CN102345331B - Construction method of solar energy lightning protection facility on building roof - Google Patents

Construction method of solar energy lightning protection facility on building roof Download PDF

Info

Publication number
CN102345331B
CN102345331B CN 201110195613 CN201110195613A CN102345331B CN 102345331 B CN102345331 B CN 102345331B CN 201110195613 CN201110195613 CN 201110195613 CN 201110195613 A CN201110195613 A CN 201110195613A CN 102345331 B CN102345331 B CN 102345331B
Authority
CN
China
Prior art keywords
lightning
protection
solar energy
solar
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110195613
Other languages
Chinese (zh)
Other versions
CN102345331A (en
Inventor
葛加君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xindongyang Construction Group Co., Ltd.
Original Assignee
葛加君
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 葛加君 filed Critical 葛加君
Priority to CN 201110195613 priority Critical patent/CN102345331B/en
Publication of CN102345331A publication Critical patent/CN102345331A/en
Application granted granted Critical
Publication of CN102345331B publication Critical patent/CN102345331B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction method of a solar energy lightning protection facility on a building roof. The construction method comprises steps of carrying out external lightning protection and equipotential bonding on a solar energy photovoltaic power system, shielding and protecting a power circuit of the solar energy photovoltaic power system. The solar energy lightning protection facility has the characteristics of good lightning stroke resistant effect, wide application range and universality; the construction method is a fundamental measure for guaranteeing the personal safety and property safety of building users and is an optimal means for the lightning stroke anticipating control of the solar energy facility; therefore, the construction method has the practical applicability characteristic; and the construction method has the systematic characteristic as the anticipating control is comprehensively carried out in terms of external lightning stroke anticipating control, equipotential bonding, circuit shielding, power line and signal wire protection of the solar energy facility.

Description

Building roof solar energy lightning protection facility job practices
Technical field
The present invention relates to a kind of building roof solar energy lightning protection facility job practices.
Background technology
In recent years, the building roof solar power-generating facility is more and more, and effect is obvious, carries out emphasis as green energy resource and applies.But because in the solar water heating system, be provided with storage tank, support, heating, vacuum pipe and upper and lower conduit, and the intellectuality of solar product height, auxiliary heating, water level, water temperature show automatically, moisturizing, the automatically control of cutting off the water supply, and these functions all realize by electronic installations such as special purpose computer control chip, sensing devices.Electronic installation is indoor; Auxiliary heating, sensing device are outdoor, in the solar water heater case.The holding wire of the power line of these electronic installation power supplies, demonstration and control usefulness, control line also can suffer the impact of indirect lightning strike and LEMP except directly being struck by lightning.In recent years, the frequency that the building roof solar power-generating facility is struck by lightning is very high, brings threat for people's life security, brings loss for people's property.
Summary of the invention
The object of the present invention is to provide a kind of anti-lightning strike effective building roof solar energy lightning protection facility job practices.
Technical solution of the present invention is:
A kind of building roof solar energy lightning protection facility job practices is characterized in that: comprise the following steps:
1) solar energy is estimated the outside lightning protection of electricity generation system: installing the lightning rod that exceeds solar panel additional from 3 meters distant places of solar water heater cell panel, and carrying out ground connection;
2) the solar photovoltaic generation system equipotential connects: solar water heater metallic support, hardware are connected as equipotential with lightening protection installation on the building;
3) shielding of solar photovoltaic generation system power circuit: carry out the shielding of outdoor various power circuits, and carry out equipotential with other hardwares and be connected;
4) protection of solar photovoltaic generation system power line, the two-stage protection is set, first order protection: first order arrester is arranged in parallel between solar panel and inverter, carry out the lightning current discharge, the residual voltage of lightning surge at this section circuit is controlled in 4000 volts first order arrester model: AT PORT/4P-B100 three-phase B level power supply arrester; Second level protection: between inverter and the power distribution cabinet and between power distribution cabinet and the load equipment; the selected module design; change easily surge protection device, the lightning surge residual voltage is controlled in 2500 volts, second level arrester model: AT T385/4P-C40 three-phase C level power supply lightning arrester box.
The concrete grammar of step 3) is: solar water heater all will adopt shielding line from roof to the power circuit that uses the hot water room, shielding line passes the shielded metal pipe again, the metal tube upper end is connected with rack of solar water heater, and the metal tube lower end is connected to connect with roof strap type lightening protector.
The present invention is anti-lightning strike effective, and range of application is large, has the universal characteristics; The enforcement of this engineering method is to be the personal safety that ensures the building user and the fundamental measure of property safety, is the best means of building roof solar power-generating facility thunderbolt pre-control, therefore has the practicality characteristics; This engineering method has been carried out pre-control, so have systemic characteristics from outside thunderbolt pre-control, equipotential connection, circuit shielding, power line, the holding wire protection of solar power-generating facility comprehensively.
The invention will be further described below in conjunction with embodiment.
The specific embodiment
A kind of building roof solar energy lightning protection facility job practices comprises the following steps:
1) solar energy is estimated the outside lightning protection of electricity generation system: installing the lightning rod that exceeds solar panel additional from 3 meters distant places of solar water heater cell panel, and carrying out ground connection;
2) the solar photovoltaic generation system equipotential connects: solar water heater metallic support, hardware are connected as equipotential with lightening protection installation on the building;
3) shielding of solar photovoltaic generation system power circuit: carry out the shielding of outdoor various power circuits, and carry out equipotential with other hardwares and be connected;
4) protection of solar photovoltaic generation system power line, the two-stage protection is set, first order protection: first order arrester is arranged in parallel between solar panel and inverter, carry out the lightning current discharge, the residual voltage of lightning surge at this section circuit is controlled in 4000 volts first order arrester model: AT PORT/4P-B100 three-phase B level power supply arrester; Second level protection: between inverter and the power distribution cabinet and between power distribution cabinet and the load equipment; the selected module design; change easily surge protection device, the lightning surge residual voltage is controlled in 2500 volts, second level arrester model: AT T385/4P-C40 three-phase C level power supply lightning arrester box.
The concrete grammar of step 3) is: solar water heater all will adopt shielding line from roof to the power circuit that uses the hot water room, shielding line passes the shielded metal pipe again, the metal tube upper end is connected with rack of solar water heater, and the metal tube lower end is connected to connect with roof strap type lightening protector.

Claims (2)

1. a building roof solar energy lightning protection facility job practices is characterized in that: comprise the following steps:
1) installs the lightning rod that exceeds solar panel additional from 3 meters distant places of solar water heater cell panel, and carrying out ground connection;
2) the solar photovoltaic generation system equipotential connects: solar water heater metallic support, hardware are connected as equipotential with lightening protection installation on the building;
3) shielding of solar photovoltaic generation system power circuit: carry out the shielding of outdoor various power circuits, and carry out equipotential with other hardwares and be connected;
4) protection of solar photovoltaic generation system power line, the two-stage protection is set, first order protection: first order arrester is arranged in parallel between solar panel and inverter, carry out the lightning current discharge, the residual voltage of lightning surge at this section circuit is controlled in 4000 volts first order arrester model: AT PORT/4P-B100 three-phase B level power supply arrester; Second level protection: between inverter and the power distribution cabinet and between power distribution cabinet and the load equipment; the selected module design; change easily surge protection device, the lightning surge residual voltage is controlled in 2500 volts, second level arrester model: AT T385/4P-C40 three-phase C level power supply lightning arrester box.
2. building roof solar energy lightning protection facility job practices according to claim 1, it is characterized in that: the concrete grammar of step 3) is: solar water heater all will adopt shielding line from roof to the power circuit that uses the hot water room, shielding line passes the shielded metal pipe again, the metal tube upper end is connected with rack of solar water heater, and the metal tube lower end is connected to connect with roof strap type lightening protector.
CN 201110195613 2011-07-13 2011-07-13 Construction method of solar energy lightning protection facility on building roof Expired - Fee Related CN102345331B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110195613 CN102345331B (en) 2011-07-13 2011-07-13 Construction method of solar energy lightning protection facility on building roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110195613 CN102345331B (en) 2011-07-13 2011-07-13 Construction method of solar energy lightning protection facility on building roof

Publications (2)

Publication Number Publication Date
CN102345331A CN102345331A (en) 2012-02-08
CN102345331B true CN102345331B (en) 2013-03-27

Family

ID=45544372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110195613 Expired - Fee Related CN102345331B (en) 2011-07-13 2011-07-13 Construction method of solar energy lightning protection facility on building roof

Country Status (1)

Country Link
CN (1) CN102345331B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526866B (en) * 2013-11-06 2016-03-09 上海市建筑装饰工程集团有限公司 Dry-hang stone curtain wall and mounting method thereof
CN103774766B (en) * 2014-01-10 2015-12-09 葛加君 Intelligent building thunder and lightning pre-control construction method
CN103779824B (en) * 2014-01-10 2016-05-04 葛加君 Photovoltaic solar building lightning protection facility construction method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330729A (en) * 2004-05-20 2005-12-02 Taisei Corp Concrete member
DE102008060189B4 (en) * 2008-11-28 2010-09-16 Xaver Kirchhoff Gmbh Lightning protection coating for metallic components of building structures, as well as supports or girders
CN201467019U (en) * 2009-07-01 2010-05-12 天津市津能电池科技有限公司 Fast insertion type waterproof array header box
JP5438562B2 (en) * 2009-09-16 2014-03-12 橋本精密工業株式会社 Lightning protection connector and connection method of concrete structure using the same
CN201569068U (en) * 2009-09-28 2010-09-01 孙洪新 Lightning protection natural energy four-season type hot water system
CN201532042U (en) * 2009-10-31 2010-07-21 罗永义 Solar energy water heater
CN201724429U (en) * 2010-06-30 2011-01-26 苏州新亚科技有限公司 Solar heat pump water heater

Also Published As

Publication number Publication date
CN102345331A (en) 2012-02-08

Similar Documents

Publication Publication Date Title
CN101950956B (en) Lightning-proof electric control device of photovoltaic power generation system
CN102345331B (en) Construction method of solar energy lightning protection facility on building roof
KR101132759B1 (en) System and method for controlling power flow
Zhang et al. Transients in solar photovoltaic systems during lightning strikes to a transmission line
CN201846074U (en) Lightning-proof control device for photovoltaic power generating system
CN205159875U (en) Low -voltage distribution box
CN202248573U (en) Device for using solar photo-electricity on building, conserving energy and reducing emission
CN205882692U (en) Comprehensive lightning protection system of photovoltaic transformer substation
CN202142831U (en) Solar energy lightning protection system of building roof
CN206481055U (en) Lightning protection device
CN204088904U (en) A kind of multi-functional photovoltaic exchanges header box
CN209119804U (en) Electric furnace overvoltage energy absorption protective device
CN202231429U (en) Three-in-one monitoring multi-functional lightning protection device
CN205960973U (en) Portable dark wet environment construction safe voltage illumination power supply unit
CN205945638U (en) Solar energy lightning protection system
CN207038963U (en) A kind of lightning protection power distribution cabinet
CN204720852U (en) A kind of agriculture portable temporary power car
CN104466717A (en) Height adjusting device of electrical equipment box
CN208299230U (en) A kind of light distribution cabinet of thunder-lightning
CN203774609U (en) Simple overvoltage protection device
CN207475157U (en) A kind of lightning arrester for thunder resisting equipment
CN203826968U (en) Energy saver
CN204012295U (en) The compact-type low-voltage comprehensive distribution box that a kind of one side opens the door
CN201430382Y (en) Lightning protection distribution box
CN204045369U (en) Amorphous alloy transformer low voltage surge arrester mounting bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU ZEDA CIVIL ENGINEERING CONSULTING CO., LT

Free format text: FORMER OWNER: GE JIAJUN

Effective date: 20130603

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226400 NANTONG, JIANGSU PROVINCE TO: 310016 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130603

Address after: 209 room 3, building 193, 310016 hang Hai Road, Hangzhou, Zhejiang, Jianggan District

Patentee after: Hangzhou Zeda Civil Engineering Consulting Co., Ltd.

Address before: Rudong County, Jiangsu province 226400 Nantong juegang Taishan Road East Development Building 1002

Patentee before: Ge Jiajun

ASS Succession or assignment of patent right

Owner name: ZHEJIANG XINDONGYANG CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: HANGZHOU ZEDA CIVIL ENGINEERING CONSULTING CO., LTD.

Effective date: 20131113

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310016 HANGZHOU, ZHEJIANG PROVINCE TO: 322100 JINHUA, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20131113

Address after: 322100 No. 10 Song Mountain Road, Jinhua, Zhejiang, Dongyang

Patentee after: Zhejiang Xindongyang Construction Group Co., Ltd.

Address before: 209 room 3, building 193, 310016 hang Hai Road, Hangzhou, Zhejiang, Jianggan District

Patentee before: Hangzhou Zeda Civil Engineering Consulting Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20170713