27 | 2006-10-25 | 中铁八局集团有限公司 | 纵连式轨道板 |
CN201087316Y (zh) * | 2007-08-16 | 2008-07-16 | 同济大学 | 新型磁浮轨道梁 |
CN201546165U (zh) * | 2009-11-18 | 2010-08-11 | 上海市城市建设设计研究院 | 简支变连续箱梁结构 |
CN102101319A (zh) * | 2010-04-26 | 2011-06-22 | 中建二局土木工程有限公司 | 运用33块长线台座制造crtsⅱ型板式无砟轨道板的方法 |
-
2011
- 2011-07-22 CN CN2011102060709A patent/CN102359033A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1130162A2 (de) * | 2000-02-29 | 2001-09-05 | Pfleiderer Infrastrukturtechnik GmbH & Co. KG | Betonlose Schwelle |
CN1851127A (zh) * | 2006-04-27 | 2006-10-25 | 中铁八局集团有限公司 | 纵连式轨道板 |
CN201087316Y (zh) * | 2007-08-16 | 2008-07-16 | 同济大学 | 新型磁浮轨道梁 |
CN201546165U (zh) * | 2009-11-18 | 2010-08-11 | 上海市城市建设设计研究院 | 简支变连续箱梁结构 |
CN102101319A (zh) * | 2010-04-26 | 2011-06-22 | 中建二局土木工程有限公司 | 运用33块长线台座制造crtsⅱ型板式无砟轨道板的方法 |
Non-Patent Citations (1)
Title |
---|
张恩龙: "CRTSⅡ型无砟轨道板制造技术", 《铁道工程学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463947A (zh) * | 2015-12-31 | 2016-04-06 | 四川省成都普什机电技术研究有限公司 | 无砟轨道板 |
CN107618106A (zh) * | 2017-09-30 | 2018-01-23 | 中铁上海工程局集团第工程有限公司乐山制板场 | Crtsⅲ型普通钢筋混凝土轨道板制造方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204435638U (zh) | 一种空心叠合楼板 | |
CN108381746B (zh) | 滑移式台座预制箱梁的施工方法 | |
CN108487630B (zh) | 混凝土坎台预制装配施工方法 | |
CN104631674A (zh) | 一种叠合楼板及其施工方法 | |
CN201990944U (zh) | 组合结构桥面连续装置 | |
CN204001436U (zh) | 一种保证梁底保护层、梁高及板厚的施工结构 | |
CN206859480U (zh) | 一种装配式大跨度组合钢桁架混凝土叠合板 | |
CN102359033A (zh) | 一种改进型crtsⅱ型轨道板及其预制工艺 | |
CN113898102A (zh) | 一种带肋混凝土叠合板 | |
CN202214661U (zh) | 改进型crtsii型轨道板 | |
CN203188130U (zh) | 预应力反张拉预压牛腿式鹰架支撑装置 | |
CN102465605A (zh) | 建筑底板钢筋支架方法 | |
CN202148694U (zh) | 预制t型梁钢筋绑扎定位装置 | |
CN111749383A (zh) | 一种新型预制板 | |
CN204139466U (zh) | 一种混凝土预制垫块 | |
CN103352469B (zh) | 一种用于超大断截面斜坡垫层的施工方法和结构 | |
CN203129604U (zh) | 一种控制钢筋混凝土楼板厚度的结构 | |
CN202882227U (zh) | 一种可预埋锯齿形混凝土马凳 | |
CN204899041U (zh) | 板筋上下保护层控制马凳 | |
CN208323721U (zh) | 一种十字拖具模具和十字拖具 | |
CN102359034A (zh) | 改进型crtsⅱ型轨道板 | |
CN108775192B (zh) | 一种预应力混凝土塔柱结构及其施工方法 | |
CN108457427A (zh) | 一种用于建筑混凝土模板支设的止水定型垫块及制作方法 | |
CN204455723U (zh) | 一种钢筋笼及其轨道板 | |
CN204491947U (zh) | 一种叠合楼板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |