CN102304926A - 一种在湿地固定电杆的方法 - Google Patents
一种在湿地固定电杆的方法 Download PDFInfo
- Publication number
- CN102304926A CN102304926A CN201110188968A CN201110188968A CN102304926A CN 102304926 A CN102304926 A CN 102304926A CN 201110188968 A CN201110188968 A CN 201110188968A CN 201110188968 A CN201110188968 A CN 201110188968A CN 102304926 A CN102304926 A CN 102304926A
- Authority
- CN
- China
- Prior art keywords
- electric pole
- telegraph pole
- electric
- stayguy
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Catching Or Destruction (AREA)
Abstract
一种在湿地固定电杆的方法,电杆坑内壁铺设有第三塑料布,第三塑料布面积大于等于电杆坑内表面积,从电杆坑底部依次向上铺设有第一层细沙、第三塑料布、第二层细沙,底盘铺设在第二层细沙上,电杆固定在底盘上,底盘与电杆之间用第二塑料布隔开;与第二塑料布接触的电杆端作为封堵端,从电杆封堵端向杆身方向缠绕设置有第一塑料布;电杆坑用鹅卵石层铺满,在鹅卵石层顶部铺设有水泥砂浆层,水泥砂浆层至少与地面平齐;电杆周围至少有两个拉线坑,拉线盘置于拉线坑底部,拉线盘、拉线棒和防风拉线依次串接,防风拉线另一端与电杆连接。目前,经改造运行一年半的10KV大西线和35KV巴大线没有出现电杆纵向裂纹和回拨问题。
Description
技术领域
本发明涉及一种固定电杆的方法,具体涉及一种在湿地固定电杆的方法。
背景技术
近年来,巴里坤供电局所辖的35KV巴大线和10KV大西线由于所处巴里坤湿地,电杆发生纵向裂纹、回拨和倾斜问题,每年开春虽采取校正电杆、基础培土加固等防范措施,但还是发生了倒杆事件,影响了安全生产,究其原因,都是因电杆所处湿地所致。
所述湿地是指,不论其为天然或人工、长久或暂时性的沼泽地、泥炭地或水域地带、静止或流动、淡水、半咸水、咸水体,包括低潮时水深不超过6米的水域。其特点是其表面常年或经常覆盖着水或充满了水,是介于陆地和水体之间的过渡带。人们把湿地称为“地球之肾”、天然水库和天然物种库。
2002年10月8日10KV大西线197号杆因所处湿地回拨严重发生倒杆,将一头奶牛电击死亡。2008年5月12日10KV大西线190杆因回拨严重发生倒杆,两次抢修由于机动车辆无法进入湿地,人力进行电杆运输、基础开挖和立杆,投入大量的人力和物力,但效果甚微。
2006年5月29日35KV巴大线从29号杆至171杆存在不同程度的纵向裂纹,轻微纵向裂纹为2-3米,严重纵向裂纹已从杆尾到杆头,而且96号杆至120号杆因回拨发生严重倾斜,随时有倒杆的可能。为防止发生倒杆事故,2006年8月10日对严重倾斜的电杆用木杆进行支撑加固,不久检查发现两个支撑木杆被盗窃,而且其余支撑木杆由于承受的重力较大,大部分木杆杆头已开裂,木杆杆尾也不断陷入湿地,35KV巴大线96号杆至120号杆在不断向东倾斜。2008年6月10日对35KV巴大线倾斜电杆进行校正,由于电杆纵向裂纹和回拨严重,给校杆工作带来一定的危险性,校正的电杆只是暂时解决了防止倒杆问题,但不是长久之策,电杆还是在不停的发生纵向裂纹和回拨现象。为此,解决输配电电线路电杆在湿地发生纵向裂纹和回拨问题迫在眉睫。
巴里坤县地域辽阔,总的地势是南高北低,平均海拔在1677.2米以上,县属温带大陆性干旱冷凉气候区荒漠干旱地区,夏季炎热,七月份平均气温零上21.3℃,极端最高温度34.8℃,冬季严寒,一月份平均气温零下17.9℃,极端最低温度-43.6℃(1958年1月)。最大冻土深度2.39米。
根据气象条件和现场勘查,技术人员分析出输配电线路电杆在湿地发生纵向裂纹和回拨的主要原因是:1、巴里坤湿地最低点基础开挖40厘米便涌出大量泉水,以前该线路施工杆坑开挖深度为2米,由于电杆杆尾没有进行封堵,水从杆尾进入杆内的水位最高达到1.6米,由于是拔梢杆,冬季极端最低温度使杆内的水结冰膨胀造成电杆纵向裂纹,这种现象就像是冬季将一个空玻璃瓶灌满水放在室外,第二天早上发现玻璃瓶被冻冰胀裂了。2、由于当时施工条件限制,杆坑开挖后涌出的泉水不能及时排出,加上四周泥沙的滑落,放入杆坑底部的底盘浸入水中不能定位到确切位置,以致电杆吊入杆坑后没有与底盘连接形成一个整体,加上回填用的是就地开挖的泥沙,造成电杆四周透气性能较差,冬季极端最低温度使电杆底端的水结冰膨胀将电杆向上顶起,春季冻冰融化,由于地下水在流动,流沙不断聚集在电杆底端,年复一年流沙的聚集增厚使电杆在不断向上回拨。3、由于当时设计和施工条件限制35KV巴大线电杆开挖深度为2米,没有越过最大冻土深度2.39米,这使得电杆根部冬季处在一个临界点上,结冰后给电杆回拨创造了一个良好的环境。
发明内容
为了克服电杆在湿地发生纵向裂纹、回拨和倾斜问题,本发明提供克服上述缺陷的方法。
一种在湿地固定电杆的方法,电杆坑内壁铺设有第三塑料布,第三塑料布面积大于等于电杆坑内表面积,从电杆坑底部依次向上铺设有第一层细沙、第三塑料布、第二层细沙,底盘铺设在第二层细沙上,电杆固定在底盘上,底盘与电杆之间用第二塑料布隔开;与第二塑料布接触的电杆端作为封堵端,从电杆封堵端向杆身方向缠绕设置有第一塑料布;电杆坑用鹅卵石层铺满,在鹅卵石层顶部铺设有水泥砂浆层,水泥砂浆层至少与地面平齐;电杆周围至少有两个拉线坑,拉线盘置于拉线坑底部,拉线盘、拉线棒和防风拉线依次串接,防风拉线另一端与电杆连接。
所述底盘与地面之间的电杆上设置有卡盘,卡盘防止电杆倾斜。
从所述电杆封堵端封堵水泥砂浆至杆身位置的长度至少为0.3m。
距离电杆3~3.5m处做三油两麻防腐处理,拉线棒做三油两麻处理,卡盘、底盘和拉线盘刷防腐漆。
所述拉线棒与地面的夹角大于等于45度。
目前,经改造运行一年半的10KV大西线和35KV巴大线电杆没有出现纵向裂纹和回拨问题,该线路在巴里坤湿地的成功,为巴里坤大河镇、三塘湖乡、良种场、八墙子乡和化工区的安全可靠供电奠定了坚实的基础,在今后10KV大西线和35KV巴大线改造、无电地区电网建设、抗震安居、拉动内需等工程项目中,若遇到输配电线路途经湿地时,勘测、设计和施工人员不妨参考上述的施工方案,消除“家族性”缺陷,切实做到将工程零缺陷移交运行单位,避免输配电线路电杆在湿地发生的像10KV大西线和35KV巴大线纵向裂纹和回拨导致的本不该发生的安全生产倒杆事故。
附图说明
附图用来提供对本发明的进一步解释,并且构成说明书的一部分,与本发明的实施例一起用来解释本发明,并不构成对本发明的限制,在附图中:
图1是本发明实施例中电杆固定剖面图;
图2为图1中A处的局部放大图;
图中标记为:1—拉线坑;2—拉线盘;3—拉线棒;4—防风拉线;5—鹅卵石;6—电杆坑;7—水泥砂浆层;8—卡盘;9—第一塑料布;10—电杆;11—底盘;12—细沙;13—第二塑料布;14—第三塑料布。
具体实施方式
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
实施例1
在本实施例中,如图1、图2所示,在湿地固定电杆的方法为:
1、选用直径Ф190mm长12m电杆10,电杆10基础使用LP6拉线盘2和预制钢筋砼DP6底盘11,砼杆号为C20级;细沙12规格为Ф0.8mm。
2、全部基础做防腐蚀处理,具体做法为从电杆10封堵端用水泥砂浆封堵到杆身1.5m处,与电杆10封堵端距离为3m处做三油两麻处理,拉线棒3做三油两麻处理,底盘11、拉线盘2和KP8-1卡盘8刷两道防腐漆,防腐处理后晾晒一星期,确保干燥、结构牢固。
3、为了防止吊车、挖掘机和卡车陷入湿地,人工铺设临时道路。
4、挖掘机将电杆坑6开挖为深为2.5m,电杆坑6的坑底直径为2.5m。此时电杆坑6涌出大量泉水,四周泥沙也不断在滑落,吊车将2节直径为1.2m,高度为1m的水泥管吊入电杆坑6,阻隔四周泥沙的滑落,水泥管内水位迅速上升至1.6m。
5、将3台污水泵放入电杆坑6,启动15KW的柴油发动机,将3台污水泵同时启动,抽干水泥管内的泉水和泥沙。
6、将污水泵停止运行,并提至地面,下入电杆坑6的施工人员穿雨靴,鞋底上不得沾有锋利的杂物,上面的施工人员将细沙12用铁桶吊入,电杆坑6的施工人员将细沙12铺成1m×1m×厚度为2.5cm的正方形,将三层第三塑料布14(长6.5m×宽6.5m×厚0.8mm)放入电杆坑6,电杆坑6的施工人员将细沙12在第三塑料布14底部铺成1m×1m×厚度为2.5cm的正方形,这样做的主要目的是防止电杆坑6的沙石或放入的底盘锋利物将第三塑料布14刺破,失去隔水作用,然后将底盘11(长0.8m×宽0.8m×高0.25m)吊入定位到铺设正方形细沙12的中心位置,底盘11圆形盘内铺设三层第二塑料布13(长1m×宽1m×厚0.8mm)。
7、有专人指挥,吊车将2节直径为1.2m,高度为1m的水泥管吊出电杆坑6(滑落严重的地段放弃吊出水泥管),吊车将防腐处理后晾晒一星期电杆10吊起,当电杆10垂直起吊至封堵端距地面20cm后停止起吊,地面上的施工人员将高2.5m×宽0.5m×厚度为1.2mm的第一塑料布9从电杆10封堵端套至电杆10的2.5m处,从电杆10封堵端缠绕第一塑料布9至电杆10高度的2.5m处,不断挤压,以便排出第一塑料布9内的空气。
8、吊车将包裹第一塑料布9的电杆10缓缓吊入电杆坑6,电杆坑6内施工人员将电杆10扶移至底盘11圆形盘内铺设三层第二塑料布13的正中,电杆10着落与底盘11受力后,停止起吊。地面施工人员将和好的(水:水泥:砂=1:1:3)水泥砂浆用铁桶吊入电杆坑6,电杆坑6内施工人员将电杆10封堵端与底盘11的交界处用水泥砂浆浇筑,并用模子抹成45°的斜坡形。
9、电杆坑6内的施工人员从电杆10封堵端缠绕第一塑料布9至电杆10的一定高度时再由地面上的施工人员配合直至电杆10的2.5m处,也是不断挤压,以便排出第一塑料布9内的空气。
10、有专人指挥吊车调整电杆10的垂直度。
11、地面的施工人员将3块高3m×宽40cm×厚5cm的木板送至电杆坑6将包裹三层第一塑料布9的电杆10四周护围起来,底盘11以上的电杆10被木板护围起来。
12、为了防止回填的鹅卵石5(4cm×4cm以上)砸破3层第三塑料布14,地面的施工人员用铁桶将鹅卵石5吊入电杆坑6内,由电杆坑6内施工人员轻轻的将一桶桶鹅卵石5倾倒在电杆坑6内,直至掩盖25cm以上,电杆坑6内施工人员上至地面,地面上的施工人员用铁锹将鹅卵石5回填至电杆坑6内,距离地面60cm时停止回填,地面施工人员将放入电杆坑6内的3块木板缓缓抽出,然后将卡盘8固定在电杆10上,此时再回填20cm鹅卵石5,回填鹅卵石5的目的是增加电杆10周围的透气性能,减少或阻止电杆10回拨。
13、地面施工人员将和好的水泥砂浆浇筑在鹅卵石层的顶部,然后将高出地面的塑料布9回折,用水泥砂浆整体砌成长80cm×80cm×高80cm的水泥砂浆层7。
14、在电杆10周围开挖至少二个拉线坑1,拉线盘2、拉线棒3和防风拉线4依次串接,防风拉线4另一端与电杆10连接。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种在湿地固定电杆的方法,其特征在于:电杆坑内壁铺设有第三塑料布,第三塑料布面积大于等于电杆坑内表面积,从电杆坑底部依次向上铺设有第一层细沙、第三塑料布、第二层细沙,底盘铺设在第二层细沙上,电杆固定在底盘上,底盘与电杆之间用第二塑料布隔开;与第二塑料布接触的电杆端作为封堵端,从电杆封堵端向杆身方向缠绕设置有第一塑料布;电杆坑用鹅卵石层铺满,在鹅卵石层顶部铺设有水泥砂浆层,水泥砂浆层至少与地面平齐;电杆周围至少有两个拉线坑,拉线盘置于拉线坑底部,拉线盘、拉线棒和防风拉线依次串接,防风拉线另一端与电杆连接。
2.根据权利要求1所述的方法,其特征在于:所述底盘与地面之间的电杆上设置有卡盘。
3.根据权利要求2所述的方法,其特征在于:从所述电杆封堵端封堵水泥砂浆至杆身位置的长度至少为0.3m。
4.根据权利要求3所述的方法,其特征在于:距离电杆3~3.5m处做三油两麻防腐处理,拉线棒做三油两麻处理,卡盘、底盘和拉线盘刷防腐漆。
5.根据权利要求4所述的方法,其特征在于:所述拉线棒与地面的夹角大于等于45度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110188968 CN102304926B (zh) | 2011-07-07 | 2011-07-07 | 一种在湿地固定电杆的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110188968 CN102304926B (zh) | 2011-07-07 | 2011-07-07 | 一种在湿地固定电杆的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102304926A true CN102304926A (zh) | 2012-01-04 |
CN102304926B CN102304926B (zh) | 2013-04-03 |
Family
ID=45378828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110188968 Expired - Fee Related CN102304926B (zh) | 2011-07-07 | 2011-07-07 | 一种在湿地固定电杆的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102304926B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061353A (zh) * | 2013-01-05 | 2013-04-24 | 台山市宁华电力设计有限公司 | 防风加固的砼杆套筒基础 |
CN104282119A (zh) * | 2014-10-29 | 2015-01-14 | 国家电网公司 | 一种防输电架倾斜报警结构 |
CN105041036A (zh) * | 2015-07-22 | 2015-11-11 | 国家电网公司 | 一种防止输电线路水泥杆上拔结构及其施工方法 |
CN105064393A (zh) * | 2015-08-01 | 2015-11-18 | 国家电网公司 | 一种杆架式变压器防沉底盘 |
CN105216094A (zh) * | 2015-10-08 | 2016-01-06 | 三峡大学 | 一种水泥拉线盘连续自动化生产装置 |
CN105507341A (zh) * | 2014-09-24 | 2016-04-20 | 胡广生 | 固定电杆的方法 |
CN108643681A (zh) * | 2018-07-25 | 2018-10-12 | 广东正华钢构有限公司 | 钢结构管件与预制基座的抗震连接结构 |
CN108643680A (zh) * | 2018-05-17 | 2018-10-12 | 国网内蒙古东部电力有限公司电力科学研究院 | 一种防止土壤冻胀引起电线杆上拔的结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0319141A (ja) * | 1989-06-15 | 1991-01-28 | Sanyo Electric Co Ltd | 駆動電圧発生回路 |
US5326410A (en) * | 1993-03-25 | 1994-07-05 | Timber Products, Inc. | Method for reinforcing structural supports and reinforced structural supports |
JPH09119141A (ja) * | 1995-10-25 | 1997-05-06 | Toudentsuu:Kk | 自立式建柱工法 |
CN2443097Y (zh) * | 2000-10-19 | 2001-08-15 | 马强 | 一种用复合材料制作的免维护电力杆塔 |
CN101446088A (zh) * | 2008-11-11 | 2009-06-03 | 中国电力科学研究院 | 一种用于戈壁滩碎石土地区的杆塔基础施工方法 |
KR20100105918A (ko) * | 2009-03-23 | 2010-10-01 | 이재문 | 지주 |
-
2011
- 2011-07-07 CN CN 201110188968 patent/CN102304926B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0319141A (ja) * | 1989-06-15 | 1991-01-28 | Sanyo Electric Co Ltd | 駆動電圧発生回路 |
US5326410A (en) * | 1993-03-25 | 1994-07-05 | Timber Products, Inc. | Method for reinforcing structural supports and reinforced structural supports |
JPH09119141A (ja) * | 1995-10-25 | 1997-05-06 | Toudentsuu:Kk | 自立式建柱工法 |
CN2443097Y (zh) * | 2000-10-19 | 2001-08-15 | 马强 | 一种用复合材料制作的免维护电力杆塔 |
CN101446088A (zh) * | 2008-11-11 | 2009-06-03 | 中国电力科学研究院 | 一种用于戈壁滩碎石土地区的杆塔基础施工方法 |
KR20100105918A (ko) * | 2009-03-23 | 2010-10-01 | 이재문 | 지주 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061353A (zh) * | 2013-01-05 | 2013-04-24 | 台山市宁华电力设计有限公司 | 防风加固的砼杆套筒基础 |
CN105507341A (zh) * | 2014-09-24 | 2016-04-20 | 胡广生 | 固定电杆的方法 |
CN104282119A (zh) * | 2014-10-29 | 2015-01-14 | 国家电网公司 | 一种防输电架倾斜报警结构 |
CN104282119B (zh) * | 2014-10-29 | 2016-06-08 | 国家电网公司 | 一种防输电架倾斜报警结构 |
CN105041036A (zh) * | 2015-07-22 | 2015-11-11 | 国家电网公司 | 一种防止输电线路水泥杆上拔结构及其施工方法 |
CN105041036B (zh) * | 2015-07-22 | 2018-01-30 | 国家电网公司 | 一种防止输电线路水泥杆上拔结构及其施工方法 |
CN105064393A (zh) * | 2015-08-01 | 2015-11-18 | 国家电网公司 | 一种杆架式变压器防沉底盘 |
CN105064393B (zh) * | 2015-08-01 | 2018-03-30 | 国家电网公司 | 一种杆架式变压器防沉底盘 |
CN105216094A (zh) * | 2015-10-08 | 2016-01-06 | 三峡大学 | 一种水泥拉线盘连续自动化生产装置 |
CN105216094B (zh) * | 2015-10-08 | 2017-04-19 | 三峡大学 | 一种水泥拉线盘连续自动化生产装置 |
CN108643680A (zh) * | 2018-05-17 | 2018-10-12 | 国网内蒙古东部电力有限公司电力科学研究院 | 一种防止土壤冻胀引起电线杆上拔的结构 |
CN108643681A (zh) * | 2018-07-25 | 2018-10-12 | 广东正华钢构有限公司 | 钢结构管件与预制基座的抗震连接结构 |
Also Published As
Publication number | Publication date |
---|---|
CN102304926B (zh) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102304926B (zh) | 一种在湿地固定电杆的方法 | |
CN102661171A (zh) | 隧道防冻害排水系统 | |
CN203939288U (zh) | 防风网结构 | |
CN109797769B (zh) | 一种湿陷性黄土地区地下综合管廊地基结构及其施工方法 | |
CN103485354B (zh) | 保持冻土边坡稳定的框架通风冷却锚管结构及施工方法 | |
CN202560320U (zh) | 一种隧道防冻害排水系统 | |
CN104762982B (zh) | 一种富水红砂岩地质地下水位控制的施工方法 | |
CN107630500A (zh) | 一种给排水施工方法 | |
CN107604929A (zh) | 集排水防液化抗滑桩及施工方法 | |
CN103855650A (zh) | 专用于对电力顶管的施工方法 | |
CN104499501A (zh) | 一种输电线路窄基塔单桩墩式自稳基础 | |
CN101768960A (zh) | 永冻土层的灌注桩施工方法 | |
CN109487793A (zh) | 一种复杂环境下的密排灌注桩内支撑基坑永久支护结构 | |
CN208023600U (zh) | 一种适用于复杂环境的沉井结构 | |
CN207662389U (zh) | 一种利用暗涵工程的沉降变形观测基点 | |
CN207812515U (zh) | 一种基桩防冻装置 | |
CN102383440A (zh) | 一种预置式塔吊深基础施工方法及结构 | |
CN202706049U (zh) | 一种钢筋混凝土水池沉井 | |
CN105484260A (zh) | 一种大面积地下室结构体抗裂防渗止浮的设计与施工方法 | |
CN113931171A (zh) | 一种预防管桩冻胀破坏的保护装置 | |
CN207828722U (zh) | 一种适用于新疆地区路基跨越坎儿井的保护结构 | |
CN109763682B (zh) | 一种地下冷库结构及其施工方法 | |
CN208379625U (zh) | 一种组合式锚碇基础 | |
CN110106930A (zh) | 一种新型铁塔基础加固保护方法 | |
CN205171540U (zh) | 一种用于输电杆塔的嵌固锚杆联合岩石基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 |
|
CF01 | Termination of patent right due to non-payment of annual fee |