CN102354977A - Feeder fault handling method - Google Patents

Feeder fault handling method Download PDF

Info

Publication number
CN102354977A
CN102354977A CN2011103199831A CN201110319983A CN102354977A CN 102354977 A CN102354977 A CN 102354977A CN 2011103199831 A CN2011103199831 A CN 2011103199831A CN 201110319983 A CN201110319983 A CN 201110319983A CN 102354977 A CN102354977 A CN 102354977A
Authority
CN
China
Prior art keywords
fault
power supply
feeder
obtains
conventional method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103199831A
Other languages
Chinese (zh)
Other versions
CN102354977B (en
Inventor
赵永生
谭志海
孙秋鹏
冷华
周淑雄
张亮峰
葛亮
赵凤青
张磊
李华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Original Assignee
Beijing Sifang Automation Co Ltd
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN 201110319983 priority Critical patent/CN102354977B/en
Publication of CN102354977A publication Critical patent/CN102354977A/en
Application granted granted Critical
Publication of CN102354977B publication Critical patent/CN102354977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention introduces a feeder fault handling method, which comprises the following steps of: 1) conducting online search and locating a feeder fault; 2) conducting network topology analysis to draw a conclusion; 3) finding out the section of the fault; 4) searching for the boundary switch of the fault section and making a fault isolation plan; 5) defining non-fault power outage areas; 6) making power supply restoration plans for outage areas on the upstream side and the downstream side of the fault; 7) conducting safety evaluation to the downstream power supply restoration plan; and 8) executing the plans according to the safety evaluation obtained at the step 7. The feeder fault handling method has the advantages that: 1) the method is suitable for the automatic construction of feeders of a power distribution network which is wired in any way; 2) the practicability is high, the impedance parameters of the equipment of the distribution network are not required and the power flow calculation module is not required to be called; and 3) the power supply restoration can be separately conducted to the non-fault sections, so as to reduce the power outage range and decrease the power outage duration as much as possible.

