CN102338845A - Insulation characteristic test device of insulating rod - Google Patents

Insulation characteristic test device of insulating rod Download PDF

Info

Publication number
CN102338845A
CN102338845A CN2011102845117A CN201110284511A CN102338845A CN 102338845 A CN102338845 A CN 102338845A CN 2011102845117 A CN2011102845117 A CN 2011102845117A CN 201110284511 A CN201110284511 A CN 201110284511A CN 102338845 A CN102338845 A CN 102338845A
Authority
CN
China
Prior art keywords
insulating bar
frame
base
insulating rod
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102845117A
Other languages
Chinese (zh)
Other versions
CN102338845B (en
Inventor
程德
陶照宇
陈健
汪长亮
马玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN 201110284511 priority Critical patent/CN102338845B/en
Publication of CN102338845A publication Critical patent/CN102338845A/en
Application granted granted Critical
Publication of CN102338845B publication Critical patent/CN102338845B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The invention discloses an insulation characteristic test device of an insulating rod, comprising a base, brackets and an insulating rod mounting rack; the base is a rectangular frame; the brackets include a left bracket and a right bracket; the left bracket and the right bracket respectively comprise a lower bracket body and an upper bracket body; the insulating rod mounting rack is installed at the upper part of the upper bracket body through a locking screw; the lower part of the insulating rod mounting rack is fixedly provided with a rectangular frame-shaped crossarm on which a plurality of adjustable metal buckles are arranged; a corona resistant ball is arranged at the upper part of an ejector rod at the top of the insulating rod mounting rack; the base is provided with a hand adjusting wheel on which a pull rope is arranged; and the upper end and the lower end of the lower bracket body are respectively provided with an upper pulley and a lower pulley. The insulation characteristic test device of the insulating rod in the invention has the advantages of high work efficiency, improved precision and safety of test, reduced labor cost and the like.

Description

The insulation characterisitic proving installation of insulating bar
Technical field
The present invention relates to a kind of insulation characterisitic proving installation, especially a kind of in electric system the insulation characterisitic proving installation of insulating bar.
Background technology
Along with the fast development of electric utility, the continuous quickening of scale of power, the maintenance task of converting equipment is also heavy day by day.Insulating bar is the managing security tools and instruments that power transformation operation, test maintenance department the most often use; Xuancheng electric company repaiies trial work district high-tension laboratory every year and will carry out the insulation safety test to nearly 400 insulated bars according to statistics; So many insulating bar is used by one line production division of company; If Insulation Test method and test instrument can not satisfy the testing requirements of rules, certainly will cause negative effect to the accuracy and the security of test, thereby bring potential safety hazard for the user of insulating bar.
At present, the insulating bar test normally hangs on (height 5 can reach rice) on the testing transformer with insulating bar head hook, utilizes lead with insulating bar tail end ground connection again, and pressurization makes an experiment then.In the process that test is prepared, testing crew needs cat ladder to ascend a height, and it is insecure reliable that insulating bar hangs on high-pressure side; Therefore there is certain potential safety hazard in the process of the test; And workflow is loaded down with trivial details, and inefficiency has all brought certain risk and loss for testing crew and company.
Summary of the invention
The present invention is the weak point that exists in the above-mentioned prior art for avoiding, and a kind of insulation characterisitic proving installation of insulating bar is provided, and with the short form test flow process, improves experiment work efficient, strengthens the security and the reliability of test.
The present invention adopts following technical scheme for the technical solution problem.
The insulation characterisitic proving installation of insulating bar, its design feature are to comprise base, support and insulating bar erecting frame; Said base is a rectangular frame, and the bottom that base is four jiaos respectively is provided with a roller; Said support comprises left socle and right support; Said left socle and right support include the lower frame that is fixedly installed on the said base and be installed on also can be at the upper frame of vertical direction along the lower frame up-down on the said lower frame; Said insulating bar erecting frame is installed on the top of said upper frame through lock-screw; Said insulating bar erecting frame bottom is fixed with a rectangular box-like crossbearer, and said crossbearer is provided with a plurality of adjustable metal buckles that are used for fastening tested insulating bar; The push rod top at said insulating bar erecting frame top is provided with the anticorona ball of a plurality of hollows; On said base, be provided with a hand-rail type adjustment wheel, said adjustment wheel is provided with and is used to spur the stay cord that upper frame makes that upper frame rises along lower frame at vertical direction; The top and bottom of said lower frame are respectively equipped with top sheave and lower sheave; One end of said stay cord is fixed on the adjustment wheel and goes up and be wound on the adjustment wheel; The other end of said stay cord is anchored on the lower end in lower frame after walking around lower sheave and top sheave successively.
The design feature of the insulation characterisitic proving installation of insulating bar of the present invention also is:
Said insulating bar erecting frame is a rectangular frame, and the outer peripheral face on the top of the vertical rod of the said insulating bar erecting frame left and right sides is provided with the insulation full skirt of anti-pollution flashover.
Also be provided with surveyors' staff on the said crossbearer.
Said adjustable metal buckle includes clasp, spring and pull bar; Said clasp is fixed on the crossbeam of said crossbearer through the flange at its two ends; Said crossbeam is provided with through hole; Said pull bar passes from said through hole and first end of pull bar is positioned at the cavity that said clasp centers on; The end of first end of said pull bar is provided with the arc top flat, and said spring housing is located on the outer peripheral face of first end of pull bar, and the diameter of said spring is greater than the diameter of said through hole; Be fixed with a spherical on second end of said pull bar.
Compared with present technology, beneficial effect of the present invention is embodied in:
1, proving installation of the present invention is a design basis with power test technical standard (DL/T878-2004), through the standardized component size, and integrated insulating bar test unit, thus the accuracy and reliability of insulating bar test is increased greatly.In insulating bar process of the test in the past; All be that the insulating bar head end is hung on the testing transformer; The mode that adopts the iron wire winding is with insulating bar tail end ground connection; This coarse mode of connection does not meet specified standard size in the power test technical standard (DL/T878-2004), has all brought very big negative effect for the reliability of test.And in test in the past, because the height of insulating bar suspension is very high, when confirming the test effective length of insulating bar, the measurement of need ascending a height, it is very big to make that the result who measures comes in and goes out, and has influenced the degree of accuracy of test findings.The present invention has fixedly mounted steel tape on the insulating bar erecting frame, can measure the test length of insulating bar easily, has improved the work efficiency of insulating bar test.
2, proving installation of the present invention has used modular mentality of designing, has simplified in the process of insulating bar test and has tested link, has reduced insulating bar loading and unloading, regular time, has improved test efficiency, has reduced human cost.In test in the past, more because link is prepared in test, and the operation of need ascending a height, insulating bar loading and unloading, set time need about 3~5 minutes, have wasted lot of manpower and material resources.Proving installation of the present invention make insulating bar test loading and unloading, fixedly link becomes simply, the time spent reduces greatly, only needs about 0.75 minute kind can accomplish the work that insulating bar loads and unloads, fixes.
3, proving installation of the present invention has used liftable insulation bracing frame, in carrying out the insulating bar process of the test, need not ascending stair and climbs (need ascend a height 4 meters in the test) in the past, has strengthened the security in the process of the test.Used buckle that the insulating bar two ends are fixed,, reduced in process of the test because the not firm falling risk that causes of contact has improved the security of testing with respect to the suspension type method in the test in the past.
Proving installation of the present invention has the advantages such as human cost of high efficiency, the degree of accuracy that can improve test and security, reduction test.
Description of drawings
Fig. 1 is the stereographic map (omitting parts such as pulley and stay cord) of proving installation of the present invention.
Fig. 2 is the A-A sectional view among Fig. 1.
Fig. 3 is the front view of proving installation of the present invention.
Fig. 4 is the left view of proving installation of the present invention.
Fig. 5 is the structural representation of the adjustable metal buckle of proving installation of the present invention.
Label in accompanying drawing 1~accompanying drawing 5: 1 base, 2 supports, 3 insulating bar erecting frames, 301 push rods, 302 vertical rods, 4 rollers, 5 left socles; 6 right supports, 7 lower frames, 8 upper frames, 9 lock-screws, 10 crossbearers, 1001 crossbeams, 11 buckles; 1101 clasps, 1102 springs, 1103 pull bars, 1104 flange, 1105 arc top flats, 1106 sphericals, 12 anticorona balls; 13 adjustment wheels, 14 stay cords, 15 top sheaves, 16 lower sheaves, 17 insulation full skirts, 18 surveyors' staffs, 19 insulating bars to be tested.
Below pass through embodiment, and combine accompanying drawing that the present invention is described further.
Embodiment
Referring to Fig. 1~Fig. 5, the insulation characterisitic proving installation of insulating bar comprises base 1, support 2 and insulating bar erecting frame 3; Said base 1 is a rectangular frame, and the bottom that base is 1 four jiaos respectively is provided with a roller 4; Said support 2 comprises left socle 5 and right support 6; Said left socle 5 includes the lower frame 7 that is fixedly installed on the said base 1 with right support 6 and is installed on also can be at the upper frame 8 of vertical direction along lower frame 7 up-downs on the said lower frame 7; Said insulating bar erecting frame 3 is installed on the top of said upper frame 8 through lock-screw 9; Said insulating bar erecting frame 3 bottoms are fixed with a rectangular box-like crossbearer 10, and said crossbearer 10 is provided with a plurality of adjustable metal buckles 11 that are used for fastening tested insulating bar; Push rod 301 tops at said insulating bar erecting frame 3 tops are provided with the anticorona ball 12 of a plurality of hollows; On said base 1, be provided with a hand-rail type adjustment wheel 13, said adjustment wheel 13 is provided with and is used to spur the stay cord 14 that upper frame 8 makes that upper frame 8 rises along lower frame 7 at vertical direction; The top and bottom of said lower frame 7 are respectively equipped with top sheave 15 and lower sheave 16; One end of said stay cord 14 is fixed on the adjustment wheel 13 and is wound on the adjustment wheel 13; The other end of said stay cord 14 is anchored in the lower end of lower frame 7 after walking around lower sheave 16 and top sheave 15 successively.Upper frame and lower frame are the structure of ladder shape; The transversal section of the stock of upper frame and lower frame both sides all is (as shown in Figure 2) that is the U type; The stock of upper frame and the stock of lower frame are entrenched togather, and make the physical efficiency of putting on the shelf slide up and down along the length direction of lower frame through the groove on the stock.When needs rising upper frame, shake the adjustment wheel and roll stay cord, rise by stay cord pulling upper frame, can realize the adjustment of the height of insulating bar 19 to be tested.When needs are fallen upper frame, shake adjustment wheel and loosen stay cord, under the effect of the deadweight of upper frame and insulating bar erecting frame, upper frame can descend along lower frame gradually.When the angle of needs adjustment insulating bar erecting frame, unclamp lock-screw, the insulating bar erecting frame is adjusted to the angle that needs, lock-screw is tightened got final product again.Owing to be provided with a plurality of adjustable metal buckles and a plurality of anticorona ball, thereby can once carry out the test of a plurality of insulating bars, improved testing efficiency.Proving installation of the present invention has advantage efficiently easy to adjust.
Said insulating bar erecting frame 3 is a rectangular frame, and the outer peripheral face on the top of the vertical rod 302 of said insulating bar erecting frame 3 left and right sides is provided with the insulation full skirt 17 of anti-pollution flashover.Through the insulation full skirt is set, can improve the dielectric strength of system and the ability that resistant is dodged discharge, improve the security performance of insulating bar test job.
Also be provided with surveyors' staff 18 on the said crossbearer 10.Surveyors' staff adopts the steel tape that has back-moving spring.Install after the insulating bar 19 to be tested, the insulating bar erecting frame is fixed, pull out the steel ruler of steel tape then, can measure the test length of insulating bar easily; Do not need again insulating bar to be pulled down in addition to measure, improved the work efficiency of insulating bar test.
As shown in Figure 5, said adjustable metal buckle 11 includes clasp 1101, spring 1102 and pull bar 1103; Said clasp 1101 is fixed on the crossbeam 1001 of said crossbearer 10 through the flange 1104 at its two ends; Said crossbeam 1001 is provided with through hole; Said pull bar 1103 passes from said through hole and first end of pull bar 1103 is positioned at the cavity that said clasp 1101 is centered on; The end of first end of said pull bar 1103 is provided with arc top flat 1105, and said spring 1102 is sheathed on the outer peripheral face of first end of pull bar 1103, and the diameter of said spring 1102 is greater than the diameter of said through hole; Be fixed with a spherical 1106 on second end of said pull bar 1103.The staff spurs pull bar with the spherical of holding pull bar one end in hand, and spring just is compressed; Insulating bar 19 to be tested is passed between arc top flat and clasp; The insulating bar 19 to be tested that constantly raises, in the cavity of anticorona ball is inserted on the top of insulating bar 19 to be tested, releasing lever then; Because the effect of spring, insulating bar 19 to be tested just is fastened between arc top flat and the clasp.After test finishes, move pull bar once more to, insulating bar 19 to be tested is taken out to carry out the test of next insulating bar.Proving installation of the present invention has adopted the buckle that has spring, thereby is applicable to the insulating bar of different-diameter, has good versatility.
Utilize adjustable fixing metal buckle that insulating bar is fixed between live end and the earth terminal, and measure the effective length of insulating bar test and carry out the adjustment of effective length, connect pressurized line and ground wire then through surveyors' staff.Utilize the adjustment wheel that insulating bar is elevated to the height that satisfies testing requirements, carry out applied voltage test again.After the off-test, shake the adjustment wheel, fall upper frame, pull down insulating bar 19 to be tested then, make an experiment once more behind the replacing insulating bar.

Claims (4)

1. the insulation characterisitic proving installation of insulating bar is characterized in that, comprises base (1), support (2) and insulating bar erecting frame (3); Said base (1) is a rectangular frame, and the bottom that base is (1) four jiao respectively is provided with a roller (4); Said support (2) comprises left socle (5) and right support (6); Said left socle (5) and right support (6) include the lower frame (7) that is fixedly installed on the said base (1) and be installed on said lower frame (7) upward also can be at the upper frame (8) of vertical direction along lower frame (7) up-down; Said insulating bar erecting frame (3) is installed on the top of said upper frame (8) through lock-screw (9); Said insulating bar erecting frame (3) bottom is fixed with a rectangular box-like crossbearer (10), and said crossbearer (10) is provided with a plurality of adjustable metal buckles (11) that are used for fastening tested insulating bar; Push rod (301) top at said insulating bar erecting frame (3) top is provided with the anticorona ball (12) of a plurality of hollows; On said base (1), be provided with a hand-rail type adjustment wheel (13), said adjustment wheel (13) is provided with and is used to spur the stay cord (14) that upper frame (8) makes that upper frame (8) rises along lower frame (7) at vertical direction; The top and bottom of said lower frame (7) are respectively equipped with top sheave (15) and lower sheave (16); One end of said stay cord (14) is fixed on adjustment wheel (13) and goes up and be wound on the adjustment wheel (13); The other end of said stay cord (14) is anchored in the lower end of lower frame (7) after walking around lower sheave (16) and top sheave (15) successively.
2. the insulation characterisitic proving installation of insulating bar according to claim 1; It is characterized in that; Said insulating bar erecting frame (3) is a rectangular frame, and the outer peripheral face on the top of the vertical rod (302) of said insulating bar erecting frame (3) left and right sides is provided with the insulation full skirt (17) of anti-pollution flashover.
3. the insulation characterisitic proving installation of insulating bar according to claim 2 is characterized in that, also is provided with surveyors' staff (18) on the said crossbearer (10).
4. the insulation characterisitic proving installation of insulating bar according to claim 1 is characterized in that, said adjustable metal buckle (11) includes clasp (1101), spring (1102) and pull bar (1103); Said clasp (1101) is fixed on the crossbeam (1001) of said crossbearer (10) through the flange (1104) at its two ends; Said crossbeam (1001) is provided with through hole; Said pull bar (1103) passes from said through hole and first end of pull bar (1103) is positioned at the cavity that said clasp (1101) is centered on; The end of first end of said pull bar (1103) is provided with arc top flat (1105); Said spring (1102) is sheathed on the outer peripheral face of first end of pull bar (1103), and the diameter of said spring (1102) is greater than the diameter of said through hole; Be fixed with a spherical (1106) on second end of said pull bar (1103).
CN 201110284511 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod Expired - Fee Related CN102338845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110284511 CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110284511 CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Publications (2)

Publication Number Publication Date
CN102338845A true CN102338845A (en) 2012-02-01
CN102338845B CN102338845B (en) 2013-06-12

Family

ID=45514676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110284511 Expired - Fee Related CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Country Status (1)

Country Link
CN (1) CN102338845B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944795A (en) * 2012-11-20 2013-02-27 山东电力集团公司滨州供电公司 Test table frame for basic insulating safe tools and instruments
CN103941168A (en) * 2014-04-30 2014-07-23 国网河南省电力公司商丘供电公司 Insulation and voltage resistance testing device and method
CN104007295A (en) * 2014-06-10 2014-08-27 国家电网公司 Voltage-withdrawing testing support of insulation operation bar
CN104297652A (en) * 2014-11-12 2015-01-21 国网河南省电力公司南阳供电公司 Device for high-voltage insulation test of insulation rods in batch
CN104897928A (en) * 2015-06-18 2015-09-09 江苏省电力公司太仓市供电公司 Insulator spindle elevating gear
CN105403821A (en) * 2015-12-14 2016-03-16 国家电网公司 Insulation appliance test platform
CN109298295A (en) * 2018-10-29 2019-02-01 国网新疆电力有限公司昌吉供电公司 Packaged type insulating bar industrial frequency withstand voltage experimental rig
CN112505502A (en) * 2020-11-25 2021-03-16 佛山市建筑工程质量检测站 Auxiliary device for power frequency alternating current voltage withstand test of electric wire and cable

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0396996A (en) * 1989-09-08 1991-04-22 Tokyo Electric Co Ltd Character output device
JPH09196996A (en) * 1996-01-23 1997-07-31 Ngk Insulators Ltd Device for testing corona discharge of insulation cylinder and testing method using the device
CN201035119Y (en) * 2007-04-28 2008-03-12 武汉奋进电力技术有限公司 Annular insulating stud suspension testing jig
CN201628755U (en) * 2010-04-15 2010-11-10 浙江华特电气有限公司 Insulating rope or insulating rod electric test frame
CN102001606A (en) * 2010-11-25 2011-04-06 甘肃省电力公司兰州超高压输变电公司 Insulating lifting device
CN202204908U (en) * 2011-09-22 2012-04-25 安徽省电力公司宣城供电公司 Insulator spindle insulation characteristic testing apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0396996A (en) * 1989-09-08 1991-04-22 Tokyo Electric Co Ltd Character output device
JPH09196996A (en) * 1996-01-23 1997-07-31 Ngk Insulators Ltd Device for testing corona discharge of insulation cylinder and testing method using the device
CN201035119Y (en) * 2007-04-28 2008-03-12 武汉奋进电力技术有限公司 Annular insulating stud suspension testing jig
CN201628755U (en) * 2010-04-15 2010-11-10 浙江华特电气有限公司 Insulating rope or insulating rod electric test frame
CN102001606A (en) * 2010-11-25 2011-04-06 甘肃省电力公司兰州超高压输变电公司 Insulating lifting device
CN202204908U (en) * 2011-09-22 2012-04-25 安徽省电力公司宣城供电公司 Insulator spindle insulation characteristic testing apparatus

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944795A (en) * 2012-11-20 2013-02-27 山东电力集团公司滨州供电公司 Test table frame for basic insulating safe tools and instruments
CN103941168A (en) * 2014-04-30 2014-07-23 国网河南省电力公司商丘供电公司 Insulation and voltage resistance testing device and method
CN103941168B (en) * 2014-04-30 2016-06-29 国家电网公司 A kind of insulation pressure resistant testing device and method
CN104007295A (en) * 2014-06-10 2014-08-27 国家电网公司 Voltage-withdrawing testing support of insulation operation bar
CN104297652A (en) * 2014-11-12 2015-01-21 国网河南省电力公司南阳供电公司 Device for high-voltage insulation test of insulation rods in batch
CN104897928A (en) * 2015-06-18 2015-09-09 江苏省电力公司太仓市供电公司 Insulator spindle elevating gear
CN105403821A (en) * 2015-12-14 2016-03-16 国家电网公司 Insulation appliance test platform
CN109298295A (en) * 2018-10-29 2019-02-01 国网新疆电力有限公司昌吉供电公司 Packaged type insulating bar industrial frequency withstand voltage experimental rig
CN112505502A (en) * 2020-11-25 2021-03-16 佛山市建筑工程质量检测站 Auxiliary device for power frequency alternating current voltage withstand test of electric wire and cable

Also Published As

Publication number Publication date
CN102338845B (en) 2013-06-12

Similar Documents

Publication Publication Date Title
CN102338845B (en) Insulation characteristic test device of insulating rod
CN202204908U (en) Insulator spindle insulation characteristic testing apparatus
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
CN107181203A (en) Helicopter hotline maintenance ground wire basket of work
CN111063514B (en) Installation and construction method of power transformer
CN105092395B (en) A kind of device for increasing the load of horizontal impact testing stand
CN203148982U (en) Test fixture for loop resistance of circuit breaker
US11279593B2 (en) Compensation line storing apparatus, jump lift and the usage method thereof
CN102515068B (en) A kind of material lifter for telegraph poles
CN210016176U (en) Maintenance frame for electric power maintenance
CN112271632B (en) Standing type high-voltage cable operation device
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN204474128U (en) A kind of Electric equipment hoisting device
CN205170234U (en) Cantilever crane
CN205879486U (en) Bearing roller drop test platform
CN200992805Y (en) Knife inspection scaffold
CN201883932U (en) Hoop-type vertical insulating single ladder
CN110849710B (en) Displacement meter protective bracket and simply supported beam bending test device
CN211317974U (en) Displacement meter protective bracket and simply supported beam bending test device
CN209307871U (en) A kind of hanging basket formwork Integral lifting device
CN209148844U (en) A kind of high-voltage circuitbreaker test short jumper device
CN205634819U (en) Erection equipment for electric power construction
CN110364963A (en) A kind of protection rope for conductor cross-arm fastening means
CN103821338B (en) 10kV double loop strain insulator take-up assistance platform
CN215812870U (en) Tool for aging test of display

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130106

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130106

Address after: 242000 No. 32 East Feng Feng Road, Anhui, Xuancheng

Applicant after: Xuancheng Power Supply Co., Ltd., Anhui Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 242000 Xuancheng Province, Xuanzhou District, Ao Feng Road, No. 32, No.

Applicant before: Xuancheng Power Supply Co., Ltd., Anhui Electric Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20180922

CF01 Termination of patent right due to non-payment of annual fee