CN102296612A - Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile - Google Patents

Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile Download PDF

Info

Publication number
CN102296612A
CN102296612A CN2011101364196A CN201110136419A CN102296612A CN 102296612 A CN102296612 A CN 102296612A CN 2011101364196 A CN2011101364196 A CN 2011101364196A CN 201110136419 A CN201110136419 A CN 201110136419A CN 102296612 A CN102296612 A CN 102296612A
Authority
CN
China
Prior art keywords
concrete
conduit
sacculus
guide pipe
concrete guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101364196A
Other languages
Chinese (zh)
Inventor
李凯
刘永军
李树明
郑军波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN2011101364196A priority Critical patent/CN102296612A/en
Publication of CN102296612A publication Critical patent/CN102296612A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a device for underwater pouring concrete in a slurry retaining wall cast-in-situ bored pile, which comprises a concrete guide pipe which is used by connecting with a hopper, wherein the concrete guide pipe is internally provided with a movable ball bag, and the diameter of the ball bag is less than the inner diameter of the concrete guide pipe. The pouring method comprises the following steps: 1, digging a pile hole; 2, placing the concrete guide pipe with the ball bag in the pile hole containing slurry; 3, pouring concretes in the concrete guide pipe; 4, pressing the concretes to the ball bag to slide from a lower port in the concrete guide pipe; and 5, continuously pouring the concretes in the concrete guide pipe until the ball bag and the slurry are discharged from the pile hole together. According to the invention, the phenomenon of slag inclusion of a pile body can be effectively overcome.

Description

A kind of device and job practices of holing with slurry wall protection castinplace pile underwater casting concrete
Technical field
The present invention relates to a kind of instrument for building and job practices, especially relate to a kind of device and pouring procedure of holing with slurry wall protection castinplace pile underwater casting concrete
Background technology
At present a lot of building lots are handled and are adopted the holing with slurry wall protection filling pile construction in the construction, and the quality problems that occur easily in the holing with slurry wall protection filling pile construction are when pouring into concrete, because sediment does not float on the concrete surface and discharges a hole together with mud at the bottom of making the hole, causes pile body slag inclusion phenomenon.In addition, when concrete filling pile is built the concrete construction in construction, with the 8# iron wire a prefabricated concrete piece identical with conduit caliber size is fixed in section one segment distance of concrete conduit top according to the construction experience employing, in pipe, build concrete then, cut off iron wire after building completely, because the proportion of concrete is far longer than mud, under action of gravity this partly concrete with the hole at the bottom of sediment dashed and floated on the concrete surface, along with concrete is continuously built mud and sediment is together discharged outside the hole.The method needs a large amount of prefabricated precast concrete blocks, the wasting manpower and material resources, and construction cost is higher.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of device and pouring procedure that can overcome a kind of holing with slurry wall protection castinplace pile underwater casting concrete of pile body slag inclusion phenomenon.
The device of holing with slurry wall protection castinplace pile underwater casting concrete of the present invention, be achieved by following technical proposals: a kind of device of holing with slurry wall protection castinplace pile underwater casting concrete, the concrete conduit that uses constitutes by being connected with hopper, be provided with movable sacculus in the described concrete conduit, the diameter of described sacculus is less than the internal diameter of concrete conduit.Another technical scheme of the present invention: a kind of pouring procedure of holing with slurry wall protection castinplace pile underwater casting concrete comprises the steps:
(1) excavation stake hole;
(2) the concrete conduit that will be provided with sacculus is placed in the stake hole of containing mud;
(3) in the concrete conduit, build concrete then;
(4) concrete is depressed into sacculus and skids off from the lower end oral area in the concrete conduit;
(5) continue in the concrete conduit, to build concrete, together discharge a hole together with mud to sacculus till.
The concrete conduit is placed as 0.8~1.3m place, bottom, distance stake hole in the described step (2).
Beneficial effect of the present invention is: put a sacculus that is slightly less than concrete conduit caliber in the concrete conduit, build concrete then, along with building of concrete, sacculus overcomes mud buoyancy and is pressed into bottom, hole by concrete and goes out in the concrete conduit until ball, at this moment the buoyancy that loses ball of the concrete in the concrete conduit is circulated into a bottom, hole rapidly, sediment is gone out to float on the concrete surface clearly together discharges beyond the hole together with mud, and concrete buries conduit rapidly, simultaneously, sacculus is discharged with mud together owing to buoyancy emersion mud liquid level.Thereby reach the purpose that overcomes pile body slag inclusion phenomenon.Sacculus can be reused in addition, has not only guaranteed the quality of constructing but also has reduced the waste of human and material resources, has saved construction cost.
Description of drawings
Fig. 1 is apparatus of the present invention structural representations.
Fig. 2-the 4th, construction sequence schematic diagram of the present invention.
Reference numeral: concrete conduit 1 sacculus 2 hoppers 3 concretes 4 mud liquid 5
The specific embodiment
Below in conjunction with accompanying drawing, the present invention will be further described:
As shown in Figure 1, a kind of device of holing with slurry wall protection castinplace pile underwater casting concrete is made of the concrete conduit 1 that uses that is connected with hopper 3, is provided with movable sacculus 2 in the described concrete conduit 1, and the diameter of described sacculus 2 is less than the internal diameter of concrete conduit 1.
Utilize said apparatus, job practices of the present invention is: an excavation stake hole at first as required, then concrete conduit 1 is placed into 0.8~1.3m place, bottom, distance stake hole, and in concrete conduit 1, put a sacculus 2 that is slightly less than concrete conduit 1 caliber, see shown in Figure 2; Build concrete 4 then, along with building of concrete 4, the buoyancy that sacculus 2 overcomes mud liquid 5 moves down along the concrete conduit, sees shown in Figure 3; Sacculus 2 is pressed into a bottom, hole by concrete 4, goes out in concrete conduit 1 until sacculus 2, sees shown in Figure 4; At this moment the concrete 4 in the concrete conduit 1 loses the buoyancy of sacculus 2, is circulated into a bottom, hole rapidly, and sediment is together gone out clearly together with mud liquid 5, discharge beyond the stake hole, and concrete 4 buries concrete conduit 4 rapidly.Simultaneously, sacculus 2 is because buoyancy, also emersion mud liquid level, discharges a hole together with mud liquid 5 till.

Claims (3)

1. the device of a holing with slurry wall protection castinplace pile underwater casting concrete is made of the concrete conduit that uses that is connected with hopper, it is characterized in that be provided with movable sacculus in the described concrete conduit, the diameter of described sacculus is less than the internal diameter of concrete conduit.
2. the method for a holing with slurry wall protection castinplace pile underwater casting concrete is characterized in that, comprises the steps:
(1) excavation stake hole;
(2) the concrete conduit that will be provided with sacculus is placed in the stake hole of containing mud;
(3) in the concrete conduit, build concrete then;
(4) concrete is depressed into sacculus and skids off from the lower end oral area in the concrete conduit;
(5) continue in the concrete conduit, to build concrete, together discharge a hole together with mud to sacculus till.
3. the method for holing with slurry wall protection castinplace pile underwater casting concrete according to claim 2 is characterized in that, the concrete conduit is placed as 0.8~1.3m place, bottom, distance stake hole in the described step (2).
CN2011101364196A 2011-05-24 2011-05-24 Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile Pending CN102296612A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101364196A CN102296612A (en) 2011-05-24 2011-05-24 Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101364196A CN102296612A (en) 2011-05-24 2011-05-24 Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN102296612A true CN102296612A (en) 2011-12-28

Family

ID=45357275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101364196A Pending CN102296612A (en) 2011-05-24 2011-05-24 Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN102296612A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217850A (en) * 2017-07-04 2017-09-29 广东省建筑工程机械施工有限公司 A kind of concrete placing installation
CN107675629A (en) * 2017-11-17 2018-02-09 吴利伟 A kind of water-bed bridge pier casting machine
CN110146653A (en) * 2019-05-29 2019-08-20 河海大学 A kind of simulator and application method of liquidation curing sludge underwater casting
CN112709224A (en) * 2021-01-18 2021-04-27 广东省建筑工程机械施工有限公司 Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032271A (en) * 1999-07-26 2001-02-06 Takenaka Komuten Co Ltd Work execution method of cast-in-place concrete pile having long steel frame therein
CN101597899A (en) * 2009-07-15 2009-12-09 交通部天津水运工程科学研究所 The method for filling of underwater drilling castinplace pile
CN101725148A (en) * 2010-02-04 2010-06-09 大连阿尔滨集团有限公司 Feeding device of pouring pile underwater concrete and pouring method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001032271A (en) * 1999-07-26 2001-02-06 Takenaka Komuten Co Ltd Work execution method of cast-in-place concrete pile having long steel frame therein
CN101597899A (en) * 2009-07-15 2009-12-09 交通部天津水运工程科学研究所 The method for filling of underwater drilling castinplace pile
CN101725148A (en) * 2010-02-04 2010-06-09 大连阿尔滨集团有限公司 Feeding device of pouring pile underwater concrete and pouring method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨光煦: "《水下灌筑混凝土》", 31 December 1983 *
陈志品: "浅析钻孔灌注桩易发事故的预防及处理", 《交通标准化》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217850A (en) * 2017-07-04 2017-09-29 广东省建筑工程机械施工有限公司 A kind of concrete placing installation
CN107675629A (en) * 2017-11-17 2018-02-09 吴利伟 A kind of water-bed bridge pier casting machine
CN110146653A (en) * 2019-05-29 2019-08-20 河海大学 A kind of simulator and application method of liquidation curing sludge underwater casting
CN112709224A (en) * 2021-01-18 2021-04-27 广东省建筑工程机械施工有限公司 Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile

Similar Documents

Publication Publication Date Title
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN102296612A (en) Device and method for underwater pouring concrete in slurry retaining wall cast-in-situ bored pile
CN102433878A (en) Post-grouting device and construction method for pipe pile foundation
CN202194162U (en) Unchoking device for acoustic pipe for drilled pile
CN102220762A (en) Method and device for disposing underwater pouring concrete pile breaking accident
CN102518133B (en) Pile sinking method for prestress hollow pipe piles by aid of follow-up sleeve
CN107542093A (en) A kind of Punching Borehole Cast-in-place Concrete Pile bottom cleaning method
CN201172820Y (en) Tied joggle pile mould tube with lubricating valve pile toe
CN102561329B (en) Construction method of underwater concrete cast-in-place pipe pile
CN207032225U (en) A kind of driven cast-in-place pile immersed tube
CN101545259B (en) Device and method for non-underwater concreting by using drilled pile
CN204059617U (en) Bolt hole plugging device
CN202247897U (en) Post-grouting device for pipe pile foundation
CN102704478A (en) Building anchor rod construction technology
CN201649074U (en) Pile-forming device with valve pile shoe rectangular immersed tube concrete cast-in-place pile
CN101324070A (en) Underground continuous wall forming groove plane set-hammer construction process and apparatus
CN215441913U (en) Underwater large-area concrete bottom sealing first-pouring pre-drilling pouring structure
CN103590394B (en) The construction method of original state soil taking and filling pile
CN206800379U (en) Grouting behind shaft or drift lining pre-stress hollow square pile
CN103132510B (en) Combined pile tube used for immersed tube pressing irrigation pile overall process construction and use method thereof
CN108035357A (en) Filling pile construction scheme and its funnel
CN106351211A (en) Concrete large cylinder structure and construction method of flushing sink thereof
CN104234039B (en) The displacement apparatus of a kind of cast-in-situ bored pile emptying aperture part implant and method
CN203569560U (en) Undisturbed soil sampling filling pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111228