Description

A kind of feeder fault processing method
Technical field
The invention belongs to the electrical engineering technical field, relate in particular to a kind of feeder fault processing method that is applicable to electrical power distribution automatization system.
Background technology
Feeder automation is the Core Feature of electrical power distribution automatization system.Realize feeder automation, can when feeder line breaks down, dwindle the fault outage scope, reduced the interruption duration that fault causes, thereby improved power supply reliability.The feeder fault processing method is to realize the main means of feeder automation, and its key problem is meant how to realize the feeder fault location, how isolated fault and how to recover the power supply of non-fault zone, is called for short Fault Diagnosis, location, isolation and recovery.Tradition feeder fault processing method generally is based upon on the trend computing module; ADVANCED APPLICATIONS module coupling degrees such as feeder fault processing module and the calculating of distribution trend are bigger; Increased the complexity that feeder fault is handled; Reduce the feeder fault processing reliability, influenced the practicality that feeder fault is handled.In addition, because distribution net equipment is of a great variety, device parameter obtains very difficulty, finally causes distribution calculation of tidal current and actual conditions difference bigger than normal, has influenced feeder fault processing reliability and efficient.
Summary of the invention
The technical problem that the present invention will solve is: the defective to traditional feeder fault processing method, a kind of improved feeder fault processing method is provided, and use this method passable,
(1), the coupled relation between releasing feeder fault processing module and distribution trend computing module;
(2), improve the actuating logic of existing isolation scheme and recovery scheme, when the success of Fault Isolation part, can the operating part recovery scheme, flexibility, the rapidity of raising service restoration.
Technical solution of the present invention is: above-mentioned a kind of feeder fault processing method is to be following step:
(1), uses the on-line search of feeder fault processing server; Treat that this feeder fault processing server receives the FTU (abbreviation of English " Feeder Terminal Unit "; The Chinese translation be " line feed terminals unit ") on the RTU (abbreviation of English " Remote Terminal Unit " in the fault message that send or the transformer station; The Chinese translation be " terminal unit unit ") on the feeder line gate out switch that send protect action message, wait for 10~300 seconds.If in this setting stand-by period, receive new fault message or feeder line gate out switch protection action message, even the wait timing is made zero and restarted the accumulative total stand-by period.If in the setting stand-by period, do not receive new fault message or feeder line gate out switch protection action message, use conventional method to carry out the feeder fault location:
(2), take place according to fault before the record of switch and feeder line gate out switch state in the feeder line, use conventional method to carry out the network topology analysis, draw network topology and analyze conclusion;
(3), the feeder line gate out switch protection action message of sending on the RTU in fault message that send on the FTU that receives according to step (1) or the transformer station and step (2) the conclusion of the network topology that obtains analysis; Use conventional method to carry out fault location and handle, obtain the fault location result and promptly find the guilty culprit section.During power distribution network open loop operation, as long as the zone detection between the adjacent switch is sent fault message to any one boundary switch, then looking this section is that fault section is implemented above-mentioned fault location processing.And when the power distribution network operation with closed ring, do not provide fault location to handle;
(4), the guilty culprit section that promptly finds according to the resulting fault location result of step (3), the boundary switch of searching for this fault section utilizes the entrained information of boundary switch that is searched out to formulate fault isolation schemes by conventional method;
(5), use conventional method Simulation execution step (4) fault isolation schemes that obtains, Simulation execution finishes, and uses conventional method to carry out the network topology analysis to the Simulation execution result, draws network topology analysis conclusion.Then, analyze conclusion, the non-fault outage zone of using the conventional method delimitation to form by fault upper reaches power supply interrupted district and fault down stream power supply interrupted district according to this network topology.Wherein, said fault upper reaches power supply interrupted district is meant that said guilty culprit zone is to the power supply interrupted district between the said feeder line gate out switch; The fault down stream power supply interrupted district is meant that said guilty culprit zone is to the power supply interrupted district between the said boundary switch;
(6), search step (5) power supply interrupted district place, the fault upper reaches feeder line gate out switch of delimiting, utilize the entrained information of feeder line gate out switch that is searched out, use conventional method to formulate the fault upper reaches power supply interrupted district scheme that restores electricity; The boundary switch of the fault down stream power supply interrupted district that search step (5) delimited is utilized the entrained information of boundary switch that is searched out, and uses conventional method to formulate the fault down stream power supply interrupted district scheme that restores electricity;
(7), to step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity, that uses the downstream power supply interrupted district waits to recover load, changes supplying feeder line gate out switch rated capacity, current current value to come the downstream recovery scheme is carried out safety evaluatio.Supply the current electric current of feeder line to supply feeder line gate out switch rated capacity less than changeing if load current to be recovered adds to change, then the fail safe to the downstream recovery scheme gives sure evaluation; Otherwise, negative evaluation is made in the fail safe of downstream recovery scheme;
(8), according to step (7) safety evaluatio that obtains; If promptly step (7) safety evaluatio that obtains is sure, use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that obtains scheme and step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity that restores electricity.If step (7) safety evaluatio that obtains is negated; Use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that the obtains scheme that restores electricity, the fault down stream power supply interrupted district of abandoning execution in step (6) the corresponding negative evaluation that the obtains scheme that restores electricity.
The invention has the beneficial effects as follows: this method,
(1), is applicable to the feeder automation construction of any mode of connection power distribution network;
(2), practical, need not the impedance parameter of distribution net equipment, need not to call the trend computing module;
(3), can separately carry out service restoration to the non-fault section that is in the fault upstream and downstream handles; Isolate under the case of successful at partial fault; Can carry out part and recover, improve and recover processing more flexible, as much as possible dwindle the power failure scope and reduce interruption duration;
(4) evaluation of the non-fault section recovery scheme in downstream is adopted to change and is supplied current electric current of feeder line gate out switch and rated capacity, and very strong directive function is arranged when the dispatcher is carried out the physical fault recovery operation.
Embodiment
Embodiment 1:
(1), use the on-line search of feeder fault processing server, treat that this feeder fault processing server receives the feeder line gate out switch that send on the RTU in the fault message that send on the FTU or the transformer station and protects action message, wait for 10~300 seconds.If in this setting stand-by period, receive new fault message or feeder line gate out switch protection action message, even the wait timing is made zero and restarted the accumulative total stand-by period.
(2), take place according to fault before the record of switch and feeder line gate out switch state in the feeder line, use conventional method to carry out the network topology analysis, draw network topology and analyze conclusion;
(3), the feeder line gate out switch protection action message of sending on the RTU in fault message that send on the FTU that receives according to step (1) or the transformer station and step (2) the conclusion of the network topology that obtains analysis; Use conventional method to carry out fault location and handle, find the guilty culprit section.
(4), the guilty culprit section that finds according to step (3), the boundary switch of searching for this fault section utilizes the entrained information of boundary switch that is searched out to formulate fault isolation schemes by conventional method;
(5), use conventional method Simulation execution step (4) fault isolation schemes that obtains, Simulation execution finishes, and uses conventional method to carry out the network topology analysis to the Simulation execution result, draws network topology analysis conclusion.Then, analyze conclusion, the non-fault outage zone of using the conventional method delimitation to form by fault upper reaches power supply interrupted district and fault down stream power supply interrupted district according to this network topology;
(6), search step (5) power supply interrupted district place, the fault upper reaches feeder line gate out switch of delimiting, utilize the entrained information of feeder line gate out switch that is searched out, use conventional method to formulate the fault upper reaches power supply interrupted district scheme that restores electricity; The boundary switch of the fault down stream power supply interrupted district that search step (5) delimited is utilized the entrained information of boundary switch that is searched out, and uses conventional method to formulate the fault down stream power supply interrupted district scheme that restores electricity;
(7), to step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity, that uses the downstream power supply interrupted district waits to recover load, changes supplying feeder line gate out switch rated capacity, current current value to come the downstream recovery scheme is carried out safety evaluatio.Supply the current electric current of feeder line to supply feeder line gate out switch rated capacity less than changeing if load current to be recovered adds to change, then the fail safe to the downstream recovery scheme gives sure evaluation; Otherwise, negative evaluation is made in the fail safe of downstream recovery scheme;
(8), use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that obtains scheme and step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity that restores electricity if step (7) safety evaluatio that obtains is sure.If step (7) safety evaluatio that obtains is negated; Use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that the obtains scheme that restores electricity, the fault down stream power supply interrupted district of abandoning execution in step (6) the corresponding negative evaluation that the obtains scheme that restores electricity.
Embodiment 2:
(1), use the on-line search of feeder fault processing server, treat that this feeder fault processing server receives the feeder line gate out switch that send on the RTU in the fault message that send on the FTU or the transformer station and protects action message, wait for 10~300 seconds.If in the setting stand-by period, do not receive new fault message or feeder line gate out switch protection action message, use conventional method to carry out the feeder fault location;
Step (2)~(8) are with embodiment 1.

Claims (1)

1. feeder fault processing method, this method is following step:
(1), use the on-line search of feeder fault processing server, treat that this feeder fault processing server receives the feeder line gate out switch that send on the RTU in the fault message that send on the FTU or the transformer station and protects action message, wait for 10~300 seconds.If in this setting stand-by period, receive new fault message or feeder line gate out switch protection action message, even the wait timing is made zero and restarted the accumulative total stand-by period.If in the setting stand-by period, do not receive new fault message or feeder line gate out switch protection action message, use conventional method to carry out the feeder fault location;
(2), take place according to fault before the record of switch and feeder line gate out switch state in the feeder line, use conventional method to carry out the network topology analysis, draw network topology and analyze conclusion;
(3), the feeder line gate out switch protection action message of sending on the RTU in fault message that send on the FTU that receives according to step (1) or the transformer station and step (2) the conclusion of the network topology that obtains analysis; Use conventional method to carry out fault location and handle, find the guilty culprit section.
(4), the guilty culprit section that finds according to step (3), the boundary switch of searching for this fault section utilizes the entrained information of boundary switch that is searched out to formulate fault isolation schemes by conventional method;
(5), use conventional method Simulation execution step (4) fault isolation schemes that obtains, Simulation execution finishes, and uses conventional method to carry out the network topology analysis to the Simulation execution result, draws network topology analysis conclusion.Then, analyze conclusion, the non-fault outage zone of using the conventional method delimitation to form by fault upper reaches power supply interrupted district and fault down stream power supply interrupted district according to this network topology;
(6), search step (5) power supply interrupted district place, the fault upper reaches feeder line gate out switch of delimiting, utilize the entrained information of feeder line gate out switch that is searched out, use conventional method to formulate the fault upper reaches power supply interrupted district scheme that restores electricity; The boundary switch of the fault down stream power supply interrupted district that search step (5) delimited is utilized the entrained information of boundary switch that is searched out, and uses conventional method to formulate the fault down stream power supply interrupted district scheme that restores electricity;
(7), to step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity, that uses the downstream power supply interrupted district waits to recover load, changes supplying feeder line gate out switch rated capacity, current current value to come the downstream recovery scheme is carried out safety evaluatio.Supply the current electric current of feeder line to supply feeder line gate out switch rated capacity less than changeing if load current to be recovered adds to change, then the fail safe to the downstream recovery scheme gives sure evaluation; Otherwise, negative evaluation is made in the fail safe of downstream recovery scheme;
(8), use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that obtains scheme and step (6) the fault down stream power supply interrupted district that the obtains scheme that restores electricity that restores electricity if step (7) safety evaluatio that obtains is sure.If step (7) safety evaluatio that obtains is negated; Use conventional method execution in step (4) institute's fault isolation schemes that obtains and step (6) the fault upper reaches power supply interrupted district that the obtains scheme that restores electricity, the fault down stream power supply interrupted district of abandoning execution in step (6) the corresponding negative evaluation that the obtains scheme that restores electricity.
CN 201110319983 2011-10-20 2011-10-20 Feeder fault handling method Active CN102354977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110319983 CN102354977B (en) 2011-10-20 2011-10-20 Feeder fault handling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110319983 CN102354977B (en) 2011-10-20 2011-10-20 Feeder fault handling method

