CN102338845B - Insulation characteristic test device of insulating rod - Google Patents

Insulation characteristic test device of insulating rod Download PDF

Info

Publication number
CN102338845B
CN102338845B CN 201110284511 CN201110284511A CN102338845B CN 102338845 B CN102338845 B CN 102338845B CN 201110284511 CN201110284511 CN 201110284511 CN 201110284511 A CN201110284511 A CN 201110284511A CN 102338845 B CN102338845 B CN 102338845B
Authority
CN
China
Prior art keywords
insulating bar
frame
insulating
base
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110284511
Other languages
Chinese (zh)
Other versions
CN102338845A (en
Inventor
程德
陶照宇
陈健
汪长亮
马玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201110284511 priority Critical patent/CN102338845B/en
Publication of CN102338845A publication Critical patent/CN102338845A/en
Application granted granted Critical
Publication of CN102338845B publication Critical patent/CN102338845B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an insulation characteristic test device of an insulating rod, comprising a base, brackets and an insulating rod mounting rack; the base is a rectangular frame; the brackets include a left bracket and a right bracket; the left bracket and the right bracket respectively comprise a lower bracket body and an upper bracket body; the insulating rod mounting rack is installed at the upper part of the upper bracket body through a locking screw; the lower part of the insulating rod mounting rack is fixedly provided with a rectangular frame-shaped crossarm on which a plurality of adjustable metal buckles are arranged; a corona resistant ball is arranged at the upper part of an ejector rod at the top of the insulating rod mounting rack; the base is provided with a hand adjusting wheel on which a pull rope is arranged; and the upper end and the lower end of the lower bracket body are respectively provided with an upper pulley and a lower pulley. The insulation characteristic test device of the insulating rod in the invention has the advantages of high work efficiency, improved precision and safety of test, reduced labor cost and the like.

Description

The characteristic test device of insulating of insulating bar
Technical field
The present invention relates to a kind of characteristic test device of insulating, especially a kind of in electric system the characteristic test device of insulating of insulating bar.
Background technology
Along with the fast development of electric utility, the continuous quickening of electrical network scale, the maintenance task of converting equipment is also day by day heavy.Insulating bar is the managing security tools and instruments that power transformation operation, test maintenance department the most often uses, Xuancheng electric company repaiies trial work district high-tension laboratory and will carry out the insulation safety test to nearly 400 insulating bars every year according to statistics, so many insulating bar is used by one line production division of company, if Insulation Test method and test instrument can not satisfy the testing requirements of rules, certainly will cause negative effect to accuracy and the security of test, thereby bring potential safety hazard for the user of insulating bar.
At present, the insulating bar test normally hangs on insulating bar head hook (height 5 can reach rice) on testing transformer, and the recycling wire is with insulating bar tail end ground connection, and then pressurization is tested.In the process that test is prepared, testing crew needs cat ladder to ascend a height, and it is insecure reliable that insulating bar hangs on high-pressure side, therefore there is certain potential safety hazard in process of the test, and workflow is loaded down with trivial details, and inefficiency has all brought certain risk and loss for testing crew and company.
Summary of the invention
The present invention is the weak point that exists in above-mentioned prior art for avoiding, and a kind of characteristic test device of insulating of insulating bar is provided, and with the short form test flow process, improves experiment work efficient, the safety and reliability of strengthen test.
The present invention be the technical solution problem by the following technical solutions.
The characteristic test device of insulating of insulating bar, its design feature are to comprise base, support and insulating bar erecting frame; Described base is rectangular frame, and the bottom that base is four jiaos respectively is provided with a roller; Described support comprises left socle and right support; Described left socle and right support include the lower frame that is fixedly installed on described base and be installed on also can be at the upper frame of vertical direction along the lower frame lifting on described lower frame; Described insulating bar erecting frame is installed on the top of described upper frame by lock-screw; Described insulating bar erecting frame bottom is fixed with a rectangular box-like crossbearer, and described crossbearer is provided with a plurality of adjustable metal buckles for fastening tested insulating bar; The push rod top at described insulating bar erecting frame top is provided with the anticorona ball of a plurality of hollows; Be provided with a hand-rail type regulating wheel on described base, be provided with on described regulating wheel be used to the stay cord that pulls upper frame to make upper frame rise along lower frame at vertical direction; The top and bottom of described lower frame are respectively equipped with top sheave and lower sheave; One end of described stay cord is fixed on regulating wheel and is wound on regulating wheel; The other end of described stay cord is walked around the lower end that is anchored on after lower sheave and top sheave in lower frame successively.
The design feature of the characteristic test device of insulating of insulating bar of the present invention also is:
Described insulating bar erecting frame is rectangular frame, is provided with the insulation full skirt of anti-pollution flashover on the outer peripheral face on the top of the vertical rod of the described insulating bar erecting frame left and right sides.
Also be provided with surveyors' staff on described crossbearer.
Described adjustable metal buckle includes clasp, spring and pull bar; Described clasp is fixed on the crossbeam of described crossbearer by the flange at its two ends, described crossbeam is provided with through hole, described pull bar passes from described through hole and the first end of pull bar be positioned at described clasp around cavity, the end of the first end of described pull bar is provided with the arc top flat, described spring housing is located on the outer peripheral face of first end of pull bar, and the diameter of described spring is greater than the diameter of described through hole; Be fixed with a spherical on the second end of described pull bar.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, proving installation of the present invention is take power test technical standard (DL/T878-2004) as design basis, by the standardized component size, and integrated test device of insulating rod, thus the accuracy and reliability of insulating bar test is increased greatly.In insulating bar process of the test in the past, all that the insulating bar head end is hung on testing transformer, adopt the mode of iron wire winding with insulating bar tail end ground connection, this coarse mode of connection does not meet specified standard size in power test technical standard (DL/T878-2004), has all brought very large negative effect for the reliability of test.And in test in the past, because the height that insulating bar hangs is very high, when determining the test effective length of insulating bar, the measurement of need to ascending a height makes the result discrepancy of measurement very large, has affected the degree of accuracy of test findings.The present invention has fixedly mounted steel tape on the insulating bar erecting frame, can measure easily the test length of insulating bar, has improved the work efficiency of insulating bar test.
2, proving installation of the present invention has used modular mentality of designing, has simplified in the process of insulating bar test and has tested link, has reduced insulating bar loading and unloading, regular time, has improved test efficiency, has reduced human cost.In test in the past, more because link is prepared in test, and the operation of need to ascending a height, insulating bar loading and unloading, set time need about 3~5 minutes, have wasted a large amount of manpower and materials.Proving installation of the present invention make insulating bar test loading and unloading, fixedly link becomes simply, the used time reduces greatly, only needs about 0.75 minute kind can complete the work that insulating bar loads and unloads, fixes.
3, proving installation of the present invention has used liftable insulating carriage, need not ascending stair and climb (need ascend a height 4 meters in the test) in the past in carrying out the insulating bar process of the test, has strengthened the security in the process of the test.Use buckle that insulating bar two ends are fixed, with respect to the suspension type method in test in the past, reduced in process of the test because the not firm falling risk that causes of contact, improved the security of test.
Proving installation of the present invention has the advantages such as human cost of high efficiency, the degree of accuracy that can improve test and security, reduction test.
Description of drawings
Fig. 1 is the stereographic map (omitting the parts such as pulley and stay cord) of proving installation of the present invention.
Fig. 2 is the A-A sectional view in Fig. 1.
Fig. 3 is the front view of proving installation of the present invention.
Fig. 4 is the left view of proving installation of the present invention.
Fig. 5 is the structural representation of the adjustable metal buckle of proving installation of the present invention.
Label in accompanying drawing 1~accompanying drawing 5: 1 base, 2 supports, 3 insulating bar erecting frames, 301 push rods, 302 vertical rods, 4 rollers, 5 left socles, 6 right supports, 7 lower frames, 8 upper frames, 9 lock-screws, 10 crossbearers, 1001 crossbeams, 11 buckles, 1101 clasps, 1102 springs, 1103 pull bars, 1104 flange, 1105 arc top flats, 1106 sphericals, 12 anticorona balls, 13 regulating wheels, 14 stay cords, 15 top sheaves, 16 lower sheaves, 17 insulation full skirts, 18 surveyors' staffs, 19 tested insulating bars.
Below pass through embodiment, and the invention will be further described by reference to the accompanying drawings.
Embodiment
Referring to Fig. 1~Fig. 5, the characteristic test device of insulating of insulating bar comprises base 1, support 2 and insulating bar erecting frame 3; Described base 1 is rectangular frame, and the bottom that base is 1 four jiaos respectively is provided with a roller 4; Described support 2 comprises left socle 5 and right support 6; Described left socle 5 and right support 6 include the lower frame 7 that is fixedly installed on described base 1 and be installed on also can be at the upper frame 8 of vertical direction along lower frame 7 liftings on described lower frame 7; Described insulating bar erecting frame 3 is installed on the top of described upper frame 8 by lock-screw 9; Described insulating bar erecting frame 3 bottoms are fixed with a rectangular box-like crossbearer 10, and described crossbearer 10 is provided with a plurality of adjustable metal buckles 11 for fastening tested insulating bar; Push rod 301 tops at described insulating bar erecting frame 3 tops are provided with the anticorona ball 12 of a plurality of hollows; Be provided with a hand-rail type regulating wheel 13 on described base 1, be provided with on described regulating wheel 13 be used to the stay cord 14 that pulls upper frame 8 to make upper frame 8 rise along lower frame 7 at vertical direction; The top and bottom of described lower frame 7 are respectively equipped with top sheave 15 and lower sheave 16; One end of described stay cord 14 is fixed on regulating wheel 13 and is wound on regulating wheel 13; The other end of described stay cord 14 is anchored in the lower end of lower frame 7 after walking around successively lower sheave 16 and top sheave 15.Upper frame and lower frame are the structure of ladder shape, the transversal section of the stock of upper frame and lower frame both sides is all to be U-shaped (as shown in Figure 2), the stock of upper frame and the stock of lower frame are entrenched togather, and make added physical efficiency slide up and down along the length direction of lower frame by the groove on stock.When needs rising upper frame, shake regulating wheel and roll stay cord, pull upper frame to rise by stay cord, can realize the adjustment of the height of tested insulating bar 19.When needs are fallen upper frame, shake regulating wheel and loosen stay cord, under the effect of the deadweight of upper frame and insulating bar erecting frame, upper frame can descend gradually along lower frame.When needs are adjusted the angle of insulating bar erecting frame, unclamp lock-screw, the insulating bar erecting frame is adjusted to the angle that needs, then lock-screw is tightened got final product.Owing to being provided with a plurality of adjustable metal buckles and a plurality of anticorona ball, thereby can once carry out the test of a plurality of insulating bars, improve testing efficiency.Proving installation of the present invention has advantage efficiently easy to adjust.
Described insulating bar erecting frame 3 is rectangular frame, is provided with the insulation full skirt 17 of anti-pollution flashover on the outer peripheral face on the top of the vertical rod 302 of described insulating bar erecting frame 3 left and right sides.By the insulation full skirt is set, can improve the dielectric strength of system and the ability that resistant is dodged discharge, improve the security performance of insulating bar test job.
Also be provided with surveyors' staff 18 on described crossbearer 10.Surveyors' staff adopts the steel tape with back-moving spring.After tested insulating bar 19 is installed, the insulating bar erecting frame is fixed, then pulled out the steel ruler of steel tape, can measure easily the test length of insulating bar; Do not need again insulating bar to be pulled down in addition to measure, improved the work efficiency of insulating bar test.
As shown in Figure 5, described adjustable metal buckle 11 includes clasp 1101, spring 1102 and pull bar 1103; Described clasp 1101 is fixed on the crossbeam 1001 of described crossbearer 10 by the flange 1104 at its two ends, described crossbeam 1001 is provided with through hole, described pull bar 1103 passes from described through hole and the first end of pull bar 1103 be positioned at 1101 of described clasps around cavity, the end of the first end of described pull bar 1103 is provided with arc top flat 1105, described spring 1102 is sheathed on the outer peripheral face of first end of pull bar 1103, and the diameter of described spring 1102 is greater than the diameter of described through hole; Be fixed with a spherical 1106 on the second end of described pull bar 1103.The staff catches the spherical of pull bar one end with hand, pull pull bar, spring is just compressed, tested insulating bar 19 is passed between arc top flat and clasp, the tested insulating bar 19 that constantly raises, until the top of tested insulating bar 19 inserts in the cavity of anticorona ball, releasing lever then, due to the effect of spring, tested insulating bar 19 just is fastened between arc top flat and clasp.After being completed, again move pull bar to, tested insulating bar 19 is taken out to carry out the test of next insulating bar.Proving installation of the present invention has adopted the buckle with spring, thereby is applicable to the insulating bar of different-diameter, has good versatility.
Utilize adjustable fixing metal buckle that insulating bar is fixed between live end and earth terminal, and measure the effective length of insulating bar test and carry out the adjustment of effective length by surveyors' staff, then connect pressurized line and ground wire.Utilize regulating wheel insulating bar to be elevated to the height that satisfies testing requirements, then carry out applied voltage test.After off-test, shake regulating wheel, fall upper frame, then pull down tested insulating bar 19, again test after the replacing insulating bar.

Claims (2)

1. the characteristic test device of insulating of insulating bar, is characterized in that, comprises base (1), support (2) and insulating bar erecting frame (3); Described base (1) is rectangular frame, and the bottom that base is (1) four jiao respectively is provided with a roller (4); Described support (2) comprises left socle (5) and right support (6); Described left socle (5) and right support (6) include the lower frame (7) that is fixedly installed on described base (1) and are installed on described lower frame (7) upward and can be at the upper frame (8) of vertical direction along lower frame (7) lifting; Described insulating bar erecting frame (3) is installed on the top of described upper frame (8) by lock-screw (9); Described insulating bar erecting frame (3) bottom is fixed with a rectangular box-like crossbearer (10), and described crossbearer (10) is provided with a plurality of adjustable metal buckles (11) for fastening tested insulating bar; Push rod (301) top at described insulating bar erecting frame (3) top is provided with the anticorona ball (12) of a plurality of hollows; Be provided with a hand-rail type regulating wheel (13) on described base (1), be provided with on described regulating wheel (13) be used to the stay cord (14) that pulls upper frame (8) to make upper frame (8) rise along lower frame (7) at vertical direction; The top and bottom of described lower frame (7) are respectively equipped with top sheave (15) and lower sheave (16); One end of described stay cord (14) is fixed on regulating wheel (13) and goes up and be wound on regulating wheel (13); The other end of described stay cord (14) is anchored in the lower end of lower frame (7) after walking around successively lower sheave (16) and top sheave (15);
Described insulating bar erecting frame (3) is rectangular frame, is provided with the insulation full skirt (17) of anti-pollution flashover on the outer peripheral face on the top of the vertical rod (302) of described insulating bar erecting frame (3) left and right sides;
Described adjustable metal buckle (11) includes clasp (1101), spring (1102) and pull bar (1103); Described clasp (1101) is fixed on the crossbeam (1001) of described crossbearer (10) by the flange (1104) at its two ends, described crossbeam (1001) is provided with through hole, described pull bar (1103) passes from described through hole and the first end of pull bar (1103) be positioned at described clasp (1101) around cavity, the end of the first end of described pull bar (1103) is provided with arc top flat (1105), described spring (1102) is sheathed on the outer peripheral face of first end of pull bar (1103), and the diameter of described spring (1102) is greater than the diameter of described through hole; Be fixed with a spherical (1106) on the second end of described pull bar (1103).
2. the characteristic test device of insulating of insulating bar according to claim 1, is characterized in that, also is provided with surveyors' staff (18) on described crossbearer (10).
CN 201110284511 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod Expired - Fee Related CN102338845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110284511 CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110284511 CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Publications (2)

Publication Number Publication Date
CN102338845A CN102338845A (en) 2012-02-01
CN102338845B true CN102338845B (en) 2013-06-12

Family

ID=45514676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110284511 Expired - Fee Related CN102338845B (en) 2011-09-22 2011-09-22 Insulation characteristic test device of insulating rod

Country Status (1)

Country Link
CN (1) CN102338845B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102944795B (en) * 2012-11-20 2015-09-16 山东电力集团公司滨州供电公司 A kind of basic insulation managing security tools and instruments testboard bay
CN103941168B (en) * 2014-04-30 2016-06-29 国家电网公司 A kind of insulation pressure resistant testing device and method
CN104007295A (en) * 2014-06-10 2014-08-27 国家电网公司 Voltage-withdrawing testing support of insulation operation bar
CN104297652A (en) * 2014-11-12 2015-01-21 国网河南省电力公司南阳供电公司 Device for high-voltage insulation test of insulation rods in batch
CN104897928A (en) * 2015-06-18 2015-09-09 江苏省电力公司太仓市供电公司 Insulator spindle elevating gear
CN105403821A (en) * 2015-12-14 2016-03-16 国家电网公司 Insulation appliance test platform
CN109298295A (en) * 2018-10-29 2019-02-01 国网新疆电力有限公司昌吉供电公司 Packaged type insulating bar industrial frequency withstand voltage experimental rig
CN112505502B (en) * 2020-11-25 2021-11-02 佛山市建筑工程质量检测站 Auxiliary device for power frequency alternating current voltage withstand test of electric wire and cable

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0396996A (en) * 1989-09-08 1991-04-22 Tokyo Electric Co Ltd Character output device
JPH09196996A (en) * 1996-01-23 1997-07-31 Ngk Insulators Ltd Device for testing corona discharge of insulation cylinder and testing method using the device
CN201035119Y (en) * 2007-04-28 2008-03-12 武汉奋进电力技术有限公司 Annular insulating stud suspension testing jig
CN201628755U (en) * 2010-04-15 2010-11-10 浙江华特电气有限公司 Insulating rope or insulating rod electric test frame
CN102001606A (en) * 2010-11-25 2011-04-06 甘肃省电力公司兰州超高压输变电公司 Insulating lifting device
CN202204908U (en) * 2011-09-22 2012-04-25 安徽省电力公司宣城供电公司 Insulator spindle insulation characteristic testing apparatus

Also Published As

Publication number Publication date
CN102338845A (en) 2012-02-01

Similar Documents

Publication Publication Date Title
CN102338845B (en) Insulation characteristic test device of insulating rod
CN201220050Y (en) Device for tying and hanging safety belt rope for examine and repair operation of large-sized transformer
CN202204908U (en) Insulator spindle insulation characteristic testing apparatus
CN108952552B (en) A kind of steel tube tower ladder auxiliary device and its installation method
CN107181203A (en) Helicopter hotline maintenance ground wire basket of work
CN111081456A (en) Hoisting construction method for oil-immersed high-voltage transformer
CN108840232A (en) A kind of H profile steel special hanger
CN105092395B (en) A kind of device for increasing the load of horizontal impact testing stand
CN111063514A (en) Installation and construction method of power transformer
US20190352129A1 (en) Compensation line storing apparatus, jump lift and the usage method thereof
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN204474128U (en) A kind of Electric equipment hoisting device
CN203112276U (en) Elevator overload device
CN210016176U (en) Maintenance frame for electric power maintenance
CN102455254A (en) Safety lock test stand
CN205170234U (en) Cantilever crane
CN205879486U (en) Bearing roller drop test platform
CN211687913U (en) Full-machine hanger
CN209307871U (en) A kind of hanging basket formwork Integral lifting device
CN200992805Y (en) Knife inspection scaffold
CN208843590U (en) A kind of H profile steel special hanger
CN203769282U (en) 10 kV double-circuit tension resistant wire take-up auxiliary platform
CN103821338B (en) 10kV double loop strain insulator take-up assistance platform
CN110364963A (en) A kind of protection rope for conductor cross-arm fastening means

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130106

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130106

Address after: 242000 No. 32 East Feng Feng Road, Anhui, Xuancheng

Applicant after: Xuancheng Power Supply Co., Ltd., Anhui Electric Power Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 242000 Xuancheng Province, Xuanzhou District, Ao Feng Road, No. 32, No.

Applicant before: Xuancheng Power Supply Co., Ltd., Anhui Electric Power Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20180922

CF01 Termination of patent right due to non-payment of annual fee