power source
power
distributed power
area
cuts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410325859.XA
Other languages
Chinese (zh)
Other versions
CN104134996A (en
Inventor
时金媛
苏标龙
吴�琳
韩韬
王伟
赵仰东
张佳琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410325859.XA priority Critical patent/CN104134996B/en
Publication of CN104134996A publication Critical patent/CN104134996A/en
Application granted granted Critical
Publication of CN104134996B publication Critical patent/CN104134996B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Abstract

The invention discloses a kind of by large-area power-cuts identification, turn and effectively isolate for region, turn and recover for load Analysis, optimal reconfiguration containing distributed power source, dynamic conditioning operation and optimizing operating mode the large-area power-cuts recovery technology that realizes, can restore electricity at short notice after power distribution network occurrence of large-area is had a power failure, utilize the convenience of power distribution automation, switching manipulation in enormous quantities can be completed at short notice; In the process, will turn and effectively keep apart for region, ensure the fail safe of power supply; Participate at distributed power source, in the process of optimal reconfiguration, taking and reasonably starting principle and account form, guarantee feasibility and the reasonability of reconfiguration scheme; In dynamic operation adjustment process, when carrying out secondary network reconstruct, take network reconfiguration among a small circle, with the time requirement ensureing computational speed and restore electricity as far as possible; After failture evacuation, bus loss of pressure are removed, original operational mode can be recovered in time to ensure the optimizing operation of operational mode.

Description

Containing the power distribution network large-area power-cuts recovery technology of distributed power source
Technical field
The present invention relates to a kind of service restoration technology, be specifically related to a kind of power distribution network large-area power-cuts recovery technology containing distributed power source, belong to the troubleshooting technology in electrical power distribution automatization system.
Background technology
Distribution network failure isolation of the prior art and service restoration method are all the situations for this kind of microvariations of power distribution network generation feeder fault.But, natural calamity (ice damage, snow disaster, earthquake etc.), outside destroy cause transmission line to fall tower or transmission line malfunction maintenance etc., a fault that even many this kind of impacts of 10KV bus loss of pressure are larger can be caused, in these cases, if can not guarantee that in high-pressure side whole decompression bus restores electricity, power distribution network will be caused on a large scale to have a power failure for a long time.Although 10KV bus loss of pressure fault is small probability event, once occur, will large-area power-cuts be caused, very harmful.
Along with the construction and upgrading of electrical network, the power supply point distribution of power distribution network, grid structure and segmentation and contact are tending towards reasonable, especially in recent years, large quantities of accesses of distributed power source, for power distribution network provides active power source, make by medium voltage distribution network on a large scale transfer load become possibility, the enforcement of power distribution automation, the operation of switch in enormous quantities can be completed in a short period of time.How realizing the developing direction that power distribution network wide-area power outage troubleshooting fast recovery of power supply under the state of emergency is new technology in the industry, is also the large problem needing solution badly.
Summary of the invention
For solving the deficiencies in the prior art, the object of the invention is to be recovered by the participation of distributed power source, making power distribution network large-area power-cuts in the short time recover to be achieved.
In order to realize above-mentioned target, the present invention adopts following technical scheme:
Containing the power distribution network large-area power-cuts recovery technology of distributed power source, comprise following several step:
(1), large-area power-cuts identification: identify whether power distribution network there occurs large area blackout quickly and accurately;
(2), turn and effectively isolate for region: by all wire-outgoing breaker separating brakes of bus downstream associative, ensure to turn the obvious cut-off point for region, guarantee the Supply Security in territory, area to be transferred;
(3), turning for load Analysis: to needing the load turning confession to analyze, and according to analysis result, load classification is sorted, preparing optimal reconfiguration;
(4), containing the optimal reconfiguration of distributed power source: be optimized reconstruct so that load rejection is minimum for target, utilize the access of distributed power source, expand the power scheduling ability of power distribution network, improve large-area power-cuts recovery capability;
(5), dynamic conditioning operation: in order to the misaction run in resolution policy execution, the switch operated and the region that restored electricity are locked, after again the switch of remote control tripping being marked, and then generate new network reconfiguration scheme among a small circle to not recovering regional dynamics, ensure power supply reliability.
Wherein, large-area power-cuts is identified by and following judges and the mode of verification identifies:
(1), large-area power-cuts identification judges: comprise busbar voltage decompression and judge and the judgement of circuit breaker current zero;
(2), large-area power-cuts verification: whether the controller switching equipment electric current detecting the drive of bus downstream makes zero, verification adopts percents to judge: entirely searched for by this all controller switching equipment in bus downstream, detect the electric current of the switch of all devices, and all testing results are generated statistics ratio value, zero ratio is more than 80%, and verification is passed through; 30% to 60% is suspicious; Less than 30%, then do not pass through.
Containing in the optimal reconfiguration step of distributed power source, follow following principle:
(1), first main power source supply power mode is considered, whether the power supply total amount that calculating main power source provides can satisfy the demand turns a demand for confession load, if can satisfy the demands, then first start with main electric network source as power supply point, with the minimum recovery and optimization reconstruction calculations for target of load rejection, and form initial optimization reconfiguration scheme, due to supply path restriction, even if amount of power supply can meet the demands, also the situation that cannot meet power demands may be there is, therefore, when generating initial optimal reconfiguration scheme, if cannot power demands be met, then need to recalculate;
(2), when main power source cannot satisfy the demands, the optimal reconfiguration that the power supply considering to possess black start-up ability participates in calculates, and is still optimized reconstruct so that load rejection is minimum for target, generates new optimal reconfiguration numerical procedure; Then, then calculate the distributed power source not possessing black start-up ability, the distributed power source not possessing black starting-up condition is counted in reconfiguration scheme according to access point one by one, and carry out corrigendum calculating according to the Power supply ability of supplementing into, generate new scheme.
Preferably, when distributed power source participates in recovering, following principle is followed in its startup:
(1), when the isolated island formed after distributed power source is to network reconfiguration is powered, the black starting-up principle of distributed power source is as follows:
When recovering the isolated island that distributed power source is powered separately, needing first on-load switch all to be pulled open, entering again after waiting for distributed power source startup and recovering one by one;
During distributed power source black starting-up, the power supply possessing black start-up ability first starts, if there is multiple distributed power source possessing black start-up ability jointly to recover, test according to the demand of distributed power source paired running, if can paired running, then put into same isolated island to run, if verification is not passed through, then split into multiple isolated island and recover;
Do not possess other distributed power sources of black start-up ability, and need the load of recovery, calculate recovery capability according to power supply capacity, voltage fluctuation limit value condition, ensure power supply quality and power supply capacity, generation can meet the sequence of operation of power demands, operates;
(2), the supply network of non-islet operation: if it is grid-connected to there is distributed power source, first main power source is recovered, main power source recovery is carried out again after the load excision that cannot drive according to power supply capacity, then that distributed power source is grid-connected, according to power grid condition, verify grid-connected ability, after verification, generate grid-connected operating procedure, after distributed power source is grid-connected, to power supply capacity be expanded, finally according to newly-increased power supply capacity, the load restoration excised before be powered again.
Preferably, when whether the power supply total amount that calculating main power source provides can satisfy the demand the demand turned for load, need the redundancy nargin of consideration 0.2, namely calculate 80% of the total amount that main power source provides and whether can meet the demand turned for load, to avoid producing useless amount of calculation.
Further, after step (5), also comprise step (6), optimizing operating mode recovers: according to the system optimal operational mode recorded before large-area power-cuts, again according to development trend and the power supply capacity of power supply, the operability COMPREHENSIVE CALCULATING of switch of existing load, generating run mode recovery policy, electrical power distribution automatization system is used to carry out straighforward operation, the optimization completing operational mode recovers, and ensures the operation with closed ring of large-area power-cuts process.
Usefulness of the present invention is: by large-area power-cuts identification, turn for region effectively isolate, turn for load Analysis, containing distributed power source optimal reconfiguration, dynamic conditioning operation and optimizing operating mode recover several step, can restore electricity at short notice after power distribution network occurrence of large-area is had a power failure, utilize the convenience of power distribution automation, switching manipulation in enormous quantities can be completed at short notice; And, in the process, will turn and effectively keep apart for region, ensure the fail safe of power supply; Participate at distributed power source, in the process of optimal reconfiguration, taking and reasonably starting principle and account form, guarantee feasibility and the reasonability of reconfiguration scheme; In dynamic operation adjustment process, when carrying out secondary network reconstruct, take network reconfiguration among a small circle, with the time requirement ensureing computational speed and restore electricity as far as possible; After failture evacuation, bus loss of pressure are removed, original operational mode can be recovered in time to ensure the optimizing operation of operational mode.
Accompanying drawing explanation
Fig. 1 is the flow chart of the power distribution network large-area power-cuts Recovery processing containing distributed power source of the present invention;
Fig. 2 is the flow chart of large-area power-cuts identification;
Fig. 3 is the analysis process figure of the optimal reconfiguration containing distributed power source.
Embodiment
Below in conjunction with the drawings and specific embodiments, concrete introduction is done to the present invention.
See Fig. 1, the power distribution network large-area power-cuts recovery technology containing distributed power source of the present invention, comprises following several step:
One, large-area power-cuts identification: can identify whether power distribution network there occurs large area blackout quickly and accurately;
Large-area power-cuts be identified by two judgements add one verification mode identify, as shown in Figure 2:
(1), large-area power-cuts identification judges: comprise busbar voltage decompression and judge and the judgement of circuit breaker current zero;
(2), large-area power-cuts verification: whether the controller switching equipment electric current detecting the drive of respective bus bars downstream makes zero, and verification adopts percents to judge.Specifically, exactly this all controller switching equipment in bus downstream is searched for entirely, detect the electric current of the switch of all devices, and all testing results are generated statistics ratio value, zero ratio is more than 80%, and verification is passed through, meet the entry condition shown in Fig. 1, enter step 2; 30% to 60% is suspicious, now notifies that user has the possibility of large area dead electricity herein, and indicating probability value, be confirmed whether to continue to analyze by user, if continued, then enter step 2 below, if do not continued, do not start; Less than 30%, then do not pass through, namely do not meet the entry condition shown in Fig. 1.
Two, turn confession region effectively to isolate: in order to ensure the fail safe that distribution large-area power-cuts recovers, after recognizing large-area power-cuts, the very first time is needed effectively to isolate needing the region turning confession, ensure Supply Security, by all wire-outgoing breaker separating brakes of bus downstream associative, ensure to turn the obvious cut-off point for region, guarantee the Supply Security in territory, area to be transferred.
Three, turn for load Analysis: in conjunction with network topology, load attribute, distributed power source attribute, Power supply ability many factors, analyze needing the load turning confession, Main Analysis load character (important level, duplicate supply user), payload, the short-term load (duty) rule of development, and according to analysis result, load classification is sorted, tentatively obtain the optimal reconfiguration sequence of steps containing distributed power source, prepare optimal reconfiguration.
Four, containing the optimal reconfiguration of distributed power source: complete turning for after load Analysis of previous step, start to carry out load optimal reconstruct, reconstruct is optimized so that load rejection is minimum for target.Utilize the access of distributed power source, expand the power scheduling ability of power distribution network, improve large-area power-cuts recovery capability, thus ensure that power distribution network large-area power-cuts full recovery at short notice becomes possibility, propose in the power distribution network large-area power-cuts recovery containing distributed power source simultaneously, the startup principle of distributed power source, the generation of method of calibration and step strategy, ensures power supply capacity and the power supply quality of power distribution network.
When carrying out the optimal reconfiguration containing distributed power source, mainly follow following principle, as shown in Figure 3:
(1) main power source supply power mode, is paid the utmost attention to, whether the power supply total amount that first calculating main power source provides can satisfy the demand and turn a demand for confession load, when calculating, in order to avoid producing useless amount of calculation, need to consider certain redundancy capacity, generally get the redundancy nargin of 0.2, namely calculate 80% of the total amount that main power source provides and whether can meet the demand turned for load.If can satisfy the demands, then first start with main electric network source as power supply point, with the minimum recovery and optimization reconstruction calculations for target of load rejection, and form initial optimization reconfiguration scheme, due to supply path restriction, even if amount of power supply can meet the demands, also the situation that cannot meet power demands may be there is, therefore, when generating initial optimal reconfiguration scheme, if cannot power demands be met, then need to recalculate;
(2), when main power source cannot satisfy the demands, then consider that the optimal reconfiguration that the power supply possessing black start-up ability participates in calculates, be still optimized reconstruct so that load rejection is minimum for target, generate new optimal reconfiguration numerical procedure; Then, then calculate the distributed power source not possessing black start-up ability, the distributed power source not possessing black starting-up condition is counted in reconfiguration scheme according to access point one by one, and carry out corrigendum calculating according to the Power supply ability of supplementing into, generate new scheme.
(3), when distributed power source participates in recovering, following principle is followed in its startup:
When a, distributed power source are powered to the isolated island formed after network reconfiguration, need the black starting-up principle considering distributed power source:
Load restoration needs to recover one by one by 0 according to the power supply capacity of distributed power source, therefore when recovering the isolated island that distributed power source is powered separately, needs first all to be pulled open by on-load switch, enters again and recover one by one after waiting for distributed power source startup;
During distributed power source black starting-up, the power supply possessing black start-up ability needs first to start, if possess multiple distributed power source possessing black start-up ability jointly to recover, test according to the demand of distributed power source paired running, if can paired running, then put into and can put into same isolated island and run, if verification is not passed through, then split into multiple isolated island and recover;
Do not possess other distributed power sources of black start-up ability, and need the load of recovery, according to power supply capacity, the conditions such as voltage fluctuation limit value calculate recovery capability, ensure power supply quality and power supply capacity, generate the sequence of operation that can meet power demands, operate.
The supply network of b, non-islet operation: if it is grid-connected to there is distributed power source, first main power source is recovered, main power source recovery is carried out again after the load excision that cannot drive according to power supply capacity, then that distributed power source is grid-connected, according to power grid condition, verify grid-connected ability, after verification, generate grid-connected operating procedure, after distributed power source is grid-connected, to power supply capacity be expanded, finally according to newly-increased power supply capacity, the load restoration excised before be powered again.
Five, dynamic conditioning operation: after all operations schemes generation, the executable operations stage will be entered, straighforward operation is carried out one by one by power distribution automation main website according to the sequence of steps generated, in remote control process, may run into the remote control failure because a variety of causes causes, remote control unsuccessfully will cause subsequent operation possibly cannot normally carry out, therefore when there is remote control tripping, need to adopt dynamic conditioning operation, dynamic conditioning is carried out to ensuing operation.If now carry out the whole network reconstruction calculations again, may by what cause the switch operated again to carry out to operate, thus cause endless loop, optimum solution path cannot be obtained, situation simultaneously also in order to avoid causing user repeatedly to have a power failure, therefore the switch operated and the region that restored electricity is needed to lock, after again the switch of remote control tripping being marked, finally re-start secondary network reconstruct to not recovering region again, when carrying out secondary network reconstruct, take network reconfiguration among a small circle as far as possible, and with the minimum scheme for target of load rejection, the step obtained can be operated, the time requirement ensureing computational speed simultaneously and restore electricity.
By the execution of above steps, the large-area power-cuts that the present invention proposes containing distributed power source recovers, and further, in order to perfect disposed of in its entirety flow process, the invention allows for the optimizing operating mode recovered part after failture evacuation, being elaborated as follows.
Six, optimizing operating mode recovers: system completes after large-area power-cuts recovers, and because now operational mode is transient state mode, thus whether system starts constantly to detect large area blackout and eliminate, and whether original bus restores electricity ability.Once detect that original bussed supply ability is recovered, then carry out operational mode recovery operation, according to the system optimal operational mode recorded before large-area power-cuts, again according to development trend and the power supply capacity of power supply, the operability COMPREHENSIVE CALCULATING of switch of existing load, generating run mode recovery policy, electrical power distribution automatization system is used to carry out straighforward operation, thus the operational mode recovered before fault generation, the optimization completing operational mode recovers, and ensures the operation with closed ring of large-area power-cuts process.
More than show and describe general principle of the present invention, principal character and advantage.The technical staff of the industry should understand, and above-described embodiment does not limit the present invention in any form, the technical scheme that the mode that all employings are equal to replacement or equivalent transformation obtains, and all drops in protection scope of the present invention.

Claims (5)

1., containing the power distribution network large-area power-cuts recovery technology of distributed power source, it is characterized in that, comprise following several step:
(1), large-area power-cuts identification: identify whether power distribution network there occurs large area blackout;
(2), turn and effectively isolate for region: after confirming to there occurs large area blackout, by all wire-outgoing breaker separating brakes of bus downstream associative, ensure to turn the obvious cut-off point for region, guarantee the Supply Security in territory, area to be transferred;
(3), turning for load Analysis: to needing the load turning confession to analyze, and according to analysis result, load classification is sorted, preparing optimal reconfiguration;
(4), containing the optimal reconfiguration of distributed power source: be optimized reconstruct so that load rejection is minimum for target, utilize the access of distributed power source, expand the power scheduling ability of power distribution network, improve large-area power-cuts recovery capability, thus ensure that power distribution network large-area power-cuts full recovery at short notice becomes possibility, generate the generation of the startup principle of distributed power source in the power distribution network large-area power-cuts recovery containing distributed power source, method of calibration and step strategy simultaneously, ensure power supply capacity and the power supply quality of power distribution network;
(5), dynamic conditioning operation: in order to solve during the large-area power-cuts recovery policy generated performs the misaction run into, the switch operated and the region that restored electricity are locked, after again the switch of remote control tripping being marked, and then generate new network reconfiguration scheme among a small circle to not recovering regional dynamics, ensure power supply reliability.
2. the power distribution network large-area power-cuts recovery technology containing distributed power source according to claim 1, it is characterized in that, containing in the optimal reconfiguration step of distributed power source, principle is as follows:
(1), first main power source supply power mode is considered, whether the power supply total amount that calculating main power source provides can satisfy the demand turns a demand for confession load, if can satisfy the demands, then first start with main electric network source as power supply point, with the minimum recovery and optimization reconstruction calculations for target of load rejection, and form initial optimization reconfiguration scheme, due to supply path restriction, even if amount of power supply can meet the demands, also the situation that cannot meet power demands may be there is, therefore, when generating initial optimal reconfiguration scheme, if cannot power demands be met, then need to recalculate;
(2), when main power source cannot satisfy the demands, the optimal reconfiguration that the distributed power source considering to possess black start-up ability participates in calculates, and is still optimized reconstruct so that load rejection is minimum for target, generates new optimal reconfiguration numerical procedure; Then, then calculate the distributed power source not possessing black start-up ability, the distributed power source not possessing black starting-up condition is counted in reconfiguration scheme according to access point one by one, and carry out corrigendum calculating according to the Power supply ability of supplementing into, generate new scheme.
3. the power distribution network large-area power-cuts recovery technology containing distributed power source according to claim 2, is characterized in that, when distributed power source participates in recovering, following principle is followed in its startup:
(1), when the isolated island formed after distributed power source is to network reconfiguration is powered, the black starting-up principle of distributed power source is as follows:
When recovering the isolated island that distributed power source is powered separately, needing first on-load switch all to be pulled open, entering again after waiting for distributed power source startup and recovering one by one;
During distributed power source black starting-up, the distributed power source possessing black start-up ability first starts, if there is multiple distributed power source possessing black start-up ability jointly to recover, test according to the demand of distributed power source paired running, if can paired running, then put into same isolated island to run, if verification is not passed through, then split into multiple isolated island and recover;
Do not possess other distributed power sources of black start-up ability, and need the load of recovery, calculate recovery capability according to power supply capacity, voltage fluctuation limit value condition, ensure power supply quality and power supply capacity, generation can meet the sequence of operation of power demands, operates;
(2), the supply network of non-islet operation: if it is grid-connected to there is distributed power source, first main power source is recovered, main power source recovery is carried out again after the load excision that cannot drive according to power supply capacity, then that distributed power source is grid-connected, according to power grid condition, verify grid-connected ability, after verification, generate grid-connected operating procedure, after distributed power source is grid-connected, to power supply capacity be expanded, finally according to newly-increased power supply capacity, the load restoration excised before be powered again.
4. the power distribution network large-area power-cuts recovery technology containing distributed power source according to claim 2, it is characterized in that, calculate the power supply total amount that provides of main power source whether can satisfy the demand the demand turned for load time, need the redundancy nargin of consideration 0.2, namely calculate 80% of the total amount that main power source provides and whether can meet the demand turned for load, to avoid producing useless amount of calculation.
5. the power distribution network large-area power-cuts recovery technology containing distributed power source according to any one of claim 1-4, it is characterized in that, step (6) is also comprised after step (5), optimizing operating mode recovers: according to the system optimal operational mode recorded before large-area power-cuts, again according to the development trend of existing load and the power supply capacity of power supply, the operability COMPREHENSIVE CALCULATING of switch, generating run mode recovery policy, at failture evacuation, after bus recovery voltage, electrical power distribution automatization system is used to carry out straighforward operation, the optimization completing operational mode recovers, ensure the operation with closed ring of large-area power-cuts process.
CN201410325859.XA 2014-07-09 2014-07-09 Containing the power distribution network large-area power-cuts recovery technology of distributed power source Active CN104134996B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410325859.XA CN104134996B (en) 2014-07-09 2014-07-09 Containing the power distribution network large-area power-cuts recovery technology of distributed power source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410325859.XA CN104134996B (en) 2014-07-09 2014-07-09 Containing the power distribution network large-area power-cuts recovery technology of distributed power source

Publications (2)

Publication Number Publication Date
CN104134996A CN104134996A (en) 2014-11-05
CN104134996B true CN104134996B (en) 2016-01-13

Family

ID=51807572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410325859.XA Active CN104134996B (en) 2014-07-09 2014-07-09 Containing the power distribution network large-area power-cuts recovery technology of distributed power source

Country Status (1)

Country Link
CN (1) CN104134996B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105337314B (en) * 2015-12-09 2018-02-02 国家电网公司 A kind of multi-source based on distributed power source black starting-up technology coordinates control fault handling method
CN105656040B (en) * 2016-03-22 2018-06-29 国网山东省电力公司潍坊供电公司 A kind of power system restoration power computational methods for considering black starting-up process
CN106026177B (en) * 2016-07-14 2018-10-12 国网江苏省电力公司电力科学研究院 The power grid"black-start" method of electricity generation system is stored up based on light
CN106953349B (en) 2017-04-27 2019-06-21 南京南瑞继保电气有限公司 A method of start for flexible island direct current transmission system island
CN107846011B (en) * 2017-07-17 2020-06-30 中国南方电网有限责任公司 Power distribution network fault recovery method based on main and distribution network cooperative control
CN107994551A (en) * 2017-11-22 2018-05-04 国电南瑞科技股份有限公司 The fast quick-recovery processing method of failure based on transmission & distribution collaboration
CN113627766A (en) * 2021-08-02 2021-11-09 广西电网有限责任公司 Risk identification method for topology identification power failure maintenance plan

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916408A (en) * 2012-10-25 2013-02-06 江苏省电力公司扬州供电公司 Fault handling method for distribution network including distributed power source
CN103778230A (en) * 2014-01-23 2014-05-07 华北电力大学(保定) Online automatic generation method for black-start scheme

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102916408A (en) * 2012-10-25 2013-02-06 江苏省电力公司扬州供电公司 Fault handling method for distribution network including distributed power source
CN103778230A (en) * 2014-01-23 2014-05-07 华北电力大学(保定) Online automatic generation method for black-start scheme

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
徐玉琴等.基于多智能体遗传算法并考虑分布式电源的配电网大面积断电供电恢复算法.《电工技术学报》.2010,第25卷(第4期),全文. *
考虑分布式发电孤岛运行方式的智能配电网供电恢复策略研究;赵晶晶等;《电力系统保护与控制》;20110901;第39卷(第17期);全文 *
配电网故障恢复及负荷平衡的重构算法研究;乐秀璠等;《电网技术》;20020731;第26卷(第7期);全文 *

Also Published As

Publication number Publication date
CN104134996A (en) 2014-11-05

Similar Documents

Publication Publication Date Title
CN104134996B (en) Containing the power distribution network large-area power-cuts recovery technology of distributed power source
CN101436780B (en) Self-healing control method for urban power distribution network
CN101944777B (en) Intelligent self-healing monitoring method of extra high voltage power network
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
CN104701831A (en) Power distribution network self-healing control method
CN103490392B (en) Fault handling method of power distribution network comprising distributed power supplies and microgrids
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN103022994A (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN102354977A (en) Feeder fault handling method
Sarathkumar et al. A technical review on self-healing control strategy for smart grid power systems
CN103414173A (en) Method for performing fault recovery on power distribution network based on ultra-short term load
CN107994551A (en) The fast quick-recovery processing method of failure based on transmission & distribution collaboration
CN104242467A (en) Intelligent self-healing controlling method of feeder line of distribution network
CN110474327B (en) CPS (control performance Standard) information-physical combination expected fault generation method and system for power distribution network
US11309699B2 (en) Control system for and method of fault location, isolation and supply restoration
CN105337314A (en) Multisource coordination control fault treatment method based on distributed power supply black start technology
Li et al. A comprehensive method for fault location of active distribution network based on improved matrix algorithm and optimization algorithm
Capitanescu Are we prepared against blackouts during the energy transition?: Probabilistic risk-based decision making encompassing jointly security and resilience
CN111641206B (en) Multi-stage collaborative troubleshooting method for power grid faults after natural disasters
CN112234610B (en) Reliability analysis method for feeder automation system controlled by centralized FTU
Kilani et al. North Africa grid interconnection weakness: Impact on the Tunisian PES emergencies
CN111786383B (en) Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines
CN103728529B (en) A kind of switch gap condition discrimination method
Amarnath et al. Prevention of power blackout and power theft using IED
Popov et al. Synchrophasor-based Applications to Enhance Electrical System Performance in the Netherlands

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model