Publications (2)

Publication Number Publication Date
CN102354977A true CN102354977A (en) 2012-02-15
CN102354977B CN102354977B (en) 2013-04-03

Family

ID=45578500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110319983 Active CN102354977B (en) 2011-10-20 2011-10-20 Feeder fault handling method

Country Status (1)

Country Link
CN (1) CN102354977B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916431A (en) * 2012-09-20 2013-02-06 中国电力科学研究院 Assisted decision making method for load transfer in regional power grid
CN103605047A (en) * 2013-11-29 2014-02-26 国家电网公司 Power restoration monitoring system and method
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN103872688A (en) * 2014-03-31 2014-06-18 国网上海市电力公司 Automatic protecting method for double-annular-ring four-power-supply structure feeder
CN104751300A (en) * 2015-04-22 2015-07-01 国家电网公司 Method and system for quick emergency handling of power outage of transformer substation
CN104882867A (en) * 2014-02-27 2015-09-02 国家电网公司 Power distribution network self-healing control method and system
CN106099926A (en) * 2016-08-25 2016-11-09 东方电子股份有限公司 A kind of power distribution network secondary based on the rejection of trunk supply path turns method of supplying power to
CN106229975A (en) * 2016-08-25 2016-12-14 东方电子股份有限公司 A kind of distribution network load based on path node difference matching turns for method for splitting
CN106253252A (en) * 2016-08-27 2016-12-21 国网山东省电力公司蓬莱市供电公司 A kind of feeder automation fault self-recovery method of high fault tolerance
CN106872854A (en) * 2017-01-26 2017-06-20 南京陇源汇能电力科技有限公司 The fault handling method of power distribution automation equipment in a kind of distribution system
CN108493928A (en) * 2018-03-28 2018-09-04 国电南瑞科技股份有限公司 Distributed feeder automation distribution line topology ad hoc network method
CN111337787A (en) * 2020-05-16 2020-06-26 广州思泰信息技术有限公司 Remote detection device for primary and secondary fusion equipment of power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4622968B2 (en) * 2006-08-30 2011-02-02 株式会社明電舎 Power interchange method for distribution automation system
CN102037630A (en) * 2008-07-21 2011-04-27 Abb研究有限公司 Feeder automation system and method for operating the same
CN102097808A (en) * 2011-01-31 2011-06-15 天津大学 Method for estimating reliability of electric distribution system containing distributive wind power, photovoltaic and energy storage devices
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4622968B2 (en) * 2006-08-30 2011-02-02 株式会社明電舎 Power interchange method for distribution automation system
CN102037630A (en) * 2008-07-21 2011-04-27 Abb研究有限公司 Feeder automation system and method for operating the same
CN102097808A (en) * 2011-01-31 2011-06-15 天津大学 Method for estimating reliability of electric distribution system containing distributive wind power, photovoltaic and energy storage devices
CN102136721A (en) * 2011-03-08 2011-07-27 中国电力科学研究院 Multi-object optimized power supply recovery reasoning and searching method

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916431B (en) * 2012-09-20 2015-01-21 中国电力科学研究院 Assisted decision making method for load transfer in regional power grid
CN102916431A (en) * 2012-09-20 2013-02-06 中国电力科学研究院 Assisted decision making method for load transfer in regional power grid
CN103605047B (en) * 2013-11-29 2017-01-04 国家电网公司 A kind of telegram in reply monitoring system and method
CN103605047A (en) * 2013-11-29 2014-02-26 国家电网公司 Power restoration monitoring system and method
CN103746376A (en) * 2014-01-21 2014-04-23 重庆大学 Power distribution network dynamic power restoration method based on load curve
CN103746376B (en) * 2014-01-21 2015-09-09 重庆大学 A kind of power distribution network dynamic power restoration method based on load curve
CN104882867A (en) * 2014-02-27 2015-09-02 国家电网公司 Power distribution network self-healing control method and system
CN103872688A (en) * 2014-03-31 2014-06-18 国网上海市电力公司 Automatic protecting method for double-annular-ring four-power-supply structure feeder
CN104751300B (en) * 2015-04-22 2018-05-15 国家电网公司 A kind of quick emergency processing method of substation's power outage and system
WO2016169238A1 (en) * 2015-04-22 2016-10-27 国网浙江省电力公司杭州供电公司 Quick emergency processing method and system for power failure accident of transformer substation
CN104751300A (en) * 2015-04-22 2015-07-01 国家电网公司 Method and system for quick emergency handling of power outage of transformer substation
CN106099926A (en) * 2016-08-25 2016-11-09 东方电子股份有限公司 A kind of power distribution network secondary based on the rejection of trunk supply path turns method of supplying power to
CN106229975A (en) * 2016-08-25 2016-12-14 东方电子股份有限公司 A kind of distribution network load based on path node difference matching turns for method for splitting
CN106099926B (en) * 2016-08-25 2018-03-27 东方电子股份有限公司 A kind of power distribution network based on the rejection of trunk supply path is secondary to turn method of supplying power to
CN106229975B (en) * 2016-08-25 2018-06-08 东方电子股份有限公司 A kind of distribution network load based on path node difference matching turns for method for splitting
CN106253252A (en) * 2016-08-27 2016-12-21 国网山东省电力公司蓬莱市供电公司 A kind of feeder automation fault self-recovery method of high fault tolerance
CN106872854A (en) * 2017-01-26 2017-06-20 南京陇源汇能电力科技有限公司 The fault handling method of power distribution automation equipment in a kind of distribution system
CN106872854B (en) * 2017-01-26 2019-10-01 南京陇源汇能电力科技有限公司 The fault handling method of power distribution automation equipment in a kind of distribution system
CN108493928A (en) * 2018-03-28 2018-09-04 国电南瑞科技股份有限公司 Distributed feeder automation distribution line topology ad hoc network method
CN111337787A (en) * 2020-05-16 2020-06-26 广州思泰信息技术有限公司 Remote detection device for primary and secondary fusion equipment of power distribution network
CN111337787B (en) * 2020-05-16 2020-08-07 广州思泰信息技术有限公司 Remote detection device for primary and secondary fusion equipment of power distribution network

Also Published As

Publication number Publication date
CN102354977B (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN102354977B (en) Feeder fault handling method
CN103354353B (en) Intelligent power-distribution-network whole-line quick-reacting main protection and determination system and method
CN104767182B (en) A kind of overhead transmission line type distribution network failure processing method
CN103606910B (en) The fault self-recovery method in a kind of outlet of the distribution feeder based on Wide-area Measurement Information dead band
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN104459465B (en) A kind of Fault Section Location of Distribution Network containing distributed power source
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
CN104134996B (en) Containing the power distribution network large-area power-cuts recovery technology of distributed power source
CN103138390A (en) Power distribution network fault handling method based on self-recovering control
CN103490392A (en) Fault handling method of power distribution network comprising distributed power supplies and microgrids
CN105790442A (en) Distributed intelligent feeder automation system capable of achieving quick self-healing
CN110350651A (en) The prepared auto restart faulty action preventing method of 110kV single busbar failure
CN105226832A (en) A kind of relay protecting method
CN204481568U (en) A kind of power plant is standby throws protective device
CN103872656A (en) Distributive bus fast protection realization method for intelligent transformer substation
CN104333143B (en) Intelligent feeder terminal device for power distribution network fault detection
CN104332999A (en) Automatic main grid power supply transferring strategy generation method for regional power grid
CN103560579B (en) The method of attachment of Distributed Reserve Power Source Automatic Switching device and prepared auto restart method of operating thereof
CN106329499A (en) DC grounding protection method for single-rail backflow power supply system
Zhihai et al. An accurate fault location method of smart distribution network
CN203014357U (en) GOOSE message/switch value conversion device for relay protection digitized transformation
CN104393671A (en) Automatic switch realization method for standby power supply under small load
CN103178503B (en) A kind of feeder line fault of distribution network focuses on pattern
CN104348153B (en) Area power grid master-failure automatically turns power supply control and performs method
CN113872160A (en) Distributed power source linkage switching system of power distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: BEIJING SIFANG AUTOMATION CO., LTD. STATE GRID COR

Free format text: FORMER OWNER: BEIJING SIFANG AUTOMATION CO., LTD.

Effective date: 20121123

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121123

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant after: Beijing Sifang Jibao Automation Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant before: Beijing Sifang Jibao Automation Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant