CN102332995A - 一种网络模拟结构及其模拟方法 - Google Patents
一种网络模拟结构及其模拟方法 Download PDFInfo
- Publication number
- CN102332995A CN102332995A CN2011103016879A CN201110301687A CN102332995A CN 102332995 A CN102332995 A CN 102332995A CN 2011103016879 A CN2011103016879 A CN 2011103016879A CN 201110301687 A CN201110301687 A CN 201110301687A CN 102332995 A CN102332995 A CN 102332995A
- Authority
- CN
- China
- Prior art keywords
- arc
- network
- switch
- nodes
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/14—Network analysis or design
- H04L41/145—Network analysis or design involving simulating, designing, planning or modelling of a network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/22—Traffic simulation tools or models
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Geometry (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Optical Communication System (AREA)
- Small-Scale Networks (AREA)
Abstract
本发明公开了一种网络模拟结构及其模拟方法,结构包括多个节点及弧,所述节点之间通过弧连接,所述弧上设有开关,控制弧的通断,从而改变网络的拓扑结构。本发明能实现在一种网路模型上实现多种的拓扑结构,同时也可以实现多种的逻辑运算方式,提高运算的速度及效率。
Description
技术领域
本发明涉及网络的拓扑技术,特别涉及一种网络模拟结构及其模拟方法。
背景技术
现有的网络技术,一般是通过计算机应用技术构建某种特定数学模型去模拟实体的网络结构,再提出此种数学模型的应用算法,即当需要模拟某种实体的网络结构时,需要重新通过计算机应用技术来构建相对应的数学模型,整个过程非常复杂。另外,现有大型数学模型的应用算法一般都是通过繁复的穷举试算才获得解算,故数学界的世界悬赏难题“P=NP”一直无解。因此,采用现有技术中的模拟方法就不能方便地对各种网络、模型进行模拟、构建,也不能实现各种拓扑结构的互换,更不能实现模型的高效应用。
发明内容
本发明的目的在于克服现有技术的缺点与不足,提供一种网络模拟结构,实现多种的拓扑结构,同时也可以实现多种的运算方式,提高运算的速度及效率。
本发明的另一目的在于,提供一种网络模拟方法。
为了达到上述目的,本发明采用以下技术方案:
一种网络模拟结构,包括多个节点及弧,所述节点之间通过弧连接,所述弧上设有开关。
优选的,所述开关为电路开关或者光路开关。
为了达到上述另一目的,本发明采用以下技术方案:一种网络模拟方法,包括下述步骤:
(1)设定多个节点;
(2)所述节点之间通过弧连接;
(3)在弧上设定开关,通过开关的断开与闭合,控制弧的通断,从而实现模拟网络的拓扑结构。
优选的,每个节点之间首尾连接,形成环形拓扑结构。
优选的,通过控制弧的通断,使其中一些节点和弧形成环形拓扑结构,使另一些节点和弧形成总线拓扑结构。
本发明相对于现有技术具有如下的优点及效果:
1、本发明通过节点及弧构成的网络结构可以实现对各种实体网络的模拟,构建更高效的网络模型,从而提升运算的效率。
2、本发明通过控制开关的通断,从而控制弧的通断,在一种网络模型上实现多种的拓扑结构,同时也可以实现多种的运算方式,提高运算的速度及效率。
附图说明
图1为本发明的网络结构示意图;
图2为本发明网络拓扑结构AB边的电路示意图;
图3为本发明网络拓扑结构CD边的光路示意图。
具体实施方式
下面结合实施例及附图对本发明作进一步详细的描述,但本发明的实施方式不限于此。
实施例1
一种网络模拟结构,其特征在于,包括多个节点及弧,每两个节点之间通过弧连接,在弧上连接开关,控制弧的通断,从而改变网络的拓扑结构。
以边AB为例的电路连接,如图2所示,在AB的电路与地端间连接一电路开关(例如触点)K;当K处于开时,AB间信号连接,此边为通路;当K处于闭时,AB间信号不连接,此边为断路。如此,从而达到对各弧(边)通断的控制。
实施例2
以边CD为例的光路连接。如图3所示,在CD的光路上连接一光路开关(例如中继器)K。当K处于通时,CD间信号连接,此边为通路;当K处于断时,CD间信号不连接,此边为断路。如此,从而达到对各弧(边)通断的控制。
在以上的网络构型为基础,就可以实现对实际网络的拟态及各种具体线路的功能。
一种基于上述网络模拟结构的网络模拟方法,包括下述步骤:
(1)设定多个节点;
(2)所述节点之间通过弧连接;
(3)在弧上设定开关,通过开关的断开与闭合,控制弧的通断,从而实现网络的拓扑结构。
基于上述的网络模型,可以实现多种的逻辑运算,例如或运算线路。以图1中A、B、E三点构成的环形回路为例,只要A、B间(开关)Kab处于导通状态,A、E间的关系就取决于B、E间开关Kbe和A、E间开关Kae的状态。这样,A、E间就构成了由Kbe、Kae两个参量所决定的或运算线路。
而与运算线路,则只要A、B间(开关)Kab处于阻断状态,A、B间的关系就取决于B、E间开关Kbe和A、E间开关Kae的状态。这样,A、B间就构成了由Kbe、Kae两个参量所决定的与运算线路。
同样,通过上述的方法开控制开关的通断,可以在一种网络模型中实现多种的逻辑运算,解决实际过程中的不同问题。
很显然,这种方法对于运算参量的增加并不会成倍地增加运算时间;且不一定需要固定的运算核心,这样就能在运算器件上最大限度地同时实施多种运算,从而大大提升运算器件的处理能力。利用此种方法解决了“P=NP”这一问题,即增加运算量不会成倍增加计算的复杂度。
基于上述网络模型,可以实现多种的拓扑结构,当AB、BC、CD、DE、EA之间的开关处于闭合状态,而其余弧上的开关处于阻断状态,则构成了环形的拓扑结构,同理,通过控制弧上的通断,可以模拟总线拓扑结构、星形拓扑结构、树形拓扑结构、网状拓扑结构、蜂窝拓扑结构等等。
另外,在同一种的网络模型上,还可以实现多种的拓扑结构共存,将各种拓扑结构的优点结合起来。如图1所示,当AC、AD的开关处于闭合状态,其构成星形拓扑结构,而AB、BE、AE闭合,则构成环形拓扑结构,即在一个模型上实现了两种的拓扑结构,同理,可根据实际情况的需要,实现多种不同的网络拓扑结构的共存。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。
Claims (6)
1.一种网络模拟结构,其特征在于,包括多个节点及弧,所述节点之间通过弧连接,所述弧上设有开关。
2.根据权利要求1所述的网络模拟结构,其特征在于,所述开关为电路开关。
3.根据权利要求1所述的网络模拟结构,其特征在于,所述开关为光路开关。
4.一种基于权利要求1所述的网络模拟方法,其特征在于,包括下述步骤:
(1)设定多个节点;
(2)所述节点之间通过弧连接;
(3)在弧上设定开关,通过开关的断开与闭合,控制弧的通断,从而实现模拟网络的拓扑结构。
5.根据权利要求4所述的网络模拟方法,其特征在于,所述步骤(3)中,每个节点之间首尾连接,形成环形拓扑结构。
6.根据权利要求4所述的网络模拟方法,其特征在于,通过控制弧的通断,使其中一些节点和弧形成环形拓扑结构,使另一些节点和弧形成总线拓扑结构。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103016879A CN102332995A (zh) | 2011-03-01 | 2011-09-28 | 一种网络模拟结构及其模拟方法 |
PCT/CN2011/083964 WO2012116567A1 (zh) | 2011-03-01 | 2011-12-14 | 一种网络模拟结构及其模拟方法 |
US13/822,797 US20130179141A1 (en) | 2011-03-01 | 2011-12-14 | Network simulation structure and the simulation method thereof |
EP11860022.0A EP2819348A4 (en) | 2011-03-01 | 2011-12-14 | NETWORK SIMULATION STRUCTURE AND SIMULATION PROCESS THEREFOR |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110049679XA CN102130911A (zh) | 2011-03-01 | 2011-03-01 | 一种网络模拟方法 |
CN201110049679.X | 2011-03-01 | ||
CN2011103016879A CN102332995A (zh) | 2011-03-01 | 2011-09-28 | 一种网络模拟结构及其模拟方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102332995A true CN102332995A (zh) | 2012-01-25 |
Family
ID=44268801
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110049679XA Pending CN102130911A (zh) | 2011-03-01 | 2011-03-01 | 一种网络模拟方法 |
CN2011103016879A Pending CN102332995A (zh) | 2011-03-01 | 2011-09-28 | 一种网络模拟结构及其模拟方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110049679XA Pending CN102130911A (zh) | 2011-03-01 | 2011-03-01 | 一种网络模拟方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US20130179141A1 (zh) |
EP (1) | EP2819348A4 (zh) |
CN (2) | CN102130911A (zh) |
WO (1) | WO2012116567A1 (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102130911A (zh) * | 2011-03-01 | 2011-07-20 | 林定伟 | 一种网络模拟方法 |
CN108551678B (zh) * | 2018-03-20 | 2021-11-12 | 深圳友讯达科技股份有限公司 | 节点双模感知方法及通信系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1186577A (zh) * | 1995-04-13 | 1998-07-01 | 艾利森电话股份有限公司 | 光多信道系统 |
CN101840229A (zh) * | 2009-12-23 | 2010-09-22 | 林定伟 | 逻辑网络自动运行控制系统及自动化控制系统及应用方法 |
CN101848139A (zh) * | 2009-03-26 | 2010-09-29 | 林定伟 | 一种量化的多线程网络智能选径方法 |
WO2010108395A1 (zh) * | 2009-03-26 | 2010-09-30 | Lin Dingwei | 一种量化的多线程网络智能选径方法 |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6671818B1 (en) * | 1999-11-22 | 2003-12-30 | Accenture Llp | Problem isolation through translating and filtering events into a standard object format in a network based supply chain |
US6606744B1 (en) * | 1999-11-22 | 2003-08-12 | Accenture, Llp | Providing collaborative installation management in a network-based supply chain environment |
US6941252B2 (en) * | 2001-03-14 | 2005-09-06 | Mcdata Corporation | Striping data frames across parallel fibre channel links |
US20040063461A1 (en) * | 2002-09-26 | 2004-04-01 | Jikai Li | Proactive burst contention avoidance scheduling algorithms for labelled optical burst switching networks |
JPWO2004061722A1 (ja) * | 2002-12-27 | 2006-05-18 | 富士通株式会社 | 論理シミュレーション装置 |
US20070008884A1 (en) * | 2003-10-08 | 2007-01-11 | Bob Tang | Immediate ready implementation of virtually congestion free guarantedd service capable network |
US7957266B2 (en) * | 2004-05-28 | 2011-06-07 | Alcatel-Lucent Usa Inc. | Efficient and robust routing independent of traffic pattern variability |
US7275014B1 (en) * | 2005-02-10 | 2007-09-25 | At&T Corporation | Distributed graph layout for sensor node networks |
US20060291446A1 (en) * | 2005-06-24 | 2006-12-28 | Donald Caldwell | Systems, methods, and devices for managing routing |
WO2007016942A1 (en) * | 2005-08-08 | 2007-02-15 | Pirelli & C. S.P.A | Method for configuring an optical network |
US7564805B1 (en) * | 2005-08-08 | 2009-07-21 | At&T Intellectual Property, Ii, L.P. | Systems, methods, and device for simulating capacity in a network |
US20070094325A1 (en) * | 2005-10-21 | 2007-04-26 | Nucleoid Corp. | Hybrid peer-to-peer data communication and management |
US7940685B1 (en) * | 2005-11-16 | 2011-05-10 | At&T Intellectual Property Ii, Lp | Method and apparatus for monitoring a network |
US7844440B2 (en) * | 2006-07-07 | 2010-11-30 | Edsa Micro Corporation | Systems and methods for real-time dynamic simulation of uninterruptible power supply solutions and their control logic systems |
US8160056B2 (en) * | 2006-09-08 | 2012-04-17 | At&T Intellectual Property Ii, Lp | Systems, devices, and methods for network routing |
US8180622B2 (en) * | 2006-10-24 | 2012-05-15 | Power Analytics Corporation | Systems and methods for a real-time synchronized electrical power system simulator for “what-if” analysis and prediction over electrical power networks |
US8108918B2 (en) * | 2007-02-27 | 2012-01-31 | Red Hat, Inc. | Zero knowledge attribute storage and retrieval |
AU2009270675A1 (en) * | 2008-07-18 | 2010-01-21 | Edsa Micro Corporation | A method for predicting symmetric, automated, real-time arc flash energy within a real-time monitoring system |
US8850015B2 (en) * | 2010-01-26 | 2014-09-30 | Cisco Technology, Inc. | Network-network interface |
CN101827024A (zh) * | 2010-03-24 | 2010-09-08 | 林定伟 | 一种网络路径查找方法、最优路径选择方法及其系统 |
CN102130911A (zh) * | 2011-03-01 | 2011-07-20 | 林定伟 | 一种网络模拟方法 |
-
2011
- 2011-03-01 CN CN201110049679XA patent/CN102130911A/zh active Pending
- 2011-09-28 CN CN2011103016879A patent/CN102332995A/zh active Pending
- 2011-12-14 EP EP11860022.0A patent/EP2819348A4/en not_active Ceased
- 2011-12-14 WO PCT/CN2011/083964 patent/WO2012116567A1/zh active Application Filing
- 2011-12-14 US US13/822,797 patent/US20130179141A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1186577A (zh) * | 1995-04-13 | 1998-07-01 | 艾利森电话股份有限公司 | 光多信道系统 |
CN101848139A (zh) * | 2009-03-26 | 2010-09-29 | 林定伟 | 一种量化的多线程网络智能选径方法 |
WO2010108395A1 (zh) * | 2009-03-26 | 2010-09-30 | Lin Dingwei | 一种量化的多线程网络智能选径方法 |
CN101840229A (zh) * | 2009-12-23 | 2010-09-22 | 林定伟 | 逻辑网络自动运行控制系统及自动化控制系统及应用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102130911A (zh) | 2011-07-20 |
EP2819348A1 (en) | 2014-12-31 |
EP2819348A4 (en) | 2015-12-16 |
WO2012116567A1 (zh) | 2012-09-07 |
US20130179141A1 (en) | 2013-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109802852A (zh) | 应用于网络靶场的网络仿真拓扑的构建方法及系统 | |
Wang et al. | A graph theory based energy routing algorithm in energy local area network | |
CN110300018B (zh) | 一种面向对象的电网信息物理系统层次化建模方法 | |
Huang et al. | Balancing system survivability and cost of smart grid via modeling cascading failures | |
CN103457263B (zh) | 一种基于最大供电能力的智能主动配电网重构方法 | |
CN103179046A (zh) | 基于openflow的数据中心流量控制方法及系统 | |
Aydeger et al. | SDN-based resilience for smart grid communications | |
CN104240150A (zh) | 配电网重构方法及系统 | |
CN105117509B (zh) | 一种矩阵化自动判断最后断路器逻辑的方法 | |
Weaver et al. | Cyber-physical models for power grid security analysis: 8-substation case | |
Dong et al. | Synchronization of nonlinearly and stochastically coupled Markovian switching networks via event-triggered sampling | |
CN103560952A (zh) | 微型网络中的节点故障恢复方法 | |
CN107559182A (zh) | 一种水泵控制方法及控制系统 | |
Lai et al. | Robust distributed cooperative control for DC mircogrids with time delays, noise disturbances, and switching topologies | |
CN107196808A (zh) | 一种双层网络模型构建的方法 | |
CN102332995A (zh) | 一种网络模拟结构及其模拟方法 | |
CN103605560B (zh) | 一种继电保护与安全自动装置的连锁故障并行仿真方法 | |
CN104601371A (zh) | 一种变电站通信方法 | |
Bai | Modeling analysis of Intelligent Manufacturing System based on SDN | |
CN103178517B (zh) | 一种电力系统多级拓扑分析方法 | |
Li et al. | An Effective Node‐To‐Edge Interdependent Network and Vulnerability Analysis for Digital Coupled Power Grids | |
CN116208505A (zh) | 一种电力基础设施网络安全行为模型 | |
Tian et al. | Cascading failures in interdependent modular networks with partial random coupling preference | |
CN103279626B (zh) | 一种仿真模型建立方法及系统 | |
CN107944082A (zh) | 一种单端口子模块mmc电磁暂态通用等效建模方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120125